Download as PDF pwalker on DSK8KYBLC1PROD with NOTICES Federal Register / Vol. 75, No. 5 / Friday, January 8, 2010 / Notices Department of Energy submitted Rate Order No. WAPA–147, confirmed and approved on an interim basis, effective on January 1, 2010, Rate Schedule P– SED–F11 for firm power service from the Pick-Sloan Missouri Basin Program—Eastern Division (PSMBP— ED) and Rate Schedule P–SED–FP–11 for firm peaking power from the P– SMBP—ED, and under the authority vested in the Federal Energy Regulatory Commission by Delegation Order No. 00–037.00, submitted Rate Schedules P– SED–F11 and P–SED–FP11 for confirmation and approval on a final basis effective January 1, 2010, and ending December 31, 2014. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 15, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–59 Filed 1–7–10; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 16:14 Jan 07, 2010 Jkt 220001 1051 Comment Date: 5 p.m. Eastern Time on January 22, 2010. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [Docket No. EL10–27–000] [FR Doc. 2010–61 Filed 1–7–10; 8:45 am] Christian County Generation, LLC; Notice of Filing BILLING CODE 6717–01–P December 30, 2009. DEPARTMENT OF ENERGY Take notice that on December 23, 2009, Christian County Generation, LLC pursuant to section 207 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207 (2009), filed a petition for declaratory order requesting the Commission to confirm the reasonableness of their proposed 11.5 percent return on equity and hypothetical capital structure of 55 percent debt and 45 percent equity in connection with a levelized or deferred capital recovery method under formula rates to be filed at a later date for power sales from their proposed new Taylorville Energy Center. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. CP10–17–000] Transcontinental Gas Pipe Line Company, LLC; Notice of Filing December 31, 2009. Take notice that on November 12, 2009, Transcontinental Gas Pipe Line Company, LLC (Transco), tendered for filing an application for an order permitting and approving the partial abandonment of firm transportation service provided to the City of Danville, Virginia under Transco’s Rate Schedule FT. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\08JAN1.SGM 08JAN1

Agencies

[Federal Register Volume 75, Number 5 (Friday, January 8, 2010)]
[Notices]
[Page 1051]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-61]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL10-27-000]


Christian County Generation, LLC; Notice of Filing

December 30, 2009.
    Take notice that on December 23, 2009, Christian County Generation, 
LLC pursuant to section 207 of the Federal Energy Regulatory 
Commission's (Commission) Rules of Practice and Procedure, 18 CFR 
385.207 (2009), filed a petition for declaratory order requesting the 
Commission to confirm the reasonableness of their proposed 11.5 percent 
return on equity and hypothetical capital structure of 55 percent debt 
and 45 percent equity in connection with a levelized or deferred 
capital recovery method under formula rates to be filed at a later date 
for power sales from their proposed new Taylorville Energy Center.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on January 22, 2010.

Kimberly D. Bose,
Secretary.