Combined Notice of Filings # 1, 7577-7580 [2010-3317]
Download as PDF
Federal Register / Vol. 75, No. 34 / Monday, February 22, 2010 / Notices
item should contact Patricia J. Halsey at
the address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Patricia J. Halsey at
the address and phone number listed
above. Minutes will also be available at
the following Web site: https://
www.oakridge.doe.gov/em/ssab/
minutes.htm.
Issued at Washington, DC on February 16,
2010.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. 2010–3346 Filed 2–19–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Portsmouth
Department of Energy (DOE).
Notice of Open Meeting.
AGENCY:
cprice-sewell on DSK2BSOYB1PROD with NOTICES
ACTION:
SUMMARY: This notice announces a
meeting of the Environmental
Management Site-Specific Advisory
Board (EM SSAB), Portsmouth. The
Federal Advisory Committee Act (Pub.
L. No. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Thursday, March 4, 2010, 6 p.m.
ADDRESSES: Ohio State University,
South Center Auditorium, 1864 Shyville
Road, Piketon, Ohio 45661.
FOR FURTHER INFORMATION CONTACT: Joel
Bradburne, Deputy Designated Federal
Officer, Department of Energy
Portsmouth/Paducah Project Office, Post
Office Box 700, Piketon, Ohio 45661,
(740) 897–3822,
Joel.Bradburne@lex.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management and related
activities.
Tentative Agenda:
• Call to Order, Introductions, Review
of Agenda
• Approval of November Minutes
• Deputy Designated Federal Officer’s
Comments
VerDate Nov<24>2008
15:26 Feb 19, 2010
Jkt 220001
• Risk Based Presentation—Rick
Bonczek
• Federal Coordinator’s Comments
• Liaisons’ Comments
• Administrative Issues—Actions:
Æ Subcommittee Updates
Æ Recommendation 10–01 End Use
Study for the Portsmouth Gaseous
Diffusion Plant
• Public Comments
• Final Comments
• Adjourn
Breaks taken as appropriate.
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Joel
Bradburne at least seven days in
advance of the meeting at the phone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Joel Bradburne at the address or
telephone number listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments. This notice
is being published less than 15 days
prior to the meeting date due to
programmatic issues that had to be
resolved prior to the meeting date.
Minutes: Minutes will be available by
writing or calling Joel Bradburne at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://www.portsssab.org/publicmeetings.html.
Issued at Washington, DC on February 16,
2010.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. 2010–3347 Filed 2–19–10; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
7577
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
February 12, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–45–000.
Applicants: J–POWER USA
Generation, LP.
Description: Application Pursuant to
Section 203 for Authorization of the
Acquisition of Orange Grove Energy,
L.P. by J–POWER USA Generation, LP,
Request for Waiver and Expedited
Consideration.
Filed Date: 02/09/2010.
Accession Number: 20100209–5046.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 2, 2010.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG10–18–000.
Applicants: CER Generation, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of CER Generation,
LLC.
Filed Date: 02/03/2010.
Accession Number: 20100203–5075.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 24, 2010.
Docket Numbers: EG10–19–000.
Applicants: Day County Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Day County Wind,
LLC.
Filed Date: 02/04/2010.
Accession Number: 20100204–5100.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: EG10–20–000.
Applicants: Northeastern Power
Company.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Northeastern Power
Company.
Filed Date: 02/04/2010.
Accession Number: 20100204–5108.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: EG10–21–000.
Applicants: AES ES Westover, LLC.
Description: Notice of SelfCertification as an Exempt Wholesale
Generator of AES ES Westover, LLC.
Filed Date: 02/05/2010.
Accession Number: 20100205–5050.
Comment Date: 5 p.m. Eastern Time
on Friday, February 26, 2010.
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\22FEN1.SGM
22FEN1
cprice-sewell on DSK2BSOYB1PROD with NOTICES
7578
Federal Register / Vol. 75, No. 34 / Monday, February 22, 2010 / Notices
Docket Numbers: ER97–4143–022;
ER98–2075–027; ER98–542–024; ER07–
1130–004.
Applicants: American Electric Power
Service Corporation; CSW Energy
Services, Inc.; Central & South West
Services, Inc.; AEP Energy Partners, Inc.
Description: Supplement to its
Updated market power analysis of
American Electric Power Service
Corporation et al.
Filed Date: 02/05/2010.
Accession Number: 20100205–5108.
Comment Date: 5 p.m. Eastern Time
on Friday, February 26, 2010.
Docket Numbers: ER97–4257–014.
Applicants: Mid-Power Service
Corporation.
