Lockhart Power Company; Notice Soliciting Scoping Comments, 68815-68816 [E9-30810]

Download as PDF pwalker on DSK8KYBLC1PROD with NOTICES Federal Register / Vol. 74, No. 248 / Tuesday, December 29, 2009 / Notices two new caisson structures; and an increase in the certificated storage capacity, all as more fully set forth in the application which is on file with the Commission and open for public inspection. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, call (866) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application should be directed to Jim Goetz, MoBay Storage Hub, LLC, 5847 San Felipe, Suite 3050, Houston, Texas 77057, (713) 961–3204 (phone) or (713) 961–2676 (fax). Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the VerDate Nov<24>2008 19:02 Dec 28, 2009 Jkt 220001 proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Protests and interventions may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: January 12, 2010. Kimberly D. Bose, Secretary. [FR Doc. E9–30813 Filed 12–28–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 68815 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2621–009] Lockhart Power Company; Notice Soliciting Scoping Comments December 18, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: P–2621–009. c. Date filed: November 16, 2009. d. Applicant: Lockhart Power Company. e. Name of Project: Pacolet Hydroelectric Project. f. Location: The proposed project is located on the Pacolet River, near the Town of Pacolet, Spartanburg County, South Carolina. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Bryan D. Stone, P.O. Box 10, 420 River Street, Lockhart, SC 29364; Telephone (864) 545–2211. i. FERC Contact: Lee Emery, Telephone (202) 502–8379, or by e-mail at lee.emery@ferc.gov. j. Deadline for filing scoping comments: January 19, 2010. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp), under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All filings with the Commission must include project name and number (i.e., Pacolet Project No. 2621–009) and bear the heading ‘‘Comments on Scoping Document 1.’’ k. This application is not ready for environmental analysis at this time. l. The proposed Pacolet Project would consist of two developments; one that is an existing, licensed development (the Lower Pacolet development) and a new development (Upper Pacolet E:\FR\FM\29DEN1.SGM 29DEN1 pwalker on DSK8KYBLC1PROD with NOTICES 68816 Federal Register / Vol. 74, No. 248 / Tuesday, December 29, 2009 / Notices development). The project would have an annual generation of 8,092,000 kilowatt-hours. The proposed project would consist of the facilities described below. The Upper Pacolet development would consist of: (1) An existing 315foot-long by 18-foot-high concrete and rubble masonry dam, with the addition of 3-foot-high flashboards; (2) an existing 30-acre reservoir, with a useable storage capacity of 90 acre-feet at elevation 519.0 feet North American Vertical Datum 1988 (NAVD 88); (3) new vertical slide intake gates with rack and pinion operators, sluice gates, and trashracks having a 1.375-inch clear bar spacing with a single trash rake cleaning mechanism; (4) a new 24-foot-wide by 40-foot-long concrete powerhouse that would contain a vertical Kaplan turbine with an estimated generating capacity of 1.1 megawatts (MW); (5) a proposed 200-foot-long, 34.5 kilovolt (kV) transmission line; (6) a proposed switchyard; and (7) appurtenant facilities. The Lower Pacolet development (all existing facilities) would consist of: (1) A 347-foot-long by 24-foot-high concrete and rubble masonry dam, with 4-foothigh flashboards; (2) three sand gates; (3) an 11-acre reservoir, with a useable storage capacity of 44-acre feet at an elevation of 492.0 feet NAVD 88; (4) an intake structure equipped with trashracks, having a 1.375-inch clear bar spacing and a trash rake; (5) a 100-footlong by 10-foot-diameter penstock; (6) a 67-foot-long by 32-foot-wide concrete powerhouse, integral with the dam, containing two vertical turbines, each generating 400 kilowatts (kW); (7) a tailrace with a 340-foot-long curved training wall; (8) a 250-foot-long, 34.5kV transmission line; and (9) appurtenant facilities. