Public Utility District No. 1 of Snohomish County, WA; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a Hydrokinetic Pilot Project License Application, and Soliciting Comments, 1049-1050 [2010-64]
Download as PDF
Federal Register / Vol. 75, No. 5 / Friday, January 8, 2010 / Notices
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–57 Filed 1–7–10; 8:45 am]
[Project No. 2533–046]
BILLING CODE 6717–01–P
Wausau Paper Printing & Writing, LLC,
Wausau Paper Mills, LLC; Notice of
Application for Transfer of License and
Soliciting Comments and Motions To
Intervene
pwalker on DSK8KYBLC1PROD with NOTICES
December 30, 2009.
On December 10, 2009, Wausau Paper
Printing & Writing, LLC (transferor) and
Wausau Paper Mills, LLC (transferee)
filed an application for transfer of
license of the Brainerd Hydroelectric
Project located on the Mississippi River,
in Crow Wing County, Minnesota.
The transferor and transferee seek
Commission approval to transfer the
license for the Brainerd Hydroelectric
Project from the transferor to the
transferee.
Applicant Contacts: For Transferor
and Transferee: Ms. Cara Kurtenback,
Director of Environmental Affairs,
Wausau Paper Corp., 100 Paper Place,
Mosinee, WI 54455, (715) 692–2023, email: ckurtenbach@wausaupaper.com
and Ms. Elizabeth W. Whittle, Nixon
Peabody, LLP, 401 Ninth Street, NW.,
Suite 900, Washington, DC 20004, (202)
585–8338, e-mail:
ewhittle@nixonpeabody.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments and
motions to intervene: 15 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2008) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the eLibrary link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–2533–046) in the docket number
field to access the document. For
VerDate Nov<24>2008
16:14 Jan 07, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12690–003]
Public Utility District No. 1 of
Snohomish County, WA; Notice of
Intent To File License Application,
Filing of Draft Application, Request for
Waivers of Integrated Licensing
Process Regulations Necessary for
Expedited Processing of a
Hydrokinetic Pilot Project License
Application, and Soliciting Comments
December 30, 2009.
a. Type of Filing: Notice of Intent to
File a License Application for an
Original License for a Hydrokinetic Pilot
Project.
b. Project No.: 12690–003.
c. Date Filed: December 28, 2009.
d. Submitted By: Public Utility
District No. 1 of Snohomish County,
Washington (Snohomish PUD)
e. Name of Project: Admiralty Inlet
Pilot Tidal Project.
f. Location: On the east side of
Admiralty Inlet in Puget Sound,
Washington, about 1 kilometer west of
Whidbey Island, entirely within Island
County, Washington. The project would
not occupy any Federal lands.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Applicant Contact: Steven J. Klein,
Public Utility District of Snohomish
County, Washington, P.O. Box 1107,
2320, California Street, Everett, WA
98206–1107; (425) 783–8473.
i. FERC Contact: David Turner (202)
502–6091.
j. Snohomish PUD has filed with the
Commission: (1) A notice of intent (NOI)
to file an application for an original
license for a hydrokinetic pilot project
and a draft license application with
monitoring plans; (2) a request for
waivers of the integrated licensing
process regulations necessary for
expedited processing of a hydrokinetic
pilot project license application; and (3)
a proposed process plan and schedule.
k. With this notice, we are soliciting
comments on the pre-filing materials
listed in paragraph j above, including
the draft license application and
monitoring plans. All comments should
be sent to the address above in
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
1049
paragraph h. In addition, all comments
(original and eight copies) must be filed
with the Commission at the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. All filings with the Commission
must include on the first page, the
project name (Admiralty Inlet Pilot
Tidal Project) and number (P–12690–
003), and bear the heading ‘‘Comments
on the proposed Admiralty Inlet Pilot
Tidal Project.’’ Any individual or entity
interested in submitting comments on
the pre-filing materials must do so by
February 26, 2010.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
l. Snohomish PUD was designated as
the non-federal representative for
section 7 of the Endangered Species Act
consultation and for section 106
consultation under the National Historic
Preservation Act on November 7, 2008.
m. This notice does not constitute the
Commission’s approval of Snohomish
PUD’s request to use the Pilot Project
Licensing Procedures. Upon its review
of the project’s overall characteristics
relative to the pilot project criteria, the
draft license application contents, and
any comments filed, the Commission
will determine whether there is
adequate information to conclude the
pre-filing process.
