Environmental Impacts Statements; Notice of Availability, 65773-65774 [E9-29562]
Download as PDF
jlentini on DSKJ8SOYB1PROD with NOTICES
Federal Register / Vol. 74, No. 237 / Friday, December 11, 2009 / Notices
Approximately 400 Acres, Currently
Operated by Los Angeles Harbor
Department (LAHD), Located along
the West Side of Los Angeles Harbor’s
Main Channel, from the Vincent
Thomas Bridge to Cabrillo Beach, US
Army Section 10 and 404 and Section
103 Marine Protection, Research, and
Sanctuaries Act Permits, (MPRSA)
City of Los Angeles, CA.
Summary: EPA continues to have
concerns about the unavoidable air
quality impacts to environmental justice
communities.
EIS No. 20090335, ERP No. F–AFS–
K65341–AZ, Black River Exchange
Project, Proposal to Exchange Federal
and Non-Federal Lands, ApacheSitgreaves National Forests, Apache
County, AZ.
Summary: EPA does not object to the
proposed project.
EIS No. 20090347, ERP No. F–AFS–
J65512–MT, Butte Lookout Project,
Proposed Timber Harvest, Prescribed
Burning, Road Work and Management
Activities, Missoula Ranger District,
Lola National Forest, Missoula
County, MT.
Summary: EPA continues to have
environmental concerns because
significant portions of the proposed
rehabilitative and restorative work are
not currently funded. EPA encouraged
timely funding of the remainder of the
proposed rehabilitative and restorative
work.
EIS No. 20090351, ERP No. F–AFS–
J65503–WY, Thunder Basin National
Grassland Prairie Dog Management
Strategy, Land and Resource
Management Plan Amendment #3,
Proposes to Implement a Site-Specific
Strategy to Manage Black Trailed
Prairie Dog, Douglas Ranger District,
Medicine Bow-Routt National Forests
and Thunder Basin National
Grassland, Campbell, Converse,
Niobrara and Weston Counties, WY.
Summary: EPA continues to have
environmental concerns About impacts
to black-footed ferret habitat.
EIS No. 20090354, ERP No. F–USN–
K11023–00, West Coast Basing of the
MV–22 Determining Basing
Location(s) and Providing Efficient
Training Operations, CA, AZ.
Summary: EPA expressed
environmental concerns about projectrelated noise impacts.
EIS No. 20090355, ERP No. F–AFS–
K65361–CA, Thom-Seider Vegetation
Management and Fuels Reduction
Project, To Respond to the Increasing
Density and Fuels Hazard Evident
along the Klamath River between
VerDate Nov<24>2008
17:33 Dec 10, 2009
Jkt 220001
Hamburg and Happy Camp, Klamath
National Forest, Siskiyou County, CA.
Summary: EPA does not object to the
proposed project.
EIS No. 20090357, ERP No. F–NPS–
H65028–MO, Jefferson National
Expansion Memorial, General
Management Plan, Implementation,
St. Louis, MO.
Summary: EPA does not object to the
proposed project.
EIS No. 20090359, ERP No. F–FHW–
H40194–MO, MO–63 Corridor
Improvement Project, To Correct
Roadway Deficiencies, Reduce
Congestion and Provide Continuity
along the MO–63 Corridor on the
Existing Roadway and on New
Location, Osage, Maries and Phelps
Counties, MO.
Summary: EPA continues to have
environmental concerns about stream
and wetland impacts, and requested
additional mitigation.
EIS No. 20090361, ERP No. F–NOA–
A91073–00, Programmatic—Toward
an Ecosystem Approach for the
Western Pacific Region: From
Species-Based Fishery Management
Plans to Place-Based Fishery
Ecosystem Plans, Bottomfish and
Seamount Groundfish, Coral Reef
Ecosystems, Crustaceans, Precious
Corals, Pelagics, Implementation,
American Samoa, Commonwealth of
the Northern Mariana Islands, Hawaii,
U.S. Pacific Remote Island Area.
Summary: No formal comment letter
sent to the preparing agency.
