Environmental Impacts Statements; Notice of Availability, 63751-63752 [E9-28966]
Download as PDF
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
Estimated Total Annual Cost:
$36,952, includes $0 annualized capital
or O&M costs.
Changes in the Estimates: There is a
decrease of 140 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. This decrease is an adjustment
due to the decrease in the number of
applications the Agency expects to
receive in the next 3 years. EPA expects
to receive a projected 584 fewer annual
responses, based on a year-over-year
decrease in the number of responses
received in the 2006–2008 fiscal years.
The Agency estimates that it will
receive an average of 1,895
supplemental registrations annually for
the next three years.
Dated: November 23, 2009.
John Moses, Director,
Collection Strategies Division.
[FR Doc. E9–28973 Filed 12–3–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8986–3]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
mstockstill on DSKH9S0YB1PROD with NOTICES
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146 or https://www.epa.gov/
compliance/nepa/.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009 (74 FR 34754).
Draft EISs
EIS No. 20080434, ERP No. D–FTA–
G53011–TX, Southwest-to-Northeast
Rail Corridor Project, Transportation
Improvements in the Cities of Fort
Worth, Haltom City, North Richland
Hills, Colleyville, and Grapevine,
Funding and U.S. Army COE Section
404 Permit, Tarrant County, TX.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090249, ERP No. D–NOA–
E91028–00, Amendment 3 to the 2006
Consolidated Atlantic Highly
Migratory Species (HMS), Fishery
Management Plan, To Implement
Management Measures that Prevent
Overfishing and Rebuild Overfished
Stocks, Implementation.
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090270, ERP No. D–NRC–
A09837–00, GENERIC—License
Renewal of Nuclear Plants (NUREG–
1437), Volumes 1 and 2, Revision 1,
To Improve the Efficiency of the
License Renewal Process,
Implementation.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090285, ERP No. D–NPS–
K70010–CA, Warner Valley
Comprehensive Site Plan, Addressing
Natural and Cultural Resource
Conflicts, Parking and Circulation
Improvements in Warner Valley,
Implementation, Lassen Volcanic
National Park, Plumas County, CA.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090323, ERP No. D–FHW–
K40190–NV, I–15 Corridor
Improvement and Local Arterial
Improvements Project, Collectively
Known as Project NEON, To Improve
the Safety and Travel Efficiency in the
I–15 Corridor, City of Las Vegas, Clark
County, NV.
Summary: EPA expressed
environmental concerns about
environmental justice impacts related to
relocation, air quality, and noise issues.
Rating EC2.
EIS No. 20090325, ERP No. D–NHT–
A86245–00, Corporate Average Fuel
Economy (CAFE) Standards Passenger
Car and Light Trucks Model Years
2012–2016, To Reduce National
Energy Consumption by Increasing
the Fuel Economy of Passenger Car
and Light Trucks sold in the United
States, Implementation.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090346, ERP No. D–TVA–
E65085–00, Northeastern Tributary
Reservoirs Land Management Plan,
Implementation, Beaver Creek, Clear
Creek, Boone, Fort Patrick Henry,
South Holston, Watauga, and Wilbur
Reservoirs, Carter, Johnson, Sullivan,
and Washington Counties, TN and
Washington County, VA.
Summary: EPA expressed
environmental concerns about direct
and indirect watershed impacts. Rating
EC2.
Final EISs
EIS No. 20090353, ERP No. F–AFS–
F65076–WI, Northwest Sands
Restoration Project, Restoring the Pine
Barren Ecosystem, Implementation,
Washburn District Ranger,
Chequamegon-Nicolet National
Forest, Bayfield County, WI.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
63751
Summary: EPA’s previous request for
clarification about open barrens was
addressed; therefore, EPA does not
object to the proposed action.
EIS No. 20090356, ERP No. F–AFS–
F65075–MN, Border Project,
Proposing Forest Vegetation
Management and Related
Transportation System Activities,
LaCroix Ranger District, Superior
National Forest, St. Louis County,
MN.
Summary: EPA does not object to the
proposed project.
EIS No. 20090364, ERP No. F–NPS–
J65519–SD, Wind Cave National Park
Project, Elk General Management
Plan, Implementation, Custer County,
SD.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: December 1, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–28965 Filed 12–3–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8986–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 11/23/2009 Through 11/27/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090406, Final EIS, USFS, CA,
Modoc National Forest Motorized
Travel Management Plan,
Implementation, National Forest
Transportation System (NFTS),
Modoc, Lassen and Siskiyou
Counties, CA, Wait Period Ends:
01/04/2010, Contact: Kathleen
Borovac 530–233–8754.
EIS No. 20090407, Draft EIS, NOAA, 00,
Rationalization of the Pacific Coast
Groundfish Limited Entry Trawl
Fishery, Amendment 20,
Implementation, WA, OR and CA,
Comment Period Ends: 01/19/2010,
Contact: Barry A. Thom 206–526–
6150.
