Carolina Power & Light Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 6731-6736 [2010-2976]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
2. The title of the information
collection: NRC Form 664, General
Licensee Registration;
3. Current OMB approval number:
3150–0198.
4. The form number if applicable:
NRC Form 664.
5. How often the collection is
required: Annually.
6. Who will be required or asked to
report: General Licensees of the NRC
who possess certain generally licensed
devices subject to annual registration
authorized pursuant to 10 CFR 31.5.
7. An estimate of the number of
annual responses: 840.
8. The estimated number of annual
respondents: 840.
9. An estimate of the total number of
hours needed annually to complete the
requirement or request: The number of
hours needed annually to complete the
requirement or request: 280 hours
annually (840 respondents × 20 minutes
per form).
10. Abstract: NRC Form 664 is used
by NRC general licensees to make
reports regarding certain generally
licensed devices subject to annual
registration. The registration program
allows NRC to better track general
licensees, so that they can be contacted
or inspected as necessary, and to make
sure that generally licensed devices can
be identified even if lost or damaged.
Also, the registration program ensures
that general licensees are aware of and
understand the requirements for the
possession, use and disposal of devices
containing byproduct material. Greater
awareness helps to ensure that general
licensees will comply with the
regulatory requirements for proper
handling and disposal of generally
licensed devices and would reduce the
potential for incidents that could result
in unnecessary radiation exposure to the
public and contamination of property.
A copy of the final supporting
statement may be viewed free of charge
at the NRC Public Document Room, One
White Flint North, 11555 Rockville
Pike, Room O–1 F21, Rockville,
Maryland 20852. OMB clearance
requests are available at the NRC
worldwide Web site: https://
www.nrc.gov/public-involve/doccomment/omb/. The
document will be available on the NRC
home page site for 60 days after the
signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by March 12, 2010. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date.
VerDate Nov<24>2008
16:21 Feb 09, 2010
Jkt 220001
Christine J. Kymn, Desk Officer,
Office of Information and Regulatory
Affairs (3150–0198), NEOB–10202,
Office of Management and Budget,
Washington, DC 20503.
Comments can also be e-mailed to
Christine.J.Kymn@omb.eop.gov or
submitted by telephone at (202) 395–
4638.
The NRC Clearance Officer is
Tremaine Donnell, (301) 415–6258.
Dated at Rockville, Maryland, this 1st day
of February, 2010.
For the Nuclear Regulatory Commission.
Tremaine Donnell,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. 2010–2962 Filed 2–9–10; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–261; NRC–2010–0027]
Carolina Power & Light Company;
Notice of Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination
and Opportunity for a Hearing, and
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of an amendment
to Facility Operating License No. DPR–
23 issued to Carolina Power & Light
Company (the licensee) for operation of
the H. B. Robinson Steam Electric Plant,
Unit 2, located in Darlington County,
South Carolina.
The December 16, 2009, application
(Agencywide Documents Access and
Management System (ADAMS)
Accession No. ML093631212) contains
proprietary information, which the
Commission classifies as sensitive
unclassified non-safeguards information
(SUNSI). The proposed amendment
would modify Technical Specification
(TS) 5.5.9 to revise the steam generator
(SG) alternate repair criteria and TS
5.6.8 to revise the SG tube inspection
reporting requirements. Specifically, the
proposed change would revise
requirements in TS 5.5.9, called
alternate repair criteria, which would
allow inspection of the tube to start
within the tubesheet region (a minimum
of 17.28 inches below the top of the
tubesheet) and add requirements to
report indications in this region and
primary to secondary leakage that could
be attributed to the uninspected portion
of the tube within the tubesheet. The
PO 00000
Frm 00110
Fmt 4703
Sfmt 4703
6731
change is being proposed as a temporary
requirement until the next scheduled
inspection.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. The Proposed Change Does Not Involve
a Significant Increase in the Probability or
Consequences of an Accident Previously
Evaluated.
The proposed change does not involve
physical changes to any plant structure,
system, or component. The inspection of the
portion of the steam generator tubes within
the tubesheet region is being changed to
identify the appropriate scope of inspection
and the criteria for plugging tubes that are
found with degradation. The proposed
requirements will continue to ensure that the
probability of a steam generator tube rupture
accident is not increased. Therefore, the
probability of occurrence for a previously
analyzed accident is not significantly
increased.
