Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
+/¥ All other transactions. These
transactions include the following: local
Federal Reserve Bank checks presented
after 3 p.m. Eastern Time but before 3:00
p.m. local time; noncash collection;
currency and coin shipments; smalldollar credit adjustments; term deposit
settlements; and all debit adjustments.
V. Form of Comment Letters
Comment letters should refer to
Docket No. R–1381 and, when possible,
should use a standard typeface with a
font size of 10 or 12; this will enable the
Board to convert text submitted in paper
form to machine-readable form through
electronic scanning, and will facilitate
automated retrieval of comments for
review. Comments may be mailed
electronically to
regs.comments@federalreserve.gov.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
VI. Solicitation of Comments Regarding
Use of ‘‘Plain Language’’
Section 722 of the Gramm-LeachBliley Act of 1999 (12 U.S.C. 4809)
requires the Board to use ‘‘plain
language’’ in all proposed and final
rules published after January 1, 2000.
The Board invites comments on whether
the interim final rule is clearly stated
and effectively organized, and how the
Board might make the text of the rule
easier to understand.
VII. Regulatory Flexibility Act
In accordance with Section 3(a) of the
Regulatory Flexibility Act, 5 U.S.C. 601
et seq. (RFA), the Board has reviewed
the proposed amendments to Regulation
D. A final regulatory flexibility analysis
will be conducted after consideration of
comments received during the public
comment period.
1. Statement of the objectives of the
proposal. The Board is proposing to
amend Regulation D to authorize
Reserve Banks to offer deposits of
specified maturities to eligible
institutions. Term deposits are intended
to facilitate the conduct of monetary
policy by providing a tool that could be
used to drain excess reserves, if
necessary, to adjust the stance of
monetary policy.
2. Small entities affected by the
proposal. The number of small entities
affected by this proposal is unknown.
The proposal would only affect those
entities, regardless of size, that choose
to hold term deposits at Reserve Banks.
The impact on institutions choosing to
hold term deposits at Reserve Banks
would be positive and not adverse,
because term deposits would expand
the range of investment opportunities
available to eligible institutions.
3. Other Federal rules. The Board
believes that no Federal rules duplicate,
VerDate Nov<24>2008
17:10 Dec 30, 2009
Jkt 220001
overlap, or conflict with the proposed
amendments to Regulation D.
4. Significant alternatives to the
proposed revisions. The Board
welcomes comment on any significant
alternatives that would minimize the
impact of the proposal on small entities.
VIII. Paperwork Reduction Act
In accordance with the Paperwork
Reduction Act (PRA) of 1995 (44 U.S.C.
3506; 5 CFR 1320 Appendix A.1), the
Board reviewed the proposed rule under
the authority delegated to the Board by
the Office of Management and Budget
(OMB). The proposed rule contains no
requirements subject to the PRA.
List of Subjects in 12 CFR Part 204
Banks, banking, Reporting and
recordkeeping requirements.
Authority and Issuance
For the reasons set forth in the
preamble, the Board is proposing to
amend 12 CFR part 204 as follows:
PART 204—RESERVE
REQUIREMENTS OF DEPOSITORY
INSTITUTIONS (REGULATION D)
1. The authority citation for part 204
continues to read as follows:
from eligible institutions under the
provisions of this paragraph (e) subject
to such terms and conditions as the
Board may establish from time to time,
including but not limited to conditions
regarding the maturity of the term
deposits being offered, maximum and
minimum amounts that may be
maintained by an eligible institution in
a term deposit, the interest rate or rates
offered and, if term deposits are offered
through an auction mechanism, the size
of the offering, maximum and minimum
bid amounts, and other relevant terms.
(2) A term deposit will not satisfy any
institution’s required reserve balance or
contractual clearing balance.
(3) A term deposit may not be used for
general payments or other activities.
By order of the Board of Governors of the
Federal Reserve System, December 23, 2009.
Jennifer J. Johnson,
Secretary of the Board.
[FR Doc. E9–31040 Filed 12–30–09; 8:45 am]
BILLING CODE 6210–01–P
DEPARTMENT OF VETERANS
AFFAIRS
38 CFR Part 39
Authority: 12 U.S.C. 248(a), 248(c), 371a,
461, 601, 611, and 6105.
RIN 2900–AM96
2. Amend § 204.2 by adding
paragraph (dd) to read as follows:
State Cemetery Grants
§ 204.2
ACTION:
Definitions.
*
*
*
*
*
(dd) Term deposit means those funds
of an eligible institution that are
maintained by that institution for a
specified maturity at a Federal Reserve
Bank pursuant to § 204.10(e) of this part.
3. Section 204.10 is amended by
revising paragraph (b)(3) and by adding
a new paragraph (e) to read as follows:
§ 204.10
Payment of interest on balances.
*
*
*
*
*
(b) * * *
(3) For required reserve balances,
excess balances, and term deposits, at
any other rate or rates as determined by
the Board from time to time, not to
exceed the general level of short-term
interest rates. For purposes of this
subsection, ‘‘short-term interest rates’’
means the primary credit rate and rates
on obligations with maturities of up to
one year in which eligible institutions
may invest, such as rates on term
Federal funds, term repurchase
agreements, commercial paper, term
Eurodollar deposits, and other similar
rates.
*
*
*
*
*
(e) Term deposits. (1) A Federal
Reserve Bank may accept term deposits
PO 00000
Frm 00017
Fmt 4702
Sfmt 4702
Department of Veterans Affairs.
Proposed rule.
AGENCY:
SUMMARY: The Department of Veterans
Affairs (VA) is proposing to amend its
regulations governing grants to States
for the establishment, expansion, and
improvement of State veterans
cemeteries (Establishment, Expansion,
and Improvement Projects). We propose
to implement through regulation new
statutory authority to provide grants for
the operation and maintenance of State
veterans cemeteries (Operation and
Maintenance Projects), as authorized by
the Dr. James Allen Veteran Vision
Equity Act of 2007 (the Act), enacted on
December 26, 2007. The Act expands
VA authority to provide grants to States
for operating and maintaining State
veterans cemeteries and limits to $5
million the aggregate amount of such
grants VA may award in any fiscal year.
The Act requires that VA prescribe
regulations implementing the new
authority within 180 days of enactment.
VA proposes to amend its regulations to
outline the process, the criteria, and the
priorities relating to the award of these
Operation and Maintenance Project
grants. The proposed rule would also
revise part 39 by changing the
arrangement and numbering of the
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
current regulatory sections, updating the
references to various codes,
incorporating some non-substantive
changes to the regulations, and
removing specific forms from this part
that are available at https://
www.cem.va.gov/cem/scg_grants.asp.
DATES: Comments must be received by
VA on or before March 1, 2010.
ADDRESSES: Written comments may be
submitted through https://
www.Regulations.gov; by mail or handdelivery to: Director, Regulations
Management (02REG), Department of
Veterans Affairs, 810 Vermont Avenue,
NW., Room 1068, Washington, DC
20420; or by fax to (202) 273–9026.
Comments should indicate that they are
submitted in response to ‘‘RIN 2900–
AM96—State Cemetery Grants.’’ Copies
of comments received will be available
for public inspection in the Office of
Regulation Policy and Management,
Room 1063B, between the hours of 8
a.m. and 4:30 p.m., Monday through
Friday (except holidays). Please call
(202) 461–4923 for an appointment (this
is not a toll-free number). In addition,
during the comment period, comments
may be viewed online through the
Federal Docket Management System
(FDMS) at https://www.Regulations.gov.
See the material headed ‘‘Paperwork
Reduction Act’’ under SUPPLEMENTARY
INFORMATION regarding submission of
comments on collections of information
proposed in this proposed rule.
FOR FURTHER INFORMATION CONTACT:
Frank Salvas, Director of State Cemetery
Grants Service, National Cemetery
Administration, Department of Veterans
Affairs, 810 Vermont Avenue, NW.,
Washington, DC 20420. Telephone:
(202) 461–8947 (this is not a toll-free
number).
SUPPLEMENTARY INFORMATION: The goal
of the National Cemetery
Administration (NCA) is to ensure that
the burial needs of veterans and eligible
family members are met by providing a
burial opportunity in national and State
veterans cemeteries. State veterans
cemeteries complement VA national
cemeteries and are critical to meeting
VA’s goal of providing burial access to
90 percent of veterans and their
families. Research indicates that
veterans and their families use veterans
cemeteries when the cemeteries are
located within a reasonable distance
from their residence. The State
Cemetery Grants Service (SCGS)
encourages States to provide burial
service to our Nation’s veterans by
operating veterans cemeteries in a
manner consistent with national
cemeteries in areas where the most
number of veterans would benefit as
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
determined by VA. Under the State
Cemetery Grant Program (SCGP), the
Federal government will provide up to
100 percent of the cost of development
associated with the establishment,
expansion, and improvement of a State
veterans cemetery, as well as the cost of
initial operating equipment.
Section 202(b) of the Dr. James Allen
Veteran Vision Equity Act of 2007 (Pub.
L. 110–157) authorizes VA under the
SCGP to provide additional Federal
assistance to States for the operation
and maintenance of State veterans
cemeteries. Prior to passage of this law,
VA could only provide Federal funds
for the establishment, expansion, and
improvement of State veterans
cemeteries. VA could not fund the
operation or maintenance of State
veterans cemeteries. The new authority
granted by the Act authorizes VA to
fund Operation and Maintenance
Projects at State veterans cemeteries to
assist States in achieving the same high
standards of appearance for State
veterans cemeteries as VA achieves for
national cemeteries. Specifically, the
new operation and maintenance grants
will be targeted to help States meet VA’s
national shrine standards with respect
to cleanliness, height and alignment of
headstones and markers, leveling of
gravesites, and turf conditions. The Act
authorizes VA to award up to a total of
$5 million for such purposes each fiscal
year to ensure State veterans cemeteries
meet the highest standards of
appearance and serve as national
shrines to honor the Nation’s military
service members with a final resting
place.
The proposed rule would revise 38
CFR part 39 and express in regulation
the statutory authority of VA to grant
awards for Operation and Maintenance
Projects up to a total of $5 million per
year. The proposed rule would not
change any of the grant procedures or
requirements for Establishment,
Expansion, and Improvement Projects. It
would establish a new grant
preapplication and application process
and requirements for Operation and
Maintenance Projects only. Many
requirements of the grant application
process for Establishment, Expansion,
and Improvement Projects would be
incorporated into the grant-application
process for Operation and Maintenance
Projects and would apply to both types
of grants. The preapplication process
serves as a means for validating the
need for the project and opening lines
of communication between NCA and
potential participating States for SCGP
grants. In the preapplication process,
States certify that they will be able to
adhere to the requirements of the grant.
PO 00000
Frm 00018
Fmt 4702
Sfmt 4702
69305
The application process then becomes a
certification of actual adherence to the
requirements of the grant.
The proposed rule would amend the
existing grant prioritization process. The
proposed rule would retain the same
priority categories as those in current
part 39, but would amend one of the
categories to address Operation and
Maintenance Projects.
Once an Establishment, Expansion,
and Improvement Project is approved
for funding, VA may award a grant up
to 100 percent of the amount requested,
provided that sufficient funds are
available. Currently, the entire SCGP
annual budget is allocated to grants for
Establishment, Expansion, and
Improvement Projects. Any funds
remaining at the end of a fiscal year are
carried into the next year and allocated
to grants for Establishment, Expansion,
and Improvement Projects the following
year. With passage of the Act, the SCGS
can now fund two types of grants: (1)
Establishment, Expansion, and
Improvement Project grants and (2)
Operation and Maintenance Project
grants.
There are currently four Priority
Groups. These are:
Priority 1—Projects for gravesite
expansion or improvements that are
needed to continue service at an
existing veterans cemetery. This
includes phased development of
currently undeveloped land.
Priority 2—Projects for the
establishment of new cemeteries.
Priority 3—Planned phased gravesite
developments prior to need.
Priority 4—Other improvements to
cemetery infrastructure, such as
building expansion and upgrades to
roads and irrigation systems, that are
not directly related to the development
of new gravesites. We propose to
expand Priority 4 to include Operation
and Maintenance Projects that assist a
State to achieve the national shrine
standards of appearance at an existing
State veterans cemetery.
Within Priority Groups 1, 2, and 3,
individual projects are ranked based on
the greatest number of veterans who
benefit from the project as determined
by VA. This prioritization system, based
on veteran population data, assists VA
in maintaining and improving access for
burial to more veterans and their
eligible family members in a veterans
cemetery, and achieves the goal of
providing the greatest number of
veterans with a burial option at either a
Federal or State veterans cemetery
located within a reasonable distance
from their residence.
Priority Group 4 grants are and will
continue to be awarded only when there
E:\FR\FM\31DEP1.SGM
31DEP1
69306
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
erowe on DSK5CLS3C1PROD with PROPOSALS-1
are funds available and when there are
no remaining Priority Group 1, 2, or 3
grant applications for which a grant may
be awarded with available funds.
Regardless of the amount of funds
available, no more than a total of $5
million will be awarded for Operation
and Maintenance Project grants in any
year in accordance with the statutory
requirements of the Act.
This proposed rule would change the
arrangement and numbering of the
current sections in part 39 and update
the references to various codes. It would
also incorporate some non-substantive
changes to the current regulations and
remove specific forms from current
§ 39.26 because all forms cited in this
part are available at https://
www.cem.va.gov/cem/scg_grants.asp.
This will enable applicants to download
forms as needed.
Executive Order 12866
Executive Order 12866 directs
agencies to assess all costs and benefits
of available regulatory alternatives and,
when regulation is necessary, to select
regulatory approaches that maximize
net benefits (including potential
economic, environmental, public health
and safety, and other advantages;
distributive impacts; and equity). The
Executive Order classifies a ‘‘significant
regulatory action,’’ requiring review by
the Office of Management and Budget
(OMB), as any regulatory action that is
likely to result in a rule that may: (1)
Have an annual effect on the economy
of $100 million or more or adversely
affect in a material way the economy, a
sector of the economy, productivity,
competition, jobs, the environment,
public health or safety, or State, local,
or Tribal governments or communities;
(2) create a serious inconsistency or
interfere with an action taken or
planned by another agency; (3)
materially alter the budgetary impact of
entitlements, grants, user fees, or loan
programs or the rights and obligations of
recipients thereof; or (4) raise novel
legal or policy issues arising out of legal
mandates, the President’s priorities, or
the principles set forth in the Executive
Order.
The economic, interagency,
budgetary, legal, and policy
implications of this proposed rule have
been examined, and it has been
determined not to be a significant
regulatory action under the Executive
Order.
Regulatory Flexibility Act
The Secretary hereby certifies that
this proposed rule will not have a
significant economic impact on a
substantial number of small entities as
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
they are defined in the Regulatory
Flexibility Act, 5 U.S.C. 601–612. This
proposed rule will directly affect only
State government entities and will not
directly affect small entities. Therefore,
pursuant to 5 U.S.C. 605(b), this
proposed amendment is exempt from
the initial and final regulatory flexibility
analysis requirements of sections 603
and 604.
Unfunded Mandates
The Unfunded Mandates Reform Act
of 1995 requires, at 2 U.S.C. 1532, that
agencies prepare an assessment of
anticipated costs and benefits before
issuing any rule that may result in an
expenditure by State, local, or Tribal
governments, in the aggregate, or by the
private sector, of $100 million or more
(adjusted annually for inflation) in any
year. This proposed rule would have no
such effect on State, local, and Tribal
governments, or on the private sector.
Paperwork Reduction Act
This proposed rule contains several
provisions that constitute collections of
information under the Paperwork
Reduction Act (44 U.S.C. 3501–3521).
Some of the information collections
have already been approved by OMB, as
required by the Paperwork Reduction
Act. Those provisions display the OMB
control numbers that evidence OMB
approval (i.e., 0348–0002, 4040–0004,
4040–0008, 4040–0009, and 2900–
0559). Other information collections in
the proposed rule still require OMB
approval. These provisions are in
§§ 39.31, 39.32, 39.34, 39.81, 39.82,
39.84, 39.120, and 39.122. In accordance
with 44 U.S.C. 3507(d), VA has
forwarded a copy of this proposed rule
to OMB for its review of the collections
of information.
Comments on the proposed
collections of information contained in
this proposed rule should be submitted
to the Office of Management and
Budget, Attention: Desk Officer for the
Department of Veterans Affairs, Office
of Information and Regulatory Affairs,
Washington, DC 20503; with copies
mailed or hand delivered to: Director,
Regulations Management (02REG),
Department of Veterans Affairs, 810
Vermont Ave., NW., Room 1068,
Washington, DC 20420; faxed to (202)
273–9026; or e-mailed to ‘‘https://
www.Regulations.gov.’’ Comments
should indicate that they are submitted
in response to ‘‘RIN 2900–AM96.’’
Title: Submission of VA Form 40–
0895–2.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–2 (Certification of Compliance
PO 00000
Frm 00019
Fmt 4702
Sfmt 4702
with Provisions of the Davis-Bacon Act)
to certify that the applicant has obtained
the latest prevailing wage rates for
Federally funded projects.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with provisions of the Davis-Bacon Act
and requirements in 38 CFR part 39.
Any construction project fully or
partially funded with Federal dollars
must comply with the latest prevailing
wage rates for specific work by trade
employees (e.g., electricians,
carpenters).
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–3.
Summary of collection of information:
Proposed § 39.31 would require an
applicant to submit VA Form 40–0895–
3 (State or Tribal Government Cemetery
Grants Service Space Program
Analysis—Buildings) to provide
information on the proposed size of
cemetery buildings.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the proposed size of
cemetery buildings are within the size
allowed by VA and that the applicant
complies with requirements in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 36 hours.
Estimated annual burden per
collection: 3 hours.
Title: Submission of VA Form 40–
0895–6.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–6 (Certification of State or
Tribal Government Matching
Architectural and Engineering Funds to
Qualify for Group 1 on the Priority List)
to provide documentation that the State
has legislative authority to support the
project and the resources necessary to
initially fund the architectural and
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
engineering portion of the project
development.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant has
adequate resources for the proposed
project and complies with requirements
in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 6 hours.
