FFP Qualified Hydro 19 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 350-351 [E9-31326]
Download as PDF
350
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
(3) adjusting the existing ways to
comply with any previously applicable
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
than any one particular function or
activity.
Comments are invited on: (1) Whether
the proposed collections of information
are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden of the proposed
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information to be collected; and (4)
ways to minimize the burden of the
collection of information on those who
are to respond, including the use of
appropriate automated, electronic,
mechanical, or other technological
collection techniques or other forms of
information technology, e.g. permitting
electronic submission of responses.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31211 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSKHWCL6B1PROD with PROPOSALS
[Project No. 13581–000]
FFP Qualified Hydro 16 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 29, 2009.
On September 4, 2009, FFP Qualified
Hydro 16 LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Fulton
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
Lock and Dam Hydroelectric Project,
located on the Tennessee-Tombigbee
Waterway, in Itawamba County,
Mississippi. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following:
(1) A 40-ft by 150-ft long power canal;
(2) a 50-ft by 40-ft powerhouse; (3) a
new 3 MVA substation; (4) a 1,400-ft
long transmission line; (5) 200 feet of
new access roads; and (6) appurtenant
facilities. The proposed Fulton Lock and
Dam Hydroelectric Project would have
an average annual generation of 11
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930.
FERC Contact: Allyson Conner, 202–
502–6082.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13581) in the docket number field to
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31329 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13576–000]
FFP Qualified Hydro 19 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 29, 2009.
On September 4, 2009, FFP Qualified
Hydro 19 LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the GV
Montgomery Lock and Dam Project,
located on the Tennessee-Tombigbee
Waterway, in Itawamba County,
Mississippi. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following:
(1) A 25-ft by 200-ft long power canal;
(2) a 40-ft by 40-ft powerhouse; (3) a
new 3 MVA substation; (4) a 200-ft long
transmission line; (5) 100 feet of new
access roads; and (6) appurtenant
facilities. The proposed GV Montgomery
Lock and Dam Project would have an
average annual generation of 8 gigawatthours.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930.
FERC Contact: Allyson Conner, 202–
502–6082.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
E:\FR\FM\05JAN1.SGM
05JAN1
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13576) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31326 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13575–000]
FFP Qualified Hydro 21 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
srobinson on DSKHWCL6B1PROD with PROPOSALS
December 29, 2009.
On September 4, 2009, FFP Qualified
Hydro 21 LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Kentucky
River Lock and Dam No. 1 Hydroelectric
Project, located on the Kentucky River,
in Carroll County, Kentucky. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
(1) A 100-ft by 200-ft long power
canal; (2) a newly excavated 125-ft by
200-ft tailrace; (3) a 30-ft by 60-ft control
building; (4) a new 5 MVA substation;
(5) a 2,500-ft long transmission line; and
(6) appurtenant facilities. The proposed
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
Kentucky River Lock and Dam No. 1
Hydroelectric Project would have an
average annual generation of 20
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930.
FERC Contact: Allyson Conner, 202–
502–6082.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13575–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31325 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13456–000]
FFP Iowa 4, LLC; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
December 29, 2009.
On April 30, 2009, FFP Iowa 4, LLC
filed an application pursuant to section
4(f) of the Federal Power Act, proposing
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
351
to study the feasibility of the
Mississippi River Lock and Dam No. 17
Water Power Project (Lock & Dam 17
Project), to be located at River Mile
437.1 on the Mississippi River near
Wapello, Louisa County, Iowa and in
Mercer County, Illinois.
The proposed Lock & Dam 17 Project
would be located at the existing U.S.
Army Corps of Engineers Lock & Dam
No. 17 and would consist of: (1) Twenty
nine 525-kilowatt (kW) Very Low Head
(VHL) generating units to be installed
integral with the dam, and one hundred
37.5-kW hydrokinetic generating units
to be installed in the Mississippi River
in an area just downstream of the dam;
(2) a combined capacity of 17.7
megawatts (MW) for all turbine
generating units; and (3) an existing
single overhead three-phase 27,000-footlong, 69-kilovolt (or greater)
transmission line connected to an
existing above-ground local distribution
system. The project would have an
estimated average annual generation of
86,400 megawatt-hours.
Applicant Contact: Mr. Daniel R.
Irvin, Free Flow Power Corporation, 33
Commercial Street, Gloucester, MA
01930, (978) 252–7631.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13456) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31324 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)]
[Notices]
[Pages 350-351]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31326]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13576-000]
FFP Qualified Hydro 19 LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
December 29, 2009.
On September 4, 2009, FFP Qualified Hydro 19 LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the GV
Montgomery Lock and Dam Project, located on the Tennessee-Tombigbee
Waterway, in Itawamba County, Mississippi. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following:
(1) A 25-ft by 200-ft long power canal; (2) a 40-ft by 40-ft
powerhouse; (3) a new 3 MVA substation; (4) a 200-ft long transmission
line; (5) 100 feet of new access roads; and (6) appurtenant facilities.
The proposed GV Montgomery Lock and Dam Project would have an average
annual generation of 8 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation,
33 Commercial Street, Gloucester, MA 01930.
FERC Contact: Allyson Conner, 202-502-6082.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov/docs-filing/ferconline.asp)
[[Page 351]]
under the ``eFiling'' link. For a simpler method of submitting text
only comments, click on ``Quick Comment.'' For assistance, please
contact FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-
free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although
the Commission strongly encourages electronic filing, documents may
also be paper-filed. To paper-file, mail an original and eight copies
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13576) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-31326 Filed 1-4-10; 8:45 am]
BILLING CODE 6717-01-P