The consequences of a previously analyzed
accident are dependent on the initial
conditions assumed for the analysis, the
behavior of the fission product barriers
during the analyzed accident, the availability
and successful functioning of the equipment
assumed to operate in response to the
analyzed event, and the setpoints at which
these actions are initiated. The proposed
inspection and repair requirements will
ensure that the plant continues to meet
applicable design and safety analyses
acceptance criteria. The proposed change
does not affect the performance of any
equipment used to mitigate the consequences
of an analyzed accident. As a result, no
analysis assumptions are impacted and there
are no adverse effects on the factors that
contribute to offsite or onsite dose as a result
of an accident. The proposed change does not
affect setpoints that initiate protective or
mitigative actions. The proposed change
ensures that plant structures, systems, and
components are maintained consistent with
E:\FR\FM\10FEN1.SGM
10FEN1
sroberts on DSKD5P82C1PROD with NOTICES
6732
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
the safety analysis and licensing bases. Based
on this evaluation, there is no significant
increase in the consequences of a previously
analyzed accident.
Therefore, this change does not involve a
significant increase in the probability or
consequences of an accident previously
evaluated.
2. The Proposed Change Does Not Create
the Possibility of a New or Different Kind of
Accident From Any Previously Evaluated.
The proposed change does not involve any
physical alteration of plant systems,
structures, or components. No new or
different equipment is being installed. No
installed equipment is being operated in a
different manner. There is no change to the
parameters within which the plant is
normally operated or in the setpoints that
initiate protective or mitigative actions. The
proposed inspection and repair criteria will
establish appropriate requirements to ensure
that the steam generator tubes are properly
maintained. As a result, no new failure
modes are being introduced.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. The Proposed Change Does Not Involve
a Significant Reduction in the Margin of
Safety.
The proposed change defines the safety
significant portion of the tube that must be
inspected and repaired. WCAP–17091–P
identifies the specific inspection depth below
which any type of tube degradation is shown
to have no impact on the performance criteria
in NEI 97–06 Rev. 2, ‘‘Steam Generator
Program Guidelines’’ and TS 5.5.9, ‘‘Steam
Generator (SG) Program.’’
The proposed change that alters the SG
inspection and reporting criteria maintains
the required structural margins of the SG
tubes for normal, transient, and accident
conditions. Nuclear Energy Institute 97–06,
‘‘Steam Generator Program Guidelines,’’ and
NRC Regulatory Guide (RG) 1.121, ‘‘Bases for
Plugging Degraded PWR Steam Generator
Tubes,’’ are used as the bases in the
development of the limited tubesheet
inspection depth methodology for
determining that SG tube integrity
considerations are maintained within
acceptable limits. RG 1.121 describes a
method acceptable to the NRC for meeting
General Design Criteria (GDC) 14, ‘‘Reactor
Coolant Pressure Boundary,’’ GDC 15,
‘‘Reactor Coolant System Design,’’ GDC 31,
‘‘Fracture Prevention of Reactor Coolant
Pressure Boundary,’’ and GDC 32, ‘‘Inspection
of Reactor Coolant Pressure Boundary,’’ by
reducing the probability and consequences of
a SGTR. The probability and consequences of
a SGTR are reduced by establishing the
limiting safe conditions for tube wall
degradation. RG 1.121 uses safety factors on
loads for tube burst that are consistent with
the requirements of Section III of the
American Society of Mechanical Engineers
(ASME) Code.
For axially oriented cracking located
within the tubesheet, tube burst is precluded
due to the presence of the tubesheet. For
circumferentially oriented cracking,
Westinghouse report WCAP–17091–P defines
VerDate Nov<24>2008
16:21 Feb 09, 2010
Jkt 220001
a length of degradation-free expanded tubing
that provides the necessary resistance to tube
pullout due to the pressure induced forces,
with applicable safety factors applied.
Application of the limited hot and cold leg
tubesheet inspection criteria will preclude
unacceptable primary to secondary leakage
during applicable plant conditions. The
steam line break accident leak rate factor for
HBRSEP, Unit No. 2, is 1.82 (Table 9–7 in
WCAP–17091–P). Multiplying this factor by
the room temperature TS operational leak
rate limit of 75 gpd through any one SG
indicates that an assumed primary to
secondary accident induced leak rate of 136.5
gpd or greater through any one SG is required
to ensure that the limiting design basis
accident assumption is not exceeded (at room
temperature). This condition is satisfied by
the current UFSAR assumed primary to
secondary accident induced leak rate of 150
gpd through any one SG for SLB.
