Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Environmental Assessment and Finding of No Significant Impact, 5354-5355 [2010-2169]
Download as PDF
5354
Federal Register / Vol. 75, No. 21 / Tuesday, February 2, 2010 / Notices
the Internet from the NRC’s Agencywide
Documents Access and Management
System (ADAMS) Public Electronic
Reading Room under Accession Number
ML100250668. The ADAMS Public
Electronic Reading Room is accessible
from the NRC Web site at https://
www.nrc.gov/reading-rm/adams.html.
In addition, the application is available
at https://www.nrc.gov/reactors/
operating/licensing/renewal/
applications.html. Persons who do not
have access to the Internet or who
encounter problems in accessing the
documents located in ADAMS should
contact the NRC’s PDR reference staff at
1–800–397–4209, extension 4737, or by
e-mail to pdr.resource@nrc.gov.
A copy of the license renewal
application for CGS is also available to
local residents near the site at the
Richland Public Library, 955 Northgate
Drive, Richland, WA 99352 and at the
Kennewick Branch of Mid-Columbia
Libraries, 1620 South Union Street,
Kennewick, WA 99338.
Dated at Rockville, Maryland, this 26th day
of January 2010.
For the Nuclear Regulatory Commission.
Brian E. Holian,
Director, Division of License Renewal, Office
of Nuclear Reactor Regulation.
[FR Doc. 2010–2175 Filed 2–1–10; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2010–0030; Docket Nos. 50–259, 50–
260, and 50–296]
mstockstill on DSKH9S0YB1PROD with NOTICES
Tennessee Valley Authority; Browns
Ferry Nuclear Plant, Units 1, 2, and 3
Environmental Assessment and
Finding of No Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an Exemption, pursuant to
Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5,
‘‘Specific exemptions,’’ from the
implementation date for certain new
requirements of 10 CFR Part 73,
‘‘Physical protection of plants and
materials,’’ for Facility Operating
License Nos. DPR–33, DPR–52, and
DPR–68, issued to Tennessee Valley
Authority (TVA, the licensee), for
operation of the Browns Ferry Nuclear
Plant, Units 1, 2, and 3 (BFN), located
in Limestone County, Alabama. In
accordance with 10 CFR 51.21, the NRC
prepared an environmental assessment
documenting its finding. The NRC
concluded that the proposed actions
will have no significant environmental
impact.
VerDate Nov<24>2008
18:55 Feb 01, 2010
Jkt 220001
Environmental Assessment
Identification of the Proposed Action:
The proposed action would exempt
the TVA from the required
implementation date of March 31, 2010,
for several new requirements of 10 CFR
part 73. Specifically, BFN would be
granted an exemption from being in full
compliance with certain new
requirements contained in 10 CFR 73.55
by the March 31, 2010, deadline. TVA
has proposed an alternate full
compliance implementation date of
December 20, 2012, approximately two
and three-quarter years beyond the date
required by 10 CFR part 73. The
proposed action, an extension of the
schedule for completion of certain
actions required by the revised 10 CFR
part 73, does not involve any physical
changes to the reactor, fuel, plant
structures, support structures, water, or
land at the BFN site.
The proposed action is in accordance
with the licensee’s application dated
November 6, 2009, as supplemented by
letter dated January 11, 2010.
The Need for the Proposed Action:
The proposed action is needed to
provide the licensee with additional
time to perform the required upgrades to
the BFN security system because they
involve new components and
engineering that cannot be obtained or
completed by the March 31, 2010,
implementation date.
Environmental Impacts of the
Proposed Action:
The NRC has completed its
environmental assessment of the
proposed exemption. The staff has
concluded that the proposed action to
extend the implementation deadline
would not significantly affect plant
safety and would not have a significant
adverse effect on the probability of an
accident occurring.
The proposed action would not result
in an increased radiological hazard
beyond those previously analyzed in the
environmental assessment and finding
of no significant impact made by the
Commission in promulgating its
revisions to 10 CFR part 73 as discussed
in a Federal Register notice dated
March 27, 2009 (74 FR 13967). There
will be no change to radioactive
effluents that affect radiation exposures
to plant workers and members of the
public. Therefore, no changes or
different types of radiological impacts
are expected as a result of the proposed
exemption.