Description: Mid-Power Service
Corporation submits an amendment to
the tariff page that was included in their
Amended and Restated Application for
authorization to make wholesale sales of
energy and capacity at negotiated,
market-bases rates.
Filed Date: 02/01/2010.
Accession Number: 20100202–0028.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER99–1435–022;
ER00–1814–010; ER10–390–001.
Applicants: Avista Corporation;
Avista Turbine Power, Inc.
Description: Avista Corp.’s Request
for Waiver of Affiliate Restrictions as
Necessary to Implement the Avista
Power Purchase Agreement.
Filed Date: 02/05/2010.
Accession Number: 20100205–5112.
Comment Date: 5 p.m. Eastern Time
on Friday, February 26, 2010.
Docket Numbers: ER99–2284–014;
ER98–2185–019; ER09–1278–003;
ER09–38–004; ER99–1773–014; ER99–
1761–010; ER01–1315–010; ER01–2401–
010; ER98–2184–019; ER98–2186–020;
ER00–33–010; ER05–442–008; ER00–
1026–021.
Applicants: AEE 2, LLC; AES
Alamitos, Inc.; AES Armenia Mountain
Wind, LLC; AES Energy Storage, LLC;
AES Creative Resources, LP; AES
Eastern Energy, LP; AES Ironwood, LLC;
AES Red Oak, LLC; AES Huntington
Beach, LLC; AES Redondo Beach, LLC;
AES Placerita, Inc.; Condon Wind
Power, LLC; Indianapolis Power & Light
Company; Mountain View Power
Partners, LLC.
Description: Quarterly Report of
Generation Site Acquisitions of the AES
MBR Affiliates.
Filed Date: 02/01/2010.
Accession Number: 20100201–5114.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER99–2948–020;
ER10–346–005; ER08–860–001; ER07–
VerDate Nov<24>2008
15:26 Feb 19, 2010
Jkt 220001
247–011; ER07–245–011; ER07–244–
011; ER05–728–012; ER04–485–017;
ER02–2567–019; ER01–556–018; ER01–
1654–022; ER00–2918–019.
Applicants: Constellation Energy
Commodities Group, R.E. Ginna Nuclear
Power Plant, LLC, Baltimore Gas and
Electric Company, Constellation Pwr
Source Generation LLC, Constellation
NewEnergy, Inc., Nine Mile Point
Nuclear Station, LLC, CER Generation II,
LLC, Handsome Lake Energy, LLC,
Constellation Energy Commodities
Group M, Calvert Cliffs Nuclear Power
Plant LLC, Raven One, LLC, Raven
Three, LLC, Raven Two, LLC.
Description: Notice of Change in
Status of Constellation MBR Entities.
Filed Date: 02/03/2010.
Accession Number: 20100203–5091.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 24, 2010.
Docket Numbers: ER00–1115–012;
ER00–3562–013; ER00–38–011; ER01–
2887–011; ER01–480–010; ER02–1319–
010; ER02–1367–008; ER02–1633–008;
ER02–1959–009; ER02–2227–011;
ER02–2229–010; ER02–600–012; ER03–
1288–007; ER03–209–009; ER03–24–
010; ER03–341–008; ER03–342–009;
ER03–446–009; ER03–49–009; ER03–
838–010; ER04–1081–007; ER04–1099–
008; ER04–1100–008; ER04–1221–007;
ER04–831–009; ER05–67–007; ER05–
68–007; ER05–819–007; ER05–820–007;
ER06–441–006; ER06–741–007; ER06–
742–007; ER06–749–007; ER06–750–
007; ER06–751–008; ER06–752–007;
ER06–753–006; ER06–755–007; ER06–
756–007; ER07–1335–007; ER09–1084–
004; ER09–71–004; ER99–970–011;
ER99–1983–010.
Applicants: Calpine Construction
Finance Company, LP; Calpine Energy
Services, LP; Broad River Energy LLC;
South Point Energy Center, LLC; Mobile
Energy LLC; Zion Energy LLC; Calpine
Oneta Power, LP; Auburndale Peaker
Energy Center, LLC; CPN Bethpage 3rd
Turbine, Inc.; Creed Energy Center, LLC;
Goose Haven Energy Center, LLC; Delta
Energy Center, LLC; Rocky Mountain
Energy Center, LLC; CES Marketing V,
LP; Los Esteros Critical Energy Facility
LLC; Calpine Power America—OR, LLC;
Calpine Power America—CA, LLC;
Calpine Philadelphia, Inc; Riverside
Energy Center, LLC; Power Contract
Financing, LLC; PCF2, LLC; Bethpage
Energy Center 3, LLC; TBG Cogen
Partners; Mankato Energy Center, LLC;
Calpine Newark, LLC; Metcalf Energy
Center, LLC; Pastoria Energy Center,
LLC; CES Marketing X, LLC; Decatur
Energy Center, LLC; KIAC PARTNERS;
Pine Bluff Energy, LLC; Nissequogue
Cogen Partners; Carville Energy LLC;
Morgan Energy Center, LLC; Columbia
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Energy LLC; CPN Pryor Funding
Corporation; Calpine Gilroy Cogen, LP;
Los Medanos Energy Center LLC; Santa
Rosa Energy Center, LLC; Hermiston
Power, LLC; Otay Mesa Energy Center,
LLC; RockGen Energy, LLC; Geysers
Power Company, LLC.
