Public Service Company of Colorado; Notice of Settlement Agreement and Soliciting Comments and Reply Comments, 142 [E9-31092]

Download as PDF 142 Federal Register / Vol. 75, No. 1 / Monday, January 4, 2010 / Notices in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is January 12, 2010. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–31091 Filed 12–31–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission pwalker on DSK8KYBLC1PROD with NOTICES [Project No. 400–051] Public Service Company of Colorado; Notice of Settlement Agreement and Soliciting Comments and Reply Comments December 24, 2009. Take notice that the following Settlement Agreement (Settlement) has VerDate Nov<24>2008 17:11 Dec 31, 2009 Jkt 220001 been filed with the Commission and is available for public inspection. a. Type of Application: Settlement Agreement. b. Project No.: P–400–051. c. Date Filed: December 23, 2009. d. Applicant: Public Service Company of Colorado (PSCo). e. Name of Project: Ames Hydroelectric Project. f. Location: The existing project is located on Lake Fork, Howard Fork, and South Fork of the San Miguel River, in San Miguel County, about 6 miles north of Telluride, Colorado. The Ames Project occupies 99 acres of the Uncompahgre National Forest. g. Filed Pursuant to: Rule 602 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.602 Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Randy Rhodes, Public Service Company of Colorado, 4653 Table Mountain Drive, Golden Colorado 80403; telephone (720) 497– 2123. i. FERC Contact: David Turner (202) 502–6091 or via e-mail at david.turner@ferc.gov. j. Deadline for filing comments on the Settlement: January 12, 2010. Reply comments due January 22, 2010. Comments may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Written comments (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. k. PSCo filed the settlement agreement, which resolves all aquatic habitat and fishery related issues in conjunction with the United States Forest Service’s proposed section 4(e) conditions for the Ames Hydroelectric Project. PSCo filed the settlement agreement on behalf of itself, United States Forest Service, and the Colorado Department of Natural Resources. PSCo requests that the Commission accept and incorporate, without material modification, all of the proposed license articles in Appendix B of the settlement agreement in the new project license. l. The A copy of the settlement agreement is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘e-Library’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–31092 Filed 12–31–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13351–000] Marseilles Land and Water Company; Notice Soliciting Scoping Comments December 23, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P–13351–000. c. Date filed: December 30, 2008. d. Applicant: Marseilles Land and Water Company. e. Name of Project: Marseilles Lock and Dam Project. f. Location: On the Illinois River, in the town of Marseilles, La Salle County, Illinois. This project would not occupy any federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Lee W. Mueller, Architect and Vice President, Marseilles Land & Water Company, 4132 S. Rainbow Blvd., #247, Las Vegas, NV 89103, (702) 367–7302. i. FERC Contact: Steve Kartalia, (202) 502–6131 or Stephen.kartalia@ferc.gov. j. Deadline for filing scoping comments: January 22, 2010. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the E:\FR\FM\04JAN1.SGM 04JAN1

Agencies

[Federal Register Volume 75, Number 1 (Monday, January 4, 2010)]
[Notices]
[Page 142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-31092]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 400-051]


Public Service Company of Colorado; Notice of Settlement 
Agreement and Soliciting Comments and Reply Comments

December 24, 2009.
    Take notice that the following Settlement Agreement (Settlement) 
has been filed with the Commission and is available for public 
inspection.
    a. Type of Application: Settlement Agreement.
    b. Project No.: P-400-051.
    c. Date Filed: December 23, 2009.
    d. Applicant: Public Service Company of Colorado (PSCo).
    e. Name of Project: Ames Hydroelectric Project.
    f. Location: The existing project is located on Lake Fork, Howard 
Fork, and South Fork of the San Miguel River, in San Miguel County, 
about 6 miles north of Telluride, Colorado. The Ames Project occupies 
99 acres of the Uncompahgre National Forest.
    g. Filed Pursuant to: Rule 602 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.602 Federal Power Act 16 U.S.C. 
791(a)-825(r).
    h. Applicant Contact: Randy Rhodes, Public Service Company of 
Colorado, 4653 Table Mountain Drive, Golden Colorado 80403; telephone 
(720) 497-2123.
    i. FERC Contact: David Turner (202) 502-6091 or via e-mail at 
david.turner@ferc.gov.
    j. Deadline for filing comments on the Settlement: January 12, 
2010. Reply comments due January 22, 2010. Comments may be filed 
electronically via the Internet in lieu of paper. The Commission 
strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's Web site (https://www.ferc.gov) 
under the ``e-Filing'' link. Written comments (original and eight 
copies) should be filed with: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    k. PSCo filed the settlement agreement, which resolves all aquatic 
habitat and fishery related issues in conjunction with the United 
States Forest Service's proposed section 4(e) conditions for the Ames 
Hydroelectric Project. PSCo filed the settlement agreement on behalf of 
itself, United States Forest Service, and the Colorado Department of 
Natural Resources. PSCo requests that the Commission accept and 
incorporate, without material modification, all of the proposed license 
articles in Appendix B of the settlement agreement in the new project 
license.
    l. The A copy of the settlement agreement is available for review 
at the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``e-Library'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    Register online at https://www.ferc.gov/esubscribenow.htm to be 
notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-31092 Filed 12-31-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.