n. The proposed Admiralty Inlet Pilot
Tidal Project would consist of (1) two
10-meter, 500-kilowatt (kW) OpenCentre Turbines supplied by
OpenHydro Group Ltd., mounted on
completely submerged gravity
foundations; (2) two 250-meter service
cables connected at a subsea junction
box or spliced to a 0.5-kilometer subsea
transmission cable, connecting to a
cable termination vault about 50 meters
from shore; (3) two 81-meter-long buried
conduits containing the two DC
transmission lines from the turbines and
connecting to a power conditioning and
control building; (4) a 140-meter-long
buried cable from the control building
to the grid; and (5) appurtenant facilities
for operation and maintenance. The
estimated annual generation of the
project is 383,000 kilowatt-hours.
o. A copy of the draft license
application and all pre-filing materials
are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
E:\FR\FM\08JAN1.SGM
08JAN1
1050
Federal Register / Vol. 75, No. 5 / Friday, January 8, 2010 / Notices
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659.
p. Pre-filing process schedule. The
pre-filing process will be conducted
pursuant to the following tentative
schedule. Snohomish PUD plans to
complete studies in 2010 to provide
further support for the environmental
analysis. Revisions to the schedule
below may be made based on staff’s
review of the draft application and any
comments received.
Milestone
Date
Comments on pre-filing materials due.
Issuance of meeting
notice (if needed).
Public meeting/technical conference (if
needed).
Issuance of notice
concluding pre-filing process and
ILP waiver request
determination.
February 26, 2010.
March 15, 2010.
April 14, 2010.
March 28, 2010 (if
no meeting is
needed). April 29,
2010 (if meeting
is needed).
q. Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–64 Filed 1–7–10; 8:45 am]
BILLING CODE 6717–01–P
Alabama Power Company has requested
that Project Nos. 2146, 82, and 618 be
consolidated into one project. We are
processing these three projects under
Project No. 2146–111. This final
environmental assessment (EA) is a
cooperative undertaking between the
U.S. Army Corps of Engineers and the
Commission.
The Coosa River Project is located on
the Coosa River, in the States of
Alabama and Georgia. The Logan Martin
development affects less than 1 acre of
Federal lands, the Lay development
affects 133.5 acres of Federal lands, the
Mitchell Project affects 127.3 acres of
Federal lands, and the Jordan Project
affects 10.1 acres of Federal lands. Staff
has prepared a final EA for the project.
The final EA contains staff’s analysis
of the potential environmental effects of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
A copy of the final EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
For further information, please
contact Janet Hutzel at (202) 502–8675
or at janet.hutzel@ferc.gov.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2010–65 Filed 1–7–10; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 2146–111]
DEPARTMENT OF ENERGY
Alabama Power Company; Notice of
Availability of Final Environmental
Assessment
pwalker on DSK8KYBLC1PROD with NOTICES
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a new major license for the Coosa
River Hydroelectric Project (Coosa River
Project), which includes the Weiss, H.
Neely Henry, Logan Martin, Lay, and
Bouldin developments; the Mitchell
Hydroelectric Project (P–82); and the
Jordan Hydroelectric Project (P–618).
VerDate Nov<24>2008
16:14 Jan 07, 2010
Jkt 220001
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
December 31, 2009.
Regulatory Commission by Delegation
Order No. 00–037.00, submitted Rate
Schedule L–F9 for confirmation and
approval on a final basis effective
January 1, 2010, and ending December
31, 2014.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm Eastern Time on
January 15, 2010.
[FR Doc. 2010–58 Filed 1–7–10; 8:45 am]
[Docket No. EF10–1–000]
BILLING CODE 6717–01–P
Western Area Power Administration;
Notice of Filing
DEPARTMENT OF ENERGY
December 30, 2009.
Take notice that on December 16,
2009, the Deputy Secretary of the
Department of Energy submitted Rate
Order No. WAPA–146, confirmed and
approved on an interim basis, effective
on January 1, 2010, Rate Schedule L–F9
for firm electric service from the
Loveland Area Projects, and under the
authority vested in the Federal Energy
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EF10–2–000]
Western Area Power Administration;
Notice of Filing
December 30, 2009.
