Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 66403-66407 [E9-29772]

Download as PDF 66403 Federal Register / Vol. 74, No. 239 / Tuesday, December 15, 2009 / Notices For Further Information Contact: Chris Schaffer, Denver Airports District Office, (303) 342–1258. Public Agency: Ports of Douglas County and Chelan County, East Wenatchee, Washington. Application Number: 09–09–C–00– EAT. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $105,268. Earliest Charge Effective Date: February 1, 2010. Estimated Charge Expiration Date: August 1, 2010. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Project Approved for Collection and Use: Security fence phase II. Fire station access road phase II. Terminal design update phase II. Taxiway B design phase I. Terminal construction phase Ill. Terminal construction phase IV. Security gates/proximity locks. Airpacs—aircraft rescue and firefighting. Airport Way design and environmental assessment. Decision Date: September 23, 2009. For Further Information Contact: Trang Tran, Seattle Airports District Office, (425) 227–1662. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No. city, state 05–09–C–01–MSP Minneapolis, MN ............ 99–08–C–03–SJC San Jose, CA .................. 92–01–C–01–FLG Flagstaff, AZ .................... 95–03–C–02–PHX Phoenix, AZ .................... 97–04–U–01–PHX Phoenix, AZ .................... 03–01–C–01–MLU Monroe, LA ..................... 06–02–C–01–MLU Monroe, LA ..................... 04–04–C–01–GUC Gunnison, CO ................ 06–03–C–01–BJI Bemidji, MN ...................... 02–04–C–01–BPT Beaumont, TX ................. 02–05–C–01–BLI Bellingham, WA ................ 06–07–C–01–BLI Bellingham, WA ................ Issued in Washington, DC, on December 4, 2009. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. E9–29566 Filed 12–14–09; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals sroberts on DSKD5P82C1PROD with NOTICES AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Monthly Notice of PFC Approvals and Disapprovals. In October 2009, there were nine applications approved. This notice also includes information on six applications, approved in September 2009, inadvertently left off the September 2009 notice. Additionally, 15 approved amendments to previously approved applications are listed. SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101–508) and Part 158 of the Federal Aviation Regulations (14 VerDate Nov<24>2008 17:23 Dec 14, 2009 Jkt 220001 09/01/09 09/09/09 09/10/09 09/14/09 09/14/09 09/15/09 09/15/09 09/23/09 09/23/09 09/23/09 09/23/09 09/23/09 Original approved net PFC revenue Amended approved net PFC revenue $7,315,783 ...................... $36,880,000 .................... $2,463,581 ...................... $106,966,000 .................. NA ................................... $452,224 ......................... $720,000 ......................... $2,278,137 ...................... $337,711 ......................... $149,300 ......................... $930,653 ......................... $1,058,649 ...................... $8,659,351 ...................... $36,628,580 .................... $1,775,294 ...................... $93,230,839 .................... NA ................................... $401,025 ......................... $413,444 ......................... $1,691,864 ...................... $790,324 ......................... $116,051 ......................... $926,873 ......................... $1,058,549 ...................... CFR Part 158). This notice is published pursuant to paragraph d of § 158.29. PFC Applications Approved Public Agency: Burbank-GlendalePasadena Airport Authority, Burbank, California. Application Number: 09–09–C–00– BUR. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in This Decision: $20,465,000. Earliest Charge Effective Date: April 1, 2013. Estimated Charge Expiration Date: January 1, 2025. Class of Air Carriers Not Required To Collect PFCs: Nonscheduled/on-demand air carriers filing FAA Form 1800–31. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Bob Hope Airport. Brief Description of Projects Approved for Collection and Use at a $4.50 PFC Level: Engineered material arresting system extension. Airfield infrastructure improvements. Aircraft rescue and firefighting vehicle. Brief Description of Project Partially Approved for Collection and Use at a PO 00000 Frm 00132 Fmt 4703 Sfmt 4703 Original estimated charge exp. date Amended estimated charge exp. date 02/01/19 04/01/03 01/01/15 11/01/98 11/01/98 02/01/06 09/01/07 06/01/14 05/01/08 04/01/07 10/01/06 11/01/07 02/01/19 04/01/03 11/01/09 11/01/98 11/01/98 02/01/06 09/01/07 06/01/16 01/01/14 09/01/05 10/01/06 11/01/07 $4.50 PFC Level: Parking lot A relocation. Determination: Partially approved for collection and use. The approval is limited to the cost associated with the removal and demolition, minus any salvage value, of the existing facility. Brief Description of Projects Approved for Collection and Use at a $3.00 PFC Level: Passenger improvements—terminal A baggage claim. Airport facility/building improvements—high voltage/ switchgear replacement and public address system upgrade. Airport facility/building improvements—main entrance sign. Airfield generator. Noise monitoring system. Brief Description of Project Partially Approved for Collection and Use at a $3.00 PFC Level: Information improvements—common use passenger processing system. Determination: Revenue-producing equipment, including check-in ticket units and telephones, is not PFC eligible. Brief Description of Project Approved for Use at a $450 PFC Level: Taxiway D extension. Decision Date: September 28, 2009. FOR FURTHER INFORMATION CONTACT: Darlene Williams, Los Angeles Airports District Office, (310) 725–3625. E:\FR\FM\15DEN1.SGM 15DEN1 sroberts on DSKD5P82C1PROD with NOTICES 66404 Federal Register / Vol. 74, No. 239 / Tuesday, December 15, 2009 / Notices Public Agency: Port of Pasco, Pasco, Washington. Application Number: 09–07–C–00– PSC. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $2,884,950. Earliest Charge Effective Date: November 1, 2013. Estimated Charge Expiration Date: October 1, 2021. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Projects Approved for Collection and Use: Security access control system. Terminal access road reconstruction. Taxiway D reconstruction (runway 3L to taxiway A). North end runway 12/30 rehabilitation. Runway 3L/21 R rehabilitation. Master plan study. Acquire aircraft rescue and firefighting equipment. Construct aircraft rescue and firefighting building. Acquire interactive training system. Runway 3L121R—12/30 intersection rehabilitation. PFC administration. Decision Date: September 29, 2009. FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District Office, (425) 227–1662. Public Agency: San Diego County Regional Airport Authority, San Diego, California. Application Number: 09–07–C–00– SAN. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $85,181,950. Earliest Charge Effective Date: December 1, 2009. Estimated Charge Expiration Date: October 1, 2012. Class of Air Carriers Not Required To Collect PFC’s: Non-scheduled/on demand air carriers (air taxi/commercial operators) filing FAA Form 1800–31. