Wyoming Interstate Company, Ltd.; Notice of Intent To Prepare an Environmental Assessment for the Proposed WIC 2010 System Enhancement Project and Request for Comments on Environmental Issues, 4059-4061 [2010-1387]

Download as PDF WReier-Aviles on DSKGBLS3C1PROD with NOTICES Federal Register / Vol. 75, No. 16 / Tuesday, January 26, 2010 / Notices j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The proposed Red Rock Project would be located at the existing U.S. Army Corps of Engineers (Corps) Red Rock Dam. The existing Corps facilities consist of: (1) A 110-foot-high, 6,260foot-long earth-fill dam with a 241-footlong ogee spillway equipped with five 45-foot-high tainter gates; and (2) a 15,253-acre reservoir at a normal conservation pool water surface elevation of 742.0 feet National Geodetic Vertical Datum of 1929. The proposed project would utilize the head created by the existing Corps dam and consist of: (1) A new 127-footlong by 19-foot-wide intake structure connected to; (2) three new 19-footdiameter, 211-foot-long penstocks passing through the left side of the spillway leading to; (3) a new 59-footlong by 132-foot-wide powerhouse located directly downstream of the existing spillway structure containing three new 12.13-megawatt (MW) generating units with a total generating capacity of 36.4 MW; (4) a new 8.4-milelong, 69-kilovolt transmission line; and (5) appurtenant facilities. The estimated VerDate Nov<24>2008 14:10 Jan 25, 2010 Jkt 220001 average annual generation would be 158,000 megawatt-hours. The project would be operated in runof-river mode in that it would have no storage and only use flows released by the Corps in accordance with its present operations. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. Procedural schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. The PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 4059 Commission staff proposes to issue one environmental assessment rather than issue a draft and final EA. Comments, terms and conditions, recommendations, prescriptions, and reply comments, if any, will be addressed in an EA. Staff intends to give at least 30 days for entities to comment on the EA, and will take into consideration all comments received on the EA before final action is taken on the license application. Notice of the availability of the EA: September 2010. p. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Kimberly D. Bose, Secretary. [FR Doc. 2010–1389 Filed 1–25–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–13–000] Wyoming Interstate Company, Ltd.; Notice of Intent To Prepare an Environmental Assessment for the Proposed WIC 2010 System Enhancement Project and Request for Comments on Environmental Issues January 15, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the WIC 2010 System Enhancement Project (Project) involving construction and operation of facilities by Wyoming Interstate Company (WIC) in Weld and Sweetwater Counties, in Colorado and Wyoming, respectively. This EA will be used by the Commission in its decisionmaking process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process we will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on February 15, 2010. E:\FR\FM\26JAN1.SGM 26JAN1 4060 Federal Register / Vol. 75, No. 16 / Tuesday, January 26, 2010 / Notices This notice is being sent to the Commission’s current environmental mailing for this project, which includes affected landowners; Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; parties to this proceeding; and local libraries and newspapers. State and local government representatives are asked to notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings in accordance with State law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ was attached to the project notice WIC provided to landowners. This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (https:// www.ferc.gov). WReier-Aviles on DSKGBLS3C1PROD with NOTICES Summary of the Proposed Project The proposed Project would involve the modification of the Wamsutter Compressor Station and the construction and operation of approximately 2.43 miles of 20-inchdiameter pipeline from the Wamsutter Compressor Station to interconnections with Rockies Express Pipeline Company and Questar Overthrust Pipeline Company in Sweetwater County, Wyoming. The Project would entail piping modifications at the Cheyenne Compressor Station in Weld County, Colorado, to enable the compression of gas in a westerly direction toward Wamsutter. The Wamsutter Compressor Station compressor modification, pipeline construction, and Cheyenne Compressor Station re-piping would accommodate up to approximately 285,000 dekatherms per day of transportation volumes for westbound deliveries. VerDate Nov<24>2008 14:10 Jan 25, 2010 Jkt 220001 The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the proposed Project would disturb about 35.9 acres of land for the aboveground facilities and the pipeline. Following construction, about 16.8 acres would be maintained for permanent operation of the project’s facilities; the remaining acreage would be restored and allowed to revert to former uses. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping’’. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA. In the EA we 2 will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air quality and noise; • endangered and threatened species; • cumulative impacts; and, • public safety. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be presented in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to those on our 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 environmental mailing list (see discussion of how to remain on our mailing list on page 5). A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section beginning on page 4. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your written comments are timely and properly recorded, please send in your comments so that they will be received in Washington, DC on or before February 15, 2010. For your convenience, there are three methods which you can use to submit your written comments to the Commission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at 202–502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located at https://www.ferc.gov under the link called ‘‘Documents and Filings’’. A Quick Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the ‘‘eFiling’’ feature that is listed under the ‘‘Documents and Filings’’ link. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file to your submission. New eFiling users must first create an account by clicking on the links called ‘‘Sign up’’ or ‘‘eRegister’’. You will be E:\FR\FM\26JAN1.SGM 26JAN1 Federal Register / Vol. 75, No. 16 / Tuesday, January 26, 2010 / Notices asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file your comments with the Commission via mail by sending an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. In all instances, please reference the project docket number CP10–13–000 with your submission. Label one copy of the comments for the attention of Gas Branch 3, PJ–11.3. Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities (as defined in the Commission’s regulations). If you do not want to send comments at this time but still want to remain on our mailing list, please return the Information Request (appendix 2). If you do not return the Information Request, you will be taken off the mailing list. WReier-Aviles on DSKGBLS3C1PROD with NOTICES Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor,’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the Internet at https://www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits, in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact VerDate Nov<24>2008 14:10 Jan 25, 2010 Jkt 220001 4061 (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 5, 2010. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2010–1387 Filed 1–25–10; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. 2010–1396 Filed 1–25–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10–33–000] Federal Energy Regulatory Commission New York Independent System Operator, Inc; Notice of Filing [Docket No. ID–6223–000] January 15, 2010. Favinger, Thomas; Notice of Filing Take notice that on January 8, 2010, New York Independent System Operator, Inc. (NYISO), pursuant to section 207 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207 (2009), filed a petition that the Commission grant a declaratory order clarifying the status of New York Power Authority’s Grandfathered Transmission Congestion Contracts under Attachment L of the NYISO Open Access Transmission Tariff after the original 825 MW Charles A. Poletti unit ceases to operate and also grant them a limited waiver. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. January 19, 2010. Take notice that on January 15, 2010, Mr. Thomas G. Favinger filed an application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\26JAN1.SGM 26JAN1

