Notice of Intent To Prepare an Environmental Impact Statement for the Sigurd-Red Butte Transmission Line Project (Project) in Utah, 430-431 [E9-31239]
Download as PDF
430
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
Federal Land Policy and Management
Act (FLPMA) of 1976, as amended The
Bureau of Land Management (BLM)
Wenatchee Field Office and the U.S.
Army Yakima Training Center (YTC)
intend to prepare an Environmental
Impact Statement (EIS) for the Vantage
to Pomona Heights 230 kilovolt (kV)
Transmission Line Project. By this
notice, the BLM and YTC are
announcing the beginning of the
scoping process to solicit public
comments and identify issues.
DATES: Comments on this Notice of
Intent may be submitted in writing until
March 8, 2010. The dates and the
locations of any scoping meetings will
be announced through local media and
individual letter mailings at least 15
days prior to the events. To be
considered in the Draft EIS, all
comments must be received prior to the
close of the scoping period or 15 days
after the last public meeting, whichever
is later. BLM will provide additional
opportunities for public involvement
after publication of the Draft EIS.
ADDRESSES: You may submit comments
or resource information related to the
Vantage to Pomona Heights 230 kV
Transmission Line Project by either of
the following methods:
• E-mail:
OR_Wenatchee_Mail@blm.gov (please
reference Vantage to Pomona Heights
EIS in the subject line).
• Mail/hand deliver to: BLM
Wenatchee Field Office, ATTN: Vantage
to Pomona Heights EIS, 915 Walla Walla
Avenue, Wenatchee, Washington
98801–1521.
Documents pertinent to this proposal
may be examined at the BLM
Wenatchee Field Office.
FOR FURTHER INFORMATION CONTACT: For
further information and/or to have your
name added to our mailing list, contact
William Schurger, Realty Specialist, at
(509) 655–2100; e-mail:
OR_Wenatchee_Mail@blm.gov.
Pacific
Power has submitted applications for
rights-of-way (ROWs) across BLM- and
YTC-administered lands to construct the
Vantage to Pomona Heights 230kV
Transmission Line Project. The new 230
kV transmission line is being proposed
to address energy demand growth in the
Yakima region by increasing the
capacity of the transmission system
[that will serve growing needs] while
ensuring continued reliable service to
existing customers.
The new 230 kV transmission line
would be constructed from Pacific
Power’s existing Pomona Heights
substation east of Selah, Washington to
srobinson on DSKHWCL6B1PROD with PROPOSALS
SUPPLEMENTARY INFORMATION:
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
the Bonneville Power Administration’s
existing Vantage substation east of the
Wanapum Dam on the Columbia River.
The project would cross a distance of
approximately 38 miles through Grant,
Kittitas, and Yakima Counties. The
proposed route is generally parallel and
south of Pacific Power’s existing
Pomona-Wanapum 230 kV transmission
line. The line would cross
approximately four miles of BLMadministered land, 19 miles of the YTC
administered lands, and 15 miles of
private land. The permanent ROW
requested for the project is 125 feet
wide. H-frame wood pole structures are
proposed for most of the line located in
open terrain. The H-frame structures
would be between 65 and 100 feet tall
and spaced approximately 750 to 900
feet apart depending on terrain. In
developed areas, such as around the
Pomona Heights substation, single wood
or steel pole structures would be used.
The single pole structures would be
between 80 and 95 feet tall and spaced
approximately between 300 to 500 feet
apart. For the Columbia River crossing,
steel lattice structures would be
approximately 200 feet tall. This extra
height is required to safely span the
more than 3,000-foot river crossing.
Construction would begin in mid 2011
and be completed in late 2012.
The BLM and YTC are joint lead
Federal agencies for preparation of the
EIS. Through public scoping, BLM and
YTC expect to identify various issues,
potential impacts, mitigation measures,
and alternatives associated with the
proposed action. Through internal
scoping, the BLM and YTC identified
the following preliminary issues and
concerns:
(1) Potential conflict with YTC
training operations. The YTC is
concerned about how the proposed
transmission line would interfere with
or constrain its military training
mission.
(2) Cultural properties. Cultural
properties in the vicinity of the
proposed route are of concern to several
Native American Tribes.
(3) Habitat for sage-grouse and other
species of concern. The proposed route
would pass through occupied sagegrouse habitat.
(4) Values within the Yakima River
Canyon Area of Critical Environmental
Concern (ACEC). The proposed route
would cross through this ACEC, whose
values include three plant species of
concern, unique wildlife habitat, and
recreational opportunities.