Estimated annual burden per
collection: 30 minutes.
Title: Submission of VA Form 40–
0895–7.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–7 (Certification Regarding
Debarment, Suspension, and Other
Responsibility Matters—Primary
Covered Transactions (State or Tribal
Government)) to certify that the
applicant has not been debarred or
suspended, and is eligible to participate
in the VA grant process and receive
Federal funds.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant is eligible
for Federal funds and complies with the
requirements of 2 CFR Parts 180 and
801.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–8.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–8 (Certification Regarding
Drug-Free Workplace Requirements for
Grantees Other Than Individuals) to
certify compliance with the Drug-Free
Workplace Act of 1988 at the location
where the construction will occur.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with the requirements of the Drug-Free
Workplace Act of 1988.
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–9.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–9 (Certification Regarding
Lobbying) to certify that the applicant
has not made any payments to anyone
that influences or attempts to influence
an officer or Member of Congress in
connection with the award of a grant.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with sec. 319 of Public Law 101–121
and requirements in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–10.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–10 (Certification of
Compliance with Federal
Requirements—State or Tribal
Government Construction Grant) to
certify compliance with all
requirements of Part 39.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with the requirements in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–11.
PO 00000
Frm 00020
Fmt 4702
Sfmt 4702
69307
Summary of collection of information:
Proposed §§ 39.34 and 39.84 would
require an applicant to submit VA Form
40–0895–11 (Memorandum of
Agreement for a Grant to Construct or
Modify a State or Tribal Government
Veterans Cemetery) to identify the
parties (VA and applicant), identify the
scope of the project, and indicate how
the grant award funds will be paid to
the applicant.
Description of the need for
information and proposed use of
information: This collection is necessary
to establish an agreement between VA
and the applicant regarding a grant and
to ensure that the applicant complies
with requirements in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 24 hours.
Estimated annual burden per
collection: 2 hours.
Title: Submission of VA Form 40–
0895–12.
Summary of collection of information:
Proposed §§ 39.34 and 39.84 would
require applicants to submit VA Form
40–0895–12 (Certification Regarding
Debarment, Suspension, Ineligibility
and Voluntary Exclusion—Lower Tier
Covered Transactions (Contractor)) to
certify that the contractor has not been
debarred or suspended, and is eligible to
participate in the VA grant process and
receive Federal funds.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the contractor has not
been debarred or suspended, and is
eligible to participate in the VA grant
process and complies with the
requirements of 2 CFR Parts 180 and
801.
Description of likely respondents:
Contractors of States and Tribal
Governments applying for a grant under
this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of VA Form 40–
0895–13.
Summary of collection of information:
Proposed § 39.122 would require
grantees to submit VA Form 40–0895–
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
69308
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
13 (Certification Regarding Documents
and Information Required for State or
Tribal Government Cemetery
Construction Grants—Post Grant
Requirements) to certify that the grantee
is aware of all grant responsibilities and
to properly and timely close out the
grant.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with requirements in this Part.
Description of likely respondents:
States and Tribal Governments awarded
a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 24 hours.
Estimated annual burden per
collection: 2 hours.
Title: Submission of VA Form 40–
0895–15.
Summary of collection of information:
Proposed §§ 39.31 and 39.81 would
require an applicant to submit VA Form
40–0895–15 (Certification of Cemetery
Maintained in Accordance with
National Cemetery Administration
Standards) to certify compliance with
VA’s national shrine standards
following receipt of a grant.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the applicant complies
with requirements in this Part.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 3 hours.
Estimated annual burden per
collection: 15 minutes.
Title: Submission of project’s plans
and specifications.
Summary of collection of information:
Proposed §§ 39.32 and 39.82 would
require an applicant to submit some or
all of the following items: a boundary
and site survey, a soil investigation
report, a topographical survey, a master
plan, preliminary or design
development drawings, final
construction drawings and
specifications, and cost estimates.
Description of the need for
information and proposed use of
information: The planning requirements
as stated in §§ 39.32 and 39.82 are the
basis for appropriate project
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
development. When the required plans
and specifications are approved, the
project will be prepared for the
solicitation and will ensure that VA
received the best possible facility at the
best cost.
Description of likely respondents:
States and Tribal Governments applying
for a grant under this Part.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 7680 hours.
Estimated annual burden per
collection: 640 hours per grant.
Title: Submission of a written report
documenting grant accomplishments.
Summary of collection of information:
Proposed § 39.120 would require a
grantee to submit a written report
documenting how the grant
accomplished the desired improvements
that will assist the State or Tribal
Government in meeting VA’s national
shrine standards at its veterans
cemetery. The report would include
statistical data and detailed pictures of
the work accomplished.
Description of the need for
information and proposed use of
information: This collection is necessary
to ensure that the grantee provides a
timely response to VA regarding its
compliance with the program narrative
submitted to VA as part of the
preapplication process under
§ 39.81(b)(10).
Description of likely respondents:
State or Tribal governments that
received an Operation and Maintenance
Grant.
Estimated number of respondents per
year: 12.
Estimated frequency of responses per
year: 1.
Estimated total annual reporting and
recordkeeping burden: 48 hours.
Estimated annual burden per
collection: 4 hours.
VA considers comments by the public
on proposed collections of information
in:
• Evaluating whether the proposed
collections of information are necessary
for the proper performance of the
functions of VA, including whether the
information will have practical utility;
• Evaluating the accuracy of VA’s
estimate of the burden of the proposed
collections of information, including the
validity of the methodology and
assumptions used;
• Enhancing the quality, usefulness,
and clarity of the information to be
collected; and
• Minimizing the burden of the
collections of information on those who
PO 00000
Frm 00021
Fmt 4702
Sfmt 4702
are to respond, including responses
through the use of appropriate
automated, electronic, mechanical, or
other technological collection
techniques or other forms of information
technology, e.g., permitting electronic
submission of responses.
OMB is required to make a decision
concerning the collections of
information in this proposed rule
between 30 and 60 days after
publication of this document in the
Federal Register. Therefore, a comment
to OMB is best ensured of having its full
effect if OMB receives it within 30 days
of publication. This does not affect the
deadline for the public to comment on
the proposed rule.
Catalog of Federal Domestic Assistance
Number and Title
The Catalog of Federal Domestic
Assistance program number and title for
this proposed rule is 64.203, State
Cemetery Grants.
List of Subjects in 38 CFR Part 39
Cemeteries, Grants programs—
veterans, Veterans.
Approved: December 22, 2009.
John R. Gingrich,
Chief of Staff, Department of Veterans Affairs.
For the reasons set out in the
preamble, VA proposes to revise 38 CFR
part 39 to read as follows:
PART 39—AID TO STATES FOR
ESTABLISHMENT, EXPANSION, AND
IMPROVEMENT, OR OPERATION AND
MAINTENANCE, OF VETERANS
CEMETERIES
Subpart A—General Provisions
Sec.
39.1 Purpose.
39.2 Definitions.
39.3 Priority list.
39.4 Decision makers, notifications, and
additional information.
39.5 Submission of information and
documents to VA.
39.6 Amendments to grant application.
39.7 Line item adjustment to grants.
39.8 Withdrawal of grant application.
39.9 Hearings.
39.10 Cemetery requirements and
prohibitions and recapture provisions.
39.11 State to retain control of operations.
Subpart B—Establishment, Expansion, and
Improvement Projects
Grant Requirements and Procedures
39.30 General requirements for a grant.
39.31 Preapplication requirements.
39.32 Plan preparation.
39.33 Conferences.
39.34 Application requirements.
39.35 Final review and approval of
application.
E:\FR\FM\31DEP1.SGM
31DEP1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
Award of Grant
39.50 Amount of grant.
39.51 Payment of grant award.
Standards and Requirements
39.60 General requirements for site
selection and construction of veterans
cemeteries.
39.61 Site planning standards.
39.62 Space criteria for support facilities.
39.63 Architectural design standards.
Subpart C—Operation and Maintenance
Projects
Grant Requirements and Procedures
39.80 General requirements for a grant.
39.81 Preapplication requirements.
39.82 Plan preparation.
39.83 Conferences.
39.84 Application requirements.
39.85 Final review and approval of
application.
Award of Grant
39.100 Amount of grant.
39.101 Payment of grant award.
Subpart D—Grant Recipient
Responsibilities, Inspections, and Reports
Following Project Completion
39.120 Documentation of grant
accomplishments.
39.121 State responsibilities following
project completion.
39.122 Inspections, audits, and reports.
Authority: 38 U.S.C. 101, 501, 2408, 2411.
Subpart A—General Provisions
§ 39.1
Purpose.
This part sets forth the mechanism for
a State to obtain a grant to establish,
expand, or improve a veterans cemetery
that is or will be owned by the State or
to obtain a grant to operate or maintain
a State veterans cemetery to meet VA’s
national shrine standards of appearance.
Authority: 38 U.S.C. 501, 2408.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.2
Definitions.
For the purpose of this part:
(a) Establishment means the process
of site selection, land acquisition,
design and planning, earth moving,
landscaping, construction, and
provision of initial operating equipment
necessary to convert a tract of land to an
operational veterans cemetery.
(b) Expansion means an increase in
the burial capacity or acreage of an
existing cemetery through the addition
of gravesites and other facilities, such as
committal service shelters, crypts
(preplaced grave liners), and
columbaria, necessary for the
functioning of a cemetery.
(c) Improvement means the
enhancement of a cemetery through
landscaping, construction, or renovation
of cemetery infrastructure, such as
building expansion and upgrades to
roads and irrigation systems, that is not
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
directly related to the development of
new gravesites; nonrecurring
maintenance; and the addition of other
features appropriate to cemeteries.
(d) Establishment, Expansion, and
Improvement Project means an
undertaking to establish, expand, or
improve a site for use as a State-owned
veterans cemetery.
(e) Operation and Maintenance
Project means a project that assists a
State to achieve VA’s national shrine
standards of appearance in the key
cemetery operational areas of
cleanliness, height and alignment of
headstones and markers, leveling of
gravesites, and turf conditions.
(f) Secretary means the Secretary of
the United States Department of
Veterans Affairs.
(g) State means each of the States,
Territories, and possessions of the
United States, the District of Columbia,
and the Commonwealth of Puerto Rico.
(h) State Cemetery Grants Service
(SCGS) means the State Cemetery Grants
Service within VA’s National Cemetery
Administration (NCA).
(i) VA means the United States
Department of Veterans Affairs or the
State Cemetery Grants Service.
(j) Veteran means a person who
served in the active military, naval, or
air service and who died in line of duty
while in service or was discharged or
released under conditions other than
dishonorable.
Authority: 38 U.S.C. 101, 501, 2408.
§ 39.3
Priority list.
(a) The priority groups, with Priority
Group 1 having the highest priority and
Priority Group 4 the lowest priority, are:
(1) Priority Group 1—Projects needed
to avoid disruption in burial service that
would otherwise occur at existing
veterans cemeteries within 4 years of
the date of the preapplication. Such
projects would include expansion
projects as well as improvement projects
(such as construction of additional or
replacement facilities) when such
improvements are required to continue
interment operations.
(2) Priority Group 2—Projects for the
establishment of new veterans
cemeteries.
(3) Priority Group 3—Expansion
projects at existing veterans cemeteries
when a disruption in burial service due
to the exhaustion of existing gravesites
is not expected to occur within 4 years
of the date of the preapplication.
(4) Priority Group 4—Improvement
projects for cemetery landscaping or
infrastructure, such as building
expansion and upgrades to roads and
irrigation systems, that are not directly
related to the development of new
PO 00000
Frm 00022
Fmt 4702
Sfmt 4702
69309
gravesites. Operation and Maintenance
Projects that address VA’s national
shrine standards of appearance are
included in this group.
(b) Within Priority Groups 1, 2, and 3,
highest priority will be given to projects
in geographical locations with the
greatest number of veterans who will
benefit from the project as determined
by VA. This prioritization system, based
on veteran population data, will assist
VA in maintaining and improving
access to burial in a veterans cemetery
to more veterans and their eligible
family members. Within Priority Group
1, at the discretion of VA, higher
priority may be given to a project that
must be funded that fiscal year to avoid
disruption in burial service.
(c) Grants for projects within Priority
Group 4 will be awarded in any fiscal
year only after grants for all project
applications under Priority Groups 1, 2,
and 3 that are ready for funding have
been awarded. Within Priority Group 4,
projects will be ranked in priority order
based upon VA’s determination of the
relative importance of proposed
improvements and the degree to which
proposed Operation and Maintenance
Projects achieve VA’s national shrine
standards of appearance. No more than
$5 million in any fiscal year will be
awarded for Operation and Maintenance
Projects under Priority Group 4.
(d) By August 15 of each year, VA will
make a list prioritizing all
preapplications that were received on or
before July 1 of that year and that were
approved under § 39.31 or § 39.81,
ranking them in their order of priority
within the applicable Priority Group for
funding during the fiscal year that
begins the following October 1.
Preapplications from previous years will
be re-prioritized each year and do not
need to be resubmitted.
Authority: 38 U.S.C. 501, 2408.
§ 39.4 Decision makers, notifications, and
additional information.
Decisions required under this part
will be made by the VA Director, State
Cemetery Grants Service (SCGS),
National Cemetery Administration,
unless otherwise specified in this part.
The VA decision maker will provide to
affected States written notice of
approvals, denials, or requests for
additional information under this part.
Authority: 38 U.S.C. 501, 2408.
§ 39.5 Submission of information and
documents to VA.
All information and documents
required to be submitted to VA must be
submitted to the Director of the State
Cemetery Grants Service, National
Cemetery Administration, Department
E:\FR\FM\31DEP1.SGM
31DEP1
69310
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
of Veterans Affairs, 810 Vermont
Avenue, NW., Washington, DC 20420.
All forms cited in this part are available
at https://www.cem.va.gov/cem/
scg_grants.asp.
Authority: 38 U.S.C. 501, 2408.
§ 39.6
Amendments to grant application.
A State seeking to amend a grant
application must submit revised
Standard Forms 424 (Application for
Federal Assistance) and 424C (Budget
Information) with a narrative
description of, and justification for, the
amendment. Any amendment of an
application that changes the scope of
the application or increases the amount
of the grant requested, whether or not
the application has already been
approved, shall be subject to approval
by VA in the same manner as an original
application.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
numbers 4040–0004 and 4040–0008.)
§ 39.7
Line item adjustment to grants.
After a grant has been awarded, upon
request from the State representative,
VA may approve a change in one or
more line items (line items are
identified in Standard Form 424C) of up
to 10 percent (increase or decrease) of
the cost of each line item if the change
would be within the scope or objective
of the project and the aggregate
adjustments would not increase the total
amount of the grant.
Authority: 38 U.S.C. 501, 2408.
§ 39.8
Withdrawal of grant application.
A State representative may withdraw
an application by submitting to VA a
written document requesting
withdrawal.
Authority: 38 U.S.C. 501, 2408.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.9
Hearings.
(a) No application for a grant under
this part shall be disapproved until the
applicant has been afforded an
opportunity for a hearing.
(b) Whenever a hearing is requested
under this section, notice of the hearing,
procedure for the conduct of such
hearing, and procedures relating to
decisions and notices shall accord with
the provisions of §§ 18.9 and 18.10 of
this chapter. Failure of an applicant to
request a hearing under this section or
to appear at a hearing for which a date
has been set shall be deemed to be a
waiver of the right to be heard and
constitutes consent to the making of a
decision on the basis of such
information as is available.
Authority: 38 U.S.C. 501, 2408.
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
§ 39.10 Cemetery requirements and
prohibitions and recapture provisions.
§ 39.11 State to retain control of
operations.
(a) In order to qualify for a grant, a
State veterans cemetery must be
operated solely for the interment of
veterans, their spouses, surviving
spouses, minor children, and unmarried
adult children who were physically or
mentally disabled and incapable of selfsupport.
(b) Any grant under this part made on
or after November 21, 1997, is made on
the condition that, after the date of
receipt of the grant, the State receiving
the grant, subject to requirements for
receipt of notice in 38 U.S.C. 2408 and
2411, will prohibit in the cemetery for
which the grant is awarded the
interment of the remains or the
memorialization of any person:
(1) Who has been convicted of a
Federal capital crime, as defined in 38
CFR 38.600(b), and whose conviction is
final, other than a person whose
sentence was commuted by the
President;
(2) Who has been convicted of a State
capital crime, as defined in 38 CFR
38.600(b), and whose conviction is final,
other than a person whose sentence was
commuted by the Governor of a State.
(3) Who has been found by an
appropriate State official, as defined in
38 CFR 38.600(b), under procedures to
be established by the State, to have
committed a Federal or State capital
crime, as defined in 38 CFR 38.600(b),
but to have not been convicted of such
crime by reason of unavailability for
trial due to death or flight to avoid
prosecution.
(c) If a State which has received a
grant under this part ceases to own the
cemetery for which the grant was made,
ceases to operate such cemetery as a
veterans cemetery in accordance with
paragraph (a) of this section, violates the
prohibition in paragraph (b) of this
section, or uses any part of the funds
provided through such grant for a
purpose other than that for which the
grant was made, the United States shall
be entitled to recover from the State the
total of all grants made to the State
under this part in connection with such
cemetery.
(d) If, within 3 years after VA has
certified to the Department of the
Treasury an approved grant application,
not all funds from the grant have been
used by the State for the purpose for
which the grant was made, the United
States shall be entitled to recover any
unused grant funds from the State.
Neither the Secretary nor any
employee of VA shall exercise any
supervision or control over the
administration, personnel, maintenance,
or operation of any State veterans
cemetery that receives a grant under this
program except as prescribed in this
part.
Authority: 38 U.S.C. 501, 2408, 2411.
PO 00000
Frm 00023
Fmt 4702
Sfmt 4702
Authority: 38 U.S.C. 501, 2408.
