Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 8321 [2010-3634]

Download as PDF Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Webs ite at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13618) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–3633 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13619–000 Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications pwalker on DSK8KYBLC1PROD with NOTICES February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Green River Lock and Dam No. 4 Hydroelectric Project, located on the Green River in Woodbury, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) 8 VLH 4000 low head units; (2) a switchyard; (3) a 1⁄2-mile-long transmission line; and (4) appurtenant facilities. The proposed Green River Lock and Dam No. 4 Hydroelectric Project would have an average annual generation of 17.5 gigawatt-hours. Applicant Contact: James Borg, Mead & Hunt, Inc., 6501 Watts Road, Madison, WI 53719. FERC Contact: Allyson Conner, 202– 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing VerDate Nov<24>2008 16:49 Feb 23, 2010 Jkt 220001 applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13619) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–3634 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Docket No. CP08–152–002 North Baja Pipeline, LLC; Notice of Abbreviated Application of North Baja Pipeline LLC; To Amend Certificate of Public Convenience and Necessity February 18, 2010. Take notice that on February 4, 2010, North Baja Pipeline, LLC (NBP), filed an abbreviated application under section 7(c) of the Natural Gas Act to amend the certificate of public convenience and necessity authorizing the construction and operation of the Yuma Lateral Pipeline Project (Yuma Lateral) issued to NBP, subject to conditions, on September 2, 2008 (Order). Specifically, NBP seeks authorization to revise the initial recourse rates applicable to service on the Yuma Lateral to reflect a representative level of costs attributable to interruptible transportation service on the Yuma Lateral, in compliance with conditions contained in the Commission’s Order. In addition, NBP seeks authorization to further revise the initial recourse rates applicable to PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 8321 service on the Yuma Lateral for current estimates of the total cost of the Project. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Tuesday, February 23, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–3637 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Attendance at Nepool Meetings February 17, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following upcoming NEPOOL meetings: E:\FR\FM\24FEN1.SGM 24FEN1

Agencies

[Federal Register Volume 75, Number 36 (Wednesday, February 24, 2010)]
[Notices]
[Page 8321]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3634]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 13619-000


Coastal Hydropower LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions to Intervene, and 
Competing Applications

February 18, 2010.
    On November 5, 2009, Coastal Hydropower LLC filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act, proposing to study the feasibility of the Green River Lock and Dam 
No. 4 Hydroelectric Project, located on the Green River in Woodbury, 
Kentucky. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following:
    (1) 8 VLH 4000 low head units; (2) a switchyard; (3) a \1/2\-mile-
long transmission line; and (4) appurtenant facilities. The proposed 
Green River Lock and Dam No. 4 Hydroelectric Project would have an 
average annual generation of 17.5 gigawatt-hours.
    Applicant Contact: James Borg, Mead & Hunt, Inc., 6501 Watts Road, 
Madison, WI 53719.
    FERC Contact: Allyson Conner, 202-502-6082.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link. For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, 
for TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and eight copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13619) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-3634 Filed 2-23-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.