Dated: December 12, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–29561 Filed 12–10–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8986–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 11/30/2009 Through 12/04/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090413, Final EIS, USFS, NV,
Martin Basin Rangeland Project,
Reauthorizing Grazing on Eight
Existing Cattle and Horse Allotments:
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
65773
Bradshaw, Buffalo, Buttermilk,
Granite Peak, Indian, Martin Basin,
Rebel Creek, and West Side Flat
Creek, Santa Rosa Ranger District,
Humboldt-Toiyabe National Forest,
NV, Wait Period Ends: 01/11/2010,
Contact: Vernon Keller 775–355–
5056.
EIS No. 20090414, Draft EIS, USFS, UT,
Tropic to Hatch 138kV Transmission
Line Project, Proposing Construction
of a new 138 kV transmission Line
that would replace some or all the
existing 69 kV Transmission Line,
Applications for Special-Use Permits
and/or Right-of-Way Grants, Grand
Staircase-Escalante National
Monument Management Plan
Amendment, Garfield County, UT,
Comment Period Ends: 03/10/2010,
Contact: Susan Baughman 435–865–
3703.
EIS No. 20090415, Final EIS, FHWA, MI,
Detroit Intermodal Freight Terminal
(DIFT) Project, Proposes Improvement
to Intermodal Freight Terminals in
Wayne and Oakland Counties, MI,
Wait Period Ends: 01/11/2010,
Contact: David T. Williams 517–702–
1820.
EIS No. 20090416, Final EIS, USMC,
NC, U.S. Marine Corps Grow the
Force at MCB Camp Lejeune, MCAS
New River, and MCAS Cherry Point,
To Provide the Infrastructure to
Support the Permanent Increases at
these three Installation, US Army
Corps Section 404 and 10 Permits,
City of Jacksonville, NC, Wait Period
Ends: 01/11/2010, Contact: Michael
H. Jones 757–322–4942.
EIS No. 20090417, Final EIS, NOAA, 00,
Comprehensive Ecosystem-Base
Amendment 1 (CE–BA 1) for the
South Atlantic Region,
Implementation, Wait Period Ends:
01/11/2010, Contact: Roy E. Crabtree,
PhD 727–824–5305
EIS No. 20090418, Draft EIS, USACE,
NC, The Town of Nags Head Beach
Nourishment Project, Propose to
Utilize a Self-Contained Hooper
Dredge and Other Feasible Dredging
Equipment during a Proposed
Construction Window from April
through September, Dare County, NC,
Comment Period Ends: 01/25/2010,
Contact: Raleigh Bland 910–251–
4564.
EIS No. 20090419, Draft EIS, USACE,
MN, U.S. Steel Keetac Taconite Mine
Expansion Project, Propose to Restart
an Idled Production Line and Expand
Contiguous Sections of the Open Pit
Iron Ore Mine, located near Keewatin,
Itasca and St. Louis Counties, MN,
Comment Period Ends: 01/27/2010,
Contact: Ralph Augustin 651–290–
5378.
E:\FR\FM\11DEN1.SGM
11DEN1
jlentini on DSKJ8SOYB1PROD with NOTICES
65774
Federal Register / Vol. 74, No. 237 / Friday, December 11, 2009 / Notices
EIS No. 20090420, Final EIS, FHWA, IN,
I–69 Evansville to Indianapolis,
Indiana Project, Section 3,
Washington to Crane NSWC (US 50 to
US 231), Daviess, Greene, Knox and
Martin Counties, IN, Wait Period
Ends: 01/11/2010, Contact: Janice
Osadczuk 317–226–7486.
EIS No. 20090421, Draft Supplement,
NRC, WY, Moore Ranch In-Situ
Uranium Recovery (ISR) Project,
Proposal to Construct, Operate,
Conduct Aquifer Restoration, and
Decommission an In-Situ Recovery
(ISR) Facility, NUREG–1910,
Campbell County, WY, Comment
Period Ends: 02/01/2010, Contact:
Behram Shroff 301–415–0666.
EIS No. 20090422, Final EIS, BR, KS,
Equus Beds Aquifer Storage Recharge
and Recovery Project, To Provide
Municipal and Industrial (M&I) Water
to City and Surrounding Region,
Equus Beds Division, Wichita Project,
Kansas, Harvey, Sedgwick, and Reno
Counties, KS, Wait Period Ends: 01/
11/2010, Contact: Charles F. Webster
405–470–4831.