Therefore, the proposed change does not
involve a significant reduction in any margin
of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch (RDB), TWB–05–
PO 00000
Frm 00111
Fmt 4703
Sfmt 4703
B01M, Division of Administrative
Services, Office of Administration, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
should cite the publication date and
page number of this Federal Register
notice. Written comments may also be
faxed to the RDB at 301–492–3446.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR Part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
E:\FR\FM\10FEN1.SGM
10FEN1
sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The requestor/petitioner must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
requestor/petitioner who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
VerDate Nov<24>2008
16:21 Feb 09, 2010
Jkt 220001
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
participant should contact the Office of
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through EIE, users will be
required to install a Web browser plugin from the NRC Web site. Further
information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
PO 00000
Frm 00112
Fmt 4703
Sfmt 4703
6733
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an e-mail notice
confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a tollfree call at (866) 672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
E:\FR\FM\10FEN1.SGM
10FEN1
sroberts on DSKD5P82C1PROD with NOTICES
6734
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, or the presiding
officer. Participants are requested not to
include personal privacy information,
such as social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice. Nontimely filings will not be entertained
absent a determination by the presiding
officer that the petition or request
should be granted or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
For further details with respect to this
license amendment application, see the
application for amendment dated
December 16, 2009 (ADAMS Accession
No. ML093631212), which is available
for public inspection at the
Commission’s PDR, located at One
White Flint North, File Public Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible electronically
from the Agencywide Documents
Access and Management System’s
(ADAMS) Public Electronic Reading
Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
VerDate Nov<24>2008
16:21 Feb 09, 2010
Jkt 220001
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, 301–415–4737, or
by e-mail to pdr.resource@nrc.gov.
Attorney for licensee: David T.
Conley, Associate General Counsel II—
Legal Department, Progress Energy
Service Company, LLC, Post Office Box
1551, Raleigh, North Carolina 27602.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The e-mail address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention;
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff either after
a determination on standing and need
for access, or after a determination on
trustworthiness and reliability, the NRC
staff shall immediately notify the
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the
initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00113
Fmt 4703
Sfmt 4703
E:\FR\FM\10FEN1.SGM
10FEN1
6735
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Day
sroberts on DSKD5P82C1PROD with NOTICES
Jkt 220001
25 .................
If NRC staff finds no ‘‘need’’
or no likelihood of standing,
the deadline for requestor/
petitioner to file a motion
seeking a ruling to reverse
the NRC staff’s denial of
access; NRC staff files
copy of access determination with the presiding officer (or Chief Administrative
Judge or other designated
officer, as appropriate). If
NRC staff finds ‘‘need’’ for
SUNSI, the deadline for
any party to the proceeding
whose interest independent
of the proceeding would be
harmed by the release of
the information to file a motion seeking a ruling to reverse the NRC staff’s grant
of access.
Deadline for NRC staff reply
to motions to reverse NRC
staff determination(s).
(Receipt +30) If NRC staff
finds standing and need for
SUNSI, deadline for NRC
staff to complete information processing and file motion for Protective Order
and draft Non-Disclosure
Affidavit. Deadline for applicant/licensee to file NonDisclosure Agreement for
SUNSI.
If access granted: Issuance of
presiding officer or other
designated officer decision
on motion for protective
order for access to sensitive information (including
schedule for providing access and submission of
contentions) or decision reversing a final adverse determination by the NRC
staff.
Deadline for filing executed
Non-Disclosure Affidavits.
Access provided to SUNSI
consistent with decision
issuing the protective order.
Deadline for submission of
contentions whose development depends upon access
to SUNSI. However, if more
than 25 days remain between the petitioner’s receipt of (or access to) the
information and the deadline for filing all other contentions (as established in
the notice of hearing or opportunity for hearing), the
petitioner may file its
SUNSI contentions by that
later deadline.
(Contention receipt +25) Answers to contentions whose
development depends upon
access to SUNSI.
Event/activity
0 ...................
Publication of Federal Register notice of hearing and
opportunity to petition for
leave to intervene, including
order with instructions for
access requests.