(5) Visual resources. Portions of the
proposed transmission line would be
visible from great distances in this open
terrain.
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
(6) Wildland fire management. High
value facilities, such as the proposed
transmission line, require additional
protection from wildland fire.
The BLM will use the NEPA
commenting process to satisfy the
public involvement process of Section
106 of the National Historic
Preservation Act (16 U.S.C. 470f), as
provided for in 36 CFR 800.2(d)(3).
Native American Tribal consultations
will be conducted and Tribal concerns,
including impacts on Indian trust assets,
will be given due consideration.
Federal, State, and local agencies, along
with other stakeholders that may be
interested in or affected by the BLM’s
decision on this project, are invited to
participate in the scoping process.
Federal, State, and local agencies may
request or be asked by the BLM to
participate as a cooperating agency.
Before including your address, phone
number, e-mail address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
Robert B. Towne,
Spokane District Manager.
[FR Doc. E9–31240 Filed 1–4–10; 8:45 am]
BILLING CODE 4310–33–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLUTC00000.L51010000.ER0000.
LVRWJ09J4050; UTU–83067]
Notice of Intent To Prepare an
Environmental Impact Statement for
the Sigurd–Red Butte Transmission
Line Project (Project) in Utah
AGENCY: Bureau of Land Management,
Interior.
ACTION: Notice of intent.
SUMMARY: In compliance with the
National Environmental Policy Act
(NEPA) of 1969, as amended, and the
Federal Land Policy and Management
Act of 1976, as amended, the Bureau of
Land Management (BLM) Cedar City
Field Office, Cedar City, Utah, intends
to prepare an Environmental Impact
Statement (EIS) for a right-of-way
(ROW) application for the Sigurd-Red
Butte 345 kilovolt (kV) Transmission
Line Project and by this notice is
announcing the beginning of the
scoping process to solicit public
comments and identify issues.
DATES: This notice initiates the public
scoping process for the EIS. Comments
on issues may be submitted in writing
E:\FR\FM\05JAN1.SGM
05JAN1
srobinson on DSKHWCL6B1PROD with PROPOSALS
Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices
until February 19, 2010. The date(s) and
location(s) of any scoping meetings will
be announced at least 15 days in
advance through local media,
newspapers, and the BLM Web site at:
https://www.blm.gov/ut/st/en/fo/
cedar_city/planning.html. In order to be
considered in the Draft EIS, all
comments must be received prior to the
close of the scoping period or 15 days
after the last public meeting, whichever
is later. The BLM will provide
additional opportunities for public
participation upon publication of the
Draft EIS.
ADDRESSES: You may submit comments
related to the Sigurd-Red Butte 345
Transmission Line Project by any of the
following methods:
• Web site: https://www.blm.gov/ut/st/
en/fo/cedar_city/planning.html.
• Mail: Bureau of Land Management,
Cedar City Field Office, 176 East D.L.
Sargent Drive, Cedar City, Utah 84721,
Attention: Lucas Lucero.
• E-mail: utsrbproj@blm.gov.
Documents pertinent to the right-ofway (ROW) application for the
transmission line project may be
examined at:
• U.S. Forest Service, Dixie Office,
1789 North Wedgewood Lane, Cedar
City, Utah 84721.
• U.S. Forest Service, Fishlake Office,
115 East 900 North, Richfield, Utah
84701.
• BLM, Cedar City Field Office, 176
D.L. Sargent Drive, Cedar City, Utah
84721.
FOR FURTHER INFORMATION CONTACT: For
further information and/or to have your
name added to our mailing list, contact
Lucas Lucero, BLM Project Manager;
telephone (702) 515–5059; e-mail
Lucas_Lucero@blm.gov; address BLM,
Cedar City Field Office, 176 East D.L.
Sargent Drive, Cedar City, Utah 84721.
SUPPLEMENTARY INFORMATION:
PacifiCorp, doing business as Rocky
Mountain Power Company, has filed a
ROW application seeking authorization
to construct, operate, maintain, and
decommission a 345 kV single-circuit
overhead electric transmission line on
Federal lands. The project would
provide an additional 600 megawatts of
reliable electrical capacity by 2014 to
respond to anticipated load growth in
Southwestern Utah. The proposed
project begins at the existing Sigurd
Substation near Richfield, Utah, and
terminates at the existing Red Butte
Substation near the town of Central,
Utah. The project area spans
approximately 160 miles. Rocky
Mountain Power Company has
identified multiple alternative routes
between the two substations.