Subpart B—Establishment, Expansion,
and Improvement Projects
Grant Requirements and Procedures
§ 39.30
General requirements for a grant.
(a) For a State to obtain a grant for the
establishment, expansion, or
improvement of a State veterans
cemetery:
(1) Its preapplication for the grant
must be approved by VA under
§ 39.31(e);
(2) Its project must be ranked
sufficiently high on the priority list in
§ 39.3 for the applicable fiscal year so
that funds are available for the project;
(3) Its plans and specifications for the
project must be approved by VA under
§ 39.32;
(4) The State must meet the
application requirements in § 39.34; and
(5) Other requirements specified in
§§ 39.6, 39.10, and 39.33 must be
satisfied.
(b) VA may approve under § 39.35 any
application under this subpart up to the
amount of the grant requested once the
requirements under paragraph (a) of this
section have been satisfied, provided
that sufficient funds are available. In
determining whether sufficient funds
are available, VA shall consider the
project’s priority ranking, the total
amount of funds available for cemetery
grant awards during the applicable
fiscal year, and the prospects of higher
ranking projects being ready for the
award of a grant before the end of the
applicable fiscal year.
Authority: 38 U.S.C. 501, 2408.
§ 39.31
Preapplication requirements.
(a) A State seeking a grant of more
than $100,000 for the establishment,
expansion, or improvement of a State
veterans cemetery must submit a
preapplication to the Director, State
Cemetery Grants Service, through https://
www.cem.va.gov/cem/scg_grants.asp.
(b) No detailed drawings, plans, or
specifications are required with the
preapplication. As a part of the
preapplication, the State must submit
each of the following:
(1) Standard Form 424 (Application
for Federal Assistance) and Standard
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
Form 424C (Budget Information) signed
by the authorized representative of the
State. These forms document the
amount of the grant requested, which
may not exceed 100 percent of the
estimated cost of the project to be
funded with the grant.
(2) A program narrative describing the
objectives of the project, the need for a
grant, the method of accomplishment,
the projected interment rate, and the
results or benefits expected to be
obtained from the assistance requested.
(3) If a site has been selected, a
description of the geographic location of
the project (i.e., a map showing the
location of the project and all
appropriate geographic boundaries, and
any other supporting documentation, as
needed).
(4) A design concept describing the
major features of the project including
the number and types of gravesites, such
as columbarium niches.
(5) Any comments or
recommendations made by the State’s
‘‘Single Point of Contact’’ reviewing
agency.
(6) VA Form 40–0895–2 (Certification
of Compliance with Provisions of the
Davis-Bacon Act) to certify that the State
has obtained the latest prevailing wage
rates for Federally funded projects. Any
construction project fully or partially
funded with Federal dollars must
comply with those rates for specific
work by trade employees (e.g.,
electricians, carpenters).
(7) VA Form 40–0895–3 (State or
Tribal Government Cemetery Grants
Service Space Program Analysis—
Buildings) to provide information on the
proposed size of cemetery buildings,
based on VA guidance on the net and
gross square footage standards for
cemetery buildings. This standard is
based on a workload of 1–6 burials per
day.
(8) VA Form 40–0895–6 (Certification
of State or Tribal Government Matching
Architectural and Engineering Funds to
Qualify for Group 1 on the Priority List)
to provide documentation that the State
has legislative authority to support the
project and the resources necessary to
initially fund the architectural and
engineering portion of the project
development. Once the grant is
awarded, VA will reimburse the
applicant for all allowable architectural
and engineering costs.
(9) VA Form 40–0895–7 (Certification
Regarding Debarment, Suspension, and
Other Responsibility Matters—Primary
Covered Transactions (State or Tribal
Government)) to ensure that the
applicant has not been debarred or
suspended, and is eligible to participate
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
in the VA grant process and receive
Federal funds.
(10) VA Form 40–0895–8
(Certification Regarding Drug-Free
Workplace Requirements for Grantees
Other Than Individuals) to ensure that
the applicant complies with the DrugFree Workplace Act of 1988 at the
location where the construction will
occur.
(11) VA Form 40–0895–9
(Certification Regarding Lobbying) to
ensure that the applicant complies with
Public Law 101–121 regarding the
prohibition against any payments to
anyone that influences or attempts to
influence an officer or Member of
Congress in connection with the award
of a grant.
(12) VA Form 40–0895–10
(Certification of Compliance with
Federal Requirements—State or Tribal
Government Construction Grant) to
ensure that the applicant complies with
all requirements of Part 39.
(13) VA Form 40–0895–15
(Certification of Cemetery Maintained in
Accordance with National Cemetery
Administration Standards) to ensure
that any cemetery established,
expanded, or improved through a grant
will be operated and maintained in
accordance with the operational
standards of NCA.
(c) In addition, the State must submit
written assurance of each of the
following conditions:
(1) Any cemetery established,
expanded, or improved through a grant
will be used exclusively for the
interment or memorialization of eligible
persons, as set forth in § 39.10(a), whose
interment or memorialization is not
contrary to the conditions of the grant
(see § 39.10(b) and 38 U.S.C. 2408(d)
and 2411).
(2) Title to the site is or will be vested
solely in the State.
(3) The State possesses legal authority
to apply for the grant and to finance and
construct the proposed facilities; i.e.,
legislation or similar action has been
duly adopted or passed as an official act
of the applicant’s governing body,
authorizing the filing of the application,
including all understandings and
assurances contained therein, and
directing and authorizing the person
identified as the official representative
of the State to act in connection with the
application and to provide such
additional information as may be
required.
(4) The State will assist VA in
assuring that the grant complies with
section 106 of the National Historic
Preservation Act of 1966, as amended
(16 U.S.C. 470), Executive Order 11593
(identification and protection of historic
PO 00000
Frm 00024
Fmt 4702
Sfmt 4702
69311
properties), and the Archaeological and
Historic Preservation Act of 1974 (16
U.S.C. 469a–1 et seq.).
(5) The State will obtain approval by
VA of the final construction drawings
and specifications before the project is
advertised or placed on the market for
bidding; it will construct the project, or
cause the project to be constructed, to
completion in accordance with the
application and approved plans and
specifications; it will submit to the
Director of the State Cemetery Grants
Service, for prior approval, changes that
alter any cost of the project, use of
space, or functional layout; and it will
not enter into a construction contract for
the project or undertake other activities
until the requirements of the grant
program have been met.
(6) The State will comply with the
Federal requirements in 2 CFR parts 180
and 801 and 38 CFR part 43 and submit
Standard Form 424D (Assurances—
Construction Programs).
(7) The State will prepare an
Environmental Assessment to determine
whether an Environmental Impact
Statement is necessary, and certify that
funds are available to finance any costs
related to preparation of the
Environmental Assessment.
(d) The State must submit a copy of
the legislation, as enacted into law,
authorizing the establishment,
maintenance, and operation of the
facility as a veterans cemetery in
accordance with 38 CFR 39.10(a).
(e) Upon receipt of a complete
preapplication for a grant, including all
necessary assurances and all required
supporting documentation, VA will
determine whether the preapplication
conforms to all requirements listed in
paragraphs (a) through (d) of this
section, including whether it contains
sufficient information necessary to
establish the project’s priority. VA will
notify the State of any nonconformity. If
the preapplication does conform, VA
shall notify the State that the
preapplication has been found to meet
the preapplication requirements, and
the proposed project will be included in
the next scheduled ranking of projects,
as indicated in § 39.3(d).
Authority: 38 U.S.C. 501, 2408, 2411.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
numbers XXXX–XXXX, 4040–0004, 4040–
0008, and 4040–0009.)
§ 39.32
Plan preparation.
The State must prepare
Establishment, Expansion, and
Improvement Project plans and
specifications in accordance with the
requirements of this section for review
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
69312
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
by the SCGS. The plans and
specifications must be approved by the
SCGS prior to the State’s solicitation for
construction bids. Once SCGS approves
the plans and specifications, the State
must obtain construction bids and
determine the successful bidder prior to
submission of the application. The State
must establish procedures for
determining that costs are reasonable
and necessary and can be allocated in
accordance with the provisions of Office
of Management and Budget (OMB)
Circular No. A–87. Once the
Establishment, Expansion, and
Improvement Project preapplication and
the project’s plans and specifications
have been approved, an application for
assistance must be submitted in
compliance with the uniform
requirements for grants-in-aid to State
and local governments prescribed by
OMB Circular No. A–102, Revised.
(a) General. These requirements have
been established for the guidance of the
State agency and the design team to
provide a standard for preparation of
drawings, specifications, and estimates.
(b) Technical requirements. The State
should meet these technical
requirements as soon as possible after
VA approves the Establishment,
Expansion, and Improvement Project
preapplication.
(1) Boundary and site survey. The
State agency shall provide a survey of
the site and furnish a legal description
of the site. A boundary and site survey
need not be submitted if one was
submitted for a previously approved
project and there have been no changes.
Relevant information may then be
shown on the site plan. If required, the
site survey shall show each of the
following items:
(i) The outline and location
referenced to boundaries of all existing
buildings, streets, alleys (whether public
or private), block boundaries,
easements, encroachments, the names of
streets, railroads, and streams, and other
information as specified. If there is
nothing of this character affecting the
property, the Surveyor shall so state on
the drawings.
(ii) The point of beginning, bearing,
distances, and interior angles. Closure
computations shall be furnished with
the survey, and error of closure shall not
exceed 1 foot for each 10,000 feet of
lineal traverse. Boundaries of an
unusual nature (curvilinear, off-set, or
having other change or direction
between corners) shall be referenced
with curve data (including measurement
chord) and other data sufficient for
replacement, and such information shall
be shown on the map. For boundaries of
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
such nature, coordinates shall be given
for all angles and other pertinent points.
(iii) The area of the parcel in acres or
in square feet.
(iv) The location of all monuments.
(v) Delineation of 100-year floodplain
and source.
(vi) The signature and certification of
the Surveyor.
(2) Soil investigation. The State shall
provide a soil investigation of the scope
necessary to ascertain site
characteristics for construction and
burial or to determine foundation
requirements and utility service
connections. A new soil investigation is
not required if one was done for a
previously approved project on the
same site and information from the
previous investigation is adequate and
unchanged. Soil investigation, when
done, shall be documented in a signed
report. The investigation shall be
adequate to determine the subsoil
conditions. The investigation shall
include a sufficient number of test pits
or test borings as will determine, in the
judgment of the architect, the true
conditions. The following information
will be covered in the report:
(i) Thickness, consistency, character,
and estimated safe bearing value where
needed for structural foundation design
of the various strata encountered in each
pit or boring.
(ii) Amount and elevation of ground
water encountered in each pit or boring,
its probable variation with the seasons,
and effect on the subsoil.
(iii) The elevation of rock, if known,
and the probability of encountering
quicksand.
(iv) If the site is underlaid with mines,
the elevations and location of the tops
of the mine workings relative to the site,
or old workings located in the vicinity.
(3) Topographical survey. A
topographical survey in 1-foot contour
intervals shall be prepared for projects
establishing new cemeteries and for
significant expansion projects in
previously undeveloped land.
(c) Master plan. A master plan
showing the proposed layout of all
facilities—including buildings,
roadways, and burial sections—on the
selected site shall be prepared for all
new cemetery establishment projects for
approval by the SCGS. If the project is
to be phased into different year
programs, the phasing shall be
indicated. The master plan shall analyze
all factors affecting the design,
including climate, soil conditions, site
boundaries, topography, views,
hydrology, environmental constraints,
transportation access, etc. It should
provide a discussion of alternate designs
that were considered. In the case of an
PO 00000
Frm 00025
Fmt 4702
Sfmt 4702
expansion project or improvement
project, the work contemplated should
be consistent with the VA-approved
master plan or a justification for the
deviation should be provided.
(d) Preliminary or ‘‘design
development’’ drawings. Following VA
approval of the master plan, the State
must submit design development
drawings that show all current phase
construction elements to be funded by
the grant. The drawings must comply
with the following requirements:
(1) Site development and
environmental plans must include
locations of structures, demolition,
parking, roads, service areas, walks,
plazas, memorial paths, other paved
areas, landscape buffer and major
groupings, and interment areas
(including quantity of gravesites in each
area). A grading plan including existing
and proposed contours at 1-foot
intervals of the entire area affected by
the site work must be submitted. A site
plan of the immediate area around each
building shall be drawn to a convenient
scale and shall show the building floor
plan, utility connections, walks, gates,
walls or fences, flagpoles, drives,
parking areas, indication of
handicapped provisions, landscaping,
north arrow, and any other appropriate
items.
(2) Floor plans of all levels at a
convenient scale shall be double-line
drawings and shall show overall
dimensions, construction materials,
door swings, names and square feet for
each space, toilet room fixtures, and
interior finish schedule.
(3) Elevations of the exteriors of all
buildings shall be drawn to the same
scale as the plan and shall include all
material indications.
(4) Preliminary mechanical and
electrical layout plans shall be drawn at
a convenient scale and shall have an
equipment and plumbing fixture
schedule.
(e) Final construction drawings and
specifications. Funds for the
construction of any project being
assisted under this program will not be
released until VA approves the final
construction drawings and
specifications. If VA approves them, VA
shall send the State a written letter of
approval indicating that the project’s
plans and specifications comply with
the terms and conditions as prescribed
by VA. This does not constitute
approval of the contract documents. It is
the responsibility of the State to
ascertain that all State and Federal
requirements have been met and that
the drawings and specifications are
acceptable for bid purposes.
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
(1) General. The State shall prepare
final working drawings so that clear and
distinct prints may be obtained. These
drawings must be accurately
dimensioned to include all necessary
explanatory notes, schedules, and
legends. Working drawings shall be
complete and adequate for VA review
and comment. The State shall prepare
separate drawings for each of the
following types of work: architectural,
equipment, layout, structural, heating
and ventilating, plumbing, and
electrical.
(2) Architectural drawings. The State
shall submit drawings which include:
All structures and other work to be
removed; all floor plans if any new work
is involved; all elevations which are
affected by the alterations; building
sections; demolition drawings; all
details to complete the proposed work
and finish schedules; and fully
dimensioned floor plans at 1⁄8′ or 1⁄4′
scale.
(3) Equipment drawings. The State
shall submit a list of all equipment to be
provided under terms of the grant in the
case of an Establishment Project. Largescale drawings of typical special rooms
indicating all fixed equipment and
major items of furniture and moveable
equipment shall be included.
(4) Layout drawings. The State shall
submit a layout plan that shows:
(i) All proposed features such as
roads, buildings, walks, utility lines,
burial layout, etc.
(ii) Contours, scale, north arrow, and
legend showing existing trees.
(iii) A graphic or keyed method of
showing plant types as well as
quantities of each plant.
(iv) Plant list with the following: key,
quantity, botanical name, common
name, size, and remarks.
(v) Typical tree and shrub planting
details.
(vi) Areas to be seeded or sodded.
(vii) Areas to be mulched.
(viii) Gravesite section layout with
permanent section monument markers
and lettering system.
(ix) Individual gravesite layout and
numbering system. If the cemetery is
existing and the project is expansion or
renovation, show available, occupied,
obstructed, and reserved gravesites.
(x) Direction the headstones face.
(5) Structural drawings. The State
shall submit complete foundation and
framing plans and details, with general
notes to include: governing code,
material strengths, live loads, wind
loads, foundation design values, and
seismic zone.
(6) Mechanical drawings. The State
shall submit:
(i) Heating and ventilation drawings
showing complete systems and details
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
of air conditioning, heating, ventilation,
and exhaust; and
(ii) Plumbing drawings showing sizes
and elevations of soil and waste
systems, sizes of all hot and cold water
piping, drainage and vent systems,
plumbing fixtures, and riser diagrams.
(7) Electrical drawings. The State shall
submit separate drawings for lighting
and power, including drawings of:
(i) Service entrance, feeders, and all
characteristics;
(ii) All panel, breaker, switchboard,
and fixture schedules;
(iii) All lighting outlets, receptacles,
switches, power outlets, and circuits;
and
(iv) Telephone layout, fire alarm
systems, and emergency lighting.
(8) Final specifications. Final
specifications (to be used for bid
purposes) shall be in completed format.
Specifications shall include the
invitations for bids, cover or title sheet,
index, general requirements, form of bid
bond, form of agreement, performance
and payment bond forms, and sections
describing materials and workmanship
in detail for each class of work.
(9) Cost estimates. The State shall
show in convenient form and detail the
estimated total cost of the work to be
performed under the contract, including
provisions of fixed equipment shown by
the plans and specifications, if
applicable, to reflect the changes of the
approved financial plan. Estimates shall
be summarized and totaled under each
trade or type of work. Estimates shall
also be provided for each building
structure and other important features
such as the assembly area and shall
include burial facilities.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
number XXXX–XXXX.)
§ 39.33
Conferences.
(a) Predesign conference. A predesign
conference is required for all
Establishment, Expansion, and
Improvement Projects requiring major
construction, primarily to ensure that
the State agency becomes oriented to
VA procedures, requirements, and any
technical comments pertaining to the
project. This conference will take place
at an appropriate location near the
proposed site and should include a site
visit to ensure that all parties to the
process, including NCA staff, are
familiar with the site and its
characteristics.
(b) Additional conferences. At any
time, VA may recommend an additional
conference (such as a design
development conference) be held in VA
PO 00000
Frm 00026
Fmt 4702
Sfmt 4702
69313
Central Office in Washington, DC, to
provide an opportunity for the State and
its architects to discuss with VA
officials the requirements for a grant.
Authority: 38 U.S.C. 501, 2408.
§ 39.34
Application requirements.
(a) For an Establishment, Expansion,
and Improvement Project to be
considered for grant funding under this
subpart, the State must submit an
application (as opposed to a
preapplication) consisting of the
following:
(1) Standard Form 424 (Application
for Federal Assistance) with the box
labeled ‘‘application’’ marked;
(2) Standard Form 424C (Budget
Information), which documents the
amount of funds requested based on the
construction costs as estimated by the
successful construction bid;
(3) A copy of itemized bid tabulations
(If there are non-VA participating areas,
these shall be itemized separately.); and
(4) Standard Form 424D
(Assurances—Construction Program).
