Exelon Generation Company, LLC; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information (SUNSI) for Contention Preparation, 66159-66163 [E9-29672]
Download as PDF
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
If the hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Confirmatory Order should
be sustained.
In the absence of any request for
hearing, or written approval of an
extension of time in which to request a
hearing, this Order shall be final 20 days
from the date of its publication in the
Federal Register without further order
or proceedings. If an extension of time
for requesting a hearing has been
approved, the provisions specified in
Section V shall be final when the
extension expires if a hearing request
has not been received.
A request for a hearing shall not stay
the immediate effectiveness of this
order.
Dated this the 1st day of December 2009.
For the Nuclear Regulatory Commission.
Samuel J. Collins,
Regional Administrator.
[FR Doc. E9–29660 Filed 12–11–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–461]
mstockstill on DSKH9S0YB1PROD with NOTICES
Exelon Generation Company, LLC;
Notice of Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing and
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information (SUNSI) for
Contention Preparation
The U.S. Nuclear Regulatory
Commission (NRC, the Commission) is
considering issuance of an amendment
to Facility Operating License No. NPF–
62 issued to Exelon Generation
Company, LLC (the licensee) for
operation of the Clinton Power Station,
Unit No. 1 (CPS), located in DeWitt
County, Illinois.
The proposed amendment would
modify License Condition 2.B.(6) and
create new License Conditions 1.J and
2.B(7) as part of a pilot program to
irradiate Cobalt (Co)-59 targets to
produce Co-60, for the CPS. The
licensee also requests an amendment to
Appendix A, Technical Specifications
(TS), of the CPS Facility Operating
License, which would modify TS 4.2.1,
‘‘Fuel Assemblies,’’ to describe the
isotope test assemblies being used. The
amendment application dated June 26,
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
2009, contains sensitive unclassified
non-safeguards information (SUNSI).
The amendment application is
supplemented by letters dated
November 4, 2009 (ADAMS Package No.
ML093100316), November 17, 2009
(ADAMS Accession No. ML093210561),
and November 20, 2009 (ADAMS
Accession No. ML093280028).
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes to the license
conditions provide clarification and do not
impact plant operation in any way. The
handling of byproduct material (i.e., Co-60)
will continue to be done in accordance with
the requirements of 10 CFR 30 and the
requirements of the CPS Facility Operating
License. The proposed change to TS 4.2.1
also provides clarification and additional
description of the proposed ITAs to be used
in the CPS core. These changes provide
clarification and do not involve an increase
in the probability or consequences of an
accident previously evaluated.
The use of the GE14i ITAs, has been
evaluated for impact on the previously
evaluated transients and design basis
accidents for CPS. GE-Hitachi report NEDC–
33505P, ‘‘Safety Analysis Report to Support
Introduction of GE14i Isotope Test
Assemblies (ITAs) in Clinton Power Station,’’
dated June 2009, documents the results of the
analyses completed to demonstrate the
impact on operation following introduction
of the ITAs in the CPS core. The use of these
ITAs does not adversely affect accident
initiators or precursors nor alter the design
assumptions, conditions, and configuration
or the manner in which the plant is operated
and maintained. The Cycle 13 (i.e., the first
cycle of operation with the GE14i assembly)
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
66159
core, and subsequent cores, will be designed
so that the ITAs will be placed in nonlimiting locations with respect to thermal
limit margins and shutdown margins. The
ITAs do not adversely affect the ability of any
structures, systems or components (SSCs) to
perform their intended safety function to
mitigate the consequences of an initiating
event within the assumed acceptance limits.
In addition to evaluation of the impact to
operation with the introduction of the GE14i
assemblies, EGC has also evaluated the
effects of these assemblies on post-irradiation
conditions. The additional heat from the Co60 decay is insignificant when compared to
the total heat from a normal refueling
discharge. The small amount of extra heat
added by the cobalt isotope rods poses no
additional risk of spent fuel pool (SFP) local
boiling over that was previously analyzed.