Description: The Calpine MBR Sellers
submits the quarterly report for the
fourth quarter of 2009 on the acquisition
of sites for new generation etc.
Filed Date: 02/01/2010.
Accession Number: 20100204–0208.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER04–659–013;
ER04–660–013; ER04–994–008; ER99–
3168–012; ER04–657–013.
Applicants: Fore River Development,
LLC; Mystic Development, LLC; Boston
Generating, LLC; Astoria Generating
Company, LP; Mystic Development,
LLC.
Description: Astoria Generating
Company, LP et al. submits quarterly
report for the fourth quarter of 2009 on
the acquisition of site for new
generation capacity development etc.
Filed Date: 02/01/2010.
Accession Number: 20100204–0253.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–315–001.
Applicants: Northeast Utilities
Service Company.
Description: Refund Report of
Northeast Utilities Service Company.
Filed Date: 02/09/2010.
Accession Number: 20100209–5015.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 2, 2010.
Docket Numbers: ER10–450–002;
ER00–3696–014; ER02–506–014; ER98–
2783–018; ER03–1383–017; ER07–1000–
006; ER96–1947–028; ER01–3109–015;
ER01–1044–015; ER99–2157–015;
ER09–1491–002.
Applicants: Arlington Valley, LLC;
Griffith Energy LLC; Bluegrass
Generation Company, LLC; Bridgeport
Energy, LLC; DeSoto County Generating
Company, LLC; Las Vegas Power
Company, LLC; LS Power Marketing,
LLC; Renaissance Power, LLC; Riverside
Generating Company, LLC; Rocky Road
Power, LLC; Tilton Energy LLC.
Description: LS Power Development,
LLC submits their quarterly report for
the fourth quarter of 2009 on the
acquisition of sites for new generation
capacity development etc.
Filed Date: 02/01/2010.
Accession Number: 20100205–0001.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–583–001.
Applicants: Monarch Global Energy,
Inc.
E:\FR\FM\22FEN1.SGM
22FEN1
cprice-sewell on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 34 / Monday, February 22, 2010 / Notices
Description: Monarch Global Energy,
Inc submits amended petition for
acceptance of initial rate schedule,
waiver and blanket authority.
Filed Date: 02/01/2010.
Accession Number: 20100203–0202.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–706–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits amended and restated large
generator interconnection agreement.
Filed Date: 02/01/2010.
Accession Number: 20100202–0235.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–707–000.
Applicants: Florida Power
Corporation.
Description: Florida Power
Corporation submits Interchange
Service Agreements.
Filed Date: 02/01/2010.
Accession Number: 20100202–0233.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–708–000.
Applicants: American Electric Power
Service Corporation.
Description: Kentucky Power
Company submits and request
acceptance of a first revised
Interconnection Agreement 1530 to its
FERC Electric Tariff, Sixth Revised
Volume 1 with East Kentucky Power
Cooperative.
Filed Date: 02/01/2010.
Accession Number: 20100202–0234.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–709–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Co. submits the Twenty-Eighth Filing of
Facilities Agreements.
Filed Date: 02/01/2010.
Accession Number: 20100202–0242.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–710–000.
Applicants: Nevada Power Company,
Sierra Pacific Power Company.
Description: Nevada Power Company
et al. submit revisions to the Sierra
Pacific Resources Operating Companies
FERC Electric Third Revised Volume
No. 1 Open Access Transmission Tariff.
Filed Date: 02/01/2010.
Accession Number: 20100202–0240.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Docket Numbers: ER10–711–000.
Applicants: Respond Power LLC.
Description: Respond Power, LLC
submits their petition for acceptance of
FERC Electric Tariff, original Volume 1.
VerDate Nov<24>2008
15:26 Feb 19, 2010
Jkt 220001
Filed Date: 02/04/2010.
Accession Number: 20100205–0214.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: ER10–714–000.
Applicants: ISO New England Inc.,
New England Power Pool.