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at San Diego International Airport. Brief Description of Projects Approved for Collection and Use at a $4.50 PFC Level: Terminal improvements—gate 1A reconfiguration. Air cargo ramp improvements. Aircraft rescue and firefighting vehicle. Noise mitigation—quieter home program, phase IV. VerDate Nov<24>2008 17:23 Dec 14, 2009 Jkt 220001 Terminal planning and schematic design. Brief Description of Projects Approved for Collection and Use at a $3.00 PFC Level: Expand terminal 2 east facilities. Terminal 12 kV service upgrade—phase II. Brief Description of Project Paritally Approved for Collection and Use at a $3.00 PFC Level: Replace/protect terminal 1 escalators. Determination: Partially approved for collection and use. The FAA determined that the installation of video monitoring equipment at various locations within the escalator areas is not PFC-eligible because the purpose of the monitoring system is to allow airport personnel to monitor the operational efficiency of the escalators. Brief Description of Withdrawn Project: Runway 9 displaced threshold relocation. Date of Withdrawal: September 17, 2009. Decision Date: September 30, 2009. FOR FURTHER INFORMATION CONTACT: Darlene Williams, Los Angeles Airports District Office, (310) 725–3625. Public Agency: County of Broward, Fort Lauderdale, Florida. Application Number: 09–10–C–00– FLL. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $223,211,000. Earliest Charge Effective Date: October 1, 2012. Estimated Charge Expiration Date: February 1, 2018. Class of Air Carriers Not Required To Collect PFC’s: Non-scheduled/ondemand air carriers. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Fort Lauderdale—Hollywood International Airport. Brief Description of Projects Approved for Collection and Use at a $4.50 PFC Level: Relocate security gates. Very-high-frequency omni-directional range relocation. Security administration system. Runway overlay. Brief Description of Projects Partially Approved for Collection and Use at a $4.50 PFC Level: Terminal 4 redevelopment. Determination: Partially approved for collection and use. The FAA PO 00000 Frm 00133 Fmt 4703 Sfmt 4703 determined that the construction of new airport administrative, Transportation Security Administration, and Customs offices is not PFC eligible. Terminal area apron. Determination: Partially approved for collection and use. The FAA determined that the public agency did not provide justification for the inclusion of the hydrant fueling line item in this project. In addition, the cost estimate included an amount for design of the Concourse A project however the public agency did not include a description or justification of this work element in the PFC application. Therefore, PFC revenue may not be used for the hydrant fueling or design of Concourse A work elements. Brief Description of Projects Approved for Collection and Use at a $3.00 PFC Level: Runway 9R127L design and program management. Loading bridges. Apron lighting. Decision Date: September 30, 2009. FOR FURTHER INFORMATION CONTACT: Dean Stringer, Orlando Airports District Office, (407) 812–6331. Public Agency: City of Killeen, Texas. Application Number: 09–07–C–00– GRK. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $2,300,000. Charge Effective Date: March 1, 2010. Estimated Charge Expiration Date: February 1, 2013. Class of Air Carriers Not Required To Collect PFC’s: Part 135 charter operators. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Killeen— Fort Hood Regional Airport. Brief Description of Projects Approved for Collection and Use: Taxiway E reconstruction. Baggage handling system improvements and expansion. Security system upgrade and expansion. Procure disabled passenger lift. Flight information systems upgrade. Common use departure gate equipment upgrade. Blast pad. Drainage improvements. Administrative expenses. Decision Date: September 30, 2009. FOR FURTHER INFORMATION CONTACT: Glenn Boles, Texas Airports Development Office, (817) 222–5661. E:\FR\FM\15DEN1.SGM 15DEN1 sroberts on DSKD5P82C1PROD with NOTICES Federal Register / Vol. 74, No. 239 / Tuesday, December 15, 2009 / Notices Public Agency: City of Waco, Texas. Application Number: 09–04–C–00– ACT. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $790,163. Earliest Charge Effective Date: December 1, 2009. Estimated Charge Expiration Date: April 1, 2012. Class of Air Carriers Not Required To Collect PFC’s: Non-scheduled/ondemand air carriers filing FAA Form 1800–31. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Waco Regional Airport. Brief Description of Projects Approved for Collection and Use: Holdroom expansion. Runways 14/32 and 1/19 safety area design and construction. Install passenger loading bridges. Acquire aircraft rescue and firefighting suits. PFC preparation. Decision Date: September 30, 2009. FOR FURTHER INFORMATION CONTACT: Guillermo Villalobos, Texas Airports Development Office, (817) 222–5657. Public Agency: State of Alaska/ Department of Transportation and Public Facilities, Juneau, Alaska. Application Number: 09–03–C–00– ANC. Application Type: Impose and use a PFC. PFC Level: $3.00. Total PFC Revenue Approved in this Decision: $10,200,000. Earliest Charge Effective Date: March 1, 2012. Estimated Charge Expiration Date: July 1, 2015. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Projects Approved for Collection and Use: Acquire snow removal equipment. Passenger terminal building renovations and upgrades. Passenger terminal loading bridge replacement. Apron reconstruction. Decision Date: October 2, 2009. FOR FURTHER INFORMATION CONTACT: Eric Helms, Alaska Region Airports Division, (907) 271–5202. Public Agency: State of Hawaii, Honolulu, Hawaii. Application Number: 09–04–C–00– HNL. VerDate Nov<24>2008 17:23 Dec 14, 2009 Jkt 220001 Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $105,909,130. Earliest Charge Effective Date: January 1,2010. Estimated Charge Expiration Date: February 1, 2014. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Project Approved for Collection at Honolulu International Airport (HNL) and Use at Kahului Airport (OGG) at a $4.50 PFC Level: Taxiway A pavement improvements. Brief Description of Project Approved for Collection at HNL and Use at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II. Brief Description of Projects Approved for Collection at HNL and Use at HNL at a $4.50 PFC Level: Taxiway Z structural improvements. New airfield electrical vault. Interisland maintenance facility site preparation. Brief Description of Projects Approved for Collection at HNL and Use at HNL at a $3.00 PFC Level: Electrical distributed generation system. PFC administrative costs. Decision Date: October 13, 2009. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. Public Agency: State of Hawaii, Honolulu, Hawaii. Application Number: 09–04–C–00– OGG. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $24,663,770. Earliest Charge Effective Date: January 1, 2010. Estimated Charge Expiration Date: February 1, 2014. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Project Approved for Collection at Kahului Airport (OGG) and Use at OGG at a $4.50 PFC Level: Taxiway A pavement improvements. Brief Description of Project Approved for Collection at OGG and Use at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II. Brief Description of Projects Approved for Collection at OGG and Use at Honolulu International Airport (HNL) at a $4.50 PFC Level: Taxiway Z structural improvements. New airfield electrical vault. Interisland maintenance facility site preparation. PO 00000 Frm 00134 Fmt 4703 Sfmt 4703 66405 Brief Description of Projects Approved for Collection at OGG and Use at HNL at a $3.00 PFC Level: Electrical distributed generation system. PFC administrative costs. Decision Date: October 13, 2009. For Further Information Contact: Steve Wong, Honolulu Airports District Office, (808) 541–1225. Public Agency: State of Hawaii, Honolulu, Hawaii. Application Number: 09–04–C–00– KOA. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $7,254,050. Earliest Charge Effective Date: January 1, 2010. Estimated Charge Expiration Date: February 1, 2014. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Project Approved for Collection at Kona International Airport at Keahole (KOA) and Use at Kahului Airport (OGG) at a $4.50 PFC Level: Taxiway A pavement improvements. Brief Description of Project Approved for Collection at KOA and Use at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II. Brief Description of Projects Approved for Collection at KOA and Use at Honolulu International Airport (HNL) at a $4.50 PFC Level: Taxiway Z structural improvements. New airfield electrical vault. Interisland maintenance facility site preparation. Brief Description of Projects Approved for Collection at KOA and Use at HNL at a $3.00 PFC Level: Electrical distributed generation system. PFC administrative costs. Decision Date: October 13, 2009. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. Public Agency: State of Hawaii, Honolulu, Hawaii. Application Number: 09–04–C–00– LIH. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $7,254,050. Earliest Charge Effective Date: January 1, 2010. Estimated Charge Expiration Date: February 1, 2014. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Project Approved for Collection at Lihue Airport (LIH) E:\FR\FM\15DEN1.SGM 15DEN1 66406 Federal Register / Vol. 74, No. 239 / Tuesday, December 15, 2009 / Notices sroberts on DSKD5P82C1PROD with NOTICES And Use at Kahului Airport (OGG) at a $4.50 PFC Level: Taxiway A pavement improvements. Brief Description of Project Approved for Collection at LIH and Use at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II. Brief Description of Projects Approved for Collection at LIH and Use at Honolulu International Airport (HNL) at a $4.50 PFC Level: Taxiway Z structural improvements. New airfield electrical vault. Interisland maintenance facility site preparation. Brief Description of Projects Approved for Collection at LIH and Use at HNL at a $3.00 PFC Level: Electrical distributed generation system. PFC administrative costs. Decision Date: October 13, 2009. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. Public Agency: Lexington-Fayette Urban County Airport Board, Lexington, Kentucky. Application Number: 09–07–C–00– LEX. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $37,400,347. Earliest Charge Effective Date: August 1, 2022. Estimated Charge Expiration Date: February 1, 2038. Class of Air Carriers Not Required To Collect PFC’s: Air taxi/commercial operators filing FAA Form 1800–31. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Blue Grass Airport. Brief Description of Projects Approved for Collection and Use: Replace runway 8/26. Taxiway D relocation. Terminal curb-front improvements. PFC application development. Brief Description of Projects Partially Approved for Collection and Use: Sanitary sewer improvements. Determination: Partially approved for collection and use. The approval is limited to that portion of the improvements that serves eligible areas or facilities. Terminal interior renovation phase II. Determination: Partially approved for collection and use. The FAA determined that the replacement of the existing ceiling system and wall finishes VerDate Nov<24>2008 17:23 Dec 14, 2009 Jkt 220001 were maintenance items and not eligible development. Therefore, costs associated with these two work items, including financing costs, were disallowed. Decision Date: October 15, 2009. FOR FURTHER INFORMATION CONTACT: Cynthia Wills, Memphis Airports District Office, (901) 322–8190. Public Agency: Huntsville-Madison County Airport Authority, Huntsville, Alabama. Application Number: 09–16–C–00– HSV. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $5,007,823. Earliest Charge Effective Date: May 1, 2010. Estimated Charge Expiration Date: May 1, 2012. Classes of Air Carriers Not Required To Collect PFC’s: (1) Air taxi/commercial operators having fewer than 500 annual passenger enplanements; (2) certified air carriers having fewer than 500 annual passenger enplanements; and (3) certified route air carriers having fewer than 500 annual passenger enplanements. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that each approved class accounts for less than 1 percent of the total annual enplanements at Huntsville International Airport. Brief Description of Projects Approved for Collection and Use: Interactive training and workstations. Western land. Airfield/ramp rehabilitation. Runway 18L136R overlay design and construction. Personnel equipment and public safety radios. Speed runway sweeper and airfield sweeper. Master plan update. Airfield erosion control phase I. Runway 18R category II signage upgrade. Group VI airfield improvements. Snow plow vehicle. New security system. Snow equipment/storage. Air traffic control tower relocation/ connectivity. Air cargo ramp expansion. Decision Date: October 16, 2009. FOR FURTHER INFORMATION CONTACT: Phillip Braden, Memphis Airports District Office, (901) 322–8181. Public Agency: Greater Orlando Aviation Authority, Orlando, Florida. PO 00000 Frm 00135 Fmt 4703 Sfmt 4703 Application Number: 09–13–C–00– MCO. Application Type: Impose and use a PFC. PFC Level: $3.00. Total PFC Revenue Approved in this Decision: $227,788,000. Earliest Charge Effective Date: November 1, 2020. Estimated Charge Expiration Date: February 1, 2026. Class of Air Carriers Not Required To Collect PFC’s: None. Brief Description of Projects Approved for Collection and Use: Baggage system capacity improvements—phase I. Landside terminal restroom improvements. Automated people mover improvements. Taxiway C rehabilitation. Brief Description of Projects Partially Approved for Collection and Use: Common use self services and common use passenger processing systems improvements. Determination: Partially approved for collection and use. Those kiosks which permit airlines to collect a fee for a ticket or service, upgrade, or any other collection of money from the passenger, is considered revenue producing and, thus, is not PFC eligible. Remote baggage screening facility improvements. Determination: Partially approved for collection and use. A portion of the project, for which the public agency requested PFC funding was determined to be ineligible. Decision Date: October 27, 2009. FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District Office, (407) 812–6331. Public Agency: City of Burlington, Vermont. Application Number: 10–04–C–00– BTV. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in This Decision: $17,298,103. Earliest Charge Effective Date: December 1, 2009. Estimated Charge Expiration Date: March 1, 2014. Class of Air Carriers Not Required To Collect PFC’s: On demand air taxi commercial operators. Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Burlington International Airport. E:\FR\FM\15DEN1.SGM 15DEN1 Federal Register / Vol. 74, No. 239 / Tuesday, December 15, 2009 / Notices Brief Description of Projects Approved for Collection and Use: Expand and rehabilitate terminal building. Extend roadway system. South apron expansion. Enclosed walkway. Professional services. 66407 Decision Date: October 28, 2009. FOR FURTHER INFORMATION CONTACT: Priscilla Scott, New England Region Airports Division, (781) 238–7614. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No., City, State 04–04–C–01–MSL, Muscle Shoals, AL ............................... 08–09–C–01–VLD, Valdosta, GA ........................................ 06–09–C–01–JAX, Jacksonville, FL .................................... 03–06–C–02–MLB, Melbourne, FL* .................................... 08–08–C–02–JNU, Juneau, AK ........................................... 92–01–I–08–SRQ, Sarasota, FL ......................................... 95–02–U–05–SRQ, Sarasota, FL ........................................ 95–03–C–06–SRQ, Sarasota, FL ........................................ 02–06–C–08–MSY, New Orleans, LA ................................. 04–07–C–04–MSY, New Orleans, LA ................................. 07–03–C–01–TRI, Blountville, TN ....................................... 06–12–C–02–BNA, Nashville, TN * ..................................... 98–05–C–01–PHX, Phoenix, AZ ......................................... 02–06–C–01–PHX, Phoenix, AZ ......................................... 03–04–C–01–TYR, Tyler, TX .............................................. 09/24/09 09/24/09 09/25/09 09/25/09 10/08/09 10/08/09 10/08/09 10/08/09 10/13/09 10/13/09 10/14/09 10/15/09 10/16/09 10/16/09 10/26/09 Original approved net PFC revenue $57,355 30,300 267,389,352 6,806,435 9,905,870 13,945,012 NA 1,100,000 271,336,494 75,182,406 1,264,140 21,671,262 193,445,920 221,402,900 2,140,662 Amended approved net PFC revenue $54,730 89,427 231,806,084 6,806,435 9,897,370 13,944,391 NA 750,061 271,336,494 92,998,206 668,500 11,400,201 147,875,677 208,085,801 1,437,855 Original estimated charge exp. date 04/01/09 12/01/09 12/01/23 09/01/17 11/01/17 01/01/01 01/01/01 04/01/02 12/01/17 10/01/17 10/01/14 02/01/11 04/01/02 11/01/05 02/01/17 Amended estimated charge exp. date 04/01/09 07/01/10 10/01/23 03/01/19 11/01/17 01/01/01 01/01/01 04/01/02 09/01/18 04/01/22 07/01/13 10/01/10 04/01/02 11/01/05 10/01/11 Notes: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per enplaned passenger to $4.50 per enplaned passenger. For Melbourne, FL and Nashville, TN, this change is effective on December 1, 2009. Issued in Washington, DC, on December 9, 2009. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. E9–29772 Filed 12–14–09; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Petition for Waiver of Compliance In accordance with Part 211 of Title 49 Code of Federal Regulations (CFR), notice is hereby given that the Federal Railroad Administration (FRA) has received a request for a waiver of compliance from certain requirements of its safety standards. The individual petition is described below, including the party seeking relief, the regulatory provisions involved, the nature of the relief being requested, and the petitioner’s arguments in favor of relief. CSX Transportation, Inc. sroberts on DSKD5P82C1PROD with NOTICES [Docket Number FRA–2007–26965] The CSX Transportation, Inc. (CSXT) seeks an extension of the relief previously granted under Docket Number FRA–2007–26965. The original request granted conditional approval on January 18, 2008, for relief from the requirements of the Rules, Standards and Instructions, Title 49 CFR part 236, § 236.586—Daily or after trip test. Specifically, CSXT requested that a VerDate Nov<24>2008 17:23 Dec 14, 2009 Jkt 220001 visual inspection not be required as part of the daily or after trip test performed on locomotives equipped with microprocessor equipment during a proposed test period. For purposes of most effective monitoring, clarity of the remaining required cab signal testing and associated record-keeping, as well as consistency with a similar request from another railroad, FRA granted CSXT relief from the requirement of performing the test prescribed by § 236.586 on microprocessor-based automatic cab signal, train stop, and train control systems for a 2-year test period. Applicant’s justification for the extension: Over the past 18 months, CSXT has not seen any notable increase or decrease in locomotive shoppings as a result of not performing a daily or after-trip test prior to entering equipped territory. CSXT further request that they be allowed to conduct the currently required quarterly performance review on a semi-annual basis, with all other conditions of the January 18, 2007, letter to be abided with. Interested parties are invited to participate in these proceedings by submitting written views, data, or comments. FRA does not anticipate scheduling a public hearing in connection with these proceedings since the facts do not appear to warrant a hearing. If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before PO 00000 Frm 00136 Fmt 4703 Sfmt 4703 the end of the comment period and specify the basis for their request. All communications concerning these proceedings should identify the appropriate docket number (e.g., Waiver Petition Docket Number FRA–2007– 26965) and may be submitted by any of the following methods: • Web site: https:// www.regulations.gov. Follow the online instructions for submitting comments. • Fax: 202–493–2251. • Mail: Docket Operations Facility, U.S. Department of Transportation, 1200 New Jersey Avenue, SE., W12–140, Washington, DC 20590. • Hand Delivery: 1200 New Jersey Avenue, SE., Room W12–140, Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. Communications received within 45 days of the date of this notice will be considered by FRA before final action is taken. Comments received after that date will be considered as far as practicable. All written communications concerning these proceedings are available for examination during regular business hours (9 a.m.–5 p.m.) at the above facility. All documents in the public docket are also available for inspection and copying on the Internet at the docket facility’s Web site at https://www.regulations.gov. Anyone is able to search the electronic form of any written communications and comments received into any of our dockets by the name of the individual submitting the E:\FR\FM\15DEN1.SGM 15DEN1