EIS No. 20090423, Second Draft
Supplement, NRC, WY, Nichols
Ranch In-Situ Uranium Recovery
(ISR) Project, Proposal to Construct,
Operate, Conduct Aquifer Restoration,
and Decommission and In-Situ
Recovery Uranium Milling Facility,
Campbell and Johnson Counties, WY,
Comment Period Ends: 02/01/2010,
Contact: Irene Yu 301–415–1951.
EIS No. 20090424, Draft EIS, USN, AK,
Gulf of Alaska Navy Training
Activities, Proposal to Support and
Conduct Current, Emering, and Future
Training Activities, Implementation,
Gulf of Alaska, AK, Comment Period
Ends: 01/25/2010, Contact: Amy Burt
360–396–9024.
EIS No. 20090425, Third Draft
Supplement, NRC, WY, Lost Creek InSitu Uranium Recovery (ISR) Project,
Proposal to Construct, Operate,
Conduit Aquifer Restoration, and
Decommission an In-Situ Recovery
(ISR) Uranium Milling Facility,
Sweetwater County, WY, Comment
Period Ends: 02/01/2010, Contact:
Alan B. Bjornsen 301–415–1195.
EIS No. 20090426, Draft EIS, FRA, VA,
Richmond and the Hampton Roads
Passenger Rail Project, Proposed
Higher Speed Intercity Passenger Rail,
VA, Comment Period Ends: 01/25/
2010, Contact: John Winkle 202–493–
6067.
EIS No. 20090427, Final EIS, NPS, MN,
Disposition of Bureau of Mines
Property, Twin Cities Research Center
Main Campus, Implementation,
Hennepin County, MN, Wait Period
VerDate Nov<24>2008
17:33 Dec 10, 2009
Jkt 220001
Ends: 01/11/2010, Contact: Steven P.
Johnson 651–290–3030 Ext. 223.
Amended Notices
EIS No. 20090312, Draft EIS, USACE,
OH, Cleveland Harbor Dredged
Material Management Plan,
Operations and Maintenance,
Cuyahoga County, OH, Comment
Period Ends: 02/01/2010, Contact:
Frank O’Connor 716–879–4131.
Revision to FR Notice Published 09/
11/2009: Extending Comment Period
from 12/07/2009 to 02/01/2010.
EIS No. 20090394, Draft EIS, USN, GU,
Guam and Commonwealth of the
Northern Mariana Islands (CNMI)
Military Relocation, Proposed
Relocating Marines from Okinawa,
Visiting Aircraft Carrier Berthing, and
Army Air and Missile Defense Task
Force, Implementation, GU, Comment
Period Ends: 02/17/2010, Contact:
Kyle Fujimoto 808–472–1442.
Revision to FR Notice Published 11/
20/2009: Disregard the FR Notice of
11/28/2009: Correction to Comment
Period from 01/04/2010 to 02/17/
2010.
Dated: 12/08/2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–29562 Filed 12–10–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
ADDRESSES: Copies of the General
Permit and the Response to Comments
may be requested from Audrey
Washington, EPA Region 10, 1200 Sixth
Avenue, Suite 900, OWW–130, Seattle,
WA 98101–3140, by phone at (206) 553–
0523, or by e-mail:
washington.audrey@epa.gov.
FOR FURTHER INFORMATION CONTACT:
Copies of the general permit and
response to comments are available on
the EPA Region 10 Web site at https://
yosemite.epa.gov/R10/WATER.NSF/
NPDES+Permits/
General+NPDES+Permits.
SUPPLEMENTARY INFORMATION
A. Endangered Species Act
Section 7 of the Endangered Species
Act requires EPA to consult with the
U.S. Fish and Wildlife Service and
National Marine Fisheries Service
regarding the potential effects that an
action may have on listed endangered or
threatened species or their critical
habitat. To address these ESA
requirements, and in support of EPA’s
informal consultation with the Services,
a Biological Evaluation (BE) was
prepared to analyze these potential
effects. The results of the BE concluded
that discharges from Offshore Seafood
Processing facilities will either have no
effect or are not likely to adversely affect
threatened or endangered species, their
critical habitat, or essential fish habitat
in the vicinity of the discharge. After
reviewing the BE and permit the
Services concurred with EPA’s findings.