(5) VA Form 40–0895–11
(Memorandum of Agreement for a Grant
to Construct or Modify a State or Tribal
Government Veterans Cemetery) to
identify the parties (VA and applicant),
identify the scope of the project, and
indicate how the grant award funds will
be paid to the applicant.
(6) VA Form 40–0895–12
(Certification Regarding Debarment,
Suspension, Ineligibility and Voluntary
Exclusion—Lower Tier Covered
Transactions (Contractor)) to ensure that
the contractor has not been debarred or
suspended, and is eligible to participate
in the VA grant process and receive
Federal funds.
(b) Prior to submission of the
application, the State must submit a
copy of an Environmental Assessment
to determine if an Environmental
Impact Statement is necessary for
compliance with section 102(2)(C) of the
National Environmental Policy Act of
1969, as amended (42 U.S.C. 4332). The
Environmental Assessment must briefly
describe the project’s possible beneficial
and harmful effects on the following
impact categories:
(1) Transportation;
(2) Air quality;
(3) Noise;
(4) Solid waste;
(5) Utilities;
(6) Geology (Soils/Hydrology/
Floodplains);
(7) Water quality;
(8) Land use;
(9) Vegetation, Wildlife, Aquatic,
Ecology/Wetlands, etc.;
(10) Economic activities;
(11) Cultural resources;
E:\FR\FM\31DEP1.SGM
31DEP1
69314
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
(12) Aesthetics;
(13) Residential population;
(14) Community services and
facilities;
(15) Community plans and projects;
and
(16) Other.
(c) If an adverse environmental
impact is anticipated, the State must
explain what action will be taken to
minimize the impact. The assessment
shall comply with the requirements of
the National Environmental Policy Act
of 1969, as amended (42 U.S.C. 4321 et
seq.).
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
numbers XXXX–XXXX, 4040–0004, 4040–
0008, and 4040–0009.)
§ 39.35 Final review and approval of
application.
Following VA approval of bid
tabulations and cost estimates, VA will
review the complete Establishment,
Expansion and Improvement Project
grant application for approval in
accordance with the requirements of
§ 39.30. If the application is approved,
the grant will be awarded by a
Notification of Award of Federal Grant
Funds.
Authority: 38 U.S.C. 501, 2408.
Award of Grant
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.50
Amount of grant.
(a) The amount of an Establishment,
Expansion, and Improvement Project
grant awarded under this subpart may
not exceed 100 percent of the total cost
of the project, but may be less than the
total cost of the project.
(b) The total cost of a project under
this subpart may include:
(1) Administration and design costs,
e.g., architectural and engineering fees,
inspection fees, and printing and
advertising costs.
(2) The cost of cemetery features, e.g.,
entry features, flag plaza and assembly
areas, columbaria, preplaced liners or
crypts, irrigation systems, committalservice shelters, and administration/
maintenance buildings.
(3) In the case of an establishment
grant, the cost of equipment necessary
for the operation of the State veterans
cemetery. This may include the cost of
non-fixed equipment such as grounds
maintenance equipment, burial
equipment, and office equipment.
(4) In the case of an improvement or
expansion grant, the cost of equipment
necessary for operation of the State
veterans cemetery, but only if such
equipment:
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
(i) Was included in the construction
contract;
(ii) Was installed during construction;
and
(iii) Is permanently affixed to a
building or connected to the heating,
ventilating, air conditioning, or other
service distributed through a building
via ducts, pipes, wires, or other
connecting device, such as kitchen and
intercommunication equipment, built-in
cabinets, and equipment lifts.
(5) A contingency allowance not to
exceed five percent of the total cost of
a project that involves new construction
or eight percent of the total cost of an
improvement project that does not
involve new construction.
(c) The total cost of a project under
this subpart may not include the cost of:
(1) Land acquisition;
(2) Building space that exceeds the
space guidelines specified in this part;
(3) Improvements not on cemetery
land, such as access roads or utilities;
(4) Maintenance or repair work;
(5) Office supplies or consumable
goods (such as fuel and fertilizer) that
are routinely used in a cemetery; or
(6) Fully enclosed, climate-controlled,
committal-service facilities, freestanding
chapels, or chapels that are part of an
administrative building or information
center.
(d) VA shall certify approved
applications to the Secretary of the
Treasury in the amount of the grant, and
shall designate the appropriation from
which it shall be paid. Funds paid for
the establishment, expansion, or
improvement of a veterans cemetery
must be used solely for carrying out
approved projects.
Authority: 38 U.S.C. 501, 2408.
§ 39.51
Payment of grant award.
The amount of an Establishment,
Expansion, and Improvement Project
grant award will be paid to the State or,
if designated by the State representative,
the State veterans cemetery for which
such project is being carried out, or any
other State agency or instrumentality.
Such amount shall be paid by way of
reimbursement, and in installments that
are consistent with the progress of the
project, as the Director of the State
Cemetery Grants Service may determine
and certify for payment to the
appropriate Federal institution. Funds
paid under this section for an approved
Establishment, Expansion, and
Improvement Project shall be used
solely for carrying out such project as
approved. As a condition for the final
payment, the State representative must
submit to VA the following:
PO 00000
Frm 00027
Fmt 4702
Sfmt 4702
(a) Standard Form 271 (Outlay Report
and Request for Reimbursement for
Construction Programs);
(b) A request in writing for the final
architectural/engineering inspection,
including the name and telephone
number of the local point of contact for
the project;
(c) The written statement, ‘‘It is
hereby agreed that the monetary
commitment of the Federal government
will have been met and the project will
be considered terminated upon payment
of this voucher.’’; and
(d) Evidence that the State has met its
responsibility for an audit under the
Single Audit Act of 1984 (31 U.S.C.
7501 et seq.) and § 39.122, if applicable.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
number 0348–0002.)
Standards and Requirements
§ 39.60 General requirements for site
selection and construction of veterans
cemeteries.
(a) The various codes, requirements,
and recommendations of State and local
authorities or technical and professional
organizations, to the extent and manner
in which those codes, requirements, and
recommendations are referenced in this
subpart, are applicable to grants
involving construction of veterans
cemeteries. Additional information
concerning these codes, requirements,
and recommendations may be obtained
from VA, National Cemetery
Administration, 810 Vermont Avenue,
NW., Washington, DC 20420.
(b) The standards in §§ 39.60, 39.61,
39.62, and 39.63 constitute general
design and construction criteria and
shall apply to all Establishment,
Expansion, and Improvement Projects
for which Federal assistance is
requested under 38 U.S.C. 2408.
(c) In developing these standards, no
attempt has been made to comply with
all of the various State and local codes
and regulations. The standards
contained in §§ 39.60, 39.61, 39.62, and
39.63 shall be followed where they
exceed State or local codes and
regulations. Departure will be
permitted, however, when alternate
standards are demonstrated to provide
equivalent or better design criteria than
the standards in these sections.
Conversely, compliance is required with
State and local codes where such
requirements provide a standard higher
than those in these sections. The
additional cost, if any, in using
standards that are higher than those of
VA should be documented and justified
in the application.
E:\FR\FM\31DEP1.SGM
31DEP1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
(d) The space criteria and area
requirements referred to in these
standards shall be used as a guide in
planning. Additional area and facilities
beyond those specified as basic may be
included if found to be necessary to
meet the functional requirements of the
project but are subject to approval by
VA. Substantial deviation from the
space criteria or area standards shall be
carefully considered and justified.
Failing to meet the criteria or standards
or exceeding them by more than 10
percent in the completed plan would be
regarded as evidence of inferior design
or as exceeding the boundaries of
professional requirements. In those
projects that unjustifiably exceed
maximum space criteria or area
requirements, VA funding may be
subject to reduction in proportion to the
amount by which the space or area of
the cemetery exceeds the maximum
specified in these standards.
Authority: 38 U.S.C. 501, 2408.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.61
Site planning standards.
(a) Site selection—(1) Location. The
land should be located as close as
possible to the densest veteran
population in the area under
consideration.
(2) Size. Sufficient acreage shall be
available to provide gravesites for
estimated needs for at least 20 years.
More acreage should be provided where
feasible. Acreage could vary depending
on the State veteran population and
national cemetery availability.
(3) Accessibility. The site should be
readily accessible by highway. Offsite
improvements shall not be funded by
the grant.
(4) Topography. The land should
range from comparatively level to
rolling and moderately hilly terrain.
Natural rugged contours are suitable
only if development and maintenance
costs would not be excessive and burial
areas would be accessible to elderly or
infirm visitors. The land shall not be
subject to flooding.
(5) Water table. The water table
should be lower than the maximum
proposed depth of burial.
(6) Soil requirements. The soil should
be free from rock, muck, unstable
composition, and other materials that
would hamper the economical
excavation of graves by normal
methods. In general, the soil should
meet the standards of good agricultural
land that is capable of supporting turf
and trees, with normal care and without
the addition of topsoil.
(7) Utilities. Electricity and gas, if
required, should be available. Offsite
improvements shall not be funded by
the grant.
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
(8) Water supply. An adequate supply
of water should be available. Offsite
improvements shall not be funded by
the grant.
(9) Sewerage. An approved means to
dispose of storm flow and sewage from
the facility should be available. Offsite
improvements shall not be funded by
the grant.
(b) Site development requirements—
(1) General. The development plan shall
provide for adequate hard-surfaced
roads, walks, parking areas, public rest
rooms, a flag circle, and a main gate.
(2) Parking. All parking facilities shall
include provisions to accommodate the
physically handicapped. A minimum of
one space shall be set aside and
identified with signage in each parking
area with additional spaces provided in
the ratio of 1 handicapped space to
every 20 regular spaces. Handicapped
spaces shall not be placed between two
conventional diagonal or head-on
parking spaces. Each of the
handicapped parking spaces shall not be
less than 9 feet wide; in addition, a clear
space 4 feet wide shall be provided
between the adjacent conventional
parking spaces and also on the outside
of the end spaces. Parking shall not be
provided for large numbers of people
attending ceremonial events such as
Memorial Day services.
(3) Roads. Roads should generally
follow the topography of the cemetery
and allow pedestrian access to burial
sections on both sides. Roads should
generally not be used as ‘‘boundaries’’
outlining burial sections. Extensive
bridging should be avoided. Grant
program funding may not be used to
build access roads on property that is
not part of the cemetery. Road widths
shall be compatible with proposed
traffic flows and volumes. Primary roads
shall be generally 24 feet wide.
(4) Pavement design. The pavement
section of all roads, service areas, and
parking areas shall be designed for the
maximum anticipated traffic loads and
existing soil conditions and in
accordance with local and State design
criteria.
(5) Curbs. Bituminous roads may be
provided with integral curbs and gutters
constructed of portland cement
concrete. Freestanding curbs may be
substituted when the advantage of using
them is clearly indicated. All curbs shall
have a ‘‘roll-type’’ cross section for
vehicle and equipment access to lawn
areas except as may be necessary for
traffic control. The radii of curbs at road
intersections shall not be less than 20
feet-0 inches. Curb ramps shall be
provided to accommodate the
physically handicapped and
maintenance equipment. Curb ramps
PO 00000
Frm 00028
Fmt 4702
Sfmt 4702
69315
shall be provided at all intersections of
roads and walks. The curb ramps shall
not be less than 4 feet wide; they shall
not have a slope greater than 8 percent,
and preferably not greater than 5
percent. The vertical angle between the
surface of a curb ramp and the surface
of a road or gutter shall not be less than
176 degrees; the transition between the
two surfaces shall be smooth. Curb
ramps shall have nonskid surfaces.
(6) Walks. Walks shall be designed
with consideration for the physically
handicapped and elderly. Walks and
ramps designed on an incline shall have
periodic level platforms. All walks,
ramps and platforms shall have nonskid
surfaces. Any walk shall be ramped if
the slope exceeds 3 percent. Walks that
have gradients from 2 to 3 percent shall
be provided with level platforms at 200foot intervals and at intersections with
other walks. Ramps shall not have a
slope greater than 8 percent, and
preferably not greater than 5 percent.
The ramps shall have handrails on both
sides unless other protective devices are
provided; every handrail shall have
clearance of not less than 11⁄2 inches
between the back of the handrail and
the wall or any other vertical surface
behind it. Ramps shall not be less than
4 feet wide between curbs; curbs shall
be provided on both sides. The curbs
shall not be less than 4 inches high and
4 inches wide. A level platform in a
ramp shall not be less than the full
width of the ramp and not less than 5
feet long. Entrance platforms and ramps
shall be provided with protective
weather barriers to shield them against
hazardous conditions resulting from
inclement weather.
(7) Steps. Exterior steps may be
included in the site development as
long as provisions are made for use by
physically handicapped persons.
(8) Grading. Minimum lawn slopes
shall be 2 percent; critical spot grade
elevations shall be shown on the
contract drawings. Insofar as
practicable, lawn areas shall be
designed without steep slopes.
(9) Landscaping. The landscaping
plan should provide for a park-like
setting of harmonious open spaces
balanced with groves of indigenous and
cultivated deciduous and evergreen
trees. Shrubbery should be kept to a
minimum. Steep slopes that are
unsuitable for interment areas should be
kept in their natural state.
(10) Surface drainage. Surface grades
shall be determined in coordination
with the architectural, structural, and
mechanical design of buildings and
facilities so as to provide proper surface
drainage.
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
69316
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
(11) Burial areas. A site plan of the
cemetery shall include a burial layout.
If appropriate, the burial layout should
reflect the phases of development in the
various sections. The first phase of
construction should contain sufficient
burial sites to meet the foreseeable
demand for at least 10 years. All
applicable dimensions of roadways,
fences, utilities, or other structures shall
be indicated on the layout.
(12) Gravesites. Gravesites shall be
laid out in uniform pattern. There shall
be a minimum of 10 feet from the edge
of roads and drives and a minimum of
20 feet from the boundaries or fence
lines. Maximum distance from the edge
of a permanent road to any gravesite
shall not be over 275 feet. Temporary
roads may be provided to serve areas in
phase developments.
(13) Monumentation. Each grave shall
be marked with an appropriate marker,
and each cemetery shall maintain a
register of burials setting forth the name
of each person buried and the
designation of the grave in which he/she
is buried. Permanent gravesite control
markers shall be installed based on a
grid system throughout the burial area
unless otherwise specified. This will
facilitate the gravesite layout, placement
of utility lines, and alignment of
headstones.
(14) Entrance. The entrance should be
an architectural or landscape feature
that creates a sense of arrival.
(15) Memorial walkway. Each
cemetery should have an area for the
display of memorials donated by
veterans groups and others. Such areas
may take the form of a path or walkway
and should provide a contemplative
setting for visitors.
(16) Donation items. Family members
and others often wish to donate items
such as benches and trees. Acceptable
items of donation should be specified in
the cemetery plan. The plan should also
designate appropriate locations for such
items.
(17) Flag/assembly area. There shall
be one primary flagpole for the United
States flag. This flag shall be lighted. A
turf assembly area should be developed
for major gatherings such as Memorial
Day. The assembly area may be focused
on the flag. The area may also
incorporate an architectural or a
landscape feature that functions as a
platform or backdrop for speakers.
(18) Site furnishings. Site furnishings
include signage, trash receptacles,
benches, and flower containers. These
items should be coordinated and
complement each other, the
architectural design, and the cemetery
as a whole. They should be simple,
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
durable, standardized, and properly
scaled.
(19) Carillons. The cemetery
development plan should include a
location for a carillon tower. Carillons
are normally donated. They are not
provided for in the grant.
Authority: 38 U.S.C. 501, 2408.
§ 39.62
Space criteria for support facilities.
These criteria are based on a projected
average burial rate of one to six per day,
staffing by position, and a defined
complement of maintenance and service
equipment. For cemeteries with less
than one or more than six burials per
day, support facilities are considered on
an individual basis in accordance with
§ 39.60(d). In converting Net Square
Feet (NSF) to Gross Square Feet (GSF),
a conversion factor of 1.5 is the
maximum allowed. The applicant shall,
in support of the design, include the
following as an attachment to the
application: a list of all grounds
maintenance supplies and equipment
and the number of Full Time Employees
(FTE) by job assignment for the next 10
years.
(a) Administrative building. The
administrative building should be
approximately 1,600 NSF in total,
providing space, as needed, for the
following:
(1) Cemetery director’s office;
(2) Other offices (as needed);
(3) Administrative staff (lobby/office
area);
(4) Operations (file/office/equipment/
work area);
(5) Family/conference room;
(6) Military honors team;
(7) Refreshment unit;
(8) Housekeeping aide’s closet; and
(9) Restroom facilities.
(b) Maintenance/service building. The
maintenance/service building may be
combined with the administrative
building. The maintenance/service
building should be approximately 2,200
NSF in total, providing heated and air
conditioned space, as needed, for the
following:
(1) Foreman’s office;
(2) Lunch room;
(3) Kitchen unit;
(4) Toilet and locker room facilities;
(5) Housekeeping aide’s closet; and
(6) Vehicle and equipment
maintenance and storage.
(c) Vehicle and equipment storage.
Approximately 275 NSF/Bay as needed.
Not all types of vehicles and equipment
require storage in heated space. Based
on climatic conditions, it may be
justified to rely completely on open
structures rather than heated structures
to protect the following types of
vehicles and equipment: dump trucks,
PO 00000
Frm 00029
Fmt 4702
Sfmt 4702
pickup trucks, cemetery automobiles,
gang and circular mowers.
(d) Interment/committal service
shelter. One permanent shelter is
authorized for every five interments per
day. The shelter may include a covered
area to provide seating for
approximately 20 people and an
uncovered paved area to provide space
for approximately 50 additional people.
The shelter may also include a small,
enclosed equipment/storage area.
