Federal Register / Vol. 75, No. 24 / Friday, February 5, 2010 / Notices
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The
licensee requests a temporary variance
from article 403, the bypass flow
requirement, at the Edenville spillway
for the 5 or 6 weeks it will take to
construct the footings and first lift of the
retaining walls. BHP states that shutting
off the bypass flow will allow them to
accomplish their work in the dry and
eliminate the need for cofferdams, thus
reducing the potential for contamination
downstream.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
VerDate Nov<24>2008
16:26 Feb 04, 2010
Jkt 220001
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
6019
BILLING CODE 6717–01–P
information on how to submit these
types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the eLibrary link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–10674) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–2484 Filed 2–4–10; 8:45 am]
[FR Doc. 2010–2483 Filed 2–4–10; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 10674–015]
DEPARTMENT OF ENERGY
NewPage Wisconsin System Inc.,
Kaukauna Utilities; Notice of
Application for Transfer of License and
Soliciting Comments and Motions To
Intervene
January 29, 2010.
On January 25, 2010, NewPage
Wisconsin System Inc. (transferor) and
Kaukauna Utilities (transferee) filed an
application for transfer of license of the
Kimberly Project No. 10674 located on
the Fox River in Outagamie County,
Wisconsin.
The transferor and transferee seek
Commission approval to transfer the
license for the Kimberly Project from the
transferor to the transferee.
Applicant Contacts: For transferor:
Ronald O. Guay, NewPage Wisconsin
System Inc., 35 Hartford Street,
Rumford, ME 04276, (937) 369–2932,
and Amy S. Koch, Patton Boggs LLP,
2550 M Street, NW., Washington, DC
20037, (202) 457–5618. For transferee:
Mike Pedersen, Kaukauna Utilities, 777
Island Street, Kaukauna, WI 54130,
(920) 766–5721, and Nancy J. Skancke,
Law Offices of GKRSE, 1500 K St., NW.
Suite 330, Washington, DC 20005, (202)
408–5400.
FERC Contact: Steven Sachs, (202)
502–8666 or Steven.Sachs@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2009) and the
instructions on the Commission’s
website under the ‘‘e-Filing’’ link. If
unable to be filed electronically,
documents may be paper-filed. To
paper-file, an original and eight copies
should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. For more
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Notice of Attendance at NYISO
Meetings
January 29, 2010.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following upcoming NYISO meetings:
• NYISO Business Issues Committee
• February 3, 2010 (Rensselaer, NY)
• March 10, 2010 (Rensselaer, NY)
• April 7, 2010 (Rensselaer, NY)
• May 5, 2010 (Rensselaer, NY)
• June 2, 2010 (Rensselaer, NY)
• NYISO Management Committee
• February 24, 2010 (Rensselaer, NY)
• March 24, 2010 (Rensselaer, NY)
• April 21, 2010 (Rensselaer, NY)
• May 20, 2010 (Rensselaer, NY)
• June 15, 2010 (Rensselaer, NY)
• NYISO Annual Meeting June 14, 2010
(Bolton Landing, NY)
• NYISO ICAP Working Group
• February 12, 2010 (Rensselaer, NY)
• March 15, 2010 (Rensselaer, NY)
• April 23, 2010 (Rensselaer, NY)
• May 14, 2010 (Rensselaer, NY)
• June 17, 2010 (Rensselaer, NY)
• NYISO Operating Committee
• February 26, 2010 (Rensselaer, NY)
• March 11, 2010 (Rensselaer, NY)
• April 8, 2010 (Rensselaer, NY)
• May 6, 2010 (Rensselaer, NY)
• June 3, 2010 (Rensselaer, NY)
• NYISO Transmission Planning
Advisory Subcommittee
• February 19, 2010 (Rensselaer, NY)
• March 29, 2010 (Rensselaer, NY)
• April 29, 2010 (Rensselaer, NY)
• May 26, 2010 (Rensselaer, NY)
• June 25, 2010 (Rensselaer, NY)
For additional meeting information,
see: https://www.nyiso.com/public/
committees/calendar/index.jsp
E:\FR\FM\05FEN1.SGM
05FEN1
6020
Federal Register / Vol. 75, No. 24 / Friday, February 5, 2010 / Notices
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
including the following:
Docket Nos. EL07–39 and ER08–695,
New York Independent System
Operator, Inc.
Docket No. EL09–57, Astoria Gas
Turbine Power LLC v. New York
Independent System Operator, Inc.
Docket No. EL10–033, New York
Independent System Operator, Inc.
Docket No. ER01–3155, New York
Independent System Operator, Inc.
