Southern Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed 2011/2012 Abandonment and Replacement Project and Request for Comments on Environmental Issues, 7472-7473 [2010-3108]
Download as PDF
7472
Federal Register / Vol. 75, No. 33 / Friday, February 19, 2010 / Notices
Summary of the Proposed Project
toll-free at (866) 208–3676; for TTY,
contact (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–3101 Filed 2–18–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–36–000]
Southern Natural Gas Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed 2011/2012 Abandonment and
Replacement Project and Request for
Comments on Environmental Issues
pwalker on DSK8KYBLC1PROD with NOTICES
February 5, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Southern 2011/2012 Abandonment
and Replacement Project, involving the
abandonment and replacement of
facilities by Southern Natural Gas
Company (Southern) in Louisiana and
Mississippi. This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on March 8,
2010.
This notice is being sent to the
Commission’s current environmental
mailing for this project. State and local
government representatives are asked to
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Southern provided to
landowners. This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (https://www.ferc.gov).
VerDate Nov<24>2008
18:05 Feb 18, 2010
Jkt 220001
Southern proposes to abandon,
replace, and modify certain pipeline
facilities located within East Carroll and
West Carroll Parishes, Louisiana, and
Issaquena, Sharkey, Yazoo, Madison,
Attala, and Winston Counties,
Mississippi. Specifically, Southern
proposes to abandon in place 68.5 miles
(in five segments) of its North Main
Loop Line, consisting of 16- to 24-inchdiameter pipeline. To adjust for the
abandonment, Southern would also
replace and/or modify small segments of
its North Main and North Main Loop
pipelines. These pipeline segments were
installed using a mechanical coupling
technology in the late 1930s and early
1940s. The pipeline, consisting of 18- to
to 24-inch-diameter pipe, would be cut,
cleaned, sealed, and abandoned in
place.
Overall, the project would involve 29
separate areas of disturbance along
Southern’s system in Louisiana and
Mississippi. The general location of the
project facilities is shown in appendix
1.1
Land Requirements for Construction
The proposed project would
temporarily disturb about 6.91 acres of
land for the abandonment and
modification of the facilities.
Afterwards, all areas of disturbance
would be revegetated and return to its
previous use. All pipeline abandonment
activities would be conducted within
the existing right-of-way and
compressor station areas. No new access
roads would be required to facilitate the
abandonment of the pipeline facilities.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the proposed
project under these general headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed into the public record
and, depending on the comments
received during the scoping process, the
EA may be published and distributed to
the public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before March 8,
2010.
For your convenience, there are three
methods which you can use to submit
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 75, No. 33 / Friday, February 19, 2010 / Notices
pwalker on DSK8KYBLC1PROD with NOTICES
your written comments to the
Commission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at 202–502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located at
https://www.ferc.gov under the link
called ‘‘Documents and Filings.’’ A
Quick Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the ‘‘eFiling’’
feature that is listed under the
‘‘Documents and Filings’’ link. eFiling
involves preparing your submission in
the same manner as you would if filing
on paper, and then saving the file on
your computer’s hard drive. You will
attach that file to your submission. New
eFiling users must first create an
account by clicking on the links called
‘‘Sign up’’ or ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing;’’ or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If the EA is published for
distribution, copies will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
VerDate Nov<24>2008
18:05 Feb 18, 2010
Jkt 220001
7473
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
2).
DEPARTMENT OF ENERGY
Becoming an Intervenor
[Docket No. EL10–39–000]
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor,’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
SunZia Transmission, LLC; Notice of
Filing
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC, or on the FERC
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number, excluding
the last three digits, in the Docket
Number field (i.e., CP10–36). Be sure
you have selected an appropriate date
range. For assistance, please contact
FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at 1–866–208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–3108 Filed 2–18–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
February 5, 2010.