VerDate Nov<24>2008
16:41 Jan 04, 2010
Jkt 220001
Alternative routes identified so far
would affect Federal, State, and private
lands. The requested ROW width on
Federal lands is 150 feet. Rocky
Mountain Power Company proposes to
predominantly use steel H-frame towers
approximately 80 to 130 feet in height
with average spans between towers of
1,000 to 1,200 feet. Permanent access
roads approximately 14 feet wide would
be needed. Temporary work space
would be needed during construction
for material storage, conductor
tensioning sites, and to accommodate
vehicles and equipment. Alternative
routes currently identified would use
portions of utility corridors on Federal
lands and parallel portions of existing
overhead and underground utilities and
roadways.
The BLM is the designated lead
Federal agency for preparation of the
EIS. Other agencies with legal
jurisdiction or special expertise have
been invited to participate as
cooperating agencies in preparation of
the EIS. Currently, the U.S. Forest
Service (Dixie and Fishlake National
Forests), State of Utah, Millard County,
Sevier County, Beaver County, Utah
Division of Wildlife Resources, City of
St. George, and City of Enterprise have
agreed to participate as cooperating
agencies.
The purpose of the public scoping
process is to determine relevant issues
that will influence the scope of the
environmental analysis, including
alternatives, and guide the process for
developing the EIS. At present, the BLM
has identified the following preliminary
issues: public health and safety, noise,
visual intrusions, migratory bird habitat,
crucial deer and elk habitat, Utah Prairie
Dog habitat, socioeconomic impacts,
cultural and historic sites, National
Scenic and Historic Trails, and nearby
inventoried roadless areas on National
Forests.
The BLM will use and coordinate the
NEPA commenting process to satisfy the
public involvement process for Section
106 of the National Historic
Preservation Act (16 U.S.C. 470f) as
provided for in 36 CFR 800.2(d)(3).
Native American Tribal consultations
will be conducted and Tribal concerns
will be given due consideration,
including impacts on Indian trust assets.
Federal, State, and local agencies, along
with other stakeholders that may be
interested or affected by the BLM’s
decision on this project are invited to
participate in the scoping process and,
if eligible, may request or be requested
by the BLM to participate as a
cooperating agency.
Before including your address, phone
number, e-mail address, or other
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
431
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1501.7.
Selma Sierra,
State Director.
[FR Doc. E9–31239 Filed 1–4–10; 8:45 am]
BILLING CODE 4310–DQ–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNML00000 L16100000.DO0000]
Notice of Intent To Prepare a Resource
Management Plan for the Prehistoric
Trackways National Monument, Las
Cruces District Office, New Mexico and
Associated Environmental Impact
Statement
AGENCY: Bureau of Land Management,
Interior.
ACTION: Notice of intent.
SUMMARY: In compliance with the
National Environmental Policy Act of
1969 (NEPA), as amended, and the
Federal Land Policy and Management
Act of 1976 (FLPMA), as amended, the
Bureau of Land Management (BLM) Las
Cruces District Office, Las Cruces, New
Mexico, intends to prepare a Resource
Management Plan (RMP) with an
associated Environmental Impact
Statement (EIS) for the Prehistoric
Trackways National Monument and by
this notice is announcing the beginning
of the scoping process to solicit public
comments and identify issues. The RMP
will replace the existing Mimbres RMP
(1993).
DATES: This notice initiates the public
scoping process for the RMP with
associated EIS. Comments on issues
may be submitted in writing until
February 4, 2010. The dates and
locations of any scoping meetings will
be announced at least 15 days in
advance through local media,
newsletters, and the BLM Web site at:
https://www.blm.gov/nm/st/en/fo/
Las_Cruces_District_Office.
html. In order to be included in the
Draft EIS, all comments must be
received prior to the close of the scoping
period or 15 days after the last public
meeting, whichever is later. We will
provide additional opportunities for
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)]
[Notices]
[Pages 430-431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31239]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLUTC00000.L51010000.ER0000.LVRWJ09J4050; UTU-83067]
Notice of Intent To Prepare an Environmental Impact Statement for
the Sigurd-Red Butte Transmission Line Project (Project) in Utah
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: In compliance with the National Environmental Policy Act
(NEPA) of 1969, as amended, and the Federal Land Policy and Management
Act of 1976, as amended, the Bureau of Land Management (BLM) Cedar City
Field Office, Cedar City, Utah, intends to prepare an Environmental
Impact Statement (EIS) for a right-of-way (ROW) application for the
Sigurd-Red Butte 345 kilovolt (kV) Transmission Line Project and by
this notice is announcing the beginning of the scoping process to
solicit public comments and identify issues.
DATES: This notice initiates the public scoping process for the EIS.