Provisions must be made for the playing
of Taps by recorded means.
(e) Public Information Center. One
permanent Public Information Center is
authorized per facility. A Public
Information Center is used to orient
visitors and funeral corteges. It should
include the gravesite locator. The public
restrooms may also be combined with
this structure. Space determinations for
separate structures for public restrooms
shall be considered on an individual
basis. The Public Information Center,
including public restrooms, may be
combined with the administrative
building.
(f) Other interment structures. Space
determinations for other support
facilities such as columbaria, preplaced
graveliners (or crypts), garden niches,
etc., will be considered on an individual
basis in accordance with § 39.60(d).
Authority: 38 U.S.C. 501, 2408.
§ 39.63
Architectural design standards.
The publications listed in this section
are incorporated by reference. The
Director of the Federal Register
approves this incorporation by reference
in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Copies of these
publications may be inspected at the
office of the State Cemetery Grants
Service, National Cemetery
Administration, Department of Veterans
Affairs, 810 Vermont Avenue, NW.,
Washington, DC 20420 or at the Office
of the Federal Register, 800 North
Capitol Street, NW., Suite 700,
Washington, DC. Copies of the 2006
edition of the National Fire Protection
Association Life Safety Code and Errata
(NFPA 101), the 2006 edition of the
NFPA 5000, Building Construction and
Safety Code, and the 2008 edition of the
National Electrical Code, NFPA 70, may
be obtained from the National Fire
Protection Association, Inc. (NFPA), 1
Batterymarch Park, P.O. Box 9101,
Quincy, MA 02269–9101. Copies of the
2006 edition of the International
Mechanical Code and the 2006 edition
of the International Plumbing Code may
be obtained from the International Code
Council (ICC) 2122 112th Avenue NE.,
Suite C, Bellevue, WA 98001.
E:\FR\FM\31DEP1.SGM
31DEP1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
(a) Architectural and structural
requirements—(1) Life Safety Code.
Standards must be in accordance with
the 2006 edition of the National Fire
Protection Association Life Safety Code,
NFPA 101. Fire safety construction
features not included in NFPA 101 shall
be designed in accordance with the
requirements of the 2006 edition of the
NFPA 5000, Building Construction and
Safety Code. Where the adopted codes
state conflicting requirements, the
NFPA National Fire Codes shall govern.
(2) State and local codes. In addition
to compliance with the standards set
forth in this section, all applicable local
and State building codes and
regulations must be observed. In areas
not subject to local or State building
codes, the recommendations contained
in the 2006 edition of the NFPA 5000,
Building Construction and Safety Code,
shall apply.
(3) Occupational safety and health
standards. Applicable standards
contained in the Occupational Safety
and Health Act of 1970 (29 U.S.C. 651
et seq.) must be observed.
(b) Mechanical requirements. The
heating system, boilers, steam system,
ventilation system, and air-conditioning
system shall be furnished and installed
to meet all requirements of the local and
State codes and regulations. Where no
local or State codes are in force, the
2006 edition of the International
Mechanical Code shall apply.
(c) Plumbing requirements. Plumbing
systems shall comply with all
applicable local and State codes, the
requirements of the State Department of
Health, and the minimum general
standards as set forth in this part. Where
no local or State codes are in force, the
2006 edition of the International
Plumbing Code shall apply.
(d) Electrical requirements. The
installation of electrical work and
equipment shall comply with all local
and State codes and laws applicable to
electrical installations and the
minimum general standards set forth in
the NFPA 70, National Electrical Code,
2008 edition. The regulations of the
local utility company shall govern
service connections. Aluminum bus
ways shall not be used as a conducting
medium in the electrical distribution
system.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
Authority: 38 U.S.C. 501, 2408.
Subpart C—Operation and
Maintenance Projects
Grant Requirements and Procedures
§ 39.80
General requirements for a grant.
(a) For a State to obtain a grant for the
operation or maintenance of a State
veterans cemetery:
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
(1) Its preapplication for the grant
must be approved by VA under
§ 39.81(e);
(2) Its project must be ranked
sufficiently high within Priority Group
4 as defined in § 39.3 for the applicable
fiscal year so that funds are available for
the project, and a grant for the project
must not result in payment of more than
the $5 million total amount permissible
for all Operation and Maintenance
Projects in any fiscal year;
(3) Its plans and specifications for the
project must be approved by VA under
§ 39.82;
(4) The State must meet the
application requirements in § 39.84; and
(5) Other requirements specified in
§§ 39.6, 39.10, and 39.83 must be
satisfied.
(b) VA may approve under § 39.85 any
Operation and Maintenance Project
grant application up to the amount of
the grant requested once the
requirements under paragraph (a) of this
section have been satisfied, provided
that sufficient funds are available and
that total amount of grants awarded
during any fiscal year for Operation and
Maintenance Projects does not exceed
$5 million. In determining whether
sufficient funds are available, VA shall
consider the project’s ranking in Priority
Group 4; the total amount of funds
available for cemetery grant awards in
Priority Group 4 during the applicable
fiscal year; and the prospects of higher
ranking projects being ready for the
award of a grant before the end of the
applicable fiscal year.
Authority: 38 U.S.C. 501, 2408.
§ 39.81
Preapplication requirements.
(a) A State seeking a grant for the
operation or maintenance of a State
veterans cemetery must submit a
preapplication to the Director, State
Cemetery Grants Service, through
https://www.cem.va.gov/cem/
scg_grants.asp.
(b) No detailed drawings, plans, or
specifications are required with the
preapplication. As a part of the
preapplication, the State must submit
each of the following:
(1) Standard Form 424 (Application
for Federal Assistance) and Standard
Form 424C (Budget Information) signed
by the authorized representative of the
State. These forms document the
amount of the grant requested, which
may not exceed 100 percent of the
estimated cost of the project to be
funded with the grant.
(2) VA Form 40–0895–2 (Certification
of Compliance with Provisions of the
Davis-Bacon Act) to certify that the State
has obtained the latest prevailing wage
rates for Federally funded projects. Any
PO 00000
Frm 00030
Fmt 4702
Sfmt 4702
69317
construction project fully or partially
funded with Federal dollars must
comply with those rates for specific
work by trade employees (e.g.,
electricians, carpenters).
(3) VA Form 40–0895–6 (Certification
of State or Tribal Government Matching
Architectural and Engineering Funds to
Qualify for Group 1 on the Priority List)
to provide documentation that the State
has legislative authority to support the
project and the resources necessary to
initially fund the architectural and
engineering portion of the project
development. Once the grant is
awarded, VA will reimburse the
applicant for all allowable architectural
and engineering costs.
(4) VA Form 40–0895–7 (Certification
Regarding Debarment, Suspension, and
Other Responsibility Matters—Primary
Covered Transactions (State or Tribal
Government)) to ensure that the
applicant has not been debarred or
suspended, and is eligible to participate
in the VA grant process and receive
Federal funds.
(5) VA Form 40–0895–8 (Certification
Regarding Drug-Free Workplace
Requirements for Grantees Other Than
Individuals) to ensure that the applicant
complies with the Drug-Free Workplace
Act of 1988 at the location where the
construction will occur.
(6) VA Form 40–0895–9 (Certification
Regarding Lobbying) to ensure that the
applicant complies with Public Law
101–121 regarding the prohibition
against any payments to anyone that
influences or attempts to influence an
officer or Member of Congress in
connection with the award of a grant.
(7) VA Form 40–0895–10
(Certification of Compliance with
Federal Requirements—State or Tribal
Government Construction Grant) to
ensure that the applicant complies with
all requirements of Part 39.
(8) VA Form 40–0895–15
(Certification of Cemetery Maintained in
Accordance with National Cemetery
Administration Standards) to ensure
that any cemetery operated or
maintained through a grant will be
operated and maintained in accordance
with VA’s national shrine standards of
appearance.
(9) A gravesite assessment survey
documenting the State cemetery’s
performance related to the standards
outlined in paragraph (b)(10) of this
section for the year in which the
preapplication is submitted.
(10) A program narrative describing
how the project will assist the State in
meeting VA’s national shrine standards
with respect to cleanliness, height and
alignment of headstones and markers,
leveling of gravesites, or turf conditions.
E:\FR\FM\31DEP1.SGM
31DEP1
erowe on DSK5CLS3C1PROD with PROPOSALS-1
69318
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
Specifically, the preapplication should
explain the need for the grant, how the
work is to be accomplished, and the
expected improvement in the State
cemetery’s performance related to one
or more of the following national shrine
standards:
(i) Cleanliness. 90 percent of
headstones, markers, and niche covers
must be clean and free of debris and
objectionable accumulations.
(ii) Height. 90 percent of headstones
and markers must be set and maintained
at the proper height.
(iii) Alignment. 100 percent of
headstones, markers, and niche covers
must be properly installed. Upright
headstones in active burial sections
must be uniform in height (24″–26″
above ground), horizontally and
vertically aligned with inscriptions
visible, and installed to ensure a
pleasing top line while compensating
for ground contours. Flat markers must
be uniform in height (parallel with the
ground and no more than 1″ above
grade) and horizontally and vertically
aligned. Niche covers must be
horizontally and vertically aligned. All
inscriptions must be visible.
(iv) Grade. 95 percent of the grade of
every gravesite must blend in with
adjacent grade levels.
(v) Turf Conditions. 100 percent of
visually prominent areas must have a
well-established, healthy stand of turf
that is generally weed free; 95 percent
of visually prominent areas with
established turf must be generally free of
bare areas.
(11) A description of the geographic
location of the existing State cemetery
and any other supporting
documentation, as requested by the
SCGS Director.
(12) A description of the project
including the number and types of
headstones and markers that need to be
cleaned and aligned, a description of the
gravesites that need to be leveled, and
a description of the turf conditions that
need to be improved to meet VA’s
national shrine standards.
(c) In addition, the State must submit
written assurance of each of the
following conditions:
(1) Any cemetery in receipt of a grant
under this subpart will be used
exclusively for the interment or
memorialization of eligible persons, as
set forth in § 39.10(a), whose interment
or memorialization is not contrary to the
conditions of the grant (see § 39.10(b)
and 38 U.S.C. 2408(d) and 2411).
(2) Title to the site is or will be vested
solely in the State.
(3) The State possesses legal authority
to apply for the grant.
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
(4) The State will obtain approval by
VA of the final specifications before the
project is advertised or placed on the
market for bidding; the project will
achieve VA’s national shrine standards
with respect to cleanliness, height and
alignment of headstones and markers,
leveling of gravesites, or turf conditions
in accordance with the application and
approved plans and specifications; the
State will submit to the Director of the
State Cemetery Grants Service, for prior
approval, changes that alter any cost of
the project; and the State will not enter
into a contract for the project or
undertake other activities until all the
requirements of the grant program have
been met.
(d) Depending on the scope of the
project, the SCGS will work with the
State to determine which, if any, of the
following are required:
(1) Compliance with section 106 of
the National Historic Preservation Act of
1966, as amended (16 U.S.C. 470),
Executive Order 11593 (identification
and protection of historic properties),
and the Archaeological and Historic
Preservation Act of 1974 (16 U.S.C.
469a–1 et seq.).
(2) Compliance with the Federal
requirements in 2 CFR parts 180 and
801 and 38 CFR part 43 and submission
of Standard Form 424D (Assurances—
Construction Programs).
(3) A site Environmental Assessment
to determine whether an Environmental
Impact Statement will be necessary as a
result of the work to be performed on
the headstones and markers, gravesites,
or turf conditions.
(e) Upon receipt of a complete
preapplication for a grant, including all
necessary assurances and all required
supporting documentation, VA will
determine whether the preapplication
conforms to all requirements listed in
paragraphs (a) through (d) of this
section, including whether it contains
sufficient information necessary to
establish the project’s priority. VA will
notify the State of any nonconformity. If
the preapplication does conform, VA
shall notify the State that the
preapplication has been found to meet
the preapplication requirements, and
the proposed project will be included in
the next scheduled ranking of projects,
as indicated in § 39.3(d).
Authority: 38 U.S.C. 501, 2408, 2411.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
numbers XXXX–XXXX, 4040–0004, 4040–
0008, and 4040–0009.)
§ 39.82
Plan preparation.
(a) The State must successfully
complete its plan preparation under this
PO 00000
Frm 00031
Fmt 4702
Sfmt 4702
section before submitting a grant
application for an Operation and
Maintenance Project. The State may be
required to undertake some or all of the
following requirements of this section.
After submitting all necessary plans and
specifications to the SCGS and
obtaining approval for the State to
solicit for the Operation and
Maintenance Project contract bids, the
State shall:
(1) Obtain bids and determine the
successful bidder;
(2) Establish procedures for
determining that costs are reasonable
and necessary and can be allocated in
accordance with the provisions of OMB
Circular No. A–87 and submit
documentation of such determinations
to VA; and
(3) Comply with the uniform
requirements for grants-in-aid to State
and local governments prescribed by
OMB Circular No. A–102, Revised.
(b) Depending on the scope of the
project, the SCGS will work with the
State to determine which of the
following will be required prior to
submission of an application. As
determined by VA, these may include:
(1) A boundary and site survey
comprising a survey and legal
description of the existing State
cemetery site;
(2) Project drawings indicating the
cemetery section(s) to be impacted by
the Operation and Maintenance Project,
gravesite section layout with permanent
section monument markers and lettering
system, and the total number of
gravesites to be impacted;
(3) Project specifications (to be used
for bid purposes), which shall include
the invitation for bid, cover or title
sheet, index, general requirements, form
of bid bond, form of agreement,
performance and payment bond forms,
and detailed descriptions of materials
and workmanship for the work to be
performed to meet VA’s national shrine
standards;
(4) A detailed estimate of the total
cost of the work to be performed under
the contract; or
(5) A site Environmental Assessment
meeting the provisions of § 39.34(b) to
determine if an Environmental Impact
Statement is necessary for compliance
with section 102(2)(C) of the National
Environmental Policy Act of 1969, as
amended (42 U.S.C. 4332), as a result of
the work to be performed on the
headstones and markers, gravesites, or
turf conditions.
(c) If VA determines that the project’s
plans and specifications comply with
the terms and conditions prescribed by
VA, VA will send the State a written
letter of approval indicating that the
E:\FR\FM\31DEP1.SGM
31DEP1
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
project’s plans and specifications
comply with the terms and conditions
as prescribed by VA. This does not
constitute approval of the contract
documents. It is the responsibility of the
State to ascertain that all State and
Federal requirements have been met and
that the drawings and specifications are
acceptable for bid purposes.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
number XXXX–XXXX.)
§ 39.83
Conferences.
(a) Planning conference. The SCGS
may require planning conferences for
Operation and Maintenance Projects,
primarily to ensure that the State agency
becomes oriented to VA’s national
shrine standards, procedures,
requirements, and any technical
comments pertaining to the project.
These conferences will normally occur
over the telephone.
(b) Additional conferences. At any
time, VA may recommend an additional
telephone conference to provide an
opportunity for the State to discuss with
VA officials the requirements for an
Operation and Maintenance Project
grant.
Authority: 38 U.S.C. 501, 2408.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.84
Application requirements.
For an Operation and Maintenance
Project to be considered for grant
funding under this subpart, the State
must submit an application (as opposed
to a preapplication) consisting of the
following:
(a) Standard Form 424 (Application
for Federal Assistance) with the box
labeled ‘‘application’’ marked;
(b) Standard Form 424C (Budget
Information), which documents the
amount of funds requested based on the
construction costs as estimated by the
successful construction bid;
(c) A copy of itemized bid tabulations;
and
(d) Standard Form 424D
(Assurances—Construction Program).
(e) VA Form 40–0895–11
(Memorandum of Agreement for a Grant
to Construct or Modify a State or Tribal
Government Veterans Cemetery) to
identify the parties (VA and applicant),
identify the scope of the project, and
indicate how the grant award funds will
be paid to the applicant.
(f) VA Form 40–0895–12 (Certification
Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion—
Lower Tier Covered Transactions
(Contractor)) to ensure that the
contractor has not been debarred or
suspended, and is eligible to participate
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
in the VA grant process and receive
Federal funds.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
numbers XXXX–XXXX, 4040–0002, 4040–
0008, and 4040–0009.)
§ 39.85 Final review and approval of
application.
Following VA approval of bid
tabulations and cost estimates, the
complete Operation and Maintenance
Project grant application will be
reviewed for approval in accordance
with the requirements of § 39.80. If the
application is approved, the grant will
be awarded by a Notification of Award
of Federal Grant Funds.
Authority: 38 U.S.C. 501, 2408.
Award of Grant
§ 39.100
Amount of grant.
(a) The amount of an Operation and
Maintenance Project grant awarded
under this subpart may not exceed 100
percent of the total cost of the project,
but may be less than total cost of the
project.
(b) The total cost of a project under
this subpart may include any or all of
the following costs:
(1) Administration and design costs,
e.g., architectural and engineering fees,
inspection fees, and printing and
advertising costs.
(2) Construction costs.
(3) The cost of VA-approved
equipment that is necessary for the
completion of the project.
(c) The total cost of a project under
this subpart may not include the cost of
any of the following:
(1) Land acquisition;
(2) Buildings of any type;
(3) Improvements not on cemetery
land, such as access roads or utilities;
(4) Office supplies or consumable
goods (such as fuel and fertilizer) that
are routinely used in a cemetery; or
(5) Project contingency costs.
(d) VA shall certify approved
applications to the Secretary of the
Treasury in the amount of the grant, and
shall designate the appropriation from
which it shall be paid. Funds paid for
the operation and maintenance of a
veterans cemetery must be used solely
for carrying out approved projects.
69319
carried out, or any other State agency or
instrumentality. Such amount shall be
paid by way of reimbursement and in
installments that are consistent with the
progress of the project, as the Director
of the State Cemetery Grants Service
may determine and certify for payment
to the appropriate Federal institution.