EIS No. 20090408, Draft EIS, USFS, CO,
Rio de los Pinos Vegetation
Management Project, Proposes to
Salvage Engelmann Spruce Trees that
have been killed by, or are Infested
with, Spruce Beetle, Conejos Peak
E:\FR\FM\04DEN1.SGM
04DEN1
63752
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
Ranger District, Rio Grande National
Forest, Conejos, Rio Grande and
Archuleta Counties, CO, Comment
Period Ends: 01/19/2010, Contact:
Jack Lewis 719–274–8971.
EIS No. 20090409, Final EIS, FHWA,
CA, Partially Revised Tier 1—Placer
Parkway Corridor Preservation
Project, Select and Preserve a Corridor
for the Future Construction from CA–
70/99 to CA 65, Placer and Sutter
Counties, CA, Wait Period Ends:
01/04/2010, Contact: Gary Sweeten
916–498–5128.
EIS No. 20090410, Draft Supplemental
EIS, BR, CA, Mormon Island Auxiliary
Dam Modification Project, Addressing
Hydrologic, Seismic, Static, and Flood
Management Issues, Sacramento and
El Dorado Counties, CA, Comment
Period Ends: 01/19/2010, Contact:
Matthew See 916–989–7198.
EIS No. 20090411, Draft EIS, BLM, CA,
Clear Creek Management Area
Resource Management Plan (RMP),
Implementation, Portion of San
Benito County and Fresno County,
CA, Comment Period Ends: 03/03/
2010, Contact: Sandra McGinnis 916–
985–4474.
EIS No. 20090412, Final EIS, USFS, CA,
Stanislaus National Forest Motorized
Travel Management (17305) Plan,
Implementation, Stanislaus National
Forest, CA, Wait Period Ends: 01/19/
2010, Contact: Sue Warren 209–532–
3671 Ext. 321.
Amended Notices
EIS No. 20090343, Draft EIS, USFS, OR,
Deschutes and Ochoco National
Forest and the Crooked River National
Grassland Travel Management Project,
Implementation, Deschutes, Jefferson,
Crook, Klamath, Lake, Grant and
Wheeler County, OR, Comment
Period Ends: 12/08/2009, Contact:
Mollie Chaudet 541–383–5517.
mstockstill on DSKH9S0YB1PROD with NOTICES
Revision of FR Notice Published 10/
09/2009: Extending Comment Period
from 11/23/2009 to 12/08/2009.
Dated: December 1, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. E9–28966 Filed 12–3–09; 8:45 am]
BILLING CODE 6560–50–P
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
ENVIRONMENTAL PROTECTON
AGENCY
[EPA–HQ–OW–2009–0761; FRL–9088–1]
Executive Order 13508 Chesapeake
Bay Protection and Restoration
Section 202 Federal Agency Reports
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice and Request for Public
Comments.
SUMMARY: This notice announces the
availability of seven final reports by
federal agencies for restoration and
protection of the Chesapeake Bay and
requests public comment. The reports
were prepared pursuant to Executive
Order (E.O.) 13508 of May 12, 2009,
Chesapeake Bay Protection and
Restoration. This E.O. requires that a
draft strategy be published for public
review and comments together with the
final reports prepared by the federal
agencies. The draft strategy was made
available on November 9, 2008 for
comment.
DATES: Comments on the seven Section
202 reports must be submitted on or
before January 8, 2010.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OW–2009–0761, by one of the following
methods:
• https://www.regulations.gov: After
entering the docket for this action, click
on one of the seven agency reports, for
which you want to make comment.
Once you arrive at the page for the
specific report on which you wish to
comment, click the ‘‘Submit a
Comment’’ button at the top right of the
web page, then follow the on-line
instructions.
• Mail: Water Docket, Environmental
Protection Agency, Mailcode: 2822T,
1200 Pennsylvania Ave, NW.,
Washington, DC 20460.
• Hand Delivery: EPA Docket Center
Public Reading Room, EPA
Headquarters West, Room 3340, 1301
Constitution Avenue, NW., Washington,
DC. Such deliveries are only accepted
during the Docket’s normal hours of
operation (8:30 a.m. to 4:30 p.m.), and
special arrangements should be made
for deliveries of boxed information by
contacting the Docket Center at 202–
566–1744.
Instructions: Direct your comments to
Docket ID No. EPA–HQ–OW–2009–
0761. This Notice is not open for public
comment, but, the Section 202 reports
are available for comment on https://
www.regulations.gov. The Section 203
draft strategy was made available in the
Federal Register on November 9, 2009
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
and is also available in the docket for
comment. Additional information about
the docket is contained below.
FOR FURTHER INFORMATION CONTACT:
Marguerite Duffy, USEPA, Region 3,
Chesapeake Bay Program Office,
Annapolis City Marina, 410 Severn
Avenue, Suite 109 (3CB10), Annapolis,
MD 21403; telephone number: (410)
267–5764; fax number (410) 267–5777;
email: duffy.marguerite@epa.gov.