Description: ISO New England, Inc et
al. submits Installed Capacity
Requirement, Local Sourcing
Requirements and Maximum Capacity
Limits and Hydro Quebuec
Interconnection Capability.
Filed Date: 02/02/2010.
Accession Number: 20100204–0218.
Comment Date: 5 p.m. Eastern Time
on Tuesday, February 23, 2010.
Docket Numbers: ER10–719–000.
Applicants: Matched LLC.
Description: Matched LLC submits
Petition for Acceptance of Initial Tariff,
Waivers and Blanket Authority.
Filed Date: 02/04/2010.
Accession Number: 20100204–0251.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: ER10–721–000.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc submits its Open
Access Transmission Tariff and its
Market Administration and Control
Area Services Tariff to establish credit
requirements for bidding etc.
Filed Date: 02/04/2010.
Accession Number: 20100205–0201.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: ER10–722–000.
Applicants: Pittsfield Generating
Company, LP.
Description: Pittsfield Generating
Company, LP et al. request that the
Commission grant a limited waiver of
the deadline prescribed in the ISO New
England Inc Forward Capacity Market
Rules for modifying the Summer
Qualified Capacity etc.
Filed Date: 02/04/2010.
Accession Number: 20100205–0202.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: ER10–723–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc
submits revisions to its Open Access
Transmission Tariff, to be effective May
1, 2010.
Filed Date: 02/04/2010.
Accession Number: 20100205–0203.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Docket Numbers: ER10–724–000.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection,
LLC submits a fully executed
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
7579
Emergency Energy Transactions
Agreement dated January 12, 2010 with
East Kentucky Power Cooperative.
Filed Date: 02/04/2010.
Accession Number: 20100205–0204.
Comment Date: 5 p.m. Eastern Time
on Thursday, February 25, 2010.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES10–13–002.
Applicants: FirstEnergy Service
Company.
Description: Joint Application under
Section 204 of the Federal Power Act for
Authorization to issue short term debt
securities re FirstEnergy Service
Company on behalf of Jersey Central
Power & Light Company et al.
Filed Date: 01/29/2010.
Accession Number: 20100204–0209.
Comment Date: 5 p.m. Eastern Time
on Friday, February 19, 2010.
Docket Numbers: ES10–26–000.
Applicants: PJM Interconnection,
LLC.
Description: Application of PJM
Interconnection, LLC under Section 204
for an Order Authorizing the Issuance of
Securities.
Filed Date: 02/05/2010.
Accession Number: 20100205–5036.
Comment Date: 5 p.m. Eastern Time
on Friday, February 26, 2010.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC10–1–000.
Applicants: EDF EN Canada Inc.
Description: Notification of SelfCertification of Foreign Utility Company
Status of EDF EN Canada Inc.
Filed Date: 02/05/2010.
Accession Number: 20100205–5051.
Comment Date: 5 p.m. Eastern Time
on Friday, February 26, 2010.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA08–34–003.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits Notification
filing pursuant to Sections 19.10 and
32.5 of their Open Access Transmission
Tariff and FERC directives in Order 890
et al.
Filed Date: 02/01/2010.
Accession Number: 20100204–0212.
Comment Date: 5 p.m. Eastern Time
on Monday, February 22, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
E:\FR\FM\22FEN1.SGM
22FEN1
7580
Federal Register / Vol. 75, No. 34 / Monday, February 22, 2010 / Notices
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–3317 Filed 2–19–10; 8:45 am]
cprice-sewell on DSK2BSOYB1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southeastern Power Administration
Proposed Rate Adjustment for KerrPhilpott System
AGENCY: Southeastern Power
Administration (Southeastern), DOE.
VerDate Nov<24>2008
15:26 Feb 19, 2010
Jkt 220001
ACTION: Notice of public hearing and
opportunities for review and comment.
SUMMARY: Southeastern proposes to
replace existing schedules of rates and
charges applicable for the sale of power
from the Kerr-Philpott System effective
for a five-year period from October 1,
2010, to September 30, 2015.
Additionally, opportunities will be
available for interested persons to
review the present rates, the proposed
rates and supporting studies, to
participate in a public forum, and to
submit written comments. Southeastern
will evaluate all comments received in
this process.
DATES: Written comments are due on or
before May 24, 2010. A public
information and comment forum will be
held in Raleigh, North Carolina, at 10
a.m. on March 30, 2010. Persons
desiring to speak at the forum should
notify Southeastern at least seven (7)
days before the forum is scheduled so
that a list of forum participants can be
prepared. Others present at the forum
may speak if time permits. Persons
desiring to attend the forum should
notify Southeastern at least seven (7)
days before the forum is scheduled.