[FRL–9090–1]
B. Executive Order 12866
Issuance of a Final NPDES General
Permit (GP) for Offshore Seafood
Processors Discharging in Federal
Waters Off the Alaska Shore (Permit
Number AKG–524–000)
The Office of Management and Budget
has exempted this action from the
review requirements of Executive Order
12866 pursuant to Section 6 of that
order.
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Issuance of Final NPDES
General Permit.
C. Paperwork Reduction Act
SUMMARY: On September 26, 2008, the
Director, Office of Water and
Watersheds, EPA Region 10, proposed
to issue a general permit to cover
offshore seafood processors discharging
seafood processing waste off the shore
of Alaska. During the 76-day comment
period, EPA received comments from 11
people and has prepared a Response to
Comments document to explain changes
made in the permit and reasons for not
making changes that were requested.
DATES: The permit will become effective
March 1, 2010 and will expire February
28, 2015. The permit issuance date is
December 28, 2009.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
The information collection
requirements of this permit were
previously approved by the Office of
Management and Budget (OMB) under
the provisions of the Paperwork
Reduction Act, 44 U.S.C. 3501 et seq.
and assigned OMB control numbers
2040–0086 (NPDES permit application)
and 2040–0004 (discharge monitoring
reports).
D. Unfunded Mandates Reform Act
Section 201 of the Unfunded
Mandates Reform Act (UMRA), Public
Law 104–4, generally requires federal
agencies to assess the effects of their
‘‘regulatory actions’’ (defined to be the
same as ‘‘rules’’ subject to the RFA) on
tribal, state, and local governments and
the private sector. However, general
E:\FR\FM\11DEN1.SGM
11DEN1
Agencies
[Federal Register Volume 74, Number 237 (Friday, December 11, 2009)]
[Notices]
[Pages 65773-65774]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-29562]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8986-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 11/30/2009 Through 12/04/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090413, Final EIS, USFS, NV, Martin Basin Rangeland Project,
Reauthorizing Grazing on Eight Existing Cattle and Horse Allotments:
Bradshaw, Buffalo, Buttermilk, Granite Peak, Indian, Martin Basin,
Rebel Creek, and West Side Flat Creek, Santa Rosa Ranger District,
Humboldt-Toiyabe National Forest, NV, Wait Period Ends: 01/11/2010,
Contact: Vernon Keller 775-355-5056.
EIS No. 20090414, Draft EIS, USFS, UT, Tropic to Hatch 138kV
Transmission Line Project, Proposing Construction of a new 138 kV
transmission Line that would replace some or all the existing 69 kV
Transmission Line, Applications for Special-Use Permits and/or Right-
of-Way Grants, Grand Staircase-Escalante National Monument Management
Plan Amendment, Garfield County, UT, Comment Period Ends: 03/10/2010,
Contact: Susan Baughman 435-865-3703.
EIS No. 20090415, Final EIS, FHWA, MI, Detroit Intermodal Freight
Terminal (DIFT) Project, Proposes Improvement to Intermodal Freight
Terminals in Wayne and Oakland Counties, MI, Wait Period Ends: 01/11/
2010, Contact: David T. Williams 517-702-1820.
EIS No. 20090416, Final EIS, USMC, NC, U.S. Marine Corps Grow the Force
at MCB Camp Lejeune, MCAS New River, and MCAS Cherry Point, To Provide
the Infrastructure to Support the Permanent Increases at these three
Installation, US Army Corps Section 404 and 10 Permits, City of
Jacksonville, NC, Wait Period Ends: 01/11/2010, Contact: Michael H.
Jones 757-322-4942.
EIS No. 20090417, Final EIS, NOAA, 00, Comprehensive Ecosystem-Base
Amendment 1 (CE-BA 1) for the South Atlantic Region, Implementation,
Wait Period Ends: 01/11/2010, Contact: Roy E. Crabtree, PhD 727-824-
5305
EIS No. 20090418, Draft EIS, USACE, NC, The Town of Nags Head Beach
Nourishment Project, Propose to Utilize a Self-Contained Hooper Dredge
and Other Feasible Dredging Equipment during a Proposed Construction
Window from April through September, Dare County, NC, Comment Period
Ends: 01/25/2010, Contact: Raleigh Bland 910-251-4564.