Funds paid under this section for an
approved Operation and Maintenance
Project shall be used solely for carrying
out such project as approved. As a
condition for the final payment, the
State representative must submit to VA
each of the following:
(a) Standard Form 271 (Outlay Report
and Request for Reimbursement for
Construction Programs);
(b) A report on the project
accomplishments in accordance with
§ 39.120 and a request in writing for the
final architectural/engineering
inspection, including the name and
telephone number of the local point of
contact for the project;
(c) The written statement, ‘‘It is
hereby agreed that the monetary
commitment of the Federal government
will have been met and the project will
be considered terminated upon payment
of this voucher.’’; and
(d) Evidence that the State has met its
responsibility for an audit under the
Single Audit Act of 1984 (31 U.S.C.
7501 et seq.) and § 39.122.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
number 0348–0002.)
Subpart D—Grant Recipient
Responsibilities, Inspections, and
Reports Following Project Completion
§ 39.120 Documentation of grant
accomplishments.
Within 60 days of completion of an
Operation and Maintenance Project, the
State must submit to SCGS a written
report regarding the work performed to
meet VA’s national shrine standards.
This report must be based on the
original justification for the grant as
noted in § 39.81(b)(10) and must include
statistical data and detailed pictures of
the work accomplished.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirement in this section under control
number XXXX–XXXX.)
Authority: 38 U.S.C. 501, 2408.
Payment of grant award.
§ 39.121 State responsibilities following
project completion.
The amount of an Operation and
Maintenance Project grant award will be
paid to the State or, if designated by the
State representative, the State veterans
cemetery for which such project is being
(a) A State that has received an
Establishment, Expansion, and
Improvement Project grant or an
Operation and Maintenance Project
grant shall monitor use of the cemetery
§ 39.101
PO 00000
Frm 00032
Fmt 4702
Sfmt 4702
E:\FR\FM\31DEP1.SGM
31DEP1
69320
Federal Register / Vol. 74, No. 250 / Thursday, December 31, 2009 / Proposed Rules
by various subgroups and minority
groups, including women veterans. If
VA determines that under-utilization by
any of these groups exists, the State
shall establish a program to inform
members of these groups about benefits
available to them. If a significant
number or portion of the population
eligible to be served or likely to be
directly affected by the grant program
needs benefits information in a language
other than English, the State shall make
such information available in the
necessary language.
(b) A State veterans cemetery that has
received an Establishment, Expansion,
and Improvement Project grant or an
Operation and Maintenance Project
grant shall be operated and maintained
as follows:
(1) Buildings, grounds, roads, walks,
and other structures shall be kept in
reasonable repair to prevent undue
deterioration and hazards to users.
(2) The cemetery shall be kept open
for public use at reasonable hours based
on the time of the year.
(c) VA, in coordination with the State,
shall inspect the project for compliance
with the standards set forth in subpart
B for Establishment, Expansion, and
Improvement Projects and with the
standards set forth in subpart C for
Operation and Maintenance Projects at
the project’s completion and at least
once in every 3-year period following
completion of the project throughout the
period the facility is operated as a State
veterans cemetery. The State shall
forward to the Director, State Cemetery
Grants Service, a copy of the inspection
report, giving the date and location the
inspection was made and citing any
deficiencies and corrective action to be
taken or proposed.
(d) Failure of a State to comply with
any of paragraphs (a) through (c) of this
section shall be considered cause for VA
to suspend any payments due the State
on any project until the compliance
failure is corrected.
Authority: 38 U.S.C. 501, 2408; and E.O.
13166, 65 FR 50121.
erowe on DSK5CLS3C1PROD with PROPOSALS-1
§ 39.122
Inspections, audits, and reports.
(a) A State will allow VA inspectors
and auditors to conduct inspections as
necessary to ensure compliance with the
provisions of this part. The State will
provide to VA evidence that it has met
its responsibility under the Single Audit
Act of 1984 (see part 41 of this chapter).
(b) A State will make an annual report
on VA Form 40–0241 (‘‘State Cemetery
Data’’) signed by the authorized
representative of the State. These forms
document current burial activity at the
cemetery, use of gravesites, remaining
gravesites, and additional operational
VerDate Nov<24>2008
14:04 Dec 30, 2009
Jkt 220001
information intended to answer
questions about the status of the grant
program.
(c) A State will complete and submit
to VA a VA Form 40–0895–13
(Certification Regarding Documents and
Information Required for State or Tribal
Government Cemetery Construction
Grants—Post Grant Requirements) to
ensure that the grantee is aware of and
complies with all grant responsibilities
and to properly and timely close out the
grant.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has
approved the information collection
requirements in this section under control
number XXXX–XXXX and 2900–0559.)
[FR Doc. E9–30873 Filed 12–30–09; 8:45 am]
BILLING CODE P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 721
[EPA–HQ–OPPT–2009–0668; FRL–8796–6]
RIN 2070–AB27
Proposed Revocation of Significant
New Use Rule on a Certain Chemical
Substance
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Proposed rule.
SUMMARY: EPA is proposing to revoke a
significant new use rule (SNUR)
promulgated under section 5(a)(2) of the
Toxic Substances Control Act (TSCA)
for one chemical substance. For the
chemical substance covered by
premanufacture notice (PMN) P–95–
1772, EPA issued a non-5(e) SNUR (i.e.
SNUR on a substance that is not subject
to a TSCA section 5(e) consent order)
designating certain activities as
significant new uses based on the
concern criteria in 40 CFR 721.170(b).
EPA has received and reviewed new
information and test data for the
chemical substance and proposes to
revoke the SNUR pursuant to 40 CFR
721.185.
DATES: Comments must be received on
or before February 1, 2010.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPPT–2009–0668, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Document Control Office
(7407M), Office of Pollution Prevention
and Toxics (OPPT), Environmental
PO 00000
Frm 00033
Fmt 4702
Sfmt 4702
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460–
0001.
• Hand Delivery: OPPT Document
Control Office (DCO), EPA East Bldg.,
Rm. 6428, 1201 Constitution Ave., NW.,
Washington, DC. Attention: Docket ID
Number EPA–HQ–OPPT–2009–0668.
The DCO is open from 8 a.m. to 4 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
DCO is (202) 564–8930. Such deliveries
are only accepted during the DCO’s
normal hours of operation, and special
arrangements should be made for
deliveries of boxed information.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPPT–
2009–0668. EPA’s policy is that all
comments received will be included in
the docket without change and may be
made available on-line at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through regulations.gov or email. The regulations.gov website is an
‘‘anonymous access’’ system, which
means EPA will not know your identity
or contact information unless you
provide it in the body of your comment.
If you send an e-mail comment directly
to EPA without going through
regulations.gov, your e-mail address
will be automatically captured and
included as part of the comment that is
placed in the docket and made available
on the Internet. If you submit an
electronic comment, EPA recommends
that you include your name and other
contact information in the body of your
comment and with any disk or CD-ROM
you submit. If EPA cannot read your
comment due to technical difficulties
and cannot contact you for clarification,
EPA may not be able to consider your
comment. Electronic files should avoid
the use of special characters, any form
of encryption, and be free of any defects
or viruses.
Docket: All documents in the docket
are listed in the docket index available
at https://www.regulations.gov. Although
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available electronically at
https://www.regulations.gov, or, if only
available in hard copy, at the OPPT
Docket. The OPPT Docket is located in
E:\FR\FM\31DEP1.SGM
31DEP1
Agencies
[Federal Register Volume 74, Number 250 (Thursday, December 31, 2009)]
[Proposed Rules]
[Pages 69304-69320]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-30873]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF VETERANS AFFAIRS
38 CFR Part 39
RIN 2900-AM96
State Cemetery Grants
AGENCY: Department of Veterans Affairs.
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The Department of Veterans Affairs (VA) is proposing to amend
its regulations governing grants to States for the establishment,
expansion, and improvement of State veterans cemeteries (Establishment,
Expansion, and Improvement Projects). We propose to implement through
regulation new statutory authority to provide grants for the operation
and maintenance of State veterans cemeteries (Operation and Maintenance
Projects), as authorized by the Dr. James Allen Veteran Vision Equity
Act of 2007 (the Act), enacted on December 26, 2007. The Act expands VA
authority to provide grants to States for operating and maintaining
State veterans cemeteries and limits to $5 million the aggregate amount
of such grants VA may award in any fiscal year. The Act requires that
VA prescribe regulations implementing the new authority within 180 days
of enactment. VA proposes to amend its regulations to outline the
process, the criteria, and the priorities relating to the award of
these Operation and Maintenance Project grants. The proposed rule would
also revise part 39 by changing the arrangement and numbering of the
[[Page 69305]]
current regulatory sections, updating the references to various codes,
incorporating some non-substantive changes to the regulations, and
removing specific forms from this part that are available at https://www.cem.va.gov/cem/scg_grants.asp.
DATES: Comments must be received by VA on or before March 1, 2010.
ADDRESSES: Written comments may be submitted through https://www.Regulations.gov; by mail or hand-delivery to: Director, Regulations
Management (02REG), Department of Veterans Affairs, 810 Vermont Avenue,
NW., Room 1068, Washington, DC 20420; or by fax to (202) 273-9026.
Comments should indicate that they are submitted in response to ``RIN
2900-AM96--State Cemetery Grants.'' Copies of comments received will be
available for public inspection in the Office of Regulation Policy and
Management, Room 1063B, between the hours of 8 a.m. and 4:30 p.m.,
Monday through Friday (except holidays). Please call (202) 461-4923 for
an appointment (this is not a toll-free number). In addition, during
the comment period, comments may be viewed online through the Federal
Docket Management System (FDMS) at https://www.Regulations.gov. See the
material headed ``Paperwork Reduction Act'' under SUPPLEMENTARY
INFORMATION regarding submission of comments on collections of
information proposed in this proposed rule.
FOR FURTHER INFORMATION CONTACT: Frank Salvas, Director of State
Cemetery Grants Service, National Cemetery Administration, Department
of Veterans Affairs, 810 Vermont Avenue, NW., Washington, DC 20420.
Telephone: (202) 461-8947 (this is not a toll-free number).
SUPPLEMENTARY INFORMATION: The goal of the National Cemetery
Administration (NCA) is to ensure that the burial needs of veterans and
eligible family members are met by providing a burial opportunity in
national and State veterans cemeteries. State veterans cemeteries
complement VA national cemeteries and are critical to meeting VA's goal
of providing burial access to 90 percent of veterans and their
families. Research indicates that veterans and their families use
veterans cemeteries when the cemeteries are located within a reasonable
distance from their residence. The State Cemetery Grants Service (SCGS)
encourages States to provide burial service to our Nation's veterans by
operating veterans cemeteries in a manner consistent with national
cemeteries in areas where the most number of veterans would benefit as
determined by VA. Under the State Cemetery Grant Program (SCGP), the
Federal government will provide up to 100 percent of the cost of
development associated with the establishment, expansion, and
improvement of a State veterans cemetery, as well as the cost of
initial operating equipment.
Section 202(b) of the Dr. James Allen Veteran Vision Equity Act of
2007 (Pub. L. 110-157) authorizes VA under the SCGP to provide
additional Federal assistance to States for the operation and
maintenance of State veterans cemeteries. Prior to passage of this law,
VA could only provide Federal funds for the establishment, expansion,
and improvement of State veterans cemeteries. VA could not fund the
operation or maintenance of State veterans cemeteries. The new
authority granted by the Act authorizes VA to fund Operation and
Maintenance Projects at State veterans cemeteries to assist States in
achieving the same high standards of appearance for State veterans
cemeteries as VA achieves for national cemeteries. Specifically, the
new operation and maintenance grants will be targeted to help States
meet VA's national shrine standards with respect to cleanliness, height
and alignment of headstones and markers, leveling of gravesites, and
turf conditions. The Act authorizes VA to award up to a total of $5
million for such purposes each fiscal year to ensure State veterans
cemeteries meet the highest standards of appearance and serve as
national shrines to honor the Nation's military service members with a
final resting place.
The proposed rule would revise 38 CFR part 39 and express in
regulation the statutory authority of VA to grant awards for Operation
and Maintenance Projects up to a total of $5 million per year. The
proposed rule would not change any of the grant procedures or
requirements for Establishment, Expansion, and Improvement Projects. It
would establish a new grant preapplication and application process and
requirements for Operation and Maintenance Projects only. Many
requirements of the grant application process for Establishment,
Expansion, and Improvement Projects would be incorporated into the
grant-application process for Operation and Maintenance Projects and
would apply to both types of grants. The preapplication process serves
as a means for validating the need for the project and opening lines of
communication between NCA and potential participating States for SCGP
grants. In the preapplication process, States certify that they will be
able to adhere to the requirements of the grant. The application
process then becomes a certification of actual adherence to the
requirements of the grant.
The proposed rule would amend the existing grant prioritization
process. The proposed rule would retain the same priority categories as
those in current part 39, but would amend one of the categories to
address Operation and Maintenance Projects.
Once an Establishment, Expansion, and Improvement Project is
approved for funding, VA may award a grant up to 100 percent of the
amount requested, provided that sufficient funds are available.
Currently, the entire SCGP annual budget is allocated to grants for
Establishment, Expansion, and Improvement Projects. Any funds remaining
at the end of a fiscal year are carried into the next year and
allocated to grants for Establishment, Expansion, and Improvement
Projects the following year. With passage of the Act, the SCGS can now
fund two types of grants: (1) Establishment, Expansion, and Improvement
Project grants and (2) Operation and Maintenance Project grants.
There are currently four Priority Groups. These are:
Priority 1--Projects for gravesite expansion or improvements that
are needed to continue service at an existing veterans cemetery. This
includes phased development of currently undeveloped land.
Priority 2--Projects for the establishment of new cemeteries.
Priority 3--Planned phased gravesite developments prior to need.
Priority 4--Other improvements to cemetery infrastructure, such as
building expansion and upgrades to roads and irrigation systems, that
are not directly related to the development of new gravesites. We
propose to expand Priority 4 to include Operation and Maintenance
Projects that assist a State to achieve the national shrine standards
of appearance at an existing State veterans cemetery.
Within Priority Groups 1, 2, and 3, individual projects are ranked
based on the greatest number of veterans who benefit from the project
as determined by VA. This prioritization system, based on veteran
population data, assists VA in maintaining and improving access for
burial to more veterans and their eligible family members in a veterans
cemetery, and achieves the goal of providing the greatest number of
veterans with a burial option at either a Federal or State veterans
cemetery located within a reasonable distance from their residence.
Priority Group 4 grants are and will continue to be awarded only
when there
[[Page 69306]]
are funds available and when there are no remaining Priority Group 1,
2, or 3 grant applications for which a grant may be awarded with
available funds. Regardless of the amount of funds available, no more
than a total of $5 million will be awarded for Operation and
Maintenance Project grants in any year in accordance with the statutory
requirements of the Act.
This proposed rule would change the arrangement and numbering of
the current sections in part 39 and update the references to various
codes. It would also incorporate some non-substantive changes to the
current regulations and remove specific forms from current Sec. 39.26
because all forms cited in this part are available at https://www.cem.va.gov/cem/scg_grants.asp. This will enable applicants to
download forms as needed.
Executive Order 12866
Executive Order 12866 directs agencies to assess all costs and
benefits of available regulatory alternatives and, when regulation is
necessary, to select regulatory approaches that maximize net benefits
(including potential economic, environmental, public health and safety,
and other advantages; distributive impacts; and equity). The Executive
Order classifies a ``significant regulatory action,'' requiring review
by the Office of Management and Budget (OMB), as any regulatory action
that is likely to result in a rule that may: (1) Have an annual effect
on the economy of $100 million or more or adversely affect in a
material way the economy, a sector of the economy, productivity,
competition, jobs, the environment, public health or safety, or State,
local, or Tribal governments or communities; (2) create a serious
inconsistency or interfere with an action taken or planned by another
agency; (3) materially alter the budgetary impact of entitlements,
grants, user fees, or loan programs or the rights and obligations of
recipients thereof; or (4) raise novel legal or policy issues arising
out of legal mandates, the President's priorities, or the principles
set forth in the Executive Order.
The economic, interagency, budgetary, legal, and policy
implications of this proposed rule have been examined, and it has been
determined not to be a significant regulatory action under the
Executive Order.
Regulatory Flexibility Act
The Secretary hereby certifies that this proposed rule will not
have a significant economic impact on a substantial number of small
entities as they are defined in the Regulatory Flexibility Act, 5
U.S.C. 601-612. This proposed rule will directly affect only State
government entities and will not directly affect small entities.
Therefore, pursuant to 5 U.S.C. 605(b), this proposed amendment is
exempt from the initial and final regulatory flexibility analysis
requirements of sections 603 and 604.
Unfunded Mandates
The Unfunded Mandates Reform Act of 1995 requires, at 2 U.S.C.
1532, that agencies prepare an assessment of anticipated costs and
benefits before issuing any rule that may result in an expenditure by
State, local, or Tribal governments, in the aggregate, or by the
private sector, of $100 million or more (adjusted annually for
inflation) in any year. This proposed rule would have no such effect on
State, local, and Tribal governments, or on the private sector.
Paperwork Reduction Act
This proposed rule contains several provisions that constitute
collections of information under the Paperwork Reduction Act (44 U.S.C.
3501-3521). Some of the information collections have already been
approved by OMB, as required by the Paperwork Reduction Act. Those
provisions display the OMB control numbers that evidence OMB approval
(i.e., 0348-0002, 4040-0004, 4040-0008, 4040-0009, and 2900-0559).
Other information collections in the proposed rule still require OMB
approval. These provisions are in Sec. Sec. 39.31, 39.32, 39.34,
39.81, 39.82, 39.84, 39.120, and 39.122. In accordance with 44 U.S.C.
3507(d), VA has forwarded a copy of this proposed rule to OMB for its
review of the collections of information.