Unless Southeastern has been notified
by the close of business on March 23,
2010, that at least one person intends to
be present at the forum, the forum may
be canceled with no further notice.
ADDRESSES: Written comments should
be submitted to: Kenneth E. Legg,
Administrator, Southeastern Power
Administration, Department of Energy,
Elberton, GA 30635. The public
comment forum will meet at the
Marriott-Raleigh Crabtree Valley, 4500
Marriott Drive, Raleigh, NC 27612,
phone (919) 781–7000.
FOR FURTHER INFORMATION CONTACT:
Leon Jourolmon, Assistant
Administrator, Finance and Marketing,
Southeastern Power Administration,
Department of Energy, 1166 Athens
Tech Road, Elberton, GA 30635–6711,
(706) 213–3800.
SUPPLEMENTARY INFORMATION: The
Federal Energy Regulatory Commission
(FERC), by order issued December 8,
2006,117 FERC ¶ 62,220, confirmed and
approved Rate Schedules VA–1–A, VA–
2–A, VA–3–A, VA–4–A, CP&L–1–A,
CP&L–2–A, CP&L–3–A, CP&L–4–A, AP–
1–A, AP–2–A, AP–3–A, AP–4–A, NC–
1–A, Replacement-2, and VANC–1 for
the period October 1, 2006, to
September 30, 2011. A repayment study
prepared in January of 2010 showed that
existing rates are not adequate to
recover all costs required by present
repayment criteria. Due to the projected
shortfall a revised repayment study was
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
prepared with a revenue increase of
$3,723,000 in Fiscal Year 2011 and all
future years. The revised repayment
plan shows that all costs will be repaid
within their service life. Therefore,
Southeastern is proposing to revise the
existing rates to generate this additional
revenue. The increase is primarily due
to a severe drought. The rate adjustment
is an increase of about 20 percent.
Proposed Unit Rates
Under the proposed rates, the
capacity charge will increase from the
current $2.98 per kilowatt per month to
$3.91 per kilowatt per month. The
energy charge will increase from the
current 11.90 mills per kilowatt-hour to
15.66 mills per kilowatt-hour. In
addition, Southeastern proposes to
continue a Tandem Transmission rate,
which is designed to recover the cost of
transmitting power from a project to the
border of another transmitting system.
This rate is to be a formulary passthrough rate based on the charges by
transmission facilitators and is
estimated to be $2.14 per kilowatt per
month.
In addition to these proposed rate
adjustments, Southeastern is proposing
to continue a true-up based on the costs
that are transferred to plant in service in
the preceding fiscal year to cover the
costs associated with this rehabilitation.
The John H. Kerr Project is currently
undergoing rehabilitation, and a true-up
adjustment is incorporated in the
current rates. For each increase of
$1,000,000 to plant in service, an
increase of $0.013 per kilowatt per
month will be added to the capacity
charge, and 0.052 mills per kilowatthour will be added to the energy charge.
Southeastern is proposing the
following rate schedules to be effective
for the period from October 1, 2010, to
September 30, 2015. The capacity
charge and energy charge will be the
same for all rate schedules. These rate
schedules are necessary to
accommodate the transmission and
scheduling arrangements that are
available in the Kerr-Philpott System.
Rate Schedule VA–1–B
Available to public bodies and
cooperatives in Virginia and North
Carolina to whom power may be
transmitted and scheduled pursuant to
contracts between the Government,
Virginia Electric and Power Company
(also known as Dominion Virginia
Power [DVP]), and DVP’s Transmission
Operator, currently PJM
Interconnection, LLC (PJM).
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 75, Number 34 (Monday, February 22, 2010)]
[Notices]
[Pages 7577-7580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3317]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
February 12, 2010.
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC10-45-000.
Applicants: J-POWER USA Generation, LP.
Description: Application Pursuant to Section 203 for Authorization
of the Acquisition of Orange Grove Energy, L.P. by J-POWER USA
Generation, LP, Request for Waiver and Expedited Consideration.
Filed Date: 02/09/2010.
Accession Number: 20100209-5046.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 2, 2010.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG10-18-000.
Applicants: CER Generation, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of CER Generation, LLC.
Filed Date: 02/03/2010.
Accession Number: 20100203-5075.
Comment Date: 5 p.m. Eastern Time on Wednesday, February 24, 2010.
Docket Numbers: EG10-19-000.
Applicants: Day County Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Day County Wind, LLC.
Filed Date: 02/04/2010.
Accession Number: 20100204-5100.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: EG10-20-000.
Applicants: Northeastern Power Company.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Northeastern Power Company.
Filed Date: 02/04/2010.
Accession Number: 20100204-5108.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: EG10-21-000.
Applicants: AES ES Westover, LLC.