Deadline for submitting requests for access to Sensitive Unclassified NonSafeguards Information
(SUNSI) with information:
Supporting the standing of
a potential party identified
by name and address; describing the need for the information in order for the
potential party to participate
meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of
standing; (ii) all contentions
whose formulation does not
require access to SUNSI
(+25 Answers to petition for
intervention; +7 requestor/
petitioner reply).
Nuclear Regulatory Commission (NRC) staff informs the
requestor of the staff’s determination whether the request for access provides a
reasonable basis to believe
standing can be established
and shows need for SUNSI.
(NRC staff also informs any
party to the proceeding
whose interest independent
of the proceeding would be
harmed by the release of
the information.) If NRC
staff makes the finding of
need for SUNSI and likelihood of standing, NRC staff
begins document processing (preparation of
redactions or review of redacted documents).
10 .................
60 .................
20 .................
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
16:21 Feb 09, 2010
Event/activity
ATTACHMENT 1—General Target
Schedule for Processing and Resolving
Requests for Access to Sensitive
Unclassified Non-Safeguards
Information in this Proceeding
Dated at Rockville, Maryland, this 4th day
of February 2010.
VerDate Nov<24>2008
Day
PO 00000
30 .................
40 .................
A ...................
A + 3 ............
A + 28 ..........
A + 53 ..........
Frm 00114
Fmt 4703
Sfmt 4703
E:\FR\FM\10FEN1.SGM
10FEN1
6736
Federal Register / Vol. 75, No. 27 / Wednesday, February 10, 2010 / Notices
Day
Event/activity
A + 60 ..........
(Answer receipt +7) Petitioner/Intervenor reply to
answers.
Decision on contention admission.
>A + 60 ........
[FR Doc. 2010–2976 Filed 2–9–10; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
The Need for the Proposed Action
[Docket Nos. 50–334 and 50–412; NRC–
2010–0049]
The proposed action is needed to
provide the licensee with additional
time to design the necessary
modifications, procure equipment and
material, and implement upgrades to
comply with a specific aspect of 10 CFR
73.55.
FirstEnergy Nuclear Operating
Company, FirstEnergy Nuclear
Generation Corp., Ohio Edison
Company, the Toledo Edison
Company, Beaver Valley Power
Station, Unit Nos. 1 and 2;
Environmental Assessment and
Finding of No Significant Impact
Environmental Impacts of the Proposed
Action
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an exemption, pursuant to
Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5,
‘‘Specific exemptions,’’ from the
implementation date for a certain new
requirement of 10 CFR Part 73,
‘‘Physical protection of plants and
materials,’’ for Renewed Facility
Operating License Nos. DPR–66 and
NPF–73, issued to FirstEnergy Nuclear
Operating Company (licensee), for
operation of the Beaver Valley Power
Station, Unit Nos. 1 and 2 (BVPS–1 and
2), located in Shippingport,
Pennsylvania. In accordance with 10
CFR 51.21, the NRC prepared an
environmental assessment documenting
its finding. The NRC concluded that the
proposed actions will have no
significant environmental impact.
sroberts on DSKD5P82C1PROD with NOTICES
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt
BVPS–1 and 2 from the required
implementation date of March 31, 2010,
for a certain new requirement of 10 CFR
part 73. Specifically, BVPS–1 and 2
would be granted an exemption from
being in full compliance with a certain
new requirement contained in 10 CFR
73.55 by the March 31, 2010,
implementation deadline. The licensee
has proposed an alternate full
compliance implementation date of
December 17, 2010, approximately 9
months beyond the date required by 10
CFR part 73. The proposed action, an
extension of the schedule for
completion of certain actions required
by the revised 10 CFR part 73, does not
VerDate Nov<24>2008
16:21 Feb 09, 2010
involve any physical changes to the
reactor, fuel, plant structures, support
structures, water, or land at the BVPS–
1 and 2 site.
The proposed action is in accordance
with the licensee’s application dated
November 30, 2009 (Agencywide
Document and Management System
(ADAMS) Accession No.
ML093370152), as supplemented by
letter dated December 23, 2009 (ADAMS
Accession No. ML093650293).
Jkt 220001
The NRC has completed its
environmental assessment of the
proposed exemption. The NRC staff has
concluded that the proposed action to
extend the implementation deadline
would not significantly affect plant
safety and would not have a significant
adverse effect on the probability of an
accident occurring.