Docket Nos. ER01–3001–021/ER03–
647–012 and ER01–3001–022/ER03–
647–013, New York Independent
System Operator, Inc.
Docket No. ER04–449, New York
Independent System Operator, Inc.
Docket No. ER04–230, New York
Independent System Operator, Inc.
Docket No. ER07–612, New York
Independent System Operator, Inc.
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. ER08–867, New York
Independent System Operator, Inc.
Docket No. ER09–1142, New York
Independent System Operator, Inc.
Docket No. ER09–1204, New York
Independent System Operator, Inc.
Docket No. ER09–1682, New York
Independent System Operator, Inc.
Docket No. ER09–405, New York
Independent System Operator, Inc.
Docket No. ER10–65, New York
Independent System Operator, Inc.
Docket No. ER10–119, New York
Independent System Operator, Inc.
Docket No. ER10–603, New York
Independent System Operator, Inc.
Docket No. ER10–424, New York
Independent System Operator, Inc.
Docket No. ER10–290, New York
Independent System Operator, Inc.
Docket No. ER10–554, New York
Independent System Operator, Inc.
Docket No. ER10–555, New York
Independent System Operator, Inc.
Docket No. ER10–573, New York
Independent System Operator, Inc.
Docket No. OA08–52; New York
Independent System Operator, Inc.
Docket No. OA09–26, New York
Independent System Operator, Inc.
The meetings are open to
stakeholders. For more information,
contact Jesse Hensley, Office of Energy
Markets Regulation, Federal Energy
Regulatory Commission at (202) 502–
6228 or Jesse.Hensley@ferc.gov.
Kimberly D. Bose,
Secretary.
Project, BPA will construct a new
substation (Central Ferry Substation) on
the Little Goose-Lower Granite 500kilovolt transmission lines near the Port
of Central Ferry, Washington. This
decision to interconnect the Wind
Project is consistent with and tiered to
BPA’s Business Plan Environmental
Impact Statement (DOE/EIS–0183, June
1995), and the Business Plan Record of
Decision (BP ROD, August 1995).
ADDRESSES: Copies of this tiered ROD
and the Business Plan EIS may be
obtained by calling BPA’s toll-free
document request line, 1–800–622–
4520. The RODs and EIS are also
available on our Web site, https://
www.efw.bpa.gov.
[FR Doc. 2010–2482 Filed 2–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Bonneville Power Administration
Electrical Interconnection of the Lower
Snake River Wind Energy Project
AGENCY: Bonneville Power
Administration (BPA), Department of
Energy (DOE).
ACTION: Notice of Availability of Record
of Decision (ROD).
SUMMARY: The Bonneville Power
Administration (BPA) has decided to
offer Puget Sound Energy Inc., a Large
Generator Interconnection Agreement
for interconnection of up to 1250
megawatts of power into the Federal
Columbia River Transmission System.
The power would be generated from
their proposed Lower Snake River Wind
Energy Project (Wind Project) in
Garfield and Columbia counties,
Washington. To interconnect the Wind
FOR FURTHER INFORMATION CONTACT: Tish
Eaton, Bonneville Power
Administration—KEC–4, P.O. Box 3621,
Portland, Oregon 97208–3621; toll-free
telephone number 1–800–622–4519; fax
number 503–230–5699; or e-mail
tkeaton@bpa.gov.
Issued in Portland, Oregon, on January 28,
2010.
Stephen J. Wright,
Administrator and Chief Executive Officer.
[FR Doc. 2010–2518 Filed 2–4–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
January 29, 2010.
srobinson on DSKHWCL6B1PROD with NOTICES
Brookfield Power United States Generation Development, LLC ........................................................................................
Robertson Energy Group, LLC ...........................................................................................................................................
Brookfield Power United States
Generation Development, LLC
(Brookfield Power) and Robertson
Energy Group, LLC (Robertson Energy)
filed preliminary permit applications,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the George W. Andrews
Hydroelectric Project located at the
existing George W. Andrews Lock and
Dam on the Chattahoochee River, Early
County, Georgia, and Huston County,
Alabama, near the town of Columbia,
Alabama. The projects would occupy
federal lands under the jurisdiction of
the U. S. Army Corps of Engineers. The
sole purpose of a preliminary permit, if
VerDate Nov<24>2008
16:26 Feb 04, 2010
Jkt 220001
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Projects description:
The proposed George W. Andrews
Lock and Dam Hydroelectric Project by
Brookfield Power (Project No. 13077–
000, filed on November 16, 2007),
would be built on the Alabama side and
would consist of: (1) A new powerhouse
containing four new pit turbinegenerators each rated at 6 MW for a total
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
Project No. 13077–000.
