Clifton Power Corporation; Commissioner of Public Works of the City of Spartanburg, SC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene, 2126 [2010-535]
Download as PDF
2126
Federal Register / Vol. 75, No. 9 / Thursday, January 14, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM05–1–000]
Regulations Governing the Conduct of
Open Seasons for Alaska Natural Gas
Transportation Projects; Notice of
Alaska Natural Gas Transportation
Projects Open Season Pre-Filing
Workshop
pwalker on DSK8KYBLC1PROD with NOTICES
January 5, 2010.
On January 12, 2010, the Staff of the
Federal Energy Regulatory Commission
(FERC) will hold a workshop on the
procedures and process for commenting
upon and holding an open season for an
Alaska Natural Gas Transportation
Project. The Workshop is being hosted
by the Alaska Department of Natural
Resources and the Regulatory
Commission of Alaska.
In 2005, in the above-referenced
docket, FERC enacted regulations under
the Alaska Natural Gas Pipeline Act
which established the procedures for
conducting open seasons for the
purpose of making binding
commitments for the acquisition of
capacity on Alaskan natural gas
transportation projects. Both Denali—
The Alaska Gas Pipeline LLC and
TransCanada Alaska Company LLC—
Alaska Pipeline Project have publicly
stated that they intend to hold open
seasons for their respective Alaskan
natural gas transportation projects in
2010.
Under FERC’s open season
regulations, prior to conducting an open
season for an Alaskan natural gas
transportation project, each project
sponsor is required to submit a detailed
open season plan to FERC. After
receiving the project sponsor’s open
season plan, FERC will issue a notice
requesting public comments on the
open season plan and explain the
procedure for submitting such
comments. Absent unusual
circumstances, FERC will act on the
open season plan within 60 days of its
submission by the project sponsor.
Both of these project sponsors have
initiated FERC’s pre-filing process,
which is typically focused on FERC’s
environmental review of a project.
However in this instance, the pre-filing
process also includes FERC’s review,
approval, and oversight of the project
sponsors’ open season. FERC Staff is
holding this Open Season Pre-Filing
Workshop to provide interested parties
an opportunity to learn about and
discuss the procedures and process for
commenting upon and holding an open
season.
VerDate Nov<24>2008
17:36 Jan 13, 2010
Jkt 220001
The workshop will be held on January
12, 2010, from 1 p.m. to 5 p.m. (AST)
at: Tikhatnu Ballroom D, Anchorage
Convention Center, Dena‘Ina Civic and
Convention Center, 600 West Seventh
Avenue, Anchorage, AK 99501.
All interested parties may attend. The
workshop will not be transcribed by the
FERC Staff. Telephone participation
will be available; Conference call
participants should call in to 1–800–
315–6338 and enter code 8800#.
For additional information concerning
this event, please contact Richard Foley
at 202–502–8955 or Mary O’Driscoll at
202–502–8680.
Kimberly D. Bose,
Secretary.
Alaska Natural Gas Transportation
Projects Open Season Pre-Filing
Workshop
Agenda
1 p.m.—Welcome and Opening Remarks
Anne Brown, Deputy State Pipeline
Coordinator for the State of Alaska
1:15 p.m.—Explanation of FERC Open
Season Policy and Alaskan Open
Season Rules
Richard Foley, FERC Staff, Lead
Certificate Manager for Alaskan
Projects
2:15 p.m.—Explanation of FERC’s
Electronic Records and Filing
System
Todd Ruhkamp, FERC Staff, Senior
Certificate Analyst
2:45 p.m.—Break
3 p.m.—Questions and Discussion
4:45 p.m.—Closing Remarks and
Adjourn
[FR Doc. 2010–530 Filed 1–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
The Applicant states it acquired the
Clifton Mills #1 Hydroelectric Project
from Clifton Power Corporation through
foreclosure and seeks Commission
approval for the involuntary transfer of
the license for the project from Clifton
Power Corporation to the Applicant.
Applicant Contacts: Ms. Sue G.
Schneider, General Manager,
Spartanburg Water, P.O. Box 251,
Spartanburg, SC 29304, (864) 580–5647,
e-mail sschneider@sws-sssd.org and Ms.
Elizabeth W. Whittle, Nixon Peabody,
LLP, 401 Ninth Street, NW., Suite 900,
Washington, DC 20004, (202) 585–8338,
e-mail: ewhittle@nixonpeabody.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2008) and the
instructions on the Commission’s
website under the ‘‘e-Filing’’ link. If
unable to be filed electronically,
documents may be paper-filed. To
paper-file, an original and eight copies
should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. For more
information on how to submit these
types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the eLibrary
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–4632–032) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2010–535 Filed 1–13–10; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 4632–032]
Clifton Power Corporation;
Commissioner of Public Works of the
City of Spartanburg, SC; Notice of
Application for Transfer of License and
Soliciting Comments and Motions To
Intervene
DEPARTMENT OF ENERGY
January 7, 2010.
Calais Pipeline Company, LLC; Calais
LNG Project Company, LLC; Notice of
Application
On November 4, 2009, Commissioner
of Public Works of the City of
Spartanburg, South Carolina (Applicant)
filed an application for an involuntary
transfer of license of the Clifton Mills #1
Hydroelectric Project No. 4632 located
on the Pacolet River, in Spartanburg
County, South Carolina.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket Nos. CP10–31–000; CP10–32–000;
PF08–24–000]
January 6, 2010.
Take notice that on December 18,
2009, Calais LNG Project Company, LLC
(Calais LNG) and Calais Pipeline
Company, LLC (Calais Pipeline) 142
E:\FR\FM\14JAN1.SGM
14JAN1
Agencies
[Federal Register Volume 75, Number 9 (Thursday, January 14, 2010)]
[Notices]
[Page 2126]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-535]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4632-032]
Clifton Power Corporation; Commissioner of Public Works of the
City of Spartanburg, SC; Notice of Application for Transfer of License
and Soliciting Comments and Motions To Intervene
January 7, 2010.
On November 4, 2009, Commissioner of Public Works of the City of
Spartanburg, South Carolina (Applicant) filed an application for an
involuntary transfer of license of the Clifton Mills 1
Hydroelectric Project No. 4632 located on the Pacolet River, in
Spartanburg County, South Carolina.
The Applicant states it acquired the Clifton Mills 1
Hydroelectric Project from Clifton Power Corporation through
foreclosure and seeks Commission approval for the involuntary transfer
of the license for the project from Clifton Power Corporation to the
Applicant.
Applicant Contacts: Ms. Sue G. Schneider, General Manager,
Spartanburg Water, P.O. Box 251, Spartanburg, SC 29304, (864) 580-5647,
e-mail sssd.org">sschneider@sws-sssd.org and Ms. Elizabeth W. Whittle, Nixon
Peabody, LLP, 401 Ninth Street, NW., Suite 900, Washington, DC 20004,
(202) 585-8338, e-mail: ewhittle@nixonpeabody.com.
FERC Contact: Patricia W. Gillis, (202) 502-8735.
Deadline for filing comments and motions to intervene: 30 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii)(2008) and the instructions on the Commission's
website under the ``e-Filing'' link. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and eight copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. For more information on how to submit these types
of filings please go to the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the eLibrary link of the Commission's Web
site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-4632-032) in the docket number field to access the document.
For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-535 Filed 1-13-10; 8:45 am]
BILLING CODE 6717-01-P