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is available for inspection and reproduction at the address in Item H above. n. You may register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process The Commission staff intends to prepare a single Environmental VerDate Nov<24>2008 19:02 Dec 28, 2009 Jkt 220001 Assessment (EA) for the Pacolet Hydroelectric Project, in accordance with the National Environmental Policy Act. The EA will consider both sitespecific and cumulative environmental impacts and reasonable alternatives to the proposed action. Commission staff does not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the Scoping Document (SD) issued on December 18, 2009. Copies of the SD outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of the SD may be viewed on the Web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, call 1–866– 208–3676 or, for TTY, (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–30810 Filed 12–28–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings # 1 December 22, 2009. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC10–20–000. Applicants: Locust Ridge Wind Farm, LLC, Fortis Energy Marketing & Trading GP. Description: Supplemental Filing of Fortis Energy Marketing & Trading GP and Locust Ridge Wind Farm, LLC. Filed Date: 12/18/2009. Accession Number: 20091218–5208. Comment Date: 5 p.m. Eastern Time on Monday, December 28, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER97–2846–017; ER99–2311–014. Applicants: Carolina Power & Light Company; Florida Power Corporation. Description: Notice of Change in Status for Florida Power Corporation. Filed Date: 12/18/2009. Accession Number: 20091218–5104. Comment Date: 5 p.m. Eastern Time on Friday, January 8, 2010. Docket Numbers: ER99–2341–014; ER06–1334–008; ER07–277–006. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Applicants: Invenergy Cannon Falls LLC, Spindle Hill Energy LLC, Hardee Power Partners Limited. Description: Supplemental Information for Notification of Change in Fact Filing of Hardee Power Partners Limited, Spindle Hill Energy LLC and Invenergy Cannon Falls, LLC. Filed Date: 12/22/2009. Accession Number: 20091222–5124. Comment Date: 5 p.m. Eastern Time on Tuesday, January 12, 2010. Docket Numbers: ER07–277–007. Applicants: Invenergy Cannon Falls LLC. Description: Supplemental Information for Triennial Report Filing of Invenergy Cannon Falls LLC. Filed Date: 12/22/2009. Accession Number: 20091222–5121. Comment Date: 5 p.m. Eastern Time on Tuesday, January 12, 2010. Docket Numbers: ER08–237–006. Applicants: Forward Energy LLC. Description: Supplemental Information for Triennial Report Filing of Forward Energy LLC. Filed Date: 12/22/2009. Accession Number: 20091222–5127. Comment Date: 5 p.m. Eastern Time on Tuesday, January 12, 2010. Docket Numbers: ER09–1719–001. Applicants: Midwest Independent Transmission System. Description: Midwest Independent Transmission System Operator, Inc submits a compliance filing. Filed Date: 12/17/2009. Accession Number: 20091218–0206. Comment Date: 5 p.m. Eastern Time on Thursday, January 7, 2010. Docket Numbers: ER10–444–000. Applicants: Carolina Power & Light Company. Description: Carolina Power & Light Co. submits a revised Power Supply and Coordination Agreement. Filed Date: 12/17/2009. Accession Number: 20091218–0210. Comment Date: 5 p.m. Eastern Time on Thursday, January 7, 2010. Docket Numbers: ER10–445–000. Applicants: Oncor Electric Delivery Company LLC. Description: Oncor Electric Delivery Co, LLC’s submits First Revised Sheet No. 37 et al to FERC Electric Tariff, Twelfth Revised Volume No. 1. Filed Date: 12/17/2009. Accession Number: 20091218–0209 Comment Date: 5 p.m. Eastern Time on Thursday, January 7, 2010. Docket Numbers: ER10–446–000. Applicants: Oncor Electric Delivery Company LLC. Description: Oncor Electric Delivery Co, LLC’s submits a First Revised Sheet E:\FR\FM\29DEN1.SGM 29DEN1