The proposed action does not result
in changes to land use or water use, or
result in changes to the quality or
quantity of non-radiological effluents.
No changes to the National Pollution
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
Discharge Elimination System permit
are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the
plant, or to threatened, endangered, or
protected species under the Endangered
Species Act, or impacts to essential fish
habitat covered by the MagnusonStevens Act are expected. There are no
impacts to the air or ambient air quality.
There are no impacts to historical and
cultural resources. There would be no
impact to socioeconomic resources.
Therefore, no changes to or different
types of non-radiological environmental
impacts are expected as a result of the
proposed exemption.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action. In addition, in promulgating its
revisions to 10 CFR part 73, the
Commission prepared an environmental
assessment and published a finding of
no significant impact [Part 73, Power
Reactor Security Requirements, 74 FR
13926, 13967 (March 27, 2009)].
The licensee currently maintains a
security system acceptable to the NRC
and will continue to provide acceptable
physical protection of the BFN as TVA
implements certain new requirements in
10 CFR part 73. Therefore, the extension
of the implementation date of the new
requirements of 10 CFR part 73 to
December 20, 2012, would not have any
significant environmental impacts.
The NRC staff’s safety evaluation will
be provided in the exemption that will
be issued as part of the letter to the
licensee approving the exemption to the
regulation, if granted.
Environmental Impacts of the
Alternatives to the Proposed Action:
As an alternative to the proposed
action, the NRC staff considered denial
of the proposed action (i.e., the ‘‘noaction’’ alternative). Denial of the
exemption request would result in no
change in current environmental
impacts. If the proposed action was
denied, the licensee would have to
comply with the March 31, 2010,
implementation deadline. The
environmental impacts of the proposed
exemption and the ‘‘no action’’
alternative are similar.
Alternative Use of Resources:
The action does not involve the use of
any different resources than those
considered in the Final Environmental
Statement for the BFN dated September
1, 1972.
Agencies and Persons Consulted:
In accordance with its stated policy,
on December 24, 2009, the NRC staff
consulted with the Alabama State
official, Kirk Whatley of the Office of
Radiological Control, regarding the
environmental impact of the proposed
E:\FR\FM\02FEN1.SGM
02FEN1
Federal Register / Vol. 75, No. 21 / Tuesday, February 2, 2010 / Notices
action. The State official had no
comments.
Week of February 1, 2010
There are no meetings scheduled for
the week of February 1, 2010.
Finding of No Significant Impact
On the basis of the environmental
assessment, the NRC concludes that the
proposed action will not have a
significant effect on the quality of the
human environment. Accordingly, the
NRC has determined not to prepare an
environmental impact statement for the
proposed action.
For further details with respect to the
proposed action, see the licensee’s letter
dated November 6, 2009, as
supplemented by letter dated January
11, 2010. Portions of the November 6,
2009, submittal contain safeguards and
security sensitive information and,
accordingly, are not available to the
public. Other parts of these documents
may be examined, and/or copied for a
fee, at the NRC’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O–1F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. Publicly available
records will be accessible electronically
from the Agencywide Document Access
and Management System (ADAMS)
Public Electronic Reading Room on the
Internet at the NRC Web site: https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209 or 301–415–4737, or send an
e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 26th day
of January 2010.
For The Nuclear Regulatory Commission.
Stewart N. Bailey,
Senior Project Manager, Plant Licensing
Branch II–2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2010–2169 Filed 2–1–10; 8:45 am]
Week of February 15, 2010—Tentative
Thursday, February 18, 2010
9:30 a.m.
Briefing on Office of Nuclear
Regulatory Research—Programs,
Performance, and Future Plans
(Public Meeting). (Contact: Patricia
Santiago, 301–251–7982.)
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
Week of February 22, 2010—Tentative
Tuesday, February 23, 2010
9:30 a.m.
Briefing on Decommissioning
Funding (Public Meeting). (Contact:
Thomas Fredrichs, 301–415–5971.)
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
Week of March 1, 2010—Tentative
Tuesday, March 2, 2010
9:30 a.m.
Briefing on Uranium Recovery (Public
Meeting). (Contact: Dominick
Orlando, 301–415–6749.)
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
Week of March 8, 2010—Tentative
There are no meetings scheduled for
the week of March 8, 2010.