Description: Notice of Self-Certification as an Exempt Wholesale
Generator of AES ES Westover, LLC.
Filed Date: 02/05/2010.
Accession Number: 20100205-5050.
Comment Date: 5 p.m. Eastern Time on Friday, February 26, 2010.
Take notice that the Commission received the following electric
rate filings:
[[Page 7578]]
Docket Numbers: ER97-4143-022; ER98-2075-027; ER98-542-024; ER07-
1130-004.
Applicants: American Electric Power Service Corporation; CSW Energy
Services, Inc.; Central & South West Services, Inc.; AEP Energy
Partners, Inc.
Description: Supplement to its Updated market power analysis of
American Electric Power Service Corporation et al.
Filed Date: 02/05/2010.
Accession Number: 20100205-5108.
Comment Date: 5 p.m. Eastern Time on Friday, February 26, 2010.
Docket Numbers: ER97-4257-014.
Applicants: Mid-Power Service Corporation.
Description: Mid-Power Service Corporation submits an amendment to
the tariff page that was included in their Amended and Restated
Application for authorization to make wholesale sales of energy and
capacity at negotiated, market-bases rates.
Filed Date: 02/01/2010.
Accession Number: 20100202-0028.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER99-1435-022; ER00-1814-010; ER10-390-001.
Applicants: Avista Corporation; Avista Turbine Power, Inc.
Description: Avista Corp.'s Request for Waiver of Affiliate
Restrictions as Necessary to Implement the Avista Power Purchase
Agreement.
Filed Date: 02/05/2010.
Accession Number: 20100205-5112.
Comment Date: 5 p.m. Eastern Time on Friday, February 26, 2010.
Docket Numbers: ER99-2284-014; ER98-2185-019; ER09-1278-003; ER09-
38-004; ER99-1773-014; ER99-1761-010; ER01-1315-010; ER01-2401-010;
ER98-2184-019; ER98-2186-020; ER00-33-010; ER05-442-008; ER00-1026-021.
Applicants: AEE 2, LLC; AES Alamitos, Inc.; AES Armenia Mountain
Wind, LLC; AES Energy Storage, LLC; AES Creative Resources, LP; AES
Eastern Energy, LP; AES Ironwood, LLC; AES Red Oak, LLC; AES Huntington
Beach, LLC; AES Redondo Beach, LLC; AES Placerita, Inc.; Condon Wind
Power, LLC; Indianapolis Power & Light Company; Mountain View Power
Partners, LLC.
Description: Quarterly Report of Generation Site Acquisitions of
the AES MBR Affiliates.
Filed Date: 02/01/2010.
Accession Number: 20100201-5114.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER99-2948-020; ER10-346-005; ER08-860-001; ER07-
247-011; ER07-245-011; ER07-244-011; ER05-728-012; ER04-485-017; ER02-
2567-019; ER01-556-018; ER01-1654-022; ER00-2918-019.
Applicants: Constellation Energy Commodities Group, R.E. Ginna
Nuclear Power Plant, LLC, Baltimore Gas and Electric Company,
Constellation Pwr Source Generation LLC, Constellation NewEnergy, Inc.,
Nine Mile Point Nuclear Station, LLC, CER Generation II, LLC, Handsome
Lake Energy, LLC, Constellation Energy Commodities Group M, Calvert
Cliffs Nuclear Power Plant LLC, Raven One, LLC, Raven Three, LLC, Raven
Two, LLC.
Description: Notice of Change in Status of Constellation MBR
Entities.
Filed Date: 02/03/2010.
Accession Number: 20100203-5091.
Comment Date: 5 p.m. Eastern Time on Wednesday, February 24, 2010.
Docket Numbers: ER00-1115-012; ER00-3562-013; ER00-38-011; ER01-
2887-011; ER01-480-010; ER02-1319-010; ER02-1367-008; ER02-1633-008;
ER02-1959-009; ER02-2227-011; ER02-2229-010; ER02-600-012; ER03-1288-
007; ER03-209-009; ER03-24-010; ER03-341-008; ER03-342-009; ER03-446-
009; ER03-49-009; ER03-838-010; ER04-1081-007; ER04-1099-008; ER04-
1100-008; ER04-1221-007; ER04-831-009; ER05-67-007; ER05-68-007; ER05-
819-007; ER05-820-007; ER06-441-006; ER06-741-007; ER06-742-007; ER06-
749-007; ER06-750-007; ER06-751-008; ER06-752-007; ER06-753-006; ER06-
755-007; ER06-756-007; ER07-1335-007; ER09-1084-004; ER09-71-004; ER99-
970-011; ER99-1983-010.