The maximum incident radiation due to an
irradiated GE14i bundle placed one foot from
the spent fuel pool walls is in excess of the
radiation that would result in significant
gamma heating of the concrete. However,
analysis has demonstrated that at four feet,
the energy deposition rate is well below that
required to cause significant concrete
heating. CPS procedures exist to guide
placement of irradiated fuel bundles in the
SFP to avoid gamma heating of the wall
concrete. These procedures will be modified
to specify that the irradiated GE14i bundles
be stored at least four feet from the pool
walls. With the four foot distance
requirement in effect, there is no limitation
on the amount of time an irradiated GE14i
bundle may remain in the pool.
Handling of the licensed transfer casks will
be in accordance with the guidance in
NUREG 0612, ‘‘Control of Heavy Loads at
Nuclear Power Plants,’’ using the Fuel
Building Crane. These precautions will
support safe movement of the casks within
the Fuel Building.
The consequences of a previously analyzed
event are dependent on the initial conditions
assumed in the analysis, the availability and
successful functioning of equipment assumed
to operate in response to the analyzed event,
and the setpoints at which these actions are
initiated. The consequences of a previously
evaluated accident are not significantly
increased by the proposed change. As
documented in NEDC–33505P, the proposed
change does not affect the performance of
any equipment credited to mitigate the
radiological consequences of an accident.
Evaluation of operation with the GE14i
assemblies in the CPS core, demonstrated
that the licensing basis radiological analyses
are not impacted by the introduction of eight
GE14i assemblies at CPS. This includes the
analyses done for transients and design basis
accident events.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed revision to the CPS license
conditions and TS 4.2.1 will not introduce
E:\FR\FM\14DEN1.SGM
14DEN1
mstockstill on DSKH9S0YB1PROD with NOTICES
66160
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
any new or modified equipment since these
changes are intended to provide clarification
only. These clarifications will not result in
operation of the facility in a different way
than currently operated.
While the proposed ITA program does
result in the introduction of several modified
fuel assemblies (i.e., the GE14i assembly),
these assemblies are essentially the same as
the GE14 assemblies currently in use in the
CPS core. The only difference being the use
of a number of isotope rods in place of fuel
rods. The GE14i assembly was designed for
mechanical, nuclear, and thermal-hydraulic
compatibility with the GE14 fuel design. The
details of the design differences between the
GE14 and GE14i are documented in NEDC–
33505P. Use of the proposed ITAs does not
involve the addition or modification of any
plant equipment other than the assemblies
modified to include the cobalt target rods.
Also, use of the proposed ITAs will not alter
the design configuration or method of
operation of plant equipment beyond its
normal functional capabilities. The ITA
program does not create any new credible
failure mechanisms, malfunctions or accident
initiators.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change to the CPS operating
license conditions are intended to provide
clarification as to how the generation of
byproduct material in the CPS reactor core
meets the requirements of 10 CFR Part 30.
The proposed change to TS 4.2.1 also
provides clarification and additional
description of the proposed ITAs to be used
in the CPS core. These proposed changes
would not affect the design or operation of
any equipment important to safety. In
addition, since the proposed changes to the
license conditions and TS provide
clarification only, these changes do not affect
the results of any safety calculations.
Cycle specific analyses will be performed
for CPS Reload 12 Cycle 13 to establish fuel
operating limits for the ITAs that assure
compliance with regulatory limits. Results of
these analyses will be documented in the
CPS Reload 12 Cycle 13 Supplemental
Reload Licensing Report. Furthermore,
licensing analyses will be performed for the
ITAs for each cycle of their operation,
wherein the effect of the ITAs is considered
for each of the appropriate licensing events
and anticipated operational occurrences
(AOOs) to establish the appropriate reactor
thermal limits for operation.
The proposed introduction of the ITAs has
no impact on equipment design or
fundamental operation, other than the
modifications made to the fuel assembly as
part of the program. There are no changes
being made to safety limits or safety system
allowable values that would adversely affect
plant safety as a result of the proposed ITAs.