Agencies

[Federal Register Volume 74, Number 239 (Tuesday, December 15, 2009)]
[Notices]
[Pages 66403-66407]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-29772]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In October 
2009, there were nine applications approved. This notice also includes 
information on six applications, approved in September 2009, 
inadvertently left off the September 2009 notice. Additionally, 15 
approved amendments to previously approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
Federal Aviation Regulations (14 CFR Part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Applications Approved

    Public Agency: Burbank-Glendale-Pasadena Airport Authority, 
Burbank, California.
    Application Number: 09-09-C-00-BUR.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $20,465,000.
    Earliest Charge Effective Date: April 1, 2013.
    Estimated Charge Expiration Date: January 1, 2025.
    Class of Air Carriers Not Required To Collect PFCs: Nonscheduled/
on-demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Bob Hope Airport.
    Brief Description of Projects Approved for Collection and Use at a 
$4.50 PFC Level:

Engineered material arresting system extension.
Airfield infrastructure improvements.
Aircraft rescue and firefighting vehicle.

    Brief Description of Project Partially Approved for Collection and 
Use at a $4.50 PFC Level: Parking lot A relocation.
    Determination: Partially approved for collection and use. The 
approval is limited to the cost associated with the removal and 
demolition, minus any salvage value, of the existing facility.
    Brief Description of Projects Approved for Collection and Use at a 
$3.00 PFC Level:

Passenger improvements--terminal A baggage claim.
Airport facility/building improvements--high voltage/switchgear 
replacement and public address system upgrade.
Airport facility/building improvements--main entrance sign.
Airfield generator.
Noise monitoring system.

    Brief Description of Project Partially Approved for Collection and 
Use at a $3.00 PFC Level: Information improvements--common use 
passenger processing system.
    Determination: Revenue-producing equipment, including check-in 
ticket units and telephones, is not PFC eligible.
    Brief Description of Project Approved for Use at a $450 PFC Level: 
Taxiway D extension.
    Decision Date: September 28, 2009.

FOR FURTHER INFORMATION CONTACT: Darlene Williams, Los Angeles Airports 
District Office, (310) 725-3625.


[[Page 66404]]


    Public Agency: Port of Pasco, Pasco, Washington.
    Application Number: 09-07-C-00-PSC.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $2,884,950.
    Earliest Charge Effective Date: November 1, 2013.
    Estimated Charge Expiration Date: October 1, 2021.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Projects Approved for Collection and Use:

Security access control system.
Terminal access road reconstruction.
Taxiway D reconstruction (runway 3L to taxiway A).
North end runway 12/30 rehabilitation.
Runway 3L/21 R rehabilitation.
Master plan study.
Acquire aircraft rescue and firefighting equipment.
Construct aircraft rescue and firefighting building.
Acquire interactive training system.
Runway 3L121R--12/30 intersection rehabilitation.
PFC administration.