Take notice that on December 16,
2009, the Deputy Secretary of the
E:\FR\FM\08JAN1.SGM
08JAN1
Agencies
[Federal Register Volume 75, Number 5 (Friday, January 8, 2010)]
[Notices]
[Pages 1049-1050]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-64]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12690-003]
Public Utility District No. 1 of Snohomish County, WA; Notice of
Intent To File License Application, Filing of Draft Application,
Request for Waivers of Integrated Licensing Process Regulations
Necessary for Expedited Processing of a Hydrokinetic Pilot Project
License Application, and Soliciting Comments
December 30, 2009.
a. Type of Filing: Notice of Intent to File a License Application
for an Original License for a Hydrokinetic Pilot Project.
b. Project No.: 12690-003.
c. Date Filed: December 28, 2009.
d. Submitted By: Public Utility District No. 1 of Snohomish County,
Washington (Snohomish PUD)
e. Name of Project: Admiralty Inlet Pilot Tidal Project.
f. Location: On the east side of Admiralty Inlet in Puget Sound,
Washington, about 1 kilometer west of Whidbey Island, entirely within
Island County, Washington. The project would not occupy any Federal
lands.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Applicant Contact: Steven J. Klein, Public Utility District of
Snohomish County, Washington, P.O. Box 1107, 2320, California Street,
Everett, WA 98206-1107; (425) 783-8473.
i. FERC Contact: David Turner (202) 502-6091.
j. Snohomish PUD has filed with the Commission: (1) A notice of
intent (NOI) to file an application for an original license for a
hydrokinetic pilot project and a draft license application with
monitoring plans; (2) a request for waivers of the integrated licensing
process regulations necessary for expedited processing of a
hydrokinetic pilot project license application; and (3) a proposed
process plan and schedule.
k. With this notice, we are soliciting comments on the pre-filing
materials listed in paragraph j above, including the draft license
application and monitoring plans. All comments should be sent to the
address above in paragraph h. In addition, all comments (original and
eight copies) must be filed with the Commission at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426. All filings
with the Commission must include on the first page, the project name
(Admiralty Inlet Pilot Tidal Project) and number (P-12690-003), and
bear the heading ``Comments on the proposed Admiralty Inlet Pilot Tidal
Project.'' Any individual or entity interested in submitting comments
on the pre-filing materials must do so by February 26, 2010.
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-filing'' link.
l. Snohomish PUD was designated as the non-federal representative
for section 7 of the Endangered Species Act consultation and for
section 106 consultation under the National Historic Preservation Act
on November 7, 2008.
m. This notice does not constitute the Commission's approval of
Snohomish PUD's request to use the Pilot Project Licensing Procedures.
Upon its review of the project's overall characteristics relative to
the pilot project criteria, the draft license application contents, and
any comments filed, the Commission will determine whether there is
adequate information to conclude the pre-filing process.
n. The proposed Admiralty Inlet Pilot Tidal Project would consist
of (1) two 10-meter, 500-kilowatt (kW) Open-Centre Turbines supplied by
OpenHydro Group Ltd., mounted on completely submerged gravity
foundations; (2) two 250-meter service cables connected at a subsea
junction box or spliced to a 0.5-kilometer subsea transmission cable,
connecting to a cable termination vault about 50 meters from shore; (3)
two 81-meter-long buried conduits containing the two DC transmission
lines from the turbines and connecting to a power conditioning and
control building; (4) a 140-meter-long buried cable from the control
building to the grid; and (5) appurtenant facilities for operation and
maintenance. The estimated annual generation of the project is 383,000
kilowatt-hours.
o. A copy of the draft license application and all pre-filing
materials are available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site (https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket number,
excluding the
[[Page 1050]]
last three digits in the docket number field to access the document.
For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659.
p. Pre-filing process schedule. The pre-filing process will be
conducted pursuant to the following tentative schedule. Snohomish PUD
plans to complete studies in 2010 to provide further support for the
environmental analysis. Revisions to the schedule below may be made
based on staff's review of the draft application and any comments
received.
------------------------------------------------------------------------
Milestone Date
-----------------------------------------------------------------------
Comments on pre-filing materials due February 26, 2010...............
Issuance of meeting notice (if March 15, 2010..................
needed).
Public meeting/technical conference April 14, 2010..................
(if needed).
Issuance of notice concluding pre- March 28, 2010 (if no meeting is
filing process and ILP waiver needed). April 29, 2010 (if
request determination. meeting is needed).
------------------------------------------------------------------------
q. Register online at https://ferc.gov/esubscribenow.htm to be
notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-64 Filed 1-7-10; 8:45 am]