The performance of the systems important to
safety is not significantly affected by the use
of the proposed ITAs. The margin of safety
can be affected by the thermal limits existing
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
at the time of the postulated accident;
however, the ITA design has been evaluated
and demonstrated to have no significant
effect on the calculated thermal limits as
described above. The proposed change does
not affect safety analysis assumptions or
initial conditions and therefore, the margin of
safety in the original safety analyses is
maintained.
As documented above, the proposed
change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch, TWB–05–B01M,
Division of Administrative Services,
Office of Administration, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, and should cite the
publication date and page number of
this Federal Register notice. Written
comments may also be faxed to the
Chief, Rulemaking and Directives
Branch at 301–492–3446. Documents
may be examined, and/or copied for a
fee, at the NRC’s Public Document
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR Part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
E:\FR\FM\14DEN1.SGM
14DEN1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner/requestor must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
petitioner/requestor who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the Internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
participant should contact the Office of
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through EIE, users will be
required to install a Web browser plugin from the NRC Web site. Further
information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/e-
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
66161
submittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an e-mail notice
confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by toll-free
call at (866) 672–7640. The NRC MetaSystem Help Desk is available between
8 a.m. and 8 p.m., Eastern Time,
Monday through Friday, excluding
government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
E:\FR\FM\14DEN1.SGM
14DEN1
mstockstill on DSKH9S0YB1PROD with NOTICES
66162
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, or the presiding
officer. Participants are requested not to
include personal privacy information,
such as social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from
December 14, 2009. Non-timely filings
will not be entertained absent a
determination by the presiding officer
that the petition or request should be
granted or the contentions should be
admitted, based on a balancing of the
factors specified in 10 CFR
2.309(c)(1)(i)–(viii).
For further details with respect to this
license amendment application, see the
application for amendment dated June
24, 2009, which is available for public
inspection at the Commission’s PDR,
located at One White Flint North, File
Public Area O1 F21, 11555 Rockville
Pike (first floor), Rockville, Maryland.
Publicly available records will be
accessible from the ADAMS Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by e-mail
to pdr.resource@nrc.gov.
Attorney for Licensee: Mr. Bradley J.
Fewell, Associate General Counsel,
Exelon Generation Company, LLC, 4300
Winfield Road, Warrenville, IL 60555.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information (SUNSI) for
Contention Preparation
A. This Order contains instructions
regarding how potential parties to this
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The e-mail address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention;
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff either after
a determination on standing and need
for access, or after a determination on
trustworthiness and reliability, the NRC
staff shall immediately notify the
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E–Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
E:\FR\FM\14DEN1.SGM
14DEN1
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
H. Review of Grants of Access. A party
other than the requestor may challenge
an NRC staff determination granting
access to SUNSI whose release would
harm that party’s interest independent
of the proceeding. Such a challenge
must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
66163
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 9th day
of December 2009.
For the Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 .........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
Supporting the standing of a potential party identified by name and address; describing the need for the information in
order for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access
provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs
any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing
(preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information
to file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later
deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 .......................
60 .......................
20 .......................
25 .......................
30 .......................
40 .......................
A ........................
A + 3 ..................
A + 28 ................
A + 53 ................
A + 60 ................
>A + 60 ..............
[FR Doc. E9–29672 Filed 12–11–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
mstockstill on DSKH9S0YB1PROD with NOTICES
[NRC–2009–0556]
Draft Regulatory Guide: Issuance,
Availability
ACTION: Notice of Issuance and
Availability of Draft Regulatory Guide,
DG–8032.
FOR FURTHER INFORMATION CONTACT:
Mohammad S. Saba, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: (301) 251–
7558 or e-mail to
Mohammad.Saba@nrc.gov.
AGENCY: Nuclear Regulatory
Commission.