    Decision Date: September 29, 2009.

FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District 
Office, (425) 227-1662.

    Public Agency: San Diego County Regional Airport Authority, San 
Diego, California.
    Application Number: 09-07-C-00-SAN.
    Application Type: Impose and use a PFC. PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $85,181,950.
    Earliest Charge Effective Date: December 1, 2009.
    Estimated Charge Expiration Date: October 1, 2012.
    Class of Air Carriers Not Required To Collect PFC's: Non-scheduled/
on demand air carriers (air taxi/commercial operators) filing FAA Form 
1800-31.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at San Diego International Airport.
    Brief Description of Projects Approved for Collection and Use at a 
$4.50 PFC Level:

Terminal improvements--gate 1A reconfiguration.
Air cargo ramp improvements.
Aircraft rescue and firefighting vehicle.
Noise mitigation--quieter home program, phase IV.
Terminal planning and schematic design.

    Brief Description of Projects Approved for Collection and Use at a 
$3.00 PFC Level:

Expand terminal 2 east facilities.
Terminal 12 kV service upgrade--phase II.

    Brief Description of Project Paritally Approved for Collection and 
Use at a $3.00 PFC Level: Replace/protect terminal 1 escalators.
    Determination: Partially approved for collection and use. The FAA 
determined that the installation of video monitoring equipment at 
various locations within the escalator areas is not PFC-eligible 
because the purpose of the monitoring system is to allow airport 
personnel to monitor the operational efficiency of the escalators.
    Brief Description of Withdrawn Project: Runway 9 displaced 
threshold relocation.
    Date of Withdrawal: September 17, 2009.
    Decision Date: September 30, 2009.

FOR FURTHER INFORMATION CONTACT: Darlene Williams, Los Angeles Airports 
District Office, (310) 725-3625.

    Public Agency: County of Broward, Fort Lauderdale, Florida.
    Application Number: 09-10-C-00-FLL.
    Application Type: Impose and use a PFC. PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $223,211,000.
    Earliest Charge Effective Date: October 1, 2012.
    Estimated Charge Expiration Date: February 1, 2018.
    Class of Air Carriers Not Required To Collect PFC's: Non-scheduled/
on-demand air carriers.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Fort Lauderdale--Hollywood International Airport.
    Brief Description of Projects Approved for Collection and Use at a 
$4.50 PFC Level:

Relocate security gates.
Very-high-frequency omni-directional range relocation.
Security administration system.
Runway overlay.

    Brief Description of Projects Partially Approved for Collection and 
Use at a $4.50 PFC Level: Terminal 4 redevelopment.
    Determination: Partially approved for collection and use. The FAA 
determined that the construction of new airport administrative, 
Transportation Security Administration, and Customs offices is not PFC 
eligible. Terminal area apron.
    Determination: Partially approved for collection and use. The FAA 
determined that the public agency did not provide justification for the 
inclusion of the hydrant fueling line item in this project. In 
addition, the cost estimate included an amount for design of the 
Concourse A project however the public agency did not include a 
description or justification of this work element in the PFC 
application. Therefore, PFC revenue may not be used for the hydrant 
fueling or design of Concourse A work elements.
    Brief Description of Projects Approved for Collection and Use at a 
$3.00 PFC Level:

Runway 9R127L design and program management.
Loading bridges.
Apron lighting.

    Decision Date: September 30, 2009.

FOR FURTHER INFORMATION CONTACT: Dean Stringer, Orlando Airports 
District Office, (407) 812-6331.
    Public Agency: City of Killeen, Texas.
    Application Number: 09-07-C-00-GRK.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $2,300,000.
    Charge Effective Date: March 1, 2010.
    Estimated Charge Expiration Date: February 1, 2013.
    Class of Air Carriers Not Required To Collect PFC's: Part 135 
charter operators.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Killeen--Fort Hood Regional Airport.
    Brief Description of Projects Approved for Collection and Use:

Taxiway E reconstruction.
Baggage handling system improvements and expansion.
Security system upgrade and expansion.
Procure disabled passenger lift.
Flight information systems upgrade.
Common use departure gate equipment upgrade.
Blast pad.
Drainage improvements.
Administrative expenses.

    Decision Date: September 30, 2009.

FOR FURTHER INFORMATION CONTACT: Glenn Boles, Texas Airports 
Development Office, (817) 222-5661.


[[Page 66405]]


    Public Agency: City of Waco, Texas.
    Application Number: 09-04-C-00-ACT.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $790,163.
    Earliest Charge Effective Date: December 1, 2009.
    Estimated Charge Expiration Date: April 1, 2012.
    Class of Air Carriers Not Required To Collect PFC's: Non-scheduled/
on-demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Waco Regional Airport.
    Brief Description of Projects Approved for Collection and Use:

Holdroom expansion.
Runways 14/32 and 1/19 safety area design and construction.
Install passenger loading bridges.
Acquire aircraft rescue and firefighting suits.
PFC preparation.

    Decision Date: September 30, 2009.

FOR FURTHER INFORMATION CONTACT: Guillermo Villalobos, Texas Airports 
Development Office, (817) 222-5657.

    Public Agency: State of Alaska/Department of Transportation and 
Public Facilities, Juneau, Alaska.
    Application Number: 09-03-C-00-ANC.
    Application Type: Impose and use a PFC.
    PFC Level: $3.00.
    Total PFC Revenue Approved in this Decision: $10,200,000.
    Earliest Charge Effective Date: March 1, 2012.
    Estimated Charge Expiration Date: July 1, 2015.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Projects Approved for Collection and Use:

Acquire snow removal equipment.
Passenger terminal building renovations and upgrades.
Passenger terminal loading bridge replacement.
Apron reconstruction.

