AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Availability of the Final General Conformity Determination for Maryland for the Proposed Sparrows Point LNG Terminal and Pipeline Project, 353-354 [E9-31318]
Download as PDF
srobinson on DSKHWCL6B1PROD with PROPOSALS
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31210 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13580–000]
FFP Qualified Hydro 20 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 29, 2009.
On September 4, 2009, FFP Qualified
Hydro 20 LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Green
River Lock and Dam No. 1 Water Power
Project, located on the Green River, in
Henderson County, Kentucky. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
(1) A 125-ft by 250-ft long power
canal; (2) a newly excavated 150-ft by
300-ft tailrace; (3) a 30-ft by 60-ft control
building; (4) a new 5 MVA substation;
(5) a 1,900-ft long transmission line; and
(6) appurtenant facilities. The proposed
Green River Lock and Dam No. 1
Hydroelectric Project would have an
average annual generation of 27
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930.
FERC Contact: Allyson Conner, 202–
502–6082.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
353
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13580–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31328 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP07–62–000; CP07–63–000]
AES Sparrows Point LNG, LLC and
Mid-Atlantic Express, LLC; Notice of
Availability of the Final General
Conformity Determination for Maryland
for the Proposed Sparrows Point LNG
Terminal and Pipeline Project
December 29, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this Final
General Conformity Determination
(GCD) for Maryland to assess the
potential air quality impacts associated
with the construction and operation of
a liquefied natural gas (LNG) import
terminal and natural gas pipeline
proposed by AES Sparrows Point LNG,
LLC and Mid-Atlantic Express, LLC,
collectively referred to as AES, in the
above-referenced dockets. A separate
Final General Conformity Determination
is being prepared for Pennsylvania.
The final GCD was prepared to satisfy
the requirements of the Clean Air Act.
The FERC has determined that the
Project will achieve conformity in
Maryland.
The final GCD addresses the potential
air quality impacts from the
construction and operation of the
following LNG terminal and natural gas
pipeline facilities:
• A ship unloading facility, with two
berths, capable of receiving LNG ships
with capacities up to 217,000 m 3;
• Three 160,000 m 3 (net capacity)
full-containment LNG storage tanks;
• A closed-loop shell and tube heat
exchanger vaporization system;
E:\FR\FM\05JAN1.SGM
05JAN1
srobinson on DSKHWCL6B1PROD with PROPOSALS
354
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
• Various ancillary facilities
including administrative offices,
warehouse, main control room, security
building, and a platform control room;
• Meter and regulation station within
the LNG Terminal site;
• Dredging an approximate 118 acre
area in the Patapsco River to ¥45 feet
below mean lower low water to
accommodate the LNG vessels and
transport of the processed dredge
material to its disposal location;
• Approximately 88 miles of 30-inchdiameter natural gas pipeline
(approximately 48 miles in Maryland
and 40 miles in Pennsylvania), a pig
launcher and receiver facility at the
beginning and ending of the pipeline, 10
mainline valves, and three meter and
regulation stations, one at each of three
interconnection sites at the end of the
pipeline;
• Marine vessel transit (including
LNG vessels, security escort boats, and
assist tugs) from the LNG vessel’s
entrance into State waters, through its
transit to and from the LNG terminal at
Sparrows Point; and
• The optional combined-cycle
cogeneration power plant at the
terminal site.
The final GCD has been placed in the
public files of the FERC and is available
for distribution and public inspection
at:
Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street, NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
A limited number of hard copies of
the final GCD are available from the
FERC’s Public Reference Room,
identified above. This final GCD is also
available for public viewing on the
FERC’s Internet Web site at https://
www.ferc.gov, via the eLibrary link.
Copies of this final GCD have been
mailed to the U.S. Environmental
Protection Agency, Region III, the
Maryland Department of Natural
Resources, the Maryland Department of
Environment, the Pennsylvania
Department of Environmental
Protection, and the Virginia Department
of Environmental Quality.
Additional information about the
project is available from the
Commission’s Office of External Affairs
at 1–866–208–FERC (3372). The
administrative public record for this
proceeding to date is on the FERC
Internet Web site (https://www.ferc.gov).
Go to Documents & Filings and choose
the eLibrary link. Under eLibrary, click
on ‘‘General Search,’’ and enter the
docket number excluding the last three
digits in the Docket Number field (e.g.,
CP07–62). Be sure you have selected an
appropriate date range. For assistance,
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
please contact FERC Online Support at:
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY call
202–502–8659. The eLibrary link on the
FERC Internet Web site also provides
access to the texts of formal documents
issued by the Commission, such as
orders, notices, and rulemakings.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–31318 Filed 1–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
December 29, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER08–912–009;
ER05–365–022.
Applicants: Elk River Windfarm LLC,
Iberdrola Renewables, Inc.
Description: Iberdrola Renewables,
Inc et al. submit Original Sheet 1 to
FERC Electric Tariff, Third Revised
Volume 1.
Filed Date: 12/23/2009.
Accession Number: 20091224–0069.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–403–001.
Applicants: Covanta Plymouth
Renewable Energy Limited.
Description: Covanta Plymouth
Renewable Energy Limited Partnership
submits Notice of Cancellation of its
Rate Schedule FERC No. 2.
Filed Date: 12/23/2009.
