Combined Notice of Filings #1, 357-358 [E9-31355]
Download as PDF
srobinson on DSKHWCL6B1PROD with PROPOSALS
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH10–1–000.
Applicants: NSTAR Companies.
Description: Waiver Notification,
Form FERC–65B, of Aircraft Services
Corporation, et al.
Filed Date: 12/23/2009.
Accession Number: 20091223–5110.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: PH10–4–000.
Applicants: Brookfield Asset
Management Inc.
Description: Brookfield Asset
Management Inc., et al., Notification of
Waiver Form FERC–65B.
Filed Date: 12/22/2009.
Accession Number: 20091222–5219.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 12, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–31356 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
December 28, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER09–1287–003.
Applicants: Lumberton Energy, LLC.
Description: Supplement to Notice of
Non-Material Change in Status of
Lumberton Energy, LLC.
Filed Date: 12/23/2009.
Accession Number: 20091223–5161.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–458–000;
ER10–459–000; ER10–460–000.
Applicants: Solios Power Trading
LLC, Solios Power Midwest Trading
LLC, Solios Power Trading LLC.
Description: Application for Market
Based Rate Authority, Related Blanket
Waivers and Authorization, and
Submission of Initial Rate Schedules re
Solios Power Mid Atlantic Trading LLC
et al.
Filed Date: 12/23/2009.
Accession Number: 20091224–0070.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–468–000.
Applicants: Google Energy LLC.
Description: Application of Google
Energy LLC for Market Based Rate
Authority and Granting of Waivers and
Blanket Authority.
Filed Date: 12/23/2009.
Accession Number: 20091224–0071.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD10–7–000.
Applicants: North America Electric
Reliability Council.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
357
Description: Compliance Filing of
NERC in Response to Paragraphs 143,
156, 164, 168, 173, 179, and 187 of
Order No. 716.
Filed Date: 12/18/2009.
Accession Number: 20091218–5238.
Comment Date: 5 p.m. Eastern Time
on Friday, January 8, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
E:\FR\FM\05JAN1.SGM
05JAN1
358
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–31355 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
srobinson on DSKHWCL6B1PROD with PROPOSALS
December 23, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–433–000.
Applicants: California Independent
System Operator Corporation.
Description: Change of condition
informational filing of California
Independent System Operator
Corporation.
Filed Date: 12/15/2009.
Accession Number: 20091215–5152.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 05, 2010.
Docket Numbers: ER10–452–000.
Applicants: EWO Marketing, LP.
Description: EWO Marketing, LP
submits Notices of Termination
canceling several service agreements
etc. pursuant to the requirements set
forth in Order No 614.
Filed Date: 12/18/2009.
Accession Number: 20091222–0051.
Comment Date: 5 p.m. Eastern Time
on Friday, January 08, 2010.
Docket Numbers: ER10–454–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits the unexecuted Interim
Large Generator Interconnection
Agreement with Oklahoma Gas &
Electric Company et al.
Filed Date: 12/18/2009.
Accession Number: 20091222–0056.
Comment Date: 5 p.m. Eastern Time
on Monday, January 04, 2010.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH10–3–000.
Applicants: Brookfield Asset
Management Inc.
Description: Brookfield Asset
Management Inc. et al., Notice of
Material Change in Facts—FERC–65–A.
Filed Date: 12/22/2009.
Accession Number: 20091222–5210.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 12, 2010.
Take notice that the Commission
received the following electric
reliability filings:
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
Docket Numbers: RD10–6–000.
Applicants: North American Electric
Reliability Corp.
Description: Petition of the North
American Electric Reliability Corp for
Approval of VSLs to Critical
Infrastructure Protection Version 2
Reliability Standards CIP–002–2
through CIP–009–2 and VRFs for CIP–
003–2 and CIP–006–2.
Filed Date: 12/18/2009.
Accession Number: 20091218–5236.
Comment Date: 5 p.m. Eastern Time
on Friday, January 08, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please e-
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
mail FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–31203 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–161–000]
Bison Pipeline, L.L.C.; Notice of
Availability of the Final Environmental
Impact Statement for the Proposed
Bison Pipeline Project
December 29, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Bison Pipeline Project proposed
by Bison Pipeline, L.L.C. (Bison) in the
above-referenced docket. Bison requests
authorization to construct and operate
pipeline facilities to deliver
approximately 477 million cubic feet
per day of natural gas from the Powder
River Basin in northeast Wyoming,
through southeastern Montana and
southwestern North Dakota, to the
Northern Border pipeline system.
Through the existing Northern Border
pipeline, the natural gas would be
shipped to markets in the Midwestern
United States (primarily Iowa,
Minnesota, Wisconsin, and Illinois).
The final EIS assesses the potential
environmental effects of the
construction and operation of the Bison
Pipeline Project in accordance with the
requirements of the National
Environmental Policy Act of 1969
(NEPA). The FERC staff concludes that
approval of the proposed project would
have some adverse environmental
impact; however, we believe that
environmental impacts would be
reduced to less-than-significant levels if
the proposed Project is constructed and
operated in accordance with applicable
laws and regulations, Bison’s proposed
mitigation, and additional measures
recommended in the EIS.
The U.S. Department of the Interior,
Bureau of Land Management (BLM)
participated as a cooperating agency in
the preparation of the EIS. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis. The BLM would present their
own conclusions and recommendations
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)]
[Notices]
[Pages 357-358]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31355]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
December 28, 2009.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER09-1287-003.
Applicants: Lumberton Energy, LLC.
Description: Supplement to Notice of Non-Material Change in Status
of Lumberton Energy, LLC.
Filed Date: 12/23/2009.
Accession Number: 20091223-5161.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 13, 2010.
Docket Numbers: ER10-458-000; ER10-459-000; ER10-460-000.
Applicants: Solios Power Trading LLC, Solios Power Midwest Trading
LLC, Solios Power Trading LLC.
Description: Application for Market Based Rate Authority, Related
Blanket Waivers and Authorization, and Submission of Initial Rate
Schedules re Solios Power Mid Atlantic Trading LLC et al.
Filed Date: 12/23/2009.
Accession Number: 20091224-0070.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 13, 2010.
Docket Numbers: ER10-468-000.
Applicants: Google Energy LLC.
Description: Application of Google Energy LLC for Market Based Rate
Authority and Granting of Waivers and Blanket Authority.
Filed Date: 12/23/2009.
Accession Number: 20091224-0071.
Comment Date: 5 p.m. Eastern Time on Wednesday, January 13, 2010.
Take notice that the Commission received the following electric
reliability filings.
Docket Numbers: RD10-7-000.
Applicants: North America Electric Reliability Council.
Description: Compliance Filing of NERC in Response to Paragraphs
143, 156, 164, 168, 173, 179, and 187 of Order No. 716.
Filed Date: 12/18/2009.
Accession Number: 20091218-5238.
Comment Date: 5 p.m. Eastern Time on Friday, January 8, 2010.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
[[Page 358]]
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-31355 Filed 1-4-10; 8:45 am]
BILLING CODE 6717-01-P