Federal Register / Vol. 75, No. 9 / Thursday, January 14, 2010 / Notices
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13639) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–527 Filed 1–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13625–000]
Lock+TM Hydro Friends Fund XXX,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
pwalker on DSK8KYBLC1PROD with NOTICES
January 6, 2010.
On November 13, 2009, Lock+TM
Hydro Friends Fund XXX, LLC filed an
application, pursuant to Section 4(f) of
the Federal Power Act, proposing to
study the feasibility of Project Green
Dream (Project No. 13625), to be located
at the New Cumberland Locks and Dam
on the Ohio River, in Hancock County,
West Virginia. The New Cumberland
Locks and Dam are owned and operated
by the U.S. Army Corps of Engineers.
Project Green Dream would include
new facilities adjacent to the eastern
end of the New Cumberland Locks and
Dam. The proposed project would
consist of: (1) One new approximately
450-foot-long, 220-foot-wide conduit; (2)
two new approximately 109-foot-wide,
40-foot-tall lock frame modules,
containing nine turbines each, with a
total installed capacity of 36 megawatts;
(3) new flow control doors; (4) a new
tailrace; (5) a new switchyard,
transformer, and control room; (6) a new
approximately 1,000-foot-long, 36.7kilovolt transmission line from the
turbines to the new switchyard, and a
new approximately 2,000-foot-long, 69kilovolt transmission line from the new
switchyard to an existing distribution
VerDate Nov<24>2008
17:36 Jan 13, 2010
Jkt 220001
line; (7) and appurtenant facilities. The
project would have an estimated annual
generation of 284,018 megawatt-hours.
Applicant Contact: Wayne F. Krouse,
Lock+TM Hydro Friends Fund XXX,
LLC, 5090 Richmond Avenue #390,
Houston, TX 77056, (877) 556–6566
(ext. 709).
FERC Contact: Brandon Cherry, (202)
502–8328.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing application: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13625) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–526 Filed 1–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12635–001]
Moriah Hydro Corporation; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
January 6, 2010.
On November 2, 2009, Moriah Hydro
Corporation filed an application,
pursuant to section 4(f) of the Federal
Power Act, for a successive preliminary
permit to study the feasibility of the
Mineville Pumped Storage Project, to be
located in the existing Old Bed, New
Bed, and Harmony Mines, within the
town of Moriah in Essex County, New
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
2129
York. The mines are owned by the
X–Earth Corporation of Elizabethtown,
New York, Rhodia Corporation of
Cranbury, New Jersey, and the Town of
Moriah, New York.
The proposed pumped storage project
would consist of the following: (1) An
upper reservoir formed underground in
Harmony Mine between the existing
+400 and +1,000 foot elevation levels of
the mine, with a surface area of about
50 acres and volume of approximately
2,400 acre-feet at normal water surface
elevation of +1,000 feet Project Datum;
(2) a lower reservoir formed
underground in Harmony Mine between
the existing ¥1,650 and ¥1,050
elevation levels of the mine, with a
surface area of about 50 acres and
volume of approximately 2,400 acre-feet
at normal water surface elevation of
+1,050 feet Project Datum; (3) two
identical 2,500-foot-long, 120-inchdiameter vertical bored drop shafts; (4)
a proposed concrete powerhouse 70feet-wide by 280-feet-long by 40-feethigh, containing approximately 100
pump/turbine/generator units having a
total installed capacity of 270 megawatts
(MW); (5) a proposed underground, 1mile-long, 115 kilovolt (kV)
transmission line; and (6) appurtenant
facilities.
The development would have an
annual generation of 650 gigawatt-hours
(GWh), which would be sold to a local
utility.
Applicant Contact: Mr. James A.
Besha, P.E., Moriah Hydro Corporation
c/o Albany Engineering Corporation, 5
Washington Square, Albany, NY 12205,
(518) 456–7712.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing motions to
intervene, competing applications
(without notice of intent), or notices of
intent to file competing applications: 60
days from the issuance date of this
notice. Comments, motions to intervene,
notices of intent, and competing
applications may be electronically filed
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be filed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filling-comments.asp.
More information about this project can
be viewed or printed on the ‘‘e-library’’
link of the Commission’s Web site at
E:\FR\FM\14JAN1.SGM
14JAN1
Agencies
[Federal Register Volume 75, Number 9 (Thursday, January 14, 2010)]
[Notices]
[Page 2129]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-526]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13625-000]
Lock+TM Hydro Friends Fund XXX, LLC; Notice of
Preliminary Permit Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Competing Applications
January 6, 2010.
On November 13, 2009, Lock+TM Hydro Friends Fund XXX,
LLC filed an application, pursuant to Section 4(f) of the Federal Power
Act, proposing to study the feasibility of Project Green Dream (Project
No. 13625), to be located at the New Cumberland Locks and Dam on the
Ohio River, in Hancock County, West Virginia. The New Cumberland Locks
and Dam are owned and operated by the U.S. Army Corps of Engineers.
Project Green Dream would include new facilities adjacent to the
eastern end of the New Cumberland Locks and Dam. The proposed project
would consist of: (1) One new approximately 450-foot-long, 220-foot-
wide conduit; (2) two new approximately 109-foot-wide, 40-foot-tall
lock frame modules, containing nine turbines each, with a total
installed capacity of 36 megawatts; (3) new flow control doors; (4) a
new tailrace; (5) a new switchyard, transformer, and control room; (6)
a new approximately 1,000-foot-long, 36.7-kilovolt transmission line
from the turbines to the new switchyard, and a new approximately 2,000-
foot-long, 69-kilovolt transmission line from the new switchyard to an
existing distribution line; (7) and appurtenant facilities. The project
would have an estimated annual generation of 284,018 megawatt-hours.
Applicant Contact: Wayne F. Krouse, Lock+TM Hydro
Friends Fund XXX, LLC, 5090 Richmond Avenue 390, Houston, TX
77056, (877) 556-6566 (ext. 709).
FERC Contact: Brandon Cherry, (202) 502-8328.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing application: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
More information about this project can be viewed or printed on the
``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13625) in the docket
number field to access the document. For assistance, call toll-free 1-
866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-526 Filed 1-13-10; 8:45 am]
BILLING CODE 6717-01-P