SUPPLEMENTARY INFORMATION:
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
I. Introduction
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a draft guide in the agency’s
‘‘Regulatory Guide’’ series. This series
was developed to describe and make
available to the public such information
as methods that are acceptable to the
NRC staff for implementing specific
parts of the NRC’s regulations,
techniques that the staff uses in
evaluating specific problems or
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\14DEN1.SGM
14DEN1
Agencies
[Federal Register Volume 74, Number 238 (Monday, December 14, 2009)]
[Notices]
[Pages 66159-66163]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-29672]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-461]
Exelon Generation Company, LLC; Notice of Consideration of
Issuance of Amendment to Facility Operating License, Proposed No
Significant Hazards Consideration Determination, and Opportunity for a
Hearing and Order Imposing Procedures for Access to Sensitive
Unclassified Non-Safeguards Information (SUNSI) for Contention
Preparation
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is
considering issuance of an amendment to Facility Operating License No.
NPF-62 issued to Exelon Generation Company, LLC (the licensee) for
operation of the Clinton Power Station, Unit No. 1 (CPS), located in
DeWitt County, Illinois.
The proposed amendment would modify License Condition 2.B.(6) and
create new License Conditions 1.J and 2.B(7) as part of a pilot program
to irradiate Cobalt (Co)-59 targets to produce Co-60, for the CPS. The
licensee also requests an amendment to Appendix A, Technical
Specifications (TS), of the CPS Facility Operating License, which would
modify TS 4.2.1, ``Fuel Assemblies,'' to describe the isotope test
assemblies being used. The amendment application dated June 26, 2009,
contains sensitive unclassified non-safeguards information (SUNSI). The
amendment application is supplemented by letters dated November 4, 2009
(ADAMS Package No. ML093100316), November 17, 2009 (ADAMS Accession No.
ML093210561), and November 20, 2009 (ADAMS Accession No. ML093280028).
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes to the license conditions provide
clarification and do not impact plant operation in any way. The
handling of byproduct material (i.e., Co-60) will continue to be
done in accordance with the requirements of 10 CFR 30 and the
requirements of the CPS Facility Operating License. The proposed
change to TS 4.2.1 also provides clarification and additional
description of the proposed ITAs to be used in the CPS core. These
changes provide clarification and do not involve an increase in the
probability or consequences of an accident previously evaluated.
The use of the GE14i ITAs, has been evaluated for impact on the
previously evaluated transients and design basis accidents for CPS.
GE-Hitachi report NEDC-33505P, ``Safety Analysis Report to Support
Introduction of GE14i Isotope Test Assemblies (ITAs) in Clinton
Power Station,'' dated June 2009, documents the results of the
analyses completed to demonstrate the impact on operation following
introduction of the ITAs in the CPS core. The use of these ITAs does
not adversely affect accident initiators or precursors nor alter the
design assumptions, conditions, and configuration or the manner in
which the plant is operated and maintained. The Cycle 13 (i.e., the
first cycle of operation with the GE14i assembly) core, and
subsequent cores, will be designed so that the ITAs will be placed
in non-limiting locations with respect to thermal limit margins and
shutdown margins. The ITAs do not adversely affect the ability of
any structures, systems or components (SSCs) to perform their
intended safety function to mitigate the consequences of an
initiating event within the assumed acceptance limits.
In addition to evaluation of the impact to operation with the
introduction of the GE14i assemblies, EGC has also evaluated the
effects of these assemblies on post-irradiation conditions. The
additional heat from the Co-60 decay is insignificant when compared
to the total heat from a normal refueling discharge. The small
amount of extra heat added by the cobalt isotope rods poses no
additional risk of spent fuel pool (SFP) local boiling over that was
previously analyzed. The maximum incident radiation due to an
irradiated GE14i bundle placed one foot from the spent fuel pool
walls is in excess of the radiation that would result in significant
gamma heating of the concrete. However, analysis has demonstrated
that at four feet, the energy deposition rate is well below that
required to cause significant concrete heating. CPS procedures exist
to guide placement of irradiated fuel bundles in the SFP to avoid
gamma heating of the wall concrete. These procedures will be
modified to specify that the irradiated GE14i bundles be stored at
least four feet from the pool walls. With the four foot distance
requirement in effect, there is no limitation on the amount of time
an irradiated GE14i bundle may remain in the pool.