EIS No. 20090419, Draft EIS, USACE, MN, U.S. Steel Keetac Taconite Mine
Expansion Project, Propose to Restart an Idled Production Line and
Expand Contiguous Sections of the Open Pit Iron Ore Mine, located near
Keewatin, Itasca and St. Louis Counties, MN, Comment Period Ends: 01/
27/2010, Contact: Ralph Augustin 651-290-5378.
[[Page 65774]]
EIS No. 20090420, Final EIS, FHWA, IN, I-69 Evansville to Indianapolis,
Indiana Project, Section 3, Washington to Crane NSWC (US 50 to US 231),
Daviess, Greene, Knox and Martin Counties, IN, Wait Period Ends: 01/11/
2010, Contact: Janice Osadczuk 317-226-7486.
EIS No. 20090421, Draft Supplement, NRC, WY, Moore Ranch In-Situ
Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduct
Aquifer Restoration, and Decommission an In-Situ Recovery (ISR)
Facility, NUREG-1910, Campbell County, WY, Comment Period Ends: 02/01/
2010, Contact: Behram Shroff 301-415-0666.
EIS No. 20090422, Final EIS, BR, KS, Equus Beds Aquifer Storage
Recharge and Recovery Project, To Provide Municipal and Industrial
(M&I) Water to City and Surrounding Region, Equus Beds Division,
Wichita Project, Kansas, Harvey, Sedgwick, and Reno Counties, KS, Wait
Period Ends: 01/11/2010, Contact: Charles F. Webster 405-470-4831.
EIS No. 20090423, Second Draft Supplement, NRC, WY, Nichols Ranch In-
Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate,
Conduct Aquifer Restoration, and Decommission and In-Situ Recovery
Uranium Milling Facility, Campbell and Johnson Counties, WY, Comment
Period Ends: 02/01/2010, Contact: Irene Yu 301-415-1951.
EIS No. 20090424, Draft EIS, USN, AK, Gulf of Alaska Navy Training
Activities, Proposal to Support and Conduct Current, Emering, and
Future Training Activities, Implementation, Gulf of Alaska, AK, Comment
Period Ends: 01/25/2010, Contact: Amy Burt 360-396-9024.
EIS No. 20090425, Third Draft Supplement, NRC, WY, Lost Creek In-Situ
Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduit
Aquifer Restoration, and Decommission an In-Situ Recovery (ISR) Uranium
Milling Facility, Sweetwater County, WY, Comment Period Ends: 02/01/
2010, Contact: Alan B. Bjornsen 301-415-1195.
EIS No. 20090426, Draft EIS, FRA, VA, Richmond and the Hampton Roads
Passenger Rail Project, Proposed Higher Speed Intercity Passenger Rail,
VA, Comment Period Ends: 01/25/2010, Contact: John Winkle 202-493-6067.
EIS No. 20090427, Final EIS, NPS, MN, Disposition of Bureau of Mines
Property, Twin Cities Research Center Main Campus, Implementation,
Hennepin County, MN, Wait Period Ends: 01/11/2010, Contact: Steven P.
Johnson 651-290-3030 Ext. 223.
Amended Notices
EIS No. 20090312, Draft EIS, USACE, OH, Cleveland Harbor Dredged
Material Management Plan, Operations and Maintenance, Cuyahoga County,
OH, Comment Period Ends: 02/01/2010, Contact: Frank O'Connor 716-879-
4131. Revision to FR Notice Published 09/11/2009: Extending Comment
Period from 12/07/2009 to 02/01/2010.
EIS No. 20090394, Draft EIS, USN, GU, Guam and Commonwealth of the
Northern Mariana Islands (CNMI) Military Relocation, Proposed
Relocating Marines from Okinawa, Visiting Aircraft Carrier Berthing,
and Army Air and Missile Defense Task Force, Implementation, GU,
Comment Period Ends: 02/17/2010, Contact: Kyle Fujimoto 808-472-1442.
Revision to FR Notice Published 11/20/2009: Disregard the FR Notice of
11/28/2009: Correction to Comment Period from 01/04/2010 to 02/17/2010.
Dated: 12/08/2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-29562 Filed 12-10-09; 8:45 am]