Onyx Specialty Papers, Inc.; Notice of Availability of Draft Environmental Assessment, 6377 [2010-2728]

Download as PDF Federal Register / Vol. 75, No. 26 / Tuesday, February 9, 2010 / Notices ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 18, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–2722 Filed 2–8–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PA10–1–000; ER09–555–000; ER05–1065–000] Entergy Services, Inc.; Notice of Designation of Commission Staff as Non-Decisional Cprice-sewell on DSK2BSOYB1PROD with NOTICES February 2, 2010. With respect to the October 1, 2009 letter in Docket No. PA10–1–000 notifying Entergy Services, Inc. that the Office of Enforcement and the Office of Electric Reliability of the Federal Energy Regulatory Commission are jointly conducting an audit of Entergy Services, Inc., the staff of the Office of Enforcement is designated as nondecisional in deliberations by the Commission in the above referenced docket numbers, including all subdockets thereto, for purposes of 18 CFR 385.2202 (2009). Mark Hegerle, Olutayo Oyelade, Eric Vandenberg, Juan Villar, and Kevin Wierzbicki of the Office of Electric Reliability, Lawrence Greenfield of the Office of the General Counsel, Thomas Dautel of the Office of Energy Policy and Innovation, and Stephen Pointer of the Office of Energy Market Regulation are also designated as VerDate Nov<24>2008 14:39 Feb 08, 2010 Jkt 220001 non-decisional in these dockets and subdockets. Kimberly D. Bose, Secretary. [FR Doc. 2010–2729 Filed 2–8–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 6377 Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further information, contact Kristen Murphy at (202) 502– 6236. Kimberly D. Bose, Secretary. Federal Energy Regulatory Commission [FR Doc. 2010–2728 Filed 2–8–10; 8:45 am] [Project No. 2985–006] BILLING CODE 6717–01–P Onyx Specialty Papers, Inc.; Notice of Availability of Draft Environmental Assessment DEPARTMENT OF ENERGY February 2, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR Part 380 (Order No. 486,52 FR 47897), the Office of Energy Projects has reviewed the application for a subsequent license for the 100-kilowatt Willow Mill Hydroelectric Project, located on the Housatonic River, in the Town of Lee, Berkshire County, Massachusetts, and has prepared an Draft Environmental Assessment (DEA). In the DEA, Commission staff analyze the potential environmental effects of relicensing the project and conclude that issuing a subsequent license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the DEA is on file with the Commission and is available for public inspection. The DEA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access documents. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the DEA should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Willow Mill Project No. 2985–006’’ to all comments. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [ Docket No. ER10–505–000] Dynegy Services Plum Point; Notice of Filing February 2, 2010. Take notice that, on February 1, 2010, Dynegy Services Plum Point filed to supplement its filing in the above captioned docket with information required under the Commission’s regulations. Such filing served to reset the filing date in this proceeding. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a E:\FR\FM\09FEN1.SGM 09FEN1

Agencies

[Federal Register Volume 75, Number 26 (Tuesday, February 9, 2010)]
[Notices]
[Page 6377]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-2728]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2985-006]


Onyx Specialty Papers, Inc.; Notice of Availability of Draft 
Environmental Assessment

February 2, 2010.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR Part 
380 (Order No. 486,52 FR 47897), the Office of Energy Projects has 
reviewed the application for a subsequent license for the 100-kilowatt 
Willow Mill Hydroelectric Project, located on the Housatonic River, in 
the Town of Lee, Berkshire County, Massachusetts, and has prepared an 
Draft Environmental Assessment (DEA). In the DEA, Commission staff 
analyze the potential environmental effects of relicensing the project 
and conclude that issuing a subsequent license for the project, with 
appropriate environmental measures, would not constitute a major 
federal action significantly affecting the quality of the human 
environment.
    A copy of the DEA is on file with the Commission and is available 
for public inspection. The DEA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access documents. For assistance, contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for 
TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Comments on the DEA should be filed within 30 days from the 
issuance date of this notice, and should be addressed to the Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Willow Mill Project No. 2985-006'' 
to all comments. Comments may be filed electronically via Internet in 
lieu of paper. The Commission strongly encourages electronic filings. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site under the ``eFiling'' link. For further information, contact 
Kristen Murphy at (202) 502-6236.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-2728 Filed 2-8-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.