Independent Energy Producers Association v. California Independent System Operator Corporation; Notice of Compliance Filing, 63746-63747 [E9-28917]
Download as PDF
63746
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–28920 Filed 12–3–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2211–004]
Duke Energy Indiana, Inc.; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
mstockstill on DSKH9S0YB1PROD with NOTICES
November 25, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2211–004.
c. Date filed: April 24, 2009.
d. Applicant: Duke Energy Indiana,
Inc.
e. Name of Project: Markland
Hydroelectric Project.
f. Location: On the Ohio River in
Switzerland County, Indiana, near the
towns of Florence and Vevay, Indiana,
and Warsaw, Kentucky. The project
affects about 6.21 acres of federal lands
administered by the U.S. Army Corps of
Engineers.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Tamara Styer,
Duke Energy, Mail Code: EC12Y, P.O.
Box 1006, Charlotte, NC 28201–1006,
(704) 382–0293 or tami.styer@dukeenergy.com.
i. FERC Contact: Dianne Rodman,
(202) 502–6077 or
dianne.rodman@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Markland
Hydroelectric Project consists of a
powerhouse integrated into the north
end of the U.S. Army Corps of
Engineers’ (Corps) Markland dam,
which was constructed by the Corps
between 1959 and 1964. The project has
a total installed capacity of 64.8
megawatts (MW) and produces an
average annual generation of 350,454
megawatt-hours. All generated power is
utilized within the applicant’s electric
utility system. The project operates in
run-of-river mode, has no storage, and
only uses flows released by the Corps.
The project consists of the following
facilities: (1) A 96-foot-high, 248-footwide intake structure, with steel
trashrack panels installed along the east
side, directing flows to the connected
powerhouse; (2) a powerhouse, integral
to the Corps’ Markland dam, containing
three vertical shaft Kaplan turbine/
generator units with a total installed
capacity of 64.8 MW; (3) a tailrace
discharging flows immediately
downstream of the dam; (4) a substation
about 250 feet north of the powerhouse;
(5) an approximately 750-foot-long
existing access road; (6) a 9.37-milelong, 138-kilovolt transmission line in a
100-foot-wide right-of-way extending to
Fairview, Indiana; and (7) appurtenant
facilities. The applicant is proposing to
add a new, approximately 300-foot-long
access road, leading to a new parking
area for recreation use at the tailrace of
the dam.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–28922 Filed 12–3–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL05–146–013]
Independent Energy Producers
Association v. California Independent
System Operator Corporation; Notice
of Compliance Filing
November 25, 2009.
Take notice that on November 23,
2009, Williams Gas Marketing, Inc.
(Williams) filed a compliance refund
report and interest calculation reflecting
E:\FR\FM\04DEN1.SGM
04DEN1
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
the amount refunded, with interest, by
Williams to the California Independent
System Operator Corporation for June 1,
2006 to February 13, 2007 refund
period, pursuant to the Commission’s
order issued on August 18, 2009, 128
FERC ¶ 61,165 (2009) (Order on
Remand).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 14, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–28917 Filed 12–3–09; 8:45 am]
mstockstill on DSKH9S0YB1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 1864–003]
[ Project No. 2351–015]
Public Service Company of Colorado;
Notice of Availability of Final
Environmental Assessment
Upper Peninsula Power Company;
Notice of Intent To Prepare an
Environmental Document and
Soliciting Comments
November 25, 2009.
November 25, 2009.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s regulations,
18 CFR Part 380 (Order No. 486, 52 FR
47879), the Commission has reviewed a
request to conduct emergency repairs to
project facilities under Part 12 of the
Federal Power Act at the Cabin Creek
Pumped Storage Project, FERC Project
No. 2351. The licensee seeks
Commission approval to conduct
emergency repairs to roadways within
the project boundary. The
Environmental Assessment (EA)
analyzes the environmental impacts of
the proposed roadway repairs and
concludes that approval of the request,
with appropriate environmental
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment. The
project is located on Cabin Creek and
South Clear Creek in Clear Creek
County, Colorado.
The EA was written by staff in the
Office of Energy Projects, Federal
Energy Regulatory Commission
(Commission). A copy of the EA is on
file with the Commission and is
available for public inspections. The EA
may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–28914 Filed 12–3–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
63747
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Take notice that the following
material addressing required dam safety
measures has been filed with the
Commission and is available for public
inspection:
a. Filing: Environmental report to
support replacement of the spillway at
the Bond Falls Development which is
being required under Part 12 of the
Commission’s regulations.
b. Project No: 1864–003.
c. Date Filed: August 21, 2009, and
supplemented on November 17, 2009.
d. Licensee: Upper Peninsula Power
Company.
e. Name of Project: Bond Falls
Hydroelectric Project.
f. Location: The Bond Falls
Hydroelectric Project is located on the
Ontonagon River in Ontonagon and
Gogebic Counties, Michigan, and Vilas
county, Wisconsin, partially on lands
within the Ottawa National Forest. The
Bond Falls Development is located on
the Middle Branch of the Ontonagon
River in Ontonagon County, Michigan,
and occupies 73.5 acres of land within
the Ottawa National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Rick Moser,
Upper Peninsula Power Company, 700
North Adams Street, P.O. Box 19001,
Green Bay, WI 54307–9001, (920) 433–
2290.
i. FERC Contact: Rachel Price, (202)
502–8907, and e-mail:
rachel.price@ferc.gov.
j. Deadline for filing comments:
December 28, 2009.
All documents should be filed with:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Comments may be filed electronically
via the Internet, see 18 CFR 385.2001
(a)(1)(iii) and the instructions on the
Commission’s Web site under the ‘‘efiling’’ link. The Commission strongly
encourages electronic filings. In lieu of
electronic filing, an original and eight
copies of all documents may be mailed
to the Secretary at the address above.
k. Description of material: Upper
Peninsula Power Company has filed an
Environmental Report in support of its
plan to replace the spillway at the Bond
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 74, Number 232 (Friday, December 4, 2009)]
[Notices]
[Pages 63746-63747]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28917]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL05-146-013]
Independent Energy Producers Association v. California
Independent System Operator Corporation; Notice of Compliance Filing
November 25, 2009.
Take notice that on November 23, 2009, Williams Gas Marketing, Inc.
(Williams) filed a compliance refund report and interest calculation
reflecting
[[Page 63747]]
the amount refunded, with interest, by Williams to the California
Independent System Operator Corporation for June 1, 2006 to February
13, 2007 refund period, pursuant to the Commission's order issued on
August 18, 2009, 128 FERC ] 61,165 (2009) (Order on Remand).
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on December 14, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-28917 Filed 12-3-09; 8:45 am]