Slatersville Hydro, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions and Waiving Scoping, 4364-4365 [2010-1532]
Download as PDF
4364
Federal Register / Vol. 75, No. 17 / Wednesday, January 27, 2010 / Notices
A copy of the application may be
obtained by agencies or directly from
the Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–1533 Filed 1–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13356–000]
Slatersville Hydro, LLC; Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Terms and Conditions,
Recommendations, and Prescriptions
and Waiving Scoping
srobinson on DSKHWCL6B1PROD with NOTICES
January 20, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–13356–000.
c. Date Filed: January 15, 2009.
d. Applicant: Slatersville Hydro, LLC.
e. Name of Project: Slatersville
Hydroelectric Project.
f. Location: On the Branch River in
Providence County, Rhode Island. The
project would not occupy any land of
the United States.
g. Filed Pursuant to: Public Utilities
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Michael P.
DeFrancesco, 87 Hall Road, Exeter, RI
02822, (401) 742–1968.
i. FERC Contact: Tom Dean, (202)
502–6041.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
VerDate Nov<24>2008
16:22 Jan 26, 2010
Jkt 220001
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘eFiling’’ link.
k. A notice of intent to waive scoping
was issued on October 22, 2009,
establishing November 23, 2009 as the
deadline for filing comments. No
comments were filed. With this notice
we are waiving scoping for the proposed
Slatersville Project.
l. This application has been accepted
for filing and is now ready for
environmental analysis at this time.
m. Description of Project: The
Slatersville Project would consist of: (1)
The existing 13-foot-high RI Dam No. 43
consisting of: (a) a 175-foot-long
spillway with a spillway elevation of
250.7 feet National Geodetic Vertical
Datum 1988 (NGVD); and (b) a westerly
abutment equipped with two 3.5-footwide, 5.7-foot-high sluice gates
impounding; (2) the existing 172-acre
Upper Slatersville reservoir leading to;
(3) two new 150-foot-long, 4.5-footdiameter penstocks connecting to; (4) a
new powerhouse containing two
generating units with a total installed
capacity of 360 kilowatts; (5) a new 25foot-long tailrace discharging water into
the Lower Slatersville reservoir; (6) a
new 200-foot-long, 13.8 kilovolt
transmission line; (7) new eel and fish
passage facilities; and (8) appurtenant
facilities. The project would have an
average annual generation of about
1,250 megawatt-hours.
Project facilities would also include:
(1) The existing 6-foot-high RI Dam No.
45 with a 105-foot-long spillway; and (2)
the existing 0.3-acre reservoir with a
normal water surface elevation of 231.9
feet NGVD located in the bypassed
reach between RI Dam No. 43 and the
new tailrace.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
the three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. All filings must: (1) Bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS’’;
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate. The Commission staff
proposes to issue one environmental
assessment rather than issue a draft and
final EA. Comments, terms and
conditions, recommendations,
prescriptions, and reply comments, if
any, will be addressed in an EA. Staff
intends to give at least 30 days for
entities to comment on the EA, and will
take into consideration all comments
received on the EA before final action is
taken on the license application.
Notice of the availability of the EA:
June 2010.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
E:\FR\FM\27JAN1.SGM
27JAN1
Federal Register / Vol. 75, No. 17 / Wednesday, January 27, 2010 / Notices
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–1532 Filed 1–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12599–016]
Turnbull Hydro, LLC; Notice of
Application for Surrender of License
and Soliciting Comments, Motions To
Intervene, and Protests
srobinson on DSKHWCL6B1PROD with NOTICES
January 20, 2010.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Surrender of
License.
b. Project No.: 12599–016.
c. Date Filed: December 17, 2009.
d. Applicant: Turnbull Hydro, LLC.
e. Name of Project: Mill Coulee Drops
Hydroelectric Project.
f. Location: The unconstructed project
was to be located on the Mill Coulee
Canal in Cascade County, Montana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Ted S.
Sorensen, 5203 South 11th Street, Idaho
Falls, ID 83404, (208) 522–8069 and Mr.
Nicholas E. Josten, Project Engineer,
GeoSense, 2742 Saint Charles Avenue,
Idaho Falls, ID 83404, (208) 528–6152.
i. FERC Contact: Patricia W. Gillis,
Telephone (202) 502–8735.
j. Deadline for filing comments,
motions to intervene, and protests:
February 18, 2010. Comments, motions
to intervene, and protests may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. If unable to
be filed electronically, documents may
be paper-filed. To paper-file, an original
and eight copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
For more information on how to submit
these types of filings, please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
k. Description of Request: The
licensee filed an application to
surrender its license for the
unconstructed Mill Coulee Drops
Hydroelectric Project. The Licensee has
not commenced construction of the
VerDate Nov<24>2008
16:22 Jan 26, 2010
Jkt 220001
project. No ground disturbing activities
have occurred.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
4365
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–1530 Filed 1–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 1
January 14, 2010.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP10–301–000.