*
*
*
*
*
[NRC–2010–0002]
Sunshine Act; Meeting Notice
mstockstill on DSKH9S0YB1PROD with NOTICES
9:30 a.m.
Briefing on Regional Programs—
Programs, Performance, and Future
Plans (Public Meeting). (Contact:
Richard Barkley, 610–337–5065.)
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
*The schedule for Commission meetings is
subject to change on short notice. To verify
the status of meetings, call (recording)—(301)
415–1292. Contact person for more
information: Rochelle Bavol, (301) 415–1651.
NUCLEAR REGULATORY
COMMISSION
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATES: Weeks of February 1, 8, 15, 22,
March 1, 8, 2010.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
16:52 Feb 01, 2010
Tuesday, February 9, 2010
*
BILLING CODE 7590–01–P
VerDate Nov<24>2008
Week of February 8, 2010—Tentative
Jkt 220001
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/about-nrc/policymaking/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
5355
public meetings in another format (e.g.
braille, large print), please notify Angela
Bolduc, Chief, Employee/Labor
Relations and Work Life Branch, at 301–
492–2230, TDD: 301–415–2100, or by email at angela.bolduc@nrc.gov.
Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969),
or send an e-mail to
darlene.wright@nrc.gov.
Dated: January 28, 2010.
Rochelle C. Bavol,
Office of the Secretary.
[FR Doc. 2010–2251 Filed 1–29–10; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0568]
Notice of Extension of Comment
Period for NUREG–1934, Nuclear
Power Plant Fire Modeling Application
Guide (NPP FIRE MAG), Draft Report
for Comment
AGENCY: Nuclear Regulatory
Commission.
ACTION: Notice of extension of comment
period.
SUMMARY: The Nuclear Regulatory
Commission (NRC) published a notice
of opportunity for public comment on
‘‘NUREG–1934 (EPRI 1019195), Nuclear
Power Plant Fire Modeling Application
Guide (NPP FIRE MAG), Draft Report for
Comment’’ in the Federal Register (74
FR 68873) on December 29, 2009. Issues
encountered during the holiday season
delayed publication of NUREG–1934. In
addition, the final document has been
revised to correct some editorial issues
resulting from the conversion to a pdf
file.
DATES: The public comment period was
to end on March 10, 2010. This notice
announces an extension of the public
comment period until April 30, 2010.
Comments received after this date will
be considered if it is practical to do so,
but the NRC staff is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any one of the following methods.
Please include Docket ID NRC–2009–
0568 in the subject line of your
E:\FR\FM\02FEN1.SGM
02FEN1
Agencies
[Federal Register Volume 75, Number 21 (Tuesday, February 2, 2010)]
[Notices]
[Pages 5354-5355]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-2169]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2010-0030; Docket Nos. 50-259, 50-260, and 50-296]
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1,
2, and 3 Environmental Assessment and Finding of No Significant Impact
The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an Exemption, pursuant to Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5, ``Specific exemptions,'' from the
implementation date for certain new requirements of 10 CFR Part 73,
``Physical protection of plants and materials,'' for Facility Operating
License Nos. DPR-33, DPR-52, and DPR-68, issued to Tennessee Valley
Authority (TVA, the licensee), for operation of the Browns Ferry
Nuclear Plant, Units 1, 2, and 3 (BFN), located in Limestone County,
Alabama. In accordance with 10 CFR 51.21, the NRC prepared an
environmental assessment documenting its finding. The NRC concluded
that the proposed actions will have no significant environmental
impact.
Environmental Assessment
Identification of the Proposed Action:
The proposed action would exempt the TVA from the required
implementation date of March 31, 2010, for several new requirements of
10 CFR part 73. Specifically, BFN would be granted an exemption from
being in full compliance with certain new requirements contained in 10
CFR 73.55 by the March 31, 2010, deadline. TVA has proposed an
alternate full compliance implementation date of December 20, 2012,
approximately two and three-quarter years beyond the date required by
10 CFR part 73. The proposed action, an extension of the schedule for
completion of certain actions required by the revised 10 CFR part 73,
does not involve any physical changes to the reactor, fuel, plant
structures, support structures, water, or land at the BFN site.