Take notice that on January 29, 2010,
SunZia Transmission, LLC (SunZia)
filed a petition for declaratory order
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2009),
requesting that the Commission declare
that: (i) Each investor in SunZia may be
allocated firm transmission rights
representing 100% of the sponsor’s pro
rata investment in the transmission
capacity of the SunZia Southwest
Transmission Project; (ii) three sponsors
of the project, South Western Power
Group (SWPG), ECP SunZia, LLC (ECP),
and Shell WindEnergy Inc. (SWE), each
an owner of membership interest in
SunZia, may use up to 100% of their
pro rata share of capacity on the project
to serve affiliated generators; and (iii)
SWPG and ECP SunZia may prescribe
up to 100% of their 80% pro rata share
of the project transmission capacity
through long-term firm negotiated rate
contracts.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
E:\FR\FM\19FEN1.SGM
19FEN1
Agencies
[Federal Register Volume 75, Number 33 (Friday, February 19, 2010)]
[Notices]
[Pages 7472-7473]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3108]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-36-000]
Southern Natural Gas Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed 2011/2012 Abandonment and
Replacement Project and Request for Comments on Environmental Issues
February 5, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Southern 2011/2012 Abandonment
and Replacement Project, involving the abandonment and replacement of
facilities by Southern Natural Gas Company (Southern) in Louisiana and
Mississippi. This EA will be used by the Commission in its decision-
making process to determine whether the project is in the public
convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on March 8, 2010.
This notice is being sent to the Commission's current environmental
mailing for this project. State and local government representatives
are asked to notify their constituents of this proposed project and
encourage them to comment on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Southern provided to landowners. This fact sheet
addresses a number of typically-asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is also available for viewing on the FERC Web site (https://www.ferc.gov).
Summary of the Proposed Project
Southern proposes to abandon, replace, and modify certain pipeline
facilities located within East Carroll and West Carroll Parishes,
Louisiana, and Issaquena, Sharkey, Yazoo, Madison, Attala, and Winston
Counties, Mississippi. Specifically, Southern proposes to abandon in
place 68.5 miles (in five segments) of its North Main Loop Line,
consisting of 16- to 24-inch-diameter pipeline. To adjust for the
abandonment, Southern would also replace and/or modify small segments
of its North Main and North Main Loop pipelines. These pipeline
segments were installed using a mechanical coupling technology in the
late 1930s and early 1940s. The pipeline, consisting of 18- to to 24-
inch-diameter pipe, would be cut, cleaned, sealed, and abandoned in
place.
Overall, the project would involve 29 separate areas of disturbance
along Southern's system in Louisiana and Mississippi. The general
location of the project facilities is shown in appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
The proposed project would temporarily disturb about 6.91 acres of
land for the abandonment and modification of the facilities.
Afterwards, all areas of disturbance would be revegetated and return to
its previous use. All pipeline abandonment activities would be
conducted within the existing right-of-way and compressor station
areas. No new access roads would be required to facilitate the
abandonment of the pipeline facilities.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the proposed project under these general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed into the public record and, depending on the
comments received during the scoping process, the EA may be published
and distributed to the public. A comment period will be allotted if the
EA is published for review. We will consider all comments on the EA
before we make our recommendations to the Commission. To ensure your
comments are considered, please carefully follow the instructions in
the Public Participation section below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send in your comments
so that they will be received in Washington, DC on or before March 8,
2010.
For your convenience, there are three methods which you can use to
submit
[[Page 7473]]
your written comments to the Commission. The Commission encourages
electronic filing of comments and has expert eFiling staff available to
assist you at 202-502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located at https://www.ferc.gov under the link
called ``Documents and Filings.'' A Quick Comment is an easy method for
interested persons to submit text-only comments on a project;
(2) You may file your comments electronically by using the
``eFiling'' feature that is listed under the ``Documents and Filings''
link. eFiling involves preparing your submission in the same manner as
you would if filing on paper, and then saving the file on your
computer's hard drive. You will attach that file to your submission.
New eFiling users must first create an account by clicking on the links
called ``Sign up'' or ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing;'' or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. This list also includes all affected landowners (as
defined in the Commission's regulations) who are potential right-of-way
grantors, whose property may be used temporarily for project purposes,
or who own homes within certain distances of aboveground facilities,
and anyone who submits comments on the project. We will update the
environmental mailing list as the analysis proceeds to ensure that we
send the information related to this environmental review to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If the EA is
published for distribution, copies will be sent to the environmental
mailing list for public review and comment. If you would prefer to
receive a paper copy of the document instead of the CD version or would
like to remove your name from the mailing list, please return the
attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor,'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits, in the Docket Number field
(i.e., CP10-36). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-3108 Filed 2-18-10; 8:45 am]
BILLING CODE 6717-01-P