Applicants: Kinder Morgan Interstate
Gas Trans. LLC.
Description: Kinder Morgan Interstate
Gas Transmission LLC submits a Second
Revised Sheet 4F et al.
Filed Date: 01/08/2010.
Accession Number: 20100111–0213.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 20, 2010.
Docket Numbers: RP10–302–000.
Applicants: Northern Natural Gas
Company.
Description: Northern Natural Gas
Company submits a Fifth Revised
Volume 1 of 15 Revised Sheet 66B.35.
Filed Date: 01/08/2010.
Accession Number: 20100111–0212.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 20, 2010.
Docket Numbers: RP10–303–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Texas Gas Transmission,
LLC submits a report which compares
cash out revenues with cash out costs
incurred for the annual billing period of
11/1/08 thru 10/31/09.
Filed Date: 01/11/2010.
Accession Number: 20100111–0202.
Comment Date: 5 p.m. Eastern Time
on Monday, January 25, 2010.
Docket Numbers: RP10–304–000.
Applicants: Southern LNG, Inc.
Description: Southern LNG submits
Second Revised Sheet 43 to its FERC
Gas Tariff, Original Volume 1 to be
effective 3/1/10.
Filed Date: 01/11/2010.
Accession Number: 20100111–0201.
Comment Date: 5 p.m. Eastern Time
on Monday, January 25, 2010.
Docket Numbers: RP10–305–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits a capacity release
agreement containing negotiated rate
provisions executed by Gulf South and
Texla Energy Management, Inc.
E:\FR\FM\27JAN1.SGM
27JAN1
Agencies
[Federal Register Volume 75, Number 17 (Wednesday, January 27, 2010)]
[Notices]
[Pages 4364-4365]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-1532]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13356-000]
Slatersville Hydro, LLC; Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Terms and Conditions,
Recommendations, and Prescriptions and Waiving Scoping
January 20, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-13356-000.
c. Date Filed: January 15, 2009.
d. Applicant: Slatersville Hydro, LLC.
e. Name of Project: Slatersville Hydroelectric Project.
f. Location: On the Branch River in Providence County, Rhode
Island. The project would not occupy any land of the United States.
g. Filed Pursuant to: Public Utilities Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Michael P. DeFrancesco, 87 Hall Road, Exeter,
RI 02822, (401) 742-1968.
i. FERC Contact: Tom Dean, (202) 502-6041.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``eFiling'' link.
k. A notice of intent to waive scoping was issued on October 22,
2009, establishing November 23, 2009 as the deadline for filing
comments. No comments were filed. With this notice we are waiving
scoping for the proposed Slatersville Project.
l. This application has been accepted for filing and is now ready
for environmental analysis at this time.
m. Description of Project: The Slatersville Project would consist
of: (1) The existing 13-foot-high RI Dam No. 43 consisting of: (a) a
175-foot-long spillway with a spillway elevation of 250.7 feet National
Geodetic Vertical Datum 1988 (NGVD); and (b) a westerly abutment
equipped with two 3.5-foot-wide, 5.7-foot-high sluice gates impounding;
(2) the existing 172-acre Upper Slatersville reservoir leading to; (3)
two new 150-foot-long, 4.5-foot-diameter penstocks connecting to; (4) a
new powerhouse containing two generating units with a total installed
capacity of 360 kilowatts; (5) a new 25-foot-long tailrace discharging
water into the Lower Slatersville reservoir; (6) a new 200-foot-long,
13.8 kilovolt transmission line; (7) new eel and fish passage
facilities; and (8) appurtenant facilities. The project would have an
average annual generation of about 1,250 megawatt-hours.
Project facilities would also include: (1) The existing 6-foot-high
RI Dam No. 45 with a 105-foot-long spillway; and (2) the existing 0.3-
acre reservoir with a normal water surface elevation of 231.9 feet NGVD
located in the bypassed reach between RI Dam No. 43 and the new
tailrace.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the three digits in the docket
number field to access the document. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
o. All filings must: (1) Bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
p. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate. The Commission
staff proposes to issue one environmental assessment rather than issue
a draft and final EA. Comments, terms and conditions, recommendations,
prescriptions, and reply comments, if any, will be addressed in an EA.
Staff intends to give at least 30 days for entities to comment on the
EA, and will take into consideration all comments received on the EA
before final action is taken on the license application.
Notice of the availability of the EA: June 2010.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance
[[Page 4365]]
date of the notice of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-1532 Filed 1-26-10; 8:45 am]