The proposed action would not result
in an increased radiological hazard
beyond those previously analyzed in the
environmental assessment and finding
of no significant impact made by the
Commission in promulgating its
revisions to 10 CFR part 73 as discussed
in a Federal Register notice dated
March 27, 2009 (74 FR 13967). There
will be no change to radioactive
effluents that affect radiation exposures
to plant workers and members of the
public. Therefore, no changes or
different types of radiological impacts
are expected as a result of the proposed
exemption.
The proposed action does not result
in changes to land use or water use, or
result in changes to the quality or
quantity of non-radiological effluents.
No changes to the National Pollution
Discharge Elimination System permit
are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the
plant, or to threatened, endangered, or
protected species under the Endangered
Species Act, or impacts to essential fish
habitat covered by the MagnusonSteven’s Act are expected. There are no
impacts to the air or ambient air quality.
There are no impacts to historical and
cultural resources. There would be no
impact to socioeconomic resources.
Therefore, no changes to or different
types of non-radiological environmental
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
impacts are expected as a result of the
proposed exemption.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action. In addition, in promulgating its
revisions to 10 CFR part 73, the
Commission prepared an environmental
assessment and published a finding of
no significant impact [Part 73, Power
Reactor Security Requirements, 74 FR
13926, 13967 (March 27, 2009)].
The licensee currently maintains
security plans acceptable to the NRC.
The new 10 CFR part 73 security
measures that would be implemented by
March 31, 2010, would continue to
provide acceptable onsite physical
protection of BVPS–1 and 2. Therefore,
the extension of the implementation
date of a certain new requirement of 10
CFR part 73, to September 27, 2010,
would not have any significant
environmental impacts.
The NRC staff’s safety evaluation will
be provided in the exemption that will
be issued as part of the letter to the
licensee approving the exemption to the
regulation, if granted.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
actions, the NRC staff considered denial
of the proposed actions (i.e., the ‘‘noaction’’ alternative). Denial of the
exemption request would result in no
change in current environmental
impacts. If the proposed action was
denied, the licensee would have to
comply with the March 31, 2010,
implementation deadline. The
environmental impacts of the proposed
exemption and the ‘‘no action’’
alternative are similar.
Alternative Use of Resources
The action does not involve the use of
any different resources than those
considered in the Final Environmental
Statement for BVPS–1, dated July 1973,
and for BVPS–2, NUREG–1094, dated
September 1985, as supplemented
through the ‘‘Generic Environmental
Impact Statement for License Renewal
of Nuclear Plants Regarding Beaver
Valley Power Station, Units 1 and 2,
Supplement 36, Final Report’’ (NUREG–
1437).
Agencies and Persons Consulted
In accordance with its stated policy,
on January 20, 2010, the NRC staff
consulted with Larry Ryan of the
Pennsylvania Department of
Environmental Protection, regarding the
environmental impact of the proposed
action. The State official had no
comments.
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 75, Number 27 (Wednesday, February 10, 2010)]
[Notices]
[Pages 6731-6736]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-2976]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-261; NRC-2010-0027]
Carolina Power & Light Company; Notice of Consideration of
Issuance of Amendment to Facility Operating License, Proposed No
Significant Hazards Consideration Determination and Opportunity for a
Hearing, and Order Imposing Procedures for Access to Sensitive
Unclassified Non-Safeguards Information
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
DPR-23 issued to Carolina Power & Light Company (the licensee) for
operation of the H. B. Robinson Steam Electric Plant, Unit 2, located
in Darlington County, South Carolina.
The December 16, 2009, application (Agencywide Documents Access and
Management System (ADAMS) Accession No. ML093631212) contains
proprietary information, which the Commission classifies as sensitive
unclassified non-safeguards information (SUNSI). The proposed amendment
would modify Technical Specification (TS) 5.5.9 to revise the steam
generator (SG) alternate repair criteria and TS 5.6.8 to revise the SG
tube inspection reporting requirements. Specifically, the proposed
change would revise requirements in TS 5.5.9, called alternate repair
criteria, which would allow inspection of the tube to start within the
tubesheet region (a minimum of 17.28 inches below the top of the
tubesheet) and add requirements to report indications in this region
and primary to secondary leakage that could be attributed to the
uninspected portion of the tube within the tubesheet. The change is
being proposed as a temporary requirement until the next scheduled
inspection.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. The Proposed Change Does Not Involve a Significant Increase
in the Probability or Consequences of an Accident Previously
Evaluated.