Comments on the proposed collections of information contained in
this proposed rule should be submitted to the Office of Management and
Budget, Attention: Desk Officer for the Department of Veterans Affairs,
Office of Information and Regulatory Affairs, Washington, DC 20503;
with copies mailed or hand delivered to: Director, Regulations
Management (02REG), Department of Veterans Affairs, 810 Vermont Ave.,
NW., Room 1068, Washington, DC 20420; faxed to (202) 273-9026; or e-
mailed to ``https://www.Regulations.gov.'' Comments should indicate that
they are submitted in response to ``RIN 2900-AM96.''
Title: Submission of VA Form 40-0895-2.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-2
(Certification of Compliance with Provisions of the Davis-Bacon Act) to
certify that the applicant has obtained the latest prevailing wage
rates for Federally funded projects.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with provisions of the Davis-Bacon Act and requirements in 38
CFR part 39. Any construction project fully or partially funded with
Federal dollars must comply with the latest prevailing wage rates for
specific work by trade employees (e.g., electricians, carpenters).
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-3.
Summary of collection of information: Proposed Sec. 39.31 would
require an applicant to submit VA Form 40-0895-3 (State or Tribal
Government Cemetery Grants Service Space Program Analysis--Buildings)
to provide information on the proposed size of cemetery buildings.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the proposed
size of cemetery buildings are within the size allowed by VA and that
the applicant complies with requirements in this Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 36
hours.
Estimated annual burden per collection: 3 hours.
Title: Submission of VA Form 40-0895-6.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-6
(Certification of State or Tribal Government Matching Architectural and
Engineering Funds to Qualify for Group 1 on the Priority List) to
provide documentation that the State has legislative authority to
support the project and the resources necessary to initially fund the
architectural and
[[Page 69307]]
engineering portion of the project development.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
has adequate resources for the proposed project and complies with
requirements in this Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 6 hours.
Estimated annual burden per collection: 30 minutes.
Title: Submission of VA Form 40-0895-7.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-7
(Certification Regarding Debarment, Suspension, and Other
Responsibility Matters--Primary Covered Transactions (State or Tribal
Government)) to certify that the applicant has not been debarred or
suspended, and is eligible to participate in the VA grant process and
receive Federal funds.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
is eligible for Federal funds and complies with the requirements of 2
CFR Parts 180 and 801.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-8.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-8
(Certification Regarding Drug-Free Workplace Requirements for Grantees
Other Than Individuals) to certify compliance with the Drug-Free
Workplace Act of 1988 at the location where the construction will
occur.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with the requirements of the Drug-Free Workplace Act of 1988.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-9.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-9
(Certification Regarding Lobbying) to certify that the applicant has
not made any payments to anyone that influences or attempts to
influence an officer or Member of Congress in connection with the award
of a grant.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with sec. 319 of Public Law 101-121 and requirements in this
Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-10.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-10
(Certification of Compliance with Federal Requirements--State or Tribal
Government Construction Grant) to certify compliance with all
requirements of Part 39.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with the requirements in this Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-11.
Summary of collection of information: Proposed Sec. Sec. 39.34 and
39.84 would require an applicant to submit VA Form 40-0895-11
(Memorandum of Agreement for a Grant to Construct or Modify a State or
Tribal Government Veterans Cemetery) to identify the parties (VA and
applicant), identify the scope of the project, and indicate how the
grant award funds will be paid to the applicant.
Description of the need for information and proposed use of
information: This collection is necessary to establish an agreement
between VA and the applicant regarding a grant and to ensure that the
applicant complies with requirements in this Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 24
hours.
Estimated annual burden per collection: 2 hours.
Title: Submission of VA Form 40-0895-12.
Summary of collection of information: Proposed Sec. Sec. 39.34 and
39.84 would require applicants to submit VA Form 40-0895-12
(Certification Regarding Debarment, Suspension, Ineligibility and
Voluntary Exclusion--Lower Tier Covered Transactions (Contractor)) to
certify that the contractor has not been debarred or suspended, and is
eligible to participate in the VA grant process and receive Federal
funds.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the contractor
has not been debarred or suspended, and is eligible to participate in
the VA grant process and complies with the requirements of 2 CFR Parts
180 and 801.
Description of likely respondents: Contractors of States and Tribal
Governments applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of VA Form 40-0895-13.
Summary of collection of information: Proposed Sec. 39.122 would
require grantees to submit VA Form 40-0895-
[[Page 69308]]
13 (Certification Regarding Documents and Information Required for
State or Tribal Government Cemetery Construction Grants--Post Grant
Requirements) to certify that the grantee is aware of all grant
responsibilities and to properly and timely close out the grant.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with requirements in this Part.
Description of likely respondents: States and Tribal Governments
awarded a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 24
hours.
Estimated annual burden per collection: 2 hours.
Title: Submission of VA Form 40-0895-15.
Summary of collection of information: Proposed Sec. Sec. 39.31 and
39.81 would require an applicant to submit VA Form 40-0895-15
(Certification of Cemetery Maintained in Accordance with National
Cemetery Administration Standards) to certify compliance with VA's
national shrine standards following receipt of a grant.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the applicant
complies with requirements in this Part.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 3 hours.
Estimated annual burden per collection: 15 minutes.
Title: Submission of project's plans and specifications.
Summary of collection of information: Proposed Sec. Sec. 39.32 and
39.82 would require an applicant to submit some or all of the following
items: a boundary and site survey, a soil investigation report, a
topographical survey, a master plan, preliminary or design development
drawings, final construction drawings and specifications, and cost
estimates.
Description of the need for information and proposed use of
information: The planning requirements as stated in Sec. Sec. 39.32
and 39.82 are the basis for appropriate project development. When the
required plans and specifications are approved, the project will be
prepared for the solicitation and will ensure that VA received the best
possible facility at the best cost.
Description of likely respondents: States and Tribal Governments
applying for a grant under this Part.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 7680
hours.
Estimated annual burden per collection: 640 hours per grant.
Title: Submission of a written report documenting grant
accomplishments.
Summary of collection of information: Proposed Sec. 39.120 would
require a grantee to submit a written report documenting how the grant
accomplished the desired improvements that will assist the State or
Tribal Government in meeting VA's national shrine standards at its
veterans cemetery. The report would include statistical data and
detailed pictures of the work accomplished.
Description of the need for information and proposed use of
information: This collection is necessary to ensure that the grantee
provides a timely response to VA regarding its compliance with the
program narrative submitted to VA as part of the preapplication process
under Sec. 39.81(b)(10).
Description of likely respondents: State or Tribal governments that
received an Operation and Maintenance Grant.
Estimated number of respondents per year: 12.
Estimated frequency of responses per year: 1.
Estimated total annual reporting and recordkeeping burden: 48
hours.
Estimated annual burden per collection: 4 hours.
VA considers comments by the public on proposed collections of
information in:
Evaluating whether the proposed collections of information
are necessary for the proper performance of the functions of VA,
including whether the information will have practical utility;
Evaluating the accuracy of VA's estimate of the burden of
the proposed collections of information, including the validity of the
methodology and assumptions used;
Enhancing the quality, usefulness, and clarity of the
information to be collected; and
Minimizing the burden of the collections of information on
those who are to respond, including responses through the use of
appropriate automated, electronic, mechanical, or other technological
collection techniques or other forms of information technology, e.g.,
permitting electronic submission of responses.
OMB is required to make a decision concerning the collections of
information in this proposed rule between 30 and 60 days after
publication of this document in the Federal Register. Therefore, a
comment to OMB is best ensured of having its full effect if OMB
receives it within 30 days of publication. This does not affect the
deadline for the public to comment on the proposed rule.
Catalog of Federal Domestic Assistance Number and Title
The Catalog of Federal Domestic Assistance program number and title
for this proposed rule is 64.203, State Cemetery Grants.
List of Subjects in 38 CFR Part 39
Cemeteries, Grants programs--veterans, Veterans.
Approved: December 22, 2009.
John R. Gingrich,
Chief of Staff, Department of Veterans Affairs.
For the reasons set out in the preamble, VA proposes to revise 38
CFR part 39 to read as follows:
PART 39--AID TO STATES FOR ESTABLISHMENT, EXPANSION, AND
IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES
Subpart A--General Provisions
Sec.
39.1 Purpose.
39.2 Definitions.
39.3 Priority list.
39.4 Decision makers, notifications, and additional information.
39.5 Submission of information and documents to VA.
39.6 Amendments to grant application.
39.7 Line item adjustment to grants.
39.8 Withdrawal of grant application.
39.9 Hearings.
39.10 Cemetery requirements and prohibitions and recapture
provisions.
39.11 State to retain control of operations.
Subpart B--Establishment, Expansion, and Improvement Projects
Grant Requirements and Procedures
39.30 General requirements for a grant.
39.31 Preapplication requirements.
39.32 Plan preparation.
39.33 Conferences.
39.34 Application requirements.
39.35 Final review and approval of application.
[[Page 69309]]
Award of Grant
39.50 Amount of grant.
39.51 Payment of grant award.
Standards and Requirements
39.60 General requirements for site selection and construction of
veterans cemeteries.
39.61 Site planning standards.
39.62 Space criteria for support facilities.
39.63 Architectural design standards.
Subpart C--Operation and Maintenance Projects
Grant Requirements and Procedures
39.80 General requirements for a grant.
39.81 Preapplication requirements.
39.82 Plan preparation.
39.83 Conferences.
39.84 Application requirements.
39.85 Final review and approval of application.
Award of Grant
39.100 Amount of grant.
39.101 Payment of grant award.
Subpart D--Grant Recipient Responsibilities, Inspections, and Reports
Following Project Completion
39.120 Documentation of grant accomplishments.
39.121 State responsibilities following project completion.
39.122 Inspections, audits, and reports.
Authority: 38 U.S.C. 101, 501, 2408, 2411.
Subpart A--General Provisions
Sec. 39.1 Purpose.
This part sets forth the mechanism for a State to obtain a grant to
establish, expand, or improve a veterans cemetery that is or will be
owned by the State or to obtain a grant to operate or maintain a State
veterans cemetery to meet VA's national shrine standards of appearance.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.2 Definitions.
For the purpose of this part:
(a) Establishment means the process of site selection, land
acquisition, design and planning, earth moving, landscaping,
construction, and provision of initial operating equipment necessary to
convert a tract of land to an operational veterans cemetery.
(b) Expansion means an increase in the burial capacity or acreage
of an existing cemetery through the addition of gravesites and other
facilities, such as committal service shelters, crypts (preplaced grave
liners), and columbaria, necessary for the functioning of a cemetery.
(c) Improvement means the enhancement of a cemetery through
landscaping, construction, or renovation of cemetery infrastructure,
such as building expansion and upgrades to roads and irrigation
systems, that is not directly related to the development of new
gravesites; nonrecurring maintenance; and the addition of other
features appropriate to cemeteries.
(d) Establishment, Expansion, and Improvement Project means an
undertaking to establish, expand, or improve a site for use as a State-
owned veterans cemetery.
(e) Operation and Maintenance Project means a project that assists
a State to achieve VA's national shrine standards of appearance in the
key cemetery operational areas of cleanliness, height and alignment of
headstones and markers, leveling of gravesites, and turf conditions.
(f) Secretary means the Secretary of the United States Department
of Veterans Affairs.
(g) State means each of the States, Territories, and possessions of
the United States, the District of Columbia, and the Commonwealth of
Puerto Rico.
(h) State Cemetery Grants Service (SCGS) means the State Cemetery
Grants Service within VA's National Cemetery Administration (NCA).
(i) VA means the United States Department of Veterans Affairs or
the State Cemetery Grants Service.
(j) Veteran means a person who served in the active military,
naval, or air service and who died in line of duty while in service or
was discharged or released under conditions other than dishonorable.
Authority: 38 U.S.C. 101, 501, 2408.
Sec. 39.3 Priority list.
(a) The priority groups, with Priority Group 1 having the highest
priority and Priority Group 4 the lowest priority, are:
(1) Priority Group 1--Projects needed to avoid disruption in burial
service that would otherwise occur at existing veterans cemeteries
within 4 years of the date of the preapplication. Such projects would
include expansion projects as well as improvement projects (such as
construction of additional or replacement facilities) when such
improvements are required to continue interment operations.
(2) Priority Group 2--Projects for the establishment of new
veterans cemeteries.
(3) Priority Group 3--Expansion projects at existing veterans
cemeteries when a disruption in burial service due to the exhaustion of
existing gravesites is not expected to occur within 4 years of the date
of the preapplication.
(4) Priority Group 4--Improvement projects for cemetery landscaping
or infrastructure, such as building expansion and upgrades to roads and
irrigation systems, that are not directly related to the development of
new gravesites. Operation and Maintenance Projects that address VA's
national shrine standards of appearance are included in this group.
(b) Within Priority Groups 1, 2, and 3, highest priority will be
given to projects in geographical locations with the greatest number of
veterans who will benefit from the project as determined by VA. This
prioritization system, based on veteran population data, will assist VA
in maintaining and improving access to burial in a veterans cemetery to
more veterans and their eligible family members. Within Priority Group
1, at the discretion of VA, higher priority may be given to a project
that must be funded that fiscal year to avoid disruption in burial
service.
(c) Grants for projects within Priority Group 4 will be awarded in
any fiscal year only after grants for all project applications under
Priority Groups 1, 2, and 3 that are ready for funding have been
awarded. Within Priority Group 4, projects will be ranked in priority
order based upon VA's determination of the relative importance of
proposed improvements and the degree to which proposed Operation and
Maintenance Projects achieve VA's national shrine standards of
appearance. No more than $5 million in any fiscal year will be awarded
for Operation and Maintenance Projects under Priority Group 4.
(d) By August 15 of each year, VA will make a list prioritizing all
preapplications that were received on or before July 1 of that year and
that were approved under Sec. 39.31 or Sec. 39.81, ranking them in
their order of priority within the applicable Priority Group for
funding during the fiscal year that begins the following October 1.
Preapplications from previous years will be re-prioritized each year
and do not need to be resubmitted.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.4 Decision makers, notifications, and additional information.
Decisions required under this part will be made by the VA Director,
State Cemetery Grants Service (SCGS), National Cemetery Administration,
unless otherwise specified in this part. The VA decision maker will
provide to affected States written notice of approvals, denials, or
requests for additional information under this part.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.5 Submission of information and documents to VA.
All information and documents required to be submitted to VA must
be submitted to the Director of the State Cemetery Grants Service,
National Cemetery Administration, Department
[[Page 69310]]
of Veterans Affairs, 810 Vermont Avenue, NW., Washington, DC 20420. All
forms cited in this part are available at https://www.cem.va.gov/cem/scg_grants.asp.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.6 Amendments to grant application.
A State seeking to amend a grant application must submit revised
Standard Forms 424 (Application for Federal Assistance) and 424C
(Budget Information) with a narrative description of, and justification
for, the amendment. Any amendment of an application that changes the
scope of the application or increases the amount of the grant
requested, whether or not the application has already been approved,
shall be subject to approval by VA in the same manner as an original
application.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has approved the information
collection requirements in this section under control numbers 4040-
0004 and 4040-0008.)
Sec. 39.7 Line item adjustment to grants.
After a grant has been awarded, upon request from the State
representative, VA may approve a change in one or more line items (line
items are identified in Standard Form 424C) of up to 10 percent
(increase or decrease) of the cost of each line item if the change
would be within the scope or objective of the project and the aggregate
adjustments would not increase the total amount of the grant.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.8 Withdrawal of grant application.
A State representative may withdraw an application by submitting to
VA a written document requesting withdrawal.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.9 Hearings.
(a) No application for a grant under this part shall be disapproved
until the applicant has been afforded an opportunity for a hearing.
(b) Whenever a hearing is requested under this section, notice of
the hearing, procedure for the conduct of such hearing, and procedures
relating to decisions and notices shall accord with the provisions of
Sec. Sec. 18.9 and 18.10 of this chapter. Failure of an applicant to
request a hearing under this section or to appear at a hearing for
which a date has been set shall be deemed to be a waiver of the right
to be heard and constitutes consent to the making of a decision on the
basis of such information as is available.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.10 Cemetery requirements and prohibitions and recapture
provisions.
(a) In order to qualify for a grant, a State veterans cemetery must
be operated solely for the interment of veterans, their spouses,
surviving spouses, minor children, and unmarried adult children who
were physically or mentally disabled and incapable of self-support.
(b) Any grant under this part made on or after November 21, 1997,
is made on the condition that, after the date of receipt of the grant,
the State receiving the grant, subject to requirements for receipt of
notice in 38 U.S.C. 2408 and 2411, will prohibit in the cemetery for
which the grant is awarded the interment of the remains or the
memorialization of any person:
(1) Who has been convicted of a Federal capital crime, as defined
in 38 CFR 38.600(b), and whose conviction is final, other than a person
whose sentence was commuted by the President;
(2) Who has been convicted of a State capital crime, as defined in
38 CFR 38.600(b), and whose conviction is final, other than a person
whose sentence was commuted by the Governor of a State.
(3) Who has been found by an appropriate State official, as defined
in 38 CFR 38.600(b), under procedures to be established by the State,
to have committed a Federal or State capital crime, as defined in 38
CFR 38.600(b), but to have not been convicted of such crime by reason
of unavailability for trial due to death or flight to avoid
prosecution.
(c) If a State which has received a grant under this part ceases to
own the cemetery for which the grant was made, ceases to operate such
cemetery as a veterans cemetery in accordance with paragraph (a) of
this section, violates the prohibition in paragraph (b) of this
section, or uses any part of the funds provided through such grant for
a purpose other than that for which the grant was made, the United
States shall be entitled to recover from the State the total of all
grants made to the State under this part in connection with such
cemetery.
(d) If, within 3 years after VA has certified to the Department of
the Treasury an approved grant application, not all funds from the
grant have been used by the State for the purpose for which the grant
was made, the United States shall be entitled to recover any unused
grant funds from the State.
Authority: 38 U.S.C. 501, 2408, 2411.
Sec. 39.11 State to retain control of operations.
Neither the Secretary nor any employee of VA shall exercise any
supervision or control over the administration, personnel, maintenance,
or operation of any State veterans cemetery that receives a grant under
this program except as prescribed in this part.
