Evans Solutions, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 66124-66125 [E9-29621]
Download as PDF
66124
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–29662 Filed 12–11–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI10–3–000]
Evans Solutions, LLC; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and/or Motions
To Intervene
mstockstill on DSKH9S0YB1PROD with NOTICES
December 4, 2009.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI10–3–000.
c. Date Filed: November 24, 2009.
d. Applicant: Evans Solutions, LLC.
e. Name of Project: Lake Busbee
Hydroelectric Project.
f. Location: The proposed Lake
Busbee Hydroelectric Project will be
located on Lake Busbee, a man-made
lake that uses water from the
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
Waccamaw River, near the town of
Conway, Horry County, South Carolina.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: John A. Hodge,
Haynsworth, Sinker & Boyd, P.A. Law
Firm, P. O. Box 11889, Columbia, SC
29211–1889; telephone: (803) 779–3080;
e-mail: https://
www.jhodge@hsblawfirm.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: January 4,
2010.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
Please include the docket number
(DI10–3–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Lake Busbee Hydroelectric
Project will include: (1) A 10-foot-long
water intake, drawing 5,000 gallons of
water hourly from Lake Busbee into an
elevated water tower storing five
hundred thousand gallons of water; (2)
an elevated water tower serving as the
powerhouse, containing four 10megawatt turbines/generators; (3) a
water pipe tailrace, discharging water
into Lake Busbee; and (4) appurtenant
facilities. The proposed project will be
connected to an interstate grid.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
E:\FR\FM\14DEN1.SGM
14DEN1
Federal Register / Vol. 74, No. 238 / Monday, December 14, 2009 / Notices
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–29621 Filed 12–11–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI10–4–000]
Madison Farms; Notice of Declaration
of Intention and Soliciting Comments,
Protests, and/or Motions To Intervene
mstockstill on DSKH9S0YB1PROD with NOTICES
December 4, 2009.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI10–4–000.
c. Date Filed: December 1, 2009.
d. Applicant: Madison Farms.
e. Name of Project: Madison ASR
Hydroelectric Project.
f. Location: The proposed Madison
ASR Hydroelectric Project will be
located near the town of Echo, Umatilla
County, Oregon, affecting T. 3 N, R. 27
E, Williamette Meridian.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Kent Madison,
29299 Madison Road, Echo, OR 9826;
telephone: (541) 376–8107; Fax: (541)
376–8618; e-mail: https://
www.Kmadison@eoni.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: January 4,
2010.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
Please include the docket number
(DI10–4–000) on any comments,
protests, and/or motions filed.
VerDate Nov<24>2008
17:54 Dec 11, 2009
Jkt 220001
k. Description of Project: The
proposed Madison ASR Hydroelectric
Project contains an existing system
collecting ground water, approximately
20 feet below ground, which is piped
into a 4-foot-diameter, 25-foot-deep
shallow well. The water in the shallow
well is pumped into the irrigation
system, as needed. Excess water is
pumped through an 8-inch-diameter
pipe into a second deeper 750-foot-deep
basalt well, containing a 100horsepower line-shaft turbine pump. It
is expected that approximately 37 kW
will be created, to be sold on the
interstate grid.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
66125
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–29618 Filed 12–11–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF09–15–000]
Dominion Transmission, Inc.; Notice of
Intent To Prepare an Environmental
Assessment for the Planned
Appalachian Gateway Project and
Request for Comments on
Environmental Issues
December 4, 2009.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Appalachian Gateway Project
involving construction and operation of
facilities by Dominion Transmission,
Inc. (DTI) in northeastern West Virginia
(WV) and southwestern Pennsylvania
(PA). The EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
E:\FR\FM\14DEN1.SGM
14DEN1
Agencies
[Federal Register Volume 74, Number 238 (Monday, December 14, 2009)]
[Notices]
[Pages 66124-66125]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-29621]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI10-3-000]
Evans Solutions, LLC; Notice of Declaration of Intention and
Soliciting Comments, Protests, and/or Motions To Intervene
December 4, 2009.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI10-3-000.
c. Date Filed: November 24, 2009.
d. Applicant: Evans Solutions, LLC.
e. Name of Project: Lake Busbee Hydroelectric Project.
f. Location: The proposed Lake Busbee Hydroelectric Project will be
located on Lake Busbee, a man-made lake that uses water from the
Waccamaw River, near the town of Conway, Horry County, South Carolina.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: John A. Hodge, Haynsworth, Sinker & Boyd,
P.A. Law Firm, P. O. Box 11889, Columbia, SC 29211-1889; telephone:
(803) 779-3080; e-mail: http://www.jhodge@hsblawfirm.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or E-mail address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: January
4, 2010.
Comments, Motions to Intervene, and Protests may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and eight copies should be mailed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For more information on how to
submit these types of filings, please go to the Commission's Web site
located at https://www.ferc.gov/filing-comments.asp.
Please include the docket number (DI10-3-000) on any comments,
protests, and/or motions filed.
k. Description of Project: The proposed Lake Busbee Hydroelectric
Project will include: (1) A 10-foot-long water intake, drawing 5,000
gallons of water hourly from Lake Busbee into an elevated water tower
storing five hundred thousand gallons of water; (2) an elevated water
tower serving as the powerhouse, containing four 10-megawatt turbines/
generators; (3) a water pipe tailrace, discharging water into Lake
Busbee; and (4) appurtenant facilities. The proposed project will be
connected to an interstate grid.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the interests of interstate or foreign
commerce would be affected by the project. The Commission also
determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the Docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--All filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
Motion to Intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
[[Page 66125]]
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-29621 Filed 12-11-09; 8:45 am]
BILLING CODE 6717-01-P