Download as PDF Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices the amount refunded, with interest, by Williams to the California Independent System Operator Corporation for June 1, 2006 to February 13, 2007 refund period, pursuant to the Commission’s order issued on August 18, 2009, 128 FERC ¶ 61,165 (2009) (Order on Remand). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on December 14, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–28917 Filed 12–3–09; 8:45 am] mstockstill on DSKH9S0YB1PROD with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 1864–003] [ Project No. 2351–015] Public Service Company of Colorado; Notice of Availability of Final Environmental Assessment Upper Peninsula Power Company; Notice of Intent To Prepare an Environmental Document and Soliciting Comments November 25, 2009. November 25, 2009. In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47879), the Commission has reviewed a request to conduct emergency repairs