Project No. 13081–000.
combined plant capacity of 24 MW; (2)
an intake channel and a tailrace
channel; (3) an approximately ten miles
long transmission line connecting the
powerhouse to an existing substation;
and (4) appurtenant facilities. The
proposed project would have an average
annual generation of 89 gigawatt-hours.
The proposed George W. Andrews
Hydroelectric Project by Robertson
Energy (Project No. 13081–000, filed on
November 21, 2007), would be built on
the Alabama side and would consist of:
(1) A new powerhouse containing four
new turbine-generators each rated at 4
MW for a total combined plant capacity
of 16 MW; (2) an intake channel and a
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 75, Number 24 (Friday, February 5, 2010)]
[Notices]
[Pages 6019-6020]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-2482]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at NYISO Meetings
January 29, 2010.
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend the following
upcoming NYISO meetings:
NYISO Business Issues Committee
February 3, 2010 (Rensselaer, NY)
March 10, 2010 (Rensselaer, NY)
April 7, 2010 (Rensselaer, NY)
May 5, 2010 (Rensselaer, NY)
June 2, 2010 (Rensselaer, NY)
NYISO Management Committee
February 24, 2010 (Rensselaer, NY)
March 24, 2010 (Rensselaer, NY)
April 21, 2010 (Rensselaer, NY)
May 20, 2010 (Rensselaer, NY)
June 15, 2010 (Rensselaer, NY)
NYISO Annual Meeting June 14, 2010 (Bolton Landing, NY)
NYISO ICAP Working Group
February 12, 2010 (Rensselaer, NY)
March 15, 2010 (Rensselaer, NY)
April 23, 2010 (Rensselaer, NY)
May 14, 2010 (Rensselaer, NY)
June 17, 2010 (Rensselaer, NY)
NYISO Operating Committee
February 26, 2010 (Rensselaer, NY)
March 11, 2010 (Rensselaer, NY)
April 8, 2010 (Rensselaer, NY)
May 6, 2010 (Rensselaer, NY)
June 3, 2010 (Rensselaer, NY)
NYISO Transmission Planning Advisory Subcommittee
February 19, 2010 (Rensselaer, NY)
March 29, 2010 (Rensselaer, NY)
April 29, 2010 (Rensselaer, NY)
May 26, 2010 (Rensselaer, NY)
June 25, 2010 (Rensselaer, NY)
For additional meeting information, see: https://www.nyiso.com/public/committees/calendar/index.jsp
[[Page 6020]]
The discussions at each of the meetings described above may address
matters at issue in pending proceedings including the following:
Docket Nos. EL07-39 and ER08-695, New York Independent System Operator,
Inc.
Docket No. EL09-57, Astoria Gas Turbine Power LLC v. New York
Independent System Operator, Inc.
Docket No. EL10-033, New York Independent System Operator, Inc.
Docket No. ER01-3155, New York Independent System Operator, Inc.
Docket Nos. ER01-3001-021/ER03-647-012 and ER01-3001-022/ER03-647-013,
New York Independent System Operator, Inc.
Docket No. ER04-449, New York Independent System Operator, Inc.
Docket No. ER04-230, New York Independent System Operator, Inc.
Docket No. ER07-612, New York Independent System Operator, Inc.
Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. ER08-867, New York Independent System Operator, Inc.
Docket No. ER09-1142, New York Independent System Operator, Inc.
Docket No. ER09-1204, New York Independent System Operator, Inc.
Docket No. ER09-1682, New York Independent System Operator, Inc.
Docket No. ER09-405, New York Independent System Operator, Inc.
Docket No. ER10-65, New York Independent System Operator, Inc.
Docket No. ER10-119, New York Independent System Operator, Inc.
Docket No. ER10-603, New York Independent System Operator, Inc.
Docket No. ER10-424, New York Independent System Operator, Inc.
Docket No. ER10-290, New York Independent System Operator, Inc.
Docket No. ER10-554, New York Independent System Operator, Inc.
Docket No. ER10-555, New York Independent System Operator, Inc.
Docket No. ER10-573, New York Independent System Operator, Inc.
Docket No. OA08-52; New York Independent System Operator, Inc.
Docket No. OA09-26, New York Independent System Operator, Inc.
The meetings are open to stakeholders. For more information,
contact Jesse Hensley, Office of Energy Markets Regulation, Federal
Energy Regulatory Commission at (202) 502-6228 or
Jesse.Hensley@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-2482 Filed 2-4-10; 8:45 am]