    Decision Date: October 2, 2009.

FOR FURTHER INFORMATION CONTACT: Eric Helms, Alaska Region Airports 
Division, (907) 271-5202.

    Public Agency: State of Hawaii, Honolulu, Hawaii.
    Application Number: 09-04-C-00-HNL.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $105,909,130.
    Earliest Charge Effective Date: January 1,2010.
    Estimated Charge Expiration Date: February 1, 2014.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Project Approved for Collection at Honolulu 
International Airport (HNL) and Use at Kahului Airport (OGG) at a $4.50 
PFC Level: Taxiway A pavement improvements.
    Brief Description of Project Approved for Collection at HNL and Use 
at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II.
    Brief Description of Projects Approved for Collection at HNL and 
Use at HNL at a $4.50 PFC Level:

Taxiway Z structural improvements.
New airfield electrical vault.
Interisland maintenance facility site preparation.

    Brief Description of Projects Approved for Collection at HNL and 
Use at HNL at a $3.00 PFC Level:

Electrical distributed generation system.
PFC administrative costs.

    Decision Date: October 13, 2009.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.

    Public Agency: State of Hawaii, Honolulu, Hawaii.
    Application Number: 09-04-C-00-OGG.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $24,663,770.
    Earliest Charge Effective Date: January 1, 2010.
    Estimated Charge Expiration Date: February 1, 2014.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Project Approved for Collection at Kahului 
Airport (OGG) and Use at OGG at a $4.50 PFC Level: Taxiway A pavement 
improvements.
    Brief Description of Project Approved for Collection at OGG and Use 
at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II.
    Brief Description of Projects Approved for Collection at OGG and 
Use at Honolulu International Airport (HNL) at a $4.50 PFC Level:

Taxiway Z structural improvements.
New airfield electrical vault.
Interisland maintenance facility site preparation.

    Brief Description of Projects Approved for Collection at OGG and 
Use at HNL at a $3.00 PFC Level:

Electrical distributed generation system.
PFC administrative costs.

    Decision Date: October 13, 2009.
    For Further Information Contact: Steve Wong, Honolulu Airports 
District Office, (808) 541-1225.
    Public Agency: State of Hawaii, Honolulu, Hawaii.
    Application Number: 09-04-C-00-KOA.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $7,254,050.
    Earliest Charge Effective Date: January 1, 2010.
    Estimated Charge Expiration Date: February 1, 2014.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Project Approved for Collection at Kona 
International Airport at Keahole (KOA) and Use at Kahului Airport (OGG) 
at a $4.50 PFC Level: Taxiway A pavement improvements.
    Brief Description of Project Approved for Collection at KOA and Use 
at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II.
    Brief Description of Projects Approved for Collection at KOA and 
Use at Honolulu International Airport (HNL) at a $4.50 PFC Level:

Taxiway Z structural improvements.
New airfield electrical vault.
Interisland maintenance facility site preparation.

    Brief Description of Projects Approved for Collection at KOA and 
Use at HNL at a $3.00 PFC Level:

Electrical distributed generation system.
PFC administrative costs.

    Decision Date: October 13, 2009.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.

    Public Agency: State of Hawaii, Honolulu, Hawaii.
    Application Number: 09-04-C-00-LIH.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $7,254,050.
    Earliest Charge Effective Date: January 1, 2010.
    Estimated Charge Expiration Date: February 1, 2014.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Project Approved for Collection at Lihue 
Airport (LIH)

[[Page 66406]]

And Use at Kahului Airport (OGG) at a $4.50 PFC Level: Taxiway A 
pavement improvements.
    Brief Description of Project Approved for Collection at LIH and Use 
at OGG at a $3.00 PFC Level: Air cargo apron improvements, phase II.
    Brief Description of Projects Approved for Collection at LIH and 
Use at Honolulu International Airport (HNL) at a $4.50 PFC Level:

Taxiway Z structural improvements.
New airfield electrical vault.
Interisland maintenance facility site preparation.

    Brief Description of Projects Approved for Collection at LIH and 
Use at HNL at a $3.00 PFC Level:

Electrical distributed generation system.
PFC administrative costs.

    Decision Date: October 13, 2009.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.

    Public Agency: Lexington-Fayette Urban County Airport Board, 
Lexington, Kentucky.
    Application Number: 09-07-C-00-LEX.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $37,400,347.
    Earliest Charge Effective Date: August 1, 2022.
    Estimated Charge Expiration Date: February 1, 2038.
    Class of Air Carriers Not Required To Collect PFC's: Air taxi/
commercial operators filing FAA Form 1800-31.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Blue Grass Airport.
    Brief Description of Projects Approved for Collection and Use:

Replace runway 8/26.
Taxiway D relocation.
Terminal curb-front improvements.
PFC application development.
    Brief Description of Projects Partially Approved for Collection and 
Use: Sanitary sewer improvements.
    Determination: Partially approved for collection and use. The 
approval is limited to that portion of the improvements that serves 
eligible areas or facilities. Terminal interior renovation phase II.
    Determination: Partially approved for collection and use. The FAA 
determined that the replacement of the existing ceiling system and wall 
finishes were maintenance items and not eligible development. 
Therefore, costs associated with these two work items, including 
financing costs, were disallowed.
    Decision Date: October 15, 2009.

FOR FURTHER INFORMATION CONTACT: Cynthia Wills, Memphis Airports 
District Office, (901) 322-8190.