Agencies

[Federal Register Volume 74, Number 248 (Tuesday, December 29, 2009)]
[Notices]
[Pages 68815-68816]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-30810]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2621-009]


Lockhart Power Company; Notice Soliciting Scoping Comments

December 18, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: P-2621-009.
    c. Date filed: November 16, 2009.
    d. Applicant: Lockhart Power Company.
    e. Name of Project: Pacolet Hydroelectric Project.
    f. Location: The proposed project is located on the Pacolet River, 
near the Town of Pacolet, Spartanburg County, South Carolina. The 
project does not occupy federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Bryan D. Stone, P.O. Box 10, 420 River 
Street, Lockhart, SC 29364; Telephone (864) 545-2211.
    i. FERC Contact: Lee Emery, Telephone (202) 502-8379, or by e-mail 
at lee.emery@ferc.gov.
    j. Deadline for filing scoping comments: January 19, 2010.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov/docs-filing/ferconline.asp), under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. All filings with the 
Commission must include project name and number (i.e., Pacolet Project 
No. 2621-009) and bear the heading ``Comments on Scoping Document 1.''
    k. This application is not ready for environmental analysis at this 
time.
    l. The proposed Pacolet Project would consist of two developments; 
one that is an existing, licensed development (the Lower Pacolet 
development) and a new development (Upper Pacolet

[[Page 68816]]

development). The project would have an annual generation of 8,092,000 
kilowatt-hours. The proposed project would consist of the facilities 
described below.
    The Upper Pacolet development would consist of: (1) An existing 
315-foot-long by 18-foot-high concrete and rubble masonry dam, with the 
addition of 3-foot-high flashboards; (2) an existing 30-acre reservoir, 
with a useable storage capacity of 90 acre-feet at elevation 519.0 feet 
North American Vertical Datum 1988 (NAVD 88); (3) new vertical slide 
intake gates with rack and pinion operators, sluice gates, and 
trashracks having a 1.375-inch clear bar spacing with a single trash 
rake cleaning mechanism; (4) a new 24-foot-wide by 40-foot-long 
concrete powerhouse that would contain a vertical Kaplan turbine with 
an estimated generating capacity of 1.1 megawatts (MW); (5) a proposed 
200-foot-long, 34.5 kilovolt (kV) transmission line; (6) a proposed 
switchyard; and (7) appurtenant facilities.
    The Lower Pacolet development (all existing facilities) would 
consist of: (1) A 347-foot-long by 24-foot-high concrete and rubble 
masonry dam, with 4-foot-high flashboards; (2) three sand gates; (3) an 
11-acre reservoir, with a useable storage capacity of 44-acre feet at 
an elevation of 492.0 feet NAVD 88; (4) an intake structure equipped 
with trashracks, having a 1.375-inch clear bar spacing and a trash 
rake; (5) a 100-foot-long by 10-foot-diameter penstock; (6) a 67-foot-
long by 32-foot-wide concrete powerhouse, integral with the dam, 
containing two vertical turbines, each generating 400 kilowatts (kW); 
(7) a tailrace with a 340-foot-long curved training wall; (8) a 250-
foot-long, 34.5-kV transmission line; and (9) appurtenant facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits, in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is available for inspection and 
reproduction at the address in Item H above.
    n. You may register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    o. Scoping Process
    The Commission staff intends to prepare a single Environmental 
Assessment (EA) for the Pacolet Hydroelectric Project, in accordance 
with the National Environmental Policy Act. The EA will consider both 
site-specific and cumulative environmental impacts and reasonable 
alternatives to the proposed action.
    Commission staff does not propose to conduct any on-site scoping 
meetings at this time. Instead, we are soliciting comments, 
recommendations, and information, on the Scoping Document (SD) issued 
on December 18, 2009.
    Copies of the SD outlining the subject areas to be addressed in the 
EA were distributed to the parties on the Commission's mailing list and 
the applicant's distribution list. Copies of the SD may be viewed on 
the Web at https://www.ferc.gov, using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits, in the docket number 
field to access the document. For assistance, call 1-866-208-3676 or, 
for TTY, (202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-30810 Filed 12-28-09; 8:45 am]
BILLING CODE 6717-01-P