Handling of the licensed transfer casks will be in accordance
with the guidance in NUREG 0612, ``Control of Heavy Loads at Nuclear
Power Plants,'' using the Fuel Building Crane. These precautions
will support safe movement of the casks within the Fuel Building.
The consequences of a previously analyzed event are dependent on
the initial conditions assumed in the analysis, the availability and
successful functioning of equipment assumed to operate in response
to the analyzed event, and the setpoints at which these actions are
initiated. The consequences of a previously evaluated accident are
not significantly increased by the proposed change. As documented in
NEDC-33505P, the proposed change does not affect the performance of
any equipment credited to mitigate the radiological consequences of
an accident. Evaluation of operation with the GE14i assemblies in
the CPS core, demonstrated that the licensing basis radiological
analyses are not impacted by the introduction of eight GE14i
assemblies at CPS. This includes the analyses done for transients
and design basis accident events.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed revision to the CPS license conditions and TS 4.2.1
will not introduce
[[Page 66160]]
any new or modified equipment since these changes are intended to
provide clarification only. These clarifications will not result in
operation of the facility in a different way than currently
operated.
While the proposed ITA program does result in the introduction
of several modified fuel assemblies (i.e., the GE14i assembly),
these assemblies are essentially the same as the GE14 assemblies
currently in use in the CPS core. The only difference being the use
of a number of isotope rods in place of fuel rods. The GE14i
assembly was designed for mechanical, nuclear, and thermal-hydraulic
compatibility with the GE14 fuel design. The details of the design
differences between the GE14 and GE14i are documented in NEDC-
33505P. Use of the proposed ITAs does not involve the addition or
modification of any plant equipment other than the assemblies
modified to include the cobalt target rods. Also, use of the
proposed ITAs will not alter the design configuration or method of
operation of plant equipment beyond its normal functional
capabilities. The ITA program does not create any new credible
failure mechanisms, malfunctions or accident initiators.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change to the CPS operating license conditions are
intended to provide clarification as to how the generation of
byproduct material in the CPS reactor core meets the requirements of
10 CFR Part 30. The proposed change to TS 4.2.1 also provides
clarification and additional description of the proposed ITAs to be
used in the CPS core. These proposed changes would not affect the
design or operation of any equipment important to safety. In
addition, since the proposed changes to the license conditions and
TS provide clarification only, these changes do not affect the
results of any safety calculations.
Cycle specific analyses will be performed for CPS Reload 12
Cycle 13 to establish fuel operating limits for the ITAs that assure
compliance with regulatory limits. Results of these analyses will be
documented in the CPS Reload 12 Cycle 13 Supplemental Reload
Licensing Report. Furthermore, licensing analyses will be performed
for the ITAs for each cycle of their operation, wherein the effect
of the ITAs is considered for each of the appropriate licensing
events and anticipated operational occurrences (AOOs) to establish
the appropriate reactor thermal limits for operation.
The proposed introduction of the ITAs has no impact on equipment
design or fundamental operation, other than the modifications made
to the fuel assembly as part of the program. There are no changes
being made to safety limits or safety system allowable values that
would adversely affect plant safety as a result of the proposed
ITAs. The performance of the systems important to safety is not
significantly affected by the use of the proposed ITAs. The margin
of safety can be affected by the thermal limits existing at the time
of the postulated accident; however, the ITA design has been
evaluated and demonstrated to have no significant effect on the
calculated thermal limits as described above. The proposed change
does not affect safety analysis assumptions or initial conditions
and therefore, the margin of safety in the original safety analyses
is maintained.