Comments on issues may be submitted in writing
[[Page 431]]
until February 19, 2010. The date(s) and location(s) of any scoping
meetings will be announced at least 15 days in advance through local
media, newspapers, and the BLM Web site at: https://www.blm.gov/ut/st/en/fo/cedar_city/planning.html. In order to be considered in the Draft
EIS, all comments must be received prior to the close of the scoping
period or 15 days after the last public meeting, whichever is later.
The BLM will provide additional opportunities for public participation
upon publication of the Draft EIS.
ADDRESSES: You may submit comments related to the Sigurd-Red Butte 345
Transmission Line Project by any of the following methods:
Web site: https://www.blm.gov/ut/st/en/fo/cedar_city/planning.html.
Mail: Bureau of Land Management, Cedar City Field Office,
176 East D.L. Sargent Drive, Cedar City, Utah 84721, Attention: Lucas
Lucero.
E-mail: utsrbproj@blm.gov.
Documents pertinent to the right-of-way (ROW) application for the
transmission line project may be examined at:
U.S. Forest Service, Dixie Office, 1789 North Wedgewood
Lane, Cedar City, Utah 84721.
U.S. Forest Service, Fishlake Office, 115 East 900 North,
Richfield, Utah 84701.
BLM, Cedar City Field Office, 176 D.L. Sargent Drive,
Cedar City, Utah 84721.
FOR FURTHER INFORMATION CONTACT: For further information and/or to have
your name added to our mailing list, contact Lucas Lucero, BLM Project
Manager; telephone (702) 515-5059; e-mail Lucas_Lucero@blm.gov;
address BLM, Cedar City Field Office, 176 East D.L. Sargent Drive,
Cedar City, Utah 84721.
SUPPLEMENTARY INFORMATION: PacifiCorp, doing business as Rocky Mountain
Power Company, has filed a ROW application seeking authorization to
construct, operate, maintain, and decommission a 345 kV single-circuit
overhead electric transmission line on Federal lands. The project would
provide an additional 600 megawatts of reliable electrical capacity by
2014 to respond to anticipated load growth in Southwestern Utah. The
proposed project begins at the existing Sigurd Substation near
Richfield, Utah, and terminates at the existing Red Butte Substation
near the town of Central, Utah. The project area spans approximately
160 miles. Rocky Mountain Power Company has identified multiple
alternative routes between the two substations. Alternative routes
identified so far would affect Federal, State, and private lands. The
requested ROW width on Federal lands is 150 feet. Rocky Mountain Power
Company proposes to predominantly use steel H-frame towers
approximately 80 to 130 feet in height with average spans between
towers of 1,000 to 1,200 feet. Permanent access roads approximately 14
feet wide would be needed. Temporary work space would be needed during
construction for material storage, conductor tensioning sites, and to
accommodate vehicles and equipment. Alternative routes currently
identified would use portions of utility corridors on Federal lands and
parallel portions of existing overhead and underground utilities and
roadways.
The BLM is the designated lead Federal agency for preparation of
the EIS. Other agencies with legal jurisdiction or special expertise
have been invited to participate as cooperating agencies in preparation
of the EIS. Currently, the U.S. Forest Service (Dixie and Fishlake
National Forests), State of Utah, Millard County, Sevier County, Beaver
County, Utah Division of Wildlife Resources, City of St. George, and
City of Enterprise have agreed to participate as cooperating agencies.
The purpose of the public scoping process is to determine relevant
issues that will influence the scope of the environmental analysis,
including alternatives, and guide the process for developing the EIS.
At present, the BLM has identified the following preliminary issues:
public health and safety, noise, visual intrusions, migratory bird
habitat, crucial deer and elk habitat, Utah Prairie Dog habitat,
socioeconomic impacts, cultural and historic sites, National Scenic and
Historic Trails, and nearby inventoried roadless areas on National
Forests.
The BLM will use and coordinate the NEPA commenting process to
satisfy the public involvement process for Section 106 of the National
Historic Preservation Act (16 U.S.C. 470f) as provided for in 36 CFR
800.2(d)(3). Native American Tribal consultations will be conducted and
Tribal concerns will be given due consideration, including impacts on
Indian trust assets. Federal, State, and local agencies, along with
other stakeholders that may be interested or affected by the BLM's
decision on this project are invited to participate in the scoping
process and, if eligible, may request or be requested by the BLM to
participate as a cooperating agency.
Before including your address, phone number, e-mail address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1501.7.
Selma Sierra,
State Director.
[FR Doc. E9-31239 Filed 1-4-10; 8:45 am]