The proposed change does not involve physical changes to any
plant structure, system, or component. The inspection of the portion
of the steam generator tubes within the tubesheet region is being
changed to identify the appropriate scope of inspection and the
criteria for plugging tubes that are found with degradation. The
proposed requirements will continue to ensure that the probability
of a steam generator tube rupture accident is not increased.
Therefore, the probability of occurrence for a previously analyzed
accident is not significantly increased.
The consequences of a previously analyzed accident are dependent
on the initial conditions assumed for the analysis, the behavior of
the fission product barriers during the analyzed accident, the
availability and successful functioning of the equipment assumed to
operate in response to the analyzed event, and the setpoints at
which these actions are initiated. The proposed inspection and
repair requirements will ensure that the plant continues to meet
applicable design and safety analyses acceptance criteria. The
proposed change does not affect the performance of any equipment
used to mitigate the consequences of an analyzed accident. As a
result, no analysis assumptions are impacted and there are no
adverse effects on the factors that contribute to offsite or onsite
dose as a result of an accident. The proposed change does not affect
setpoints that initiate protective or mitigative actions. The
proposed change ensures that plant structures, systems, and
components are maintained consistent with
[[Page 6732]]
the safety analysis and licensing bases. Based on this evaluation,
there is no significant increase in the consequences of a previously
analyzed accident.
Therefore, this change does not involve a significant increase
in the probability or consequences of an accident previously
evaluated.
2. The Proposed Change Does Not Create the Possibility of a New
or Different Kind of Accident From Any Previously Evaluated.
The proposed change does not involve any physical alteration of
plant systems, structures, or components. No new or different
equipment is being installed. No installed equipment is being
operated in a different manner. There is no change to the parameters
within which the plant is normally operated or in the setpoints that
initiate protective or mitigative actions. The proposed inspection
and repair criteria will establish appropriate requirements to
ensure that the steam generator tubes are properly maintained. As a
result, no new failure modes are being introduced.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. The Proposed Change Does Not Involve a Significant Reduction
in the Margin of Safety.
The proposed change defines the safety significant portion of
the tube that must be inspected and repaired. WCAP-17091-P
identifies the specific inspection depth below which any type of
tube degradation is shown to have no impact on the performance
criteria in NEI 97-06 Rev. 2, ``Steam Generator Program Guidelines''
and TS 5.5.9, ``Steam Generator (SG) Program.''
The proposed change that alters the SG inspection and reporting
criteria maintains the required structural margins of the SG tubes
for normal, transient, and accident conditions. Nuclear Energy
Institute 97-06, ``Steam Generator Program Guidelines,'' and NRC
Regulatory Guide (RG) 1.121, ``Bases for Plugging Degraded PWR Steam
Generator Tubes,'' are used as the bases in the development of the
limited tubesheet inspection depth methodology for determining that
SG tube integrity considerations are maintained within acceptable
limits. RG 1.121 describes a method acceptable to the NRC for
meeting General Design Criteria (GDC) 14, ``Reactor Coolant Pressure
Boundary,'' GDC 15, ``Reactor Coolant System Design,'' GDC 31,
``Fracture Prevention of Reactor Coolant Pressure Boundary,'' and
GDC 32, ``Inspection of Reactor Coolant Pressure Boundary,'' by
reducing the probability and consequences of a SGTR. The probability
and consequences of a SGTR are reduced by establishing the limiting
safe conditions for tube wall degradation. RG 1.121 uses safety
factors on loads for tube burst that are consistent with the
requirements of Section III of the American Society of Mechanical
Engineers (ASME) Code.
For axially oriented cracking located within the tubesheet, tube
burst is precluded due to the presence of the tubesheet. For
circumferentially oriented cracking, Westinghouse report WCAP-17091-
P defines a length of degradation-free expanded tubing that provides
the necessary resistance to tube pullout due to the pressure induced
forces, with applicable safety factors applied. Application of the
limited hot and cold leg tubesheet inspection criteria will preclude
unacceptable primary to secondary leakage during applicable plant
conditions. The steam line break accident leak rate factor for
HBRSEP, Unit No. 2, is 1.82 (Table 9-7 in WCAP-17091-P). Multiplying
this factor by the room temperature TS operational leak rate limit
of 75 gpd through any one SG indicates that an assumed primary to
secondary accident induced leak rate of 136.5 gpd or greater through
any one SG is required to ensure that the limiting design basis
accident assumption is not exceeded (at room temperature). This
condition is satisfied by the current UFSAR assumed primary to
secondary accident induced leak rate of 150 gpd through any one SG
for SLB.
