Download as PDF 352 Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13582–000] FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications srobinson on DSKHWCL6B1PROD with PROPOSALS December 29, 2009. On September 8, 2009, FFP Qualified Hydro 18 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the John Rankin Lock and Dam Hydroelectric Project, located on the TennesseeTombigbee Waterway, in Itawamba County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 30-ft by 250-ft long power canal; (2) a 40-ft by 40-ft powerhouse; (3) a new 3 MVA substation; (4) a 200-ft long transmission line; (5) 100 feet of new access roads; and (6) appurtenant facilities. The proposed John Rankin Lock and Dam Hydroelectric Project would have an average annual generation of 9.5 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930. FERC Contact: Allyson Conner, 202– 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages VerDate Nov<24>2008 16:41 Jan 04, 2010 Jkt 220001 electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13582) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–31317 Filed 1–4–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12569–001] Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions December 28, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License. b. Project No.: 12569–001. c. Date filed: August 22, 2008. d. Applicant: Public Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location: On the Similkameen River, in the Town of Oroville, Okanogan County, Washington. The project would occupy about 35.47 acres of federal land administered by the U.S. Bureau of Land Management. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: John R. Grubich, General Manager, Public Utility District No. 1 of Okanogan County, P.O. Box 912, Okanogan, WA 98840, (509) 422–8485. i. FERC Contact: Kim A. Nguyen, 888 First Street, NE., Room 61–01, Washington, DC 20426, (202) 502–6105. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The Enloe Project would consist of: (1) An existing 315-foot-long and 54foot-high concrete gravity arch dam with an integrated 276-foot-long central overflow spillway with 5-foot-high flashboards; (2) an existing 76.6-acre reservoir (narrow channel of the Similkameen River) with a storage capacity of 775 acre-feet at 1,049.3 feet mean sea level; (3) a 190-foot-long intake canal on the east abutment of the dam diverting flows into the penstock intake structure; (4) a 35-foot-long by 30-foot-wide penstock intake structure; (5) two aboveground 8.5-foot-diameter steel penstocks carrying flows from the intake to the powerhouse; (6) a powerhouse containing two vertical Kaplan turbine/generator units with a total installed capacity of 9.0 megawatts; (7) a 180-foot-long tailrace channel that would convey flows from the powerhouse to the Similkameen River, downstream of the Similkameen Falls; (8) a new substation adjacent to the powerhouse; (9) a new 100-foot-long, 13.2-kilovolt primary transmission line from the substation connecting to an existing distribution line; (10) new and upgraded access roads, and (11) appurtenant facilities. The project is estimated to generate an average of 54 gigawatt-hours annually. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be E:\FR\FM\05JAN1.SGM 05JAN1 srobinson on DSKHWCL6B1PROD with PROPOSALS Federal Register / Vol. 75, No. 2 / Tuesday, January 5, 2010 / Notices viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS’’, ‘‘TERMS AND CONDITIONS’’, or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Kimberly D. Bose, Secretary. [FR Doc. E9–31210 Filed 1–4–10; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 16:41 Jan 04, 2010 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13580–000] FFP Qualified Hydro 20 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 29, 2009. On September 4, 2009, FFP Qualified Hydro 20 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Green River Lock and Dam No. 1 Water Power Project, located on the Green River, in Henderson County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 125-ft by 250-ft long power canal; (2) a newly excavated 150-ft by 300-ft tailrace; (3) a 30-ft by 60-ft control building; (4) a new 5 MVA substation; (5) a 1,900-ft long transmission line; and (6) appurtenant facilities. The proposed Green River Lock and Dam No. 1 Hydroelectric Project would have an average annual generation of 27 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930. FERC Contact: Allyson Conner, 202– 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 353 electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13580–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–31328 Filed 1–4–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07–62–000; CP07–63–000] AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Availability of the Final General Conformity Determination for Maryland for the Proposed Sparrows Point LNG Terminal and Pipeline Project December 29, 2009. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared this Final General Conformity Determination (GCD) for Maryland to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, collectively referred to as AES, in the above-referenced dockets. A separate Final General Conformity Determination is being prepared for Pennsylvania. The final GCD was prepared to satisfy the requirements of the Clean Air Act. The FERC has determined that the Project will achieve conformity in Maryland. The final GCD addresses the potential air quality impacts from the construction and operation of the following LNG terminal and natural gas pipeline facilities: • A ship unloading facility, with two berths, capable of receiving LNG ships with capacities up to 217,000 m 3; • Three 160,000 m 3 (net capacity) full-containment LNG storage tanks; • A closed-loop shell and tube heat exchanger vaporization system; E:\FR\FM\05JAN1.SGM 05JAN1

Agencies

[Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)]
[Notices]
[Pages 352-353]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31210]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12569-001]


Enloe Hydroelectric Project; Notice of Application Ready for 
Environmental Analysis and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

December 28, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major License.
    b. Project No.: 12569-001.
    c. Date filed: August 22, 2008.
    d. Applicant: Public Utility District No. 1 of Okanogan County.
    e. Name of Project: Enloe Hydroelectric Project.
    f. Location: On the Similkameen River, in the Town of Oroville, 
Okanogan County, Washington. The project would occupy about 35.47 acres 
of federal land administered by the U.S. Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: John R. Grubich, General Manager, Public 
Utility District No. 1 of Okanogan County, P.O. Box 912, Okanogan, WA 
98840, (509) 422-8485.
    i. FERC Contact: Kim A. Nguyen, 888 First Street, NE., Room 61-01, 
Washington, DC 20426, (202) 502-6105.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions is 60 days from the issuance of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only comments 
click on ``Quick Comment.'' For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and eight copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The Enloe Project would consist of: (1) An existing 315-foot-
long and 54-foot-high concrete gravity arch dam with an integrated 276-
foot-long central overflow spillway with 5-foot-high flashboards; (2) 
an existing 76.6-acre reservoir (narrow channel of the Similkameen 
River) with a storage capacity of 775 acre-feet at 1,049.3 feet mean 
sea level; (3) a 190-foot-long intake canal on the east abutment of the 
dam diverting flows into the penstock intake structure; (4) a 35-foot-
long by 30-foot-wide penstock intake structure; (5) two aboveground 
8.5-foot-diameter steel penstocks carrying flows from the intake to the 
powerhouse; (6) a powerhouse containing two vertical Kaplan turbine/
generator units with a total installed capacity of 9.0 megawatts; (7) a 
180-foot-long tailrace channel that would convey flows from the 
powerhouse to the Similkameen River, downstream of the Similkameen 
Falls; (8) a new substation adjacent to the powerhouse; (9) a new 100-
foot-long, 13.2-kilovolt primary transmission line from the substation 
connecting to an existing distribution line; (10) new and upgraded 
access roads, and (11) appurtenant facilities. The project is estimated 
to generate an average of 54 gigawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be

[[Page 353]]

viewed on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support. A copy is also available for 
inspection and reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND 
CONDITIONS'', or ``PRESCRIPTIONS''; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-31210 Filed 1-4-10; 8:45 am]