The proposed action is in accordance with the licensee's
application dated November 6, 2009, as supplemented by letter dated
January 11, 2010.
The Need for the Proposed Action:
The proposed action is needed to provide the licensee with
additional time to perform the required upgrades to the BFN security
system because they involve new components and engineering that cannot
be obtained or completed by the March 31, 2010, implementation date.
Environmental Impacts of the Proposed Action:
The NRC has completed its environmental assessment of the proposed
exemption. The staff has concluded that the proposed action to extend
the implementation deadline would not significantly affect plant safety
and would not have a significant adverse effect on the probability of
an accident occurring.
The proposed action would not result in an increased radiological
hazard beyond those previously analyzed in the environmental assessment
and finding of no significant impact made by the Commission in
promulgating its revisions to 10 CFR part 73 as discussed in a Federal
Register notice dated March 27, 2009 (74 FR 13967). There will be no
change to radioactive effluents that affect radiation exposures to
plant workers and members of the public. Therefore, no changes or
different types of radiological impacts are expected as a result of the
proposed exemption.
The proposed action does not result in changes to land use or water
use, or result in changes to the quality or quantity of non-
radiological effluents. No changes to the National Pollution Discharge
Elimination System permit are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the plant, or to threatened,
endangered, or protected species under the Endangered Species Act, or
impacts to essential fish habitat covered by the Magnuson-Stevens Act
are expected. There are no impacts to the air or ambient air quality.
There are no impacts to historical and cultural resources. There
would be no impact to socioeconomic resources. Therefore, no changes to
or different types of non-radiological environmental impacts are
expected as a result of the proposed exemption.
Accordingly, the NRC concludes that there are no significant
environmental impacts associated with the proposed action. In addition,
in promulgating its revisions to 10 CFR part 73, the Commission
prepared an environmental assessment and published a finding of no
significant impact [Part 73, Power Reactor Security Requirements, 74 FR
13926, 13967 (March 27, 2009)].
The licensee currently maintains a security system acceptable to
the NRC and will continue to provide acceptable physical protection of
the BFN as TVA implements certain new requirements in 10 CFR part 73.
Therefore, the extension of the implementation date of the new
requirements of 10 CFR part 73 to December 20, 2012, would not have any
significant environmental impacts.
The NRC staff's safety evaluation will be provided in the exemption
that will be issued as part of the letter to the licensee approving the
exemption to the regulation, if granted.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the NRC staff considered
denial of the proposed action (i.e., the ``no-action'' alternative).
Denial of the exemption request would result in no change in current
environmental impacts. If the proposed action was denied, the licensee
would have to comply with the March 31, 2010, implementation deadline.
The environmental impacts of the proposed exemption and the ``no
action'' alternative are similar.
Alternative Use of Resources:
The action does not involve the use of any different resources than
those considered in the Final Environmental Statement for the BFN dated
September 1, 1972.
Agencies and Persons Consulted:
In accordance with its stated policy, on December 24, 2009, the NRC
staff consulted with the Alabama State official, Kirk Whatley of the
Office of Radiological Control, regarding the environmental impact of
the proposed
[[Page 5355]]
action. The State official had no comments.
Finding of No Significant Impact
On the basis of the environmental assessment, the NRC concludes
that the proposed action will not have a significant effect on the
quality of the human environment. Accordingly, the NRC has determined
not to prepare an environmental impact statement for the proposed
action.
For further details with respect to the proposed action, see the
licensee's letter dated November 6, 2009, as supplemented by letter
dated January 11, 2010. Portions of the November 6, 2009, submittal
contain safeguards and security sensitive information and, accordingly,
are not available to the public. Other parts of these documents may be
examined, and/or copied for a fee, at the NRC's Public Document Room
(PDR), located at One White Flint North, Public File Area O-1F21, 11555
Rockville Pike (first floor), Rockville, Maryland 20852. Publicly
available records will be accessible electronically from the Agencywide
Document Access and Management System (ADAMS) Public Electronic Reading
Room on the Internet at the NRC Web site: https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems
in accessing the documents located in ADAMS should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send
an e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 26th day of January 2010.
For The Nuclear Regulatory Commission.
Stewart N. Bailey,
Senior Project Manager, Plant Licensing Branch II-2, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2010-2169 Filed 2-1-10; 8:45 am]