Therefore, the proposed change does not involve a significant
reduction in any margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Public File
Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible
[[Page 6733]]
effect of any decision or order which may be entered in the proceeding
on the requestor's/petitioner's interest. The petition must also
identify the specific contentions which the requestor/petitioner seeks
to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A requestor/petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone at (301) 415-1677, to request
(1) a digital ID certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through EIE, users will be required to install a Web
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser
plug-in, is available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North,
[[Page 6734]]
11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking
and Adjudications Staff. Participants filing a document in this manner
are responsible for serving the document on all other participants.
Filing is considered complete by first-class mail as of the time of
deposit in the mail, or by courier, express mail, or expedited delivery
service upon depositing the document with the provider of the service.
A presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the
presiding officer subsequently determines that the reason for granting
the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, or the presiding officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers in their
filings, unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants are requested not to
include copyrighted materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this license amendment
application, see the application for amendment dated December 16, 2009
(ADAMS Accession No. ML093631212), which is available for public
inspection at the Commission's PDR, located at One White Flint North,
File Public Area O1 F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available records will be accessible electronically
from the Agencywide Documents Access and Management System's (ADAMS)
Public Electronic Reading Room on the Internet at the NRC Web site,
https://www.nrc.gov/reading-rm/adams.html. Persons who do not have
access to ADAMS or who encounter problems in accessing the documents
located in ADAMS, should contact the NRC PDR Reference staff by
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to
pdr.resource@nrc.gov.
Attorney for licensee: David T. Conley, Associate General Counsel
II--Legal Department, Progress Energy Service Company, LLC, Post Office
Box 1551, Raleigh, North Carolina 27602.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the
[[Page 6735]]
requestor in writing, briefly stating the reason or reasons for the
denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 4th day of February 2010.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information in this Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0................................ Publication of Federal Register
notice of hearing and opportunity to
petition for leave to intervene,
including order with instructions
for access requests.
10............................... Deadline for submitting requests for
access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) with
information: Supporting the standing
of a potential party identified by
name and address; describing the
need for the information in order
for the potential party to
participate meaningfully in an
adjudicatory proceeding.
60............................... Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does
not require access to SUNSI (+25
Answers to petition for
intervention; +7 requestor/
petitioner reply).
20............................... Nuclear Regulatory Commission (NRC)
staff informs the requestor of the
staff's determination whether the
request for access provides a
reasonable basis to believe standing
can be established and shows need
for SUNSI. (NRC staff also informs
any party to the proceeding whose
interest independent of the
proceeding would be harmed by the
release of the information.) If NRC
staff makes the finding of need for
SUNSI and likelihood of standing,
NRC staff begins document processing
(preparation of redactions or review
of redacted documents).
25............................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline
for requestor/petitioner to file a
motion seeking a ruling to reverse
the NRC staff's denial of access;
NRC staff files copy of access
determination with the presiding
officer (or Chief Administrative
Judge or other designated officer,
as appropriate). If NRC staff finds
``need'' for SUNSI, the deadline for
any party to the proceeding whose
interest independent of the
proceeding would be harmed by the
release of the information to file a
motion seeking a ruling to reverse
the NRC staff's grant of access.
30............................... Deadline for NRC staff reply to
motions to reverse NRC staff
determination(s).
40............................... (Receipt +30) If NRC staff finds
standing and need for SUNSI,
deadline for NRC staff to complete
information processing and file
motion for Protective Order and
draft Non-Disclosure Affidavit.
Deadline for applicant/licensee to
file Non-Disclosure Agreement for
SUNSI.
A................................ If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing a
final adverse determination by the
NRC staff.
A + 3............................ Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
A + 28........................... Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days remain
between the petitioner's receipt of
(or access to) the information and
the deadline for filing all other
contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53........................... (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
[[Page 6736]]
A + 60........................... (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60.......................... Decision on contention admission.
------------------------------------------------------------------------