Agencies

[Federal Register Volume 75, Number 16 (Tuesday, January 26, 2010)]
[Notices]
[Pages 4059-4061]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-1387]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP10-13-000]


Wyoming Interstate Company, Ltd.; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed WIC 2010 System Enhancement 
Project and Request for Comments on Environmental Issues

January 15, 2010.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the WIC 2010 System Enhancement 
Project (Project) involving construction and operation of facilities by 
Wyoming Interstate Company (WIC) in Weld and Sweetwater Counties, in 
Colorado and Wyoming, respectively. This EA will be used by the 
Commission in its decision-making process to determine whether the 
project is in the public convenience and necessity.
    This notice announces the opening of the scoping process we will 
use to gather input from the public and interested agencies on the 
project. Your input will help the Commission staff determine what 
issues need to be evaluated in the EA. Please note that the scoping 
period will close on February 15, 2010.

[[Page 4060]]

    This notice is being sent to the Commission's current environmental 
mailing for this project, which includes affected landowners; Federal, 
State, and local government representatives and agencies; elected 
officials; environmental and public interest groups; Native American 
Tribes; parties to this proceeding; and local libraries and newspapers. 
State and local government representatives are asked to notify their 
constituents of this proposed project and encourage them to comment on 
their areas of concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the proposed facilities. 
The company would seek to negotiate a mutually acceptable agreement. 
However, if the project is approved by the Commission, that approval 
conveys with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings in accordance with State law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' was attached to the 
project notice WIC provided to landowners. This fact sheet addresses a 
number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings. It is 
also available for viewing on the FERC Web site (https://www.ferc.gov).