As documented above, the proposed change does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch, TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the Chief, Rulemaking and Directives Branch at 301-492-
3446. Documents may be examined, and/or copied for a fee, at the NRC's
Public Document Room (PDR), located at One White Flint North, Public
File Area O1 F21, 11555 Rockville Pike (first floor), Rockville,
Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Public File
Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In
[[Page 66161]]
addition, the petitioner/requestor shall provide a brief explanation of
the bases for the contention and a concise statement of the alleged
facts or expert opinion which support the contention and on which the
petitioner intends to rely in proving the contention at the hearing.
The petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone at (301) 415-1677, to request
(1) a digital ID certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through EIE, users will be required to install a Web
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser
plug-in, is available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by toll-free call at (866) 672-7640. The NRC
Meta-System Help Desk is available between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the
[[Page 66162]]
service. A presiding officer, having granted an exemption request from
using E-Filing, may require a participant or party to use E-Filing if
the presiding officer subsequently determines that the reason for
granting the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, or the presiding officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers in their
filings, unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants are requested not to
include copyrighted materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from December 14, 2009. Non-timely filings will not be entertained
absent a determination by the presiding officer that the petition or
request should be granted or the contentions should be admitted, based
on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-
(viii).
For further details with respect to this license amendment
application, see the application for amendment dated June 24, 2009,
which is available for public inspection at the Commission's PDR,
located at One White Flint North, File Public Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible from the ADAMS Public Electronic Reading
Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter
problems in accessing the documents located in ADAMS, should contact
the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-
4737, or by e-mail to pdr.resource@nrc.gov.
Attorney for Licensee: Mr. Bradley J. Fewell, Associate General
Counsel, Exelon Generation Company, LLC, 4300 Winfield Road,
Warrenville, IL 60555.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
[[Page 66163]]
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 9th day of December 2009.
For the Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in this Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0............................. Publication of Federal Register notice
of hearing and opportunity to petition
for leave to intervene, including order
with instructions for access requests.
10............................ Deadline for submitting requests for
access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) with
information: Supporting the standing of
a potential party identified by name
and address; describing the need for
the information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding.
60............................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does not
require access to SUNSI (+25 Answers to
petition for intervention; +7
petitioner/requestor reply).
20............................ Nuclear Regulatory Commission (NRC)
staff informs the requestor of the
staff's determination whether the
request for access provides a
reasonable basis to believe standing
can be established and shows need for
SUNSI. (NRC staff also informs any
party to the proceeding whose interest
independent of the proceeding would be
harmed by the release of the
information.) If NRC staff makes the
finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing (preparation
of redactions or review of redacted
documents).
25............................ If NRC staff finds no ``need'' or no
likelihood of standing, the deadline
for requestor/petitioner to file a
motion seeking a ruling to reverse the
NRC staff's denial of access; NRC staff
files copy of access determination with
the presiding officer (or Chief
Administrative Judge or other
designated officer, as appropriate). If
NRC staff finds ``need'' for SUNSI, the
deadline for any party to the
proceeding whose interest independent
of the proceeding would be harmed by
the release of the information to file
a motion seeking a ruling to reverse
the NRC staff's grant of access.
30............................ Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40............................ (Receipt +30) If NRC staff finds
standing and need for SUNSI, deadline
for NRC staff to complete information
processing and file motion for
Protective Order and draft Non-
Disclosure Affidavit. Deadline for
applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
A............................. If access granted: Issuance of presiding
officer or other designated officer
decision on motion for protective order
for access to sensitive information
(including schedule for providing
access and submission of contentions)
or decision reversing a final adverse
determination by the NRC staff.
A + 3......................... Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI consistent with decision
issuing the protective order.
A + 28........................ Deadline for submission of contentions
whose development depends upon access
to SUNSI. However, if more than 25 days
remain between the petitioner's receipt
of (or access to) the information and
the deadline for filing all other
contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
A + 53........................ (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI.
A + 60........................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60....................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. E9-29672 Filed 12-11-09; 8:45 am]