Applicants: Calpine Construction Finance Company, LP; Calpine
Energy Services, LP; Broad River Energy LLC; South Point Energy Center,
LLC; Mobile Energy LLC; Zion Energy LLC; Calpine Oneta Power, LP;
Auburndale Peaker Energy Center, LLC; CPN Bethpage 3rd Turbine, Inc.;
Creed Energy Center, LLC; Goose Haven Energy Center, LLC; Delta Energy
Center, LLC; Rocky Mountain Energy Center, LLC; CES Marketing V, LP;
Los Esteros Critical Energy Facility LLC; Calpine Power America--OR,
LLC; Calpine Power America--CA, LLC; Calpine Philadelphia, Inc;
Riverside Energy Center, LLC; Power Contract Financing, LLC; PCF2, LLC;
Bethpage Energy Center 3, LLC; TBG Cogen Partners; Mankato Energy
Center, LLC; Calpine Newark, LLC; Metcalf Energy Center, LLC; Pastoria
Energy Center, LLC; CES Marketing X, LLC; Decatur Energy Center, LLC;
KIAC PARTNERS; Pine Bluff Energy, LLC; Nissequogue Cogen Partners;
Carville Energy LLC; Morgan Energy Center, LLC; Columbia Energy LLC;
CPN Pryor Funding Corporation; Calpine Gilroy Cogen, LP; Los Medanos
Energy Center LLC; Santa Rosa Energy Center, LLC; Hermiston Power, LLC;
Otay Mesa Energy Center, LLC; RockGen Energy, LLC; Geysers Power
Company, LLC.
Description: The Calpine MBR Sellers submits the quarterly report
for the fourth quarter of 2009 on the acquisition of sites for new
generation etc.
Filed Date: 02/01/2010.
Accession Number: 20100204-0208.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER04-659-013; ER04-660-013; ER04-994-008; ER99-
3168-012; ER04-657-013.
Applicants: Fore River Development, LLC; Mystic Development, LLC;
Boston Generating, LLC; Astoria Generating Company, LP; Mystic
Development, LLC.
Description: Astoria Generating Company, LP et al. submits
quarterly report for the fourth quarter of 2009 on the acquisition of
site for new generation capacity development etc.
Filed Date: 02/01/2010.
Accession Number: 20100204-0253.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-315-001.
Applicants: Northeast Utilities Service Company.
Description: Refund Report of Northeast Utilities Service Company.
Filed Date: 02/09/2010.
Accession Number: 20100209-5015.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 2, 2010.
Docket Numbers: ER10-450-002; ER00-3696-014; ER02-506-014; ER98-
2783-018; ER03-1383-017; ER07-1000-006; ER96-1947-028; ER01-3109-015;
ER01-1044-015; ER99-2157-015; ER09-1491-002.
Applicants: Arlington Valley, LLC; Griffith Energy LLC; Bluegrass
Generation Company, LLC; Bridgeport Energy, LLC; DeSoto County
Generating Company, LLC; Las Vegas Power Company, LLC; LS Power
Marketing, LLC; Renaissance Power, LLC; Riverside Generating Company,
LLC; Rocky Road Power, LLC; Tilton Energy LLC.
Description: LS Power Development, LLC submits their quarterly
report for the fourth quarter of 2009 on the acquisition of sites for
new generation capacity development etc.
Filed Date: 02/01/2010.
Accession Number: 20100205-0001.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-583-001.
Applicants: Monarch Global Energy, Inc.
[[Page 7579]]
Description: Monarch Global Energy, Inc submits amended petition
for acceptance of initial rate schedule, waiver and blanket authority.
Filed Date: 02/01/2010.
Accession Number: 20100203-0202.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-706-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits amended and restated large generator interconnection agreement.
Filed Date: 02/01/2010.
Accession Number: 20100202-0235.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-707-000.
Applicants: Florida Power Corporation.
Description: Florida Power Corporation submits Interchange Service
Agreements.
Filed Date: 02/01/2010.
Accession Number: 20100202-0233.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-708-000.
Applicants: American Electric Power Service Corporation.
Description: Kentucky Power Company submits and request acceptance
of a first revised Interconnection Agreement 1530 to its FERC Electric
Tariff, Sixth Revised Volume 1 with East Kentucky Power Cooperative.
Filed Date: 02/01/2010.
Accession Number: 20100202-0234.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-709-000.
Applicants: Pacific Gas and Electric Company.
Description: Pacific Gas and Electric Co. submits the Twenty-Eighth
Filing of Facilities Agreements.
Filed Date: 02/01/2010.
Accession Number: 20100202-0242.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-710-000.
Applicants: Nevada Power Company, Sierra Pacific Power Company.