SUPPLEMENTARY INFORMATION:
Why Were These Documents Prepared?
Executive Order 13508, Chesapeake
Bay Protection and Restoration, dated
May 12, 2009 (74 FR 23099, May 15,
2009), requires a Federal Leadership
Committee composed of seven federal
agencies to prepare and publish a set of
reports and a draft strategy for public
review and comment within 180 days of
the date of the order. The deadline for
publication of the draft strategy was
November 9, 2009 and accordingly is
published in the Federal Register for a
60 day comment period. The federal
agency draft reports required by E.O.
13508 Sections 202(a) through (g) were
submitted to the Federal Leadership
Committee for the Chesapeake Bay on
September 9, 2009 and released to the
public on September 10, 2009. The
September 9, 2009, draft reports were
reviewed by the Federal Leadership
Committee for the Chesapeake Bay, in
consultation with relevant state
agencies. The revised Section 202
reports reflect consideration of the
comments received during state
consultation and preliminary public
input. During the next six months,
review and incorporation of comments
will continue as appropriate.
How Can I Access the Docket and/or
Submit Comments?
Docket: EPA has established a public
docket for this Notice under Docket ID
No. EPA–HQ–OW–2009–0761. The E.O.
13508 Section 202 reports are available
in the docket at
https://www.regulations.gov, as well as at
https://
executiveorder.chesapeakebay.net.
Assistance and tips for accessing the
docket can be found at https://
executiveorder.chesapeakebay.net. The
seven Section 202 reports are included
as separate documents within docket
number EPA–HQ–OW–2009–0761.
Comments via email are not being
accepted. Instead, comments will be
accepted through https://
www.regulations.gov and by mail. If you
are commenting on the Section 202
reports, note that there are seven
Section 202 reports within the docket
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 74, Number 232 (Friday, December 4, 2009)]
[Notices]
[Pages 63751-63752]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28966]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8986-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 11/23/2009 Through 11/27/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090406, Final EIS, USFS, CA, Modoc National Forest Motorized
Travel Management Plan, Implementation, National Forest Transportation
System (NFTS), Modoc, Lassen and Siskiyou Counties, CA, Wait Period
Ends: 01/04/2010, Contact: Kathleen Borovac 530-233-8754.
EIS No. 20090407, Draft EIS, NOAA, 00, Rationalization of the Pacific
Coast Groundfish Limited Entry Trawl Fishery, Amendment 20,
Implementation, WA, OR and CA, Comment Period Ends: 01/19/2010,
Contact: Barry A. Thom 206-526-6150.
EIS No. 20090408, Draft EIS, USFS, CO, Rio de los Pinos Vegetation
Management Project, Proposes to Salvage Engelmann Spruce Trees that
have been killed by, or are Infested with, Spruce Beetle, Conejos Peak
[[Page 63752]]
Ranger District, Rio Grande National Forest, Conejos, Rio Grande and
Archuleta Counties, CO, Comment Period Ends: 01/19/2010, Contact: Jack
Lewis 719-274-8971.
EIS No. 20090409, Final EIS, FHWA, CA, Partially Revised Tier 1--Placer
Parkway Corridor Preservation Project, Select and Preserve a Corridor
for the Future Construction from CA-70/99 to CA 65, Placer and Sutter
Counties, CA, Wait Period Ends: 01/04/2010, Contact: Gary Sweeten 916-
498-5128.
EIS No. 20090410, Draft Supplemental EIS, BR, CA, Mormon Island
Auxiliary Dam Modification Project, Addressing Hydrologic, Seismic,
Static, and Flood Management Issues, Sacramento and El Dorado Counties,
CA, Comment Period Ends: 01/19/2010, Contact: Matthew See 916-989-7198.
EIS No. 20090411, Draft EIS, BLM, CA, Clear Creek Management Area
Resource Management Plan (RMP), Implementation, Portion of San Benito
County and Fresno County, CA, Comment Period Ends: 03/03/2010, Contact:
Sandra McGinnis 916-985-4474.
EIS No. 20090412, Final EIS, USFS, CA, Stanislaus National Forest
Motorized Travel Management (17305) Plan, Implementation, Stanislaus
National Forest, CA, Wait Period Ends: 01/19/2010, Contact: Sue Warren
209-532-3671 Ext. 321.
Amended Notices
EIS No. 20090343, Draft EIS, USFS, OR, Deschutes and Ochoco National
Forest and the Crooked River National Grassland Travel Management
Project, Implementation, Deschutes, Jefferson, Crook, Klamath, Lake,
Grant and Wheeler County, OR, Comment Period Ends: 12/08/2009, Contact:
Mollie Chaudet 541-383-5517.
Revision of FR Notice Published 10/09/2009: Extending Comment
Period from 11/23/2009 to 12/08/2009.
Dated: December 1, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. E9-28966 Filed 12-3-09; 8:45 am]
BILLING CODE 6560-50-P