    Public Agency: Huntsville-Madison County Airport Authority, 
Huntsville, Alabama.
    Application Number: 09-16-C-00-HSV.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $5,007,823.
    Earliest Charge Effective Date: May 1, 2010.
    Estimated Charge Expiration Date: May 1, 2012.
    Classes of Air Carriers Not Required To Collect PFC's:
    (1) Air taxi/commercial operators having fewer than 500 annual 
passenger enplanements; (2) certified air carriers having fewer than 
500 annual passenger enplanements; and (3) certified route air carriers 
having fewer than 500 annual passenger enplanements.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that each approved 
class accounts for less than 1 percent of the total annual enplanements 
at Huntsville International Airport.
    Brief Description of Projects Approved for Collection and Use:

Interactive training and workstations.
Western land.
Airfield/ramp rehabilitation.
Runway 18L136R overlay design and construction.
Personnel equipment and public safety radios.
Speed runway sweeper and airfield sweeper.
Master plan update.
Airfield erosion control phase I.
Runway 18R category II signage upgrade.
Group VI airfield improvements.
Snow plow vehicle.
New security system.
Snow equipment/storage.
Air traffic control tower relocation/connectivity.
Air cargo ramp expansion.

    Decision Date: October 16, 2009.

FOR FURTHER INFORMATION CONTACT: Phillip Braden, Memphis Airports 
District Office, (901) 322-8181.

    Public Agency: Greater Orlando Aviation Authority, Orlando, 
Florida.
    Application Number: 09-13-C-00-MCO.
    Application Type: Impose and use a PFC.
    PFC Level: $3.00.
    Total PFC Revenue Approved in this Decision: $227,788,000.
    Earliest Charge Effective Date: November 1, 2020.
    Estimated Charge Expiration Date: February 1, 2026.
    Class of Air Carriers Not Required To Collect PFC's: None.
    Brief Description of Projects Approved for Collection and Use:

Baggage system capacity improvements--phase I.
Landside terminal restroom improvements.
Automated people mover improvements.
Taxiway C rehabilitation.

    Brief Description of Projects Partially Approved for Collection and 
Use: Common use self services and common use passenger processing 
systems improvements.
    Determination: Partially approved for collection and use. Those 
kiosks which permit airlines to collect a fee for a ticket or service, 
upgrade, or any other collection of money from the passenger, is 
considered revenue producing and, thus, is not PFC eligible. Remote 
baggage screening facility improvements.
    Determination: Partially approved for collection and use. A portion 
of the project, for which the public agency requested PFC funding was 
determined to be ineligible.
    Decision Date: October 27, 2009.

FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District 
Office, (407) 812-6331.

    Public Agency: City of Burlington, Vermont.
    Application Number: 10-04-C-00-BTV.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $17,298,103.
    Earliest Charge Effective Date: December 1, 2009.
    Estimated Charge Expiration Date: March 1, 2014.
    Class of Air Carriers Not Required To Collect PFC's: On demand air 
taxi commercial operators.
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Burlington International Airport.

[[Page 66407]]

    Brief Description of Projects Approved for Collection and Use:

Expand and rehabilitate terminal building.
Extend roadway system.
South apron expansion.
Enclosed walkway.
Professional services.

    Decision Date: October 28, 2009.

FOR FURTHER INFORMATION CONTACT: Priscilla Scott, New England Region 
Airports Division, (781) 238-7614.

                                           Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
                                                                                     Original         Amended
                                     Amendment       Original         Amended        estimated       estimated
   Amendment No., City, State      approved date   approved net    approved net     charge exp.     charge exp.
                                                    PFC revenue     PFC revenue        date            date
----------------------------------------------------------------------------------------------------------------
04-04-C-01-MSL, Muscle Shoals,          09/24/09         $57,355         $54,730        04/01/09        04/01/09
 AL.............................
08-09-C-01-VLD, Valdosta, GA....        09/24/09          30,300          89,427        12/01/09        07/01/10
06-09-C-01-JAX, Jacksonville, FL        09/25/09     267,389,352     231,806,084        12/01/23        10/01/23
03-06-C-02-MLB, Melbourne, FL*..        09/25/09       6,806,435       6,806,435        09/01/17        03/01/19
08-08-C-02-JNU, Juneau, AK......        10/08/09       9,905,870       9,897,370        11/01/17        11/01/17
92-01-I-08-SRQ, Sarasota, FL....        10/08/09      13,945,012      13,944,391        01/01/01        01/01/01
95-02-U-05-SRQ, Sarasota, FL....        10/08/09              NA              NA        01/01/01        01/01/01
95-03-C-06-SRQ, Sarasota, FL....        10/08/09       1,100,000         750,061        04/01/02        04/01/02
02-06-C-08-MSY, New Orleans, LA.        10/13/09     271,336,494     271,336,494        12/01/17        09/01/18
04-07-C-04-MSY, New Orleans, LA.        10/13/09      75,182,406      92,998,206        10/01/17        04/01/22
07-03-C-01-TRI, Blountville, TN.        10/14/09       1,264,140         668,500        10/01/14        07/01/13
06-12-C-02-BNA, Nashville, TN *.        10/15/09      21,671,262      11,400,201        02/01/11        10/01/10
98-05-C-01-PHX, Phoenix, AZ.....        10/16/09     193,445,920     147,875,677        04/01/02        04/01/02
02-06-C-01-PHX, Phoenix, AZ.....        10/16/09     221,402,900     208,085,801        11/01/05        11/01/05
03-04-C-01-TYR, Tyler, TX.......        10/26/09       2,140,662       1,437,855        02/01/17        10/01/11
----------------------------------------------------------------------------------------------------------------
Notes: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per
  enplaned passenger to $4.50 per enplaned passenger. For Melbourne, FL and Nashville, TN, this change is
  effective on December 1, 2009.


    Issued in Washington, DC, on December 9, 2009.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. E9-29772 Filed 12-14-09; 8:45 am]
BILLING CODE 4910-13-M