Authority: 38 U.S.C. 501, 2408.
Subpart B--Establishment, Expansion, and Improvement Projects
Grant Requirements and Procedures
Sec. 39.30 General requirements for a grant.
(a) For a State to obtain a grant for the establishment, expansion,
or improvement of a State veterans cemetery:
(1) Its preapplication for the grant must be approved by VA under
Sec. 39.31(e);
(2) Its project must be ranked sufficiently high on the priority
list in Sec. 39.3 for the applicable fiscal year so that funds are
available for the project;
(3) Its plans and specifications for the project must be approved
by VA under Sec. 39.32;
(4) The State must meet the application requirements in Sec.
39.34; and
(5) Other requirements specified in Sec. Sec. 39.6, 39.10, and
39.33 must be satisfied.
(b) VA may approve under Sec. 39.35 any application under this
subpart up to the amount of the grant requested once the requirements
under paragraph (a) of this section have been satisfied, provided that
sufficient funds are available. In determining whether sufficient funds
are available, VA shall consider the project's priority ranking, the
total amount of funds available for cemetery grant awards during the
applicable fiscal year, and the prospects of higher ranking projects
being ready for the award of a grant before the end of the applicable
fiscal year.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.31 Preapplication requirements.
(a) A State seeking a grant of more than $100,000 for the
establishment, expansion, or improvement of a State veterans cemetery
must submit a preapplication to the Director, State Cemetery Grants
Service, through https://www.cem.va.gov/cem/scg_grants.asp.
(b) No detailed drawings, plans, or specifications are required
with the preapplication. As a part of the preapplication, the State
must submit each of the following:
(1) Standard Form 424 (Application for Federal Assistance) and
Standard
[[Page 69311]]
Form 424C (Budget Information) signed by the authorized representative
of the State. These forms document the amount of the grant requested,
which may not exceed 100 percent of the estimated cost of the project
to be funded with the grant.
(2) A program narrative describing the objectives of the project,
the need for a grant, the method of accomplishment, the projected
interment rate, and the results or benefits expected to be obtained
from the assistance requested.
(3) If a site has been selected, a description of the geographic
location of the project (i.e., a map showing the location of the
project and all appropriate geographic boundaries, and any other
supporting documentation, as needed).
(4) A design concept describing the major features of the project
including the number and types of gravesites, such as columbarium
niches.
(5) Any comments or recommendations made by the State's ``Single
Point of Contact'' reviewing agency.
(6) VA Form 40-0895-2 (Certification of Compliance with Provisions
of the Davis-Bacon Act) to certify that the State has obtained the
latest prevailing wage rates for Federally funded projects. Any
construction project fully or partially funded with Federal dollars
must comply with those rates for specific work by trade employees
(e.g., electricians, carpenters).
(7) VA Form 40-0895-3 (State or Tribal Government Cemetery Grants
Service Space Program Analysis--Buildings) to provide information on
the proposed size of cemetery buildings, based on VA guidance on the
net and gross square footage standards for cemetery buildings. This
standard is based on a workload of 1-6 burials per day.
(8) VA Form 40-0895-6 (Certification of State or Tribal Government
Matching Architectural and Engineering Funds to Qualify for Group 1 on
the Priority List) to provide documentation that the State has
legislative authority to support the project and the resources
necessary to initially fund the architectural and engineering portion
of the project development. Once the grant is awarded, VA will
reimburse the applicant for all allowable architectural and engineering
costs.
(9) VA Form 40-0895-7 (Certification Regarding Debarment,
Suspension, and Other Responsibility Matters--Primary Covered
Transactions (State or Tribal Government)) to ensure that the applicant
has not been debarred or suspended, and is eligible to participate in
the VA grant process and receive Federal funds.
(10) VA Form 40-0895-8 (Certification Regarding Drug-Free Workplace
Requirements for Grantees Other Than Individuals) to ensure that the
applicant complies with the Drug-Free Workplace Act of 1988 at the
location where the construction will occur.
(11) VA Form 40-0895-9 (Certification Regarding Lobbying) to ensure
that the applicant complies with Public Law 101-121 regarding the
prohibition against any payments to anyone that influences or attempts
to influence an officer or Member of Congress in connection with the
award of a grant.
(12) VA Form 40-0895-10 (Certification of Compliance with Federal
Requirements--State or Tribal Government Construction Grant) to ensure
that the applicant complies with all requirements of Part 39.
(13) VA Form 40-0895-15 (Certification of Cemetery Maintained in
Accordance with National Cemetery Administration Standards) to ensure
that any cemetery established, expanded, or improved through a grant
will be operated and maintained in accordance with the operational
standards of NCA.
(c) In addition, the State must submit written assurance of each of
the following conditions:
(1) Any cemetery established, expanded, or improved through a grant
will be used exclusively for the interment or memorialization of
eligible persons, as set forth in Sec. 39.10(a), whose interment or
memorialization is not contrary to the conditions of the grant (see
Sec. 39.10(b) and 38 U.S.C. 2408(d) and 2411).
(2) Title to the site is or will be vested solely in the State.
(3) The State possesses legal authority to apply for the grant and
to finance and construct the proposed facilities; i.e., legislation or
similar action has been duly adopted or passed as an official act of
the applicant's governing body, authorizing the filing of the
application, including all understandings and assurances contained
therein, and directing and authorizing the person identified as the
official representative of the State to act in connection with the
application and to provide such additional information as may be
required.
(4) The State will assist VA in assuring that the grant complies
with section 106 of the National Historic Preservation Act of 1966, as
amended (16 U.S.C. 470), Executive Order 11593 (identification and
protection of historic properties), and the Archaeological and Historic
Preservation Act of 1974 (16 U.S.C. 469a-1 et seq.).
(5) The State will obtain approval by VA of the final construction
drawings and specifications before the project is advertised or placed
on the market for bidding; it will construct the project, or cause the
project to be constructed, to completion in accordance with the
application and approved plans and specifications; it will submit to
the Director of the State Cemetery Grants Service, for prior approval,
changes that alter any cost of the project, use of space, or functional
layout; and it will not enter into a construction contract for the
project or undertake other activities until the requirements of the
grant program have been met.
(6) The State will comply with the Federal requirements in 2 CFR
parts 180 and 801 and 38 CFR part 43 and submit Standard Form 424D
(Assurances--Construction Programs).
(7) The State will prepare an Environmental Assessment to determine
whether an Environmental Impact Statement is necessary, and certify
that funds are available to finance any costs related to preparation of
the Environmental Assessment.
(d) The State must submit a copy of the legislation, as enacted
into law, authorizing the establishment, maintenance, and operation of
the facility as a veterans cemetery in accordance with 38 CFR 39.10(a).
(e) Upon receipt of a complete preapplication for a grant,
including all necessary assurances and all required supporting
documentation, VA will determine whether the preapplication conforms to
all requirements listed in paragraphs (a) through (d) of this section,
including whether it contains sufficient information necessary to
establish the project's priority. VA will notify the State of any
nonconformity. If the preapplication does conform, VA shall notify the
State that the preapplication has been found to meet the preapplication
requirements, and the proposed project will be included in the next
scheduled ranking of projects, as indicated in Sec. 39.3(d).
Authority: 38 U.S.C. 501, 2408, 2411.
(The Office of Management and Budget has approved the information
collection requirements in this section under control numbers XXXX-
XXXX, 4040-0004, 4040-0008, and 4040-0009.)
Sec. 39.32 Plan preparation.
The State must prepare Establishment, Expansion, and Improvement
Project plans and specifications in accordance with the requirements of
this section for review
[[Page 69312]]
by the SCGS. The plans and specifications must be approved by the SCGS
prior to the State's solicitation for construction bids. Once SCGS
approves the plans and specifications, the State must obtain
construction bids and determine the successful bidder prior to
submission of the application. The State must establish procedures for
determining that costs are reasonable and necessary and can be
allocated in accordance with the provisions of Office of Management and
Budget (OMB) Circular No. A-87. Once the Establishment, Expansion, and
Improvement Project preapplication and the project's plans and
specifications have been approved, an application for assistance must
be submitted in compliance with the uniform requirements for grants-in-
aid to State and local governments prescribed by OMB Circular No. A-
102, Revised.
(a) General. These requirements have been established for the
guidance of the State agency and the design team to provide a standard
for preparation of drawings, specifications, and estimates.
(b) Technical requirements. The State should meet these technical
requirements as soon as possible after VA approves the Establishment,
Expansion, and Improvement Project preapplication.
(1) Boundary and site survey. The State agency shall provide a
survey of the site and furnish a legal description of the site. A
boundary and site survey need not be submitted if one was submitted for
a previously approved project and there have been no changes. Relevant
information may then be shown on the site plan. If required, the site
survey shall show each of the following items:
(i) The outline and location referenced to boundaries of all
existing buildings, streets, alleys (whether public or private), block
boundaries, easements, encroachments, the names of streets, railroads,
and streams, and other information as specified. If there is nothing of
this character affecting the property, the Surveyor shall so state on
the drawings.
(ii) The point of beginning, bearing, distances, and interior
angles. Closure computations shall be furnished with the survey, and
error of closure shall not exceed 1 foot for each 10,000 feet of lineal
traverse. Boundaries of an unusual nature (curvilinear, off-set, or
having other change or direction between corners) shall be referenced
with curve data (including measurement chord) and other data sufficient
for replacement, and such information shall be shown on the map. For
boundaries of such nature, coordinates shall be given for all angles
and other pertinent points.
(iii) The area of the parcel in acres or in square feet.
(iv) The location of all monuments.
(v) Delineation of 100-year floodplain and source.
(vi) The signature and certification of the Surveyor.
(2) Soil investigation. The State shall provide a soil
investigation of the scope necessary to ascertain site characteristics
for construction and burial or to determine foundation requirements and
utility service connections. A new soil investigation is not required
if one was done for a previously approved project on the same site and
information from the previous investigation is adequate and unchanged.
Soil investigation, when done, shall be documented in a signed report.
The investigation shall be adequate to determine the subsoil
conditions. The investigation shall include a sufficient number of test
pits or test borings as will determine, in the judgment of the
architect, the true conditions. The following information will be
covered in the report:
(i) Thickness, consistency, character, and estimated safe bearing
value where needed for structural foundation design of the various
strata encountered in each pit or boring.
(ii) Amount and elevation of ground water encountered in each pit
or boring, its probable variation with the seasons, and effect on the
subsoil.
(iii) The elevation of rock, if known, and the probability of
encountering quicksand.
(iv) If the site is underlaid with mines, the elevations and
location of the tops of the mine workings relative to the site, or old
workings located in the vicinity.
(3) Topographical survey. A topographical survey in 1-foot contour
intervals shall be prepared for projects establishing new cemeteries
and for significant expansion projects in previously undeveloped land.
(c) Master plan. A master plan showing the proposed layout of all
facilities--including buildings, roadways, and burial sections--on the
selected site shall be prepared for all new cemetery establishment
projects for approval by the SCGS. If the project is to be phased into
different year programs, the phasing shall be indicated. The master
plan shall analyze all factors affecting the design, including climate,
soil conditions, site boundaries, topography, views, hydrology,
environmental constraints, transportation access, etc. It should
provide a discussion of alternate designs that were considered. In the
case of an expansion project or improvement project, the work
contemplated should be consistent with the VA-approved master plan or a
justification for the deviation should be provided.
(d) Preliminary or ``design development'' drawings. Following VA
approval of the master plan, the State must submit design development
drawings that show all current phase construction elements to be funded
by the grant. The drawings must comply with the following requirements:
(1) Site development and environmental plans must include locations
of structures, demolition, parking, roads, service areas, walks,
plazas, memorial paths, other paved areas, landscape buffer and major
groupings, and interment areas (including quantity of gravesites in
each area). A grading plan including existing and proposed contours at
1-foot intervals of the entire area affected by the site work must be
submitted. A site plan of the immediate area around each building shall
be drawn to a convenient scale and shall show the building floor plan,
utility connections, walks, gates, walls or fences, flagpoles, drives,
parking areas, indication of handicapped provisions, landscaping, north
arrow, and any other appropriate items.
(2) Floor plans of all levels at a convenient scale shall be
double-line drawings and shall show overall dimensions, construction
materials, door swings, names and square feet for each space, toilet
room fixtures, and interior finish schedule.
(3) Elevations of the exteriors of all buildings shall be drawn to
the same scale as the plan and shall include all material indications.
(4) Preliminary mechanical and electrical layout plans shall be
drawn at a convenient scale and shall have an equipment and plumbing
fixture schedule.
(e) Final construction drawings and specifications. Funds for the
construction of any project being assisted under this program will not
be released until VA approves the final construction drawings and
specifications. If VA approves them, VA shall send the State a written
letter of approval indicating that the project's plans and
specifications comply with the terms and conditions as prescribed by
VA. This does not constitute approval of the contract documents. It is
the responsibility of the State to ascertain that all State and Federal
requirements have been met and that the drawings and specifications are
acceptable for bid purposes.
[[Page 69313]]
(1) General. The State shall prepare final working drawings so that
clear and distinct prints may be obtained. These drawings must be
accurately dimensioned to include all necessary explanatory notes,
schedules, and legends. Working drawings shall be complete and adequate
for VA review and comment. The State shall prepare separate drawings
for each of the following types of work: architectural, equipment,
layout, structural, heating and ventilating, plumbing, and electrical.
(2) Architectural drawings. The State shall submit drawings which
include: All structures and other work to be removed; all floor plans
if any new work is involved; all elevations which are affected by the
alterations; building sections; demolition drawings; all details to
complete the proposed work and finish schedules; and fully dimensioned
floor plans at \1/8\' or \1/4\' scale.
(3) Equipment drawings. The State shall submit a list of all
equipment to be provided under terms of the grant in the case of an
Establishment Project. Large-scale drawings of typical special rooms
indicating all fixed equipment and major items of furniture and
moveable equipment shall be included.
(4) Layout drawings. The State shall submit a layout plan that
shows:
(i) All proposed features such as roads, buildings, walks, utility
lines, burial layout, etc.
(ii) Contours, scale, north arrow, and legend showing existing
trees.
(iii) A graphic or keyed method of showing plant types as well as
quantities of each plant.
(iv) Plant list with the following: key, quantity, botanical name,
common name, size, and remarks.
(v) Typical tree and shrub planting details.
(vi) Areas to be seeded or sodded.
(vii) Areas to be mulched.
(viii) Gravesite section layout with permanent section monument
markers and lettering system.
(ix) Individual gravesite layout and numbering system. If the
cemetery is existing and the project is expansion or renovation, show
available, occupied, obstructed, and reserved gravesites.
(x) Direction the headstones face.
(5) Structural drawings. The State shall submit complete foundation
and framing plans and details, with general notes to include: governing
code, material strengths, live loads, wind loads, foundation design
values, and seismic zone.
(6) Mechanical drawings. The State shall submit:
(i) Heating and ventilation drawings showing complete systems and
details of air conditioning, heating, ventilation, and exhaust; and
(ii) Plumbing drawings showing sizes and elevations of soil and
waste systems, sizes of all hot and cold water piping, drainage and
vent systems, plumbing fixtures, and riser diagrams.
(7) Electrical drawings. The State shall submit separate drawings
for lighting and power, including drawings of:
(i) Service entrance, feeders, and all characteristics;
(ii) All panel, breaker, switchboard, and fixture schedules;
(iii) All lighting outlets, receptacles, switches, power outlets,
and circuits; and
(iv) Telephone layout, fire alarm systems, and emergency lighting.
(8) Final specifications. Final specifications (to be used for bid
purposes) shall be in completed format. Specifications shall include
the invitations for bids, cover or title sheet, index, general
requirements, form of bid bond, form of agreement, performance and
payment bond forms, and sections describing materials and workmanship
in detail for each class of work.
(9) Cost estimates. The State shall show in convenient form and
detail the estimated total cost of the work to be performed under the
contract, including provisions of fixed equipment shown by the plans
and specifications, if applicable, to reflect the changes of the
approved financial plan. Estimates shall be summarized and totaled
under each trade or type of work. Estimates shall also be provided for
each building structure and other important features such as the
assembly area and shall include burial facilities.
Authority: 38 U.S.C. 501, 2408.
(The Office of Management and Budget has approved the information
collection requirements in this section under control number XXXX-
XXXX.)
Sec. 39.33 Conferences.
(a) Predesign conference. A predesign conference is required for
all Establishment, Expansion, and Improvement Projects requiring major
construction, primarily to ensure that the State agency becomes
oriented to VA procedures, requirements, and any technical comments
pertaining to the project. This conference will take place at an
appropriate location near the proposed site and should include a site
visit to ensure that all parties to the process, including NCA staff,
are familiar with the site and its characteristics.
(b) Additional conferences. At any time, VA may recommend an
additional conference (such as a design development conference) be held
in VA Central Office in Washington, DC, to provide an opportunity for
the State and its architects to discuss with VA officials the
requirements for a grant.
Authority: 38 U.S.C. 501, 2408.
Sec. 39.34 Application requirements.
(a) For an Establishment, Expansion, and Improvement Project to be
considered for grant funding under this subpart, the State must submit
an application (as opposed to a preapplication) consisting of the
following:
(1) Standard Form 424 (Application for Federal Assistance) with the
box labeled ``application'' marked;
(2) Standard Form 424C (Budget Information), which documents the
amount of funds requested based on the construction costs as estimated
by the successful construction bid;
(3) A copy of itemized bid tabulations (If there are non-VA
participating areas, these shall be itemized separately.); and
(4) Standard Form 424D (Assurances--Construction Program).
(5) VA Form 40-0895-11 (Memorandum of Agreement for a Grant to
Construct or Modify a State or Tribal Government Veterans Cemetery) to
identify the parties (VA and applicant), identify the scope of the
project, and indicate how the grant award funds will be paid to the
applicant.
(6) VA Form 40-0895-12 (Certification Regarding Debarment,
Suspension, Ineligibility