Summary of the Proposed Project

    The proposed Project would involve the modification of the 
Wamsutter Compressor Station and the construction and operation of 
approximately 2.43 miles of 20-inch-diameter pipeline from the 
Wamsutter Compressor Station to interconnections with Rockies Express 
Pipeline Company and Questar Overthrust Pipeline Company in Sweetwater 
County, Wyoming.
    The Project would entail piping modifications at the Cheyenne 
Compressor Station in Weld County, Colorado, to enable the compression 
of gas in a westerly direction toward Wamsutter. The Wamsutter 
Compressor Station compressor modification, pipeline construction, and 
Cheyenne Compressor Station re-piping would accommodate up to 
approximately 285,000 dekatherms per day of transportation volumes for 
westbound deliveries.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
https://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed Project would disturb about 35.9 acres 
of land for the aboveground facilities and the pipeline. Following 
construction, about 16.8 acres would be maintained for permanent 
operation of the project's facilities; the remaining acreage would be 
restored and allowed to revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as ``scoping''. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA.
    In the EA we \2\ will discuss impacts that could occur as a result 
of the construction and operation of the proposed project under these 
general headings:
---------------------------------------------------------------------------

    \2\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     cumulative impacts; and,
     public safety.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be presented in the EA. 
Depending on the comments received during the scoping process, the EA 
may be published and mailed to those on our environmental mailing list 
(see discussion of how to remain on our mailing list on page 5). A 
comment period will be allotted for review if the EA is published. We 
will consider all comments on the EA before we make our recommendations 
to the Commission. To ensure your comments are considered, please 
carefully follow the instructions in the Public Participation section 
beginning on page 4.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
written comments are timely and properly recorded, please send in your 
comments so that they will be received in Washington, DC on or before 
February 15, 2010.
    For your convenience, there are three methods which you can use to 
submit your written comments to the Commission. The Commission 
encourages electronic filing of comments and has expert eFiling staff 
available to assist you at 202-502-8258 or efiling@ferc.gov.
    (1) You may file your comments electronically by using the Quick 
Comment feature, which is located at https://www.ferc.gov under the link 
called ``Documents and Filings''. A Quick Comment is an easy method for 
interested persons to submit text-only comments on a project;
    (2) You may file your comments electronically by using the 
``eFiling'' feature that is listed under the ``Documents and Filings'' 
link. eFiling involves preparing your submission in the same manner as 
you would if filing on paper, and then saving the file on your 
computer's hard drive. You will attach that file to your submission. 
New eFiling users must first create an account by clicking on the links 
called ``Sign up'' or ``eRegister''. You will be

[[Page 4061]]

asked to select the type of filing you are making. A comment on a 
particular project is considered a ``Comment on a Filing''; or
    (3) You may file your comments with the Commission via mail by 
sending an original and two copies of your letter to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Room 1A, Washington, DC 20426.
    In all instances, please reference the project docket number CP10-
13-000 with your submission. Label one copy of the comments for the 
attention of Gas Branch 3, PJ-11.3.

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within certain distances of 
aboveground facilities (as defined in the Commission's regulations).
    If you do not want to send comments at this time but still want to 
remain on our mailing list, please return the Information Request 
(appendix 2). If you do not return the Information Request, you will be 
taken off the mailing list.

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor,'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are 
included in the User's Guide under the ``e-filing'' link on the 
Commission's Web site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
Internet at https://www.ferc.gov using the ``eLibrary'' link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number, excluding the last three digits, in the Docket Number field. Be 
sure you have selected an appropriate date range. For assistance, 
please contact FERC Online Support at FercOnlineSupport@ferc.gov or 
toll free at 1-866-208-3676, or for TTY, contact (202) 502-8659. The 
eLibrary link also provides access to the texts of formal documents 
issued by the Commission, such as orders, notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-1387 Filed 1-25-10; 8:45 am]