Accession Number: 20091224–0068.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–495–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
submits an unexecuted Amended and
Restated Large Generator
Interconnection Agreement among the
Midwest ISO et al.
Filed Date: 12/23/2009.
Accession Number: 20091224–0066.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–496–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits an executed Large Generator
Interconnection Agreement with Grand
River Dam Authority etc.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Filed Date: 12/23/2009.
Accession Number: 20091224–0067.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Docket Numbers: ER10–498–000.
Applicants: Central Maine Power
Company.
Description: Central Maine Power
Company submits executed Engineering
and Procurement Agreement with
Highland Wind LLC.
Filed Date: 12/24/2009.
Accession Number: 20091228–0023.
Comment Date: 5 p.m. Eastern Time
on Thursday, January 14, 2010.
Docket Numbers: ER10–499–000.
Applicants: Central Maine Power
Company.
Description: Central Maine Power
submits executed Engineering and
Procurement Agreement with Patriot
Renewables, LLC.
Filed Date: 12/24/2009.
Accession Number: 20091228–0020.
Comment Date: 5 p.m. Eastern Time
on Thursday, January 14, 2010.
Docket Numbers: ER10–500–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
an amendment to its tariff.
Filed Date: 12/24/2009.
Accession Number: 20091228–0021.
Comment Date: 5 p.m. Eastern Time
on Thursday, January 14, 2010.
Docket Numbers: ER10–502–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits an executed Participation
Power Agreement dated 10/19/09,
between Westar and the Kansas Power
Pool.
Filed Date: 12/24/2009.
Accession Number: 20091228–0024.
Comment Date: 5 p.m. Eastern Time
on Thursday, January 14, 2010.
Docket Numbers: ER10–503–000.
Applicants: VERMONT ELECTRIC
COOPERATIVE INC.
Description: Motion for Limited
Waiver of VERMONT ELECTRIC
COOPERATIVE, INC.
Filed Date: 12/23/2009.
Accession Number: 20091223–5160.
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 13, 2010.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD10–8–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of
Interpretations to Reliability Standard
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)]
[Notices]
[Pages 353-354]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31318]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP07-62-000; CP07-63-000]
AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice
of Availability of the Final General Conformity Determination for
Maryland for the Proposed Sparrows Point LNG Terminal and Pipeline
Project
December 29, 2009.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared this Final General Conformity Determination
(GCD) for Maryland to assess the potential air quality impacts
associated with the construction and operation of a liquefied natural
gas (LNG) import terminal and natural gas pipeline proposed by AES
Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, collectively
referred to as AES, in the above-referenced dockets. A separate Final
General Conformity Determination is being prepared for Pennsylvania.
The final GCD was prepared to satisfy the requirements of the Clean
Air Act. The FERC has determined that the Project will achieve
conformity in Maryland.
The final GCD addresses the potential air quality impacts from the
construction and operation of the following LNG terminal and natural
gas pipeline facilities:
A ship unloading facility, with two berths, capable of
receiving LNG ships with capacities up to 217,000 m \3\;
Three 160,000 m \3\ (net capacity) full-containment LNG
storage tanks;
A closed-loop shell and tube heat exchanger vaporization
system;
[[Page 354]]
Various ancillary facilities including administrative
offices, warehouse, main control room, security building, and a
platform control room;
Meter and regulation station within the LNG Terminal site;
Dredging an approximate 118 acre area in the Patapsco
River to -45 feet below mean lower low water to accommodate the LNG
vessels and transport of the processed dredge material to its disposal
location;
Approximately 88 miles of 30-inch-diameter natural gas
pipeline (approximately 48 miles in Maryland and 40 miles in
Pennsylvania), a pig launcher and receiver facility at the beginning
and ending of the pipeline, 10 mainline valves, and three meter and
regulation stations, one at each of three interconnection sites at the
end of the pipeline;
Marine vessel transit (including LNG vessels, security
escort boats, and assist tugs) from the LNG vessel's entrance into
State waters, through its transit to and from the LNG terminal at
Sparrows Point; and
The optional combined-cycle cogeneration power plant at
the terminal site.
The final GCD has been placed in the public files of the FERC and
is available for distribution and public inspection at:
Federal Energy Regulatory Commission, Public Reference Room, 888
First Street, NE., Room 2A, Washington, DC 20426, (202) 502-8371.
A limited number of hard copies of the final GCD are available from
the FERC's Public Reference Room, identified above. This final GCD is
also available for public viewing on the FERC's Internet Web site at
https://www.ferc.gov, via the eLibrary link.
Copies of this final GCD have been mailed to the U.S. Environmental
Protection Agency, Region III, the Maryland Department of Natural
Resources, the Maryland Department of Environment, the Pennsylvania
Department of Environmental Protection, and the Virginia Department of
Environmental Quality.
Additional information about the project is available from the
Commission's Office of External Affairs at 1-866-208-FERC (3372). The
administrative public record for this proceeding to date is on the FERC
Internet Web site (https://www.ferc.gov). Go to Documents & Filings and
choose the eLibrary link. Under eLibrary, click on ``General Search,''
and enter the docket number excluding the last three digits in the
Docket Number field (e.g., CP07-62). Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at: FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY call 202-502-8659. The eLibrary link on the FERC Internet
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rulemakings.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-31318 Filed 1-4-10; 8:45 am]
BILLING CODE 6717-01-P