Description: Nevada Power Company et al. submit revisions to the
Sierra Pacific Resources Operating Companies FERC Electric Third
Revised Volume No. 1 Open Access Transmission Tariff.
Filed Date: 02/01/2010.
Accession Number: 20100202-0240.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Docket Numbers: ER10-711-000.
Applicants: Respond Power LLC.
Description: Respond Power, LLC submits their petition for
acceptance of FERC Electric Tariff, original Volume 1.
Filed Date: 02/04/2010.
Accession Number: 20100205-0214.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: ER10-714-000.
Applicants: ISO New England Inc., New England Power Pool.
Description: ISO New England, Inc et al. submits Installed Capacity
Requirement, Local Sourcing Requirements and Maximum Capacity Limits
and Hydro Quebuec Interconnection Capability.
Filed Date: 02/02/2010.
Accession Number: 20100204-0218.
Comment Date: 5 p.m. Eastern Time on Tuesday, February 23, 2010.
Docket Numbers: ER10-719-000.
Applicants: Matched LLC.
Description: Matched LLC submits Petition for Acceptance of Initial
Tariff, Waivers and Blanket Authority.
Filed Date: 02/04/2010.
Accession Number: 20100204-0251.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: ER10-721-000.
Applicants: New York Independent System Operator, Inc.
Description: New York Independent System Operator, Inc submits its
Open Access Transmission Tariff and its Market Administration and
Control Area Services Tariff to establish credit requirements for
bidding etc.
Filed Date: 02/04/2010.
Accession Number: 20100205-0201.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: ER10-722-000.
Applicants: Pittsfield Generating Company, LP.
Description: Pittsfield Generating Company, LP et al. request that
the Commission grant a limited waiver of the deadline prescribed in the
ISO New England Inc Forward Capacity Market Rules for modifying the
Summer Qualified Capacity etc.
Filed Date: 02/04/2010.
Accession Number: 20100205-0202.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: ER10-723-000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc submits revisions to its Open
Access Transmission Tariff, to be effective May 1, 2010.
Filed Date: 02/04/2010.
Accession Number: 20100205-0203.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Docket Numbers: ER10-724-000.
Applicants: PJM Interconnection, LLC.
Description: PJM Interconnection, LLC submits a fully executed
Emergency Energy Transactions Agreement dated January 12, 2010 with
East Kentucky Power Cooperative.
Filed Date: 02/04/2010.
Accession Number: 20100205-0204.
Comment Date: 5 p.m. Eastern Time on Thursday, February 25, 2010.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES10-13-002.
Applicants: FirstEnergy Service Company.
Description: Joint Application under Section 204 of the Federal
Power Act for Authorization to issue short term debt securities re
FirstEnergy Service Company on behalf of Jersey Central Power & Light
Company et al.
Filed Date: 01/29/2010.
Accession Number: 20100204-0209.
Comment Date: 5 p.m. Eastern Time on Friday, February 19, 2010.
Docket Numbers: ES10-26-000.
Applicants: PJM Interconnection, LLC.
Description: Application of PJM Interconnection, LLC under Section
204 for an Order Authorizing the Issuance of Securities.
Filed Date: 02/05/2010.
Accession Number: 20100205-5036.
Comment Date: 5 p.m. Eastern Time on Friday, February 26, 2010.
Take notice that the Commission received the following foreign
utility company status filings:
Docket Numbers: FC10-1-000.
Applicants: EDF EN Canada Inc.
Description: Notification of Self-Certification of Foreign Utility
Company Status of EDF EN Canada Inc.
Filed Date: 02/05/2010.
Accession Number: 20100205-5051.
Comment Date: 5 p.m. Eastern Time on Friday, February 26, 2010.
Take notice that the Commission received the following open access
transmission tariff filings:
Docket Numbers: OA08-34-003.
Applicants: Public Service Company of New Mexico.
Description: Public Service Company of New Mexico submits
Notification filing pursuant to Sections 19.10 and 32.5 of their Open
Access Transmission Tariff and FERC directives in Order 890 et al.
Filed Date: 02/01/2010.
Accession Number: 20100204-0212.
Comment Date: 5 p.m. Eastern Time on Monday, February 22, 2010.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
[[Page 7580]]
time on the specified comment date. It is not necessary to separately
intervene again in a subdocket related to a compliance filing if you
have previously intervened in the same docket. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Anyone filing a motion to intervene or protest must serve a
copy of that document on the Applicant. In reference to filings
initiating a new proceeding, interventions or protests submitted on or
before the comment deadline need not be served on persons other than
the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010-3317 Filed 2-19-10; 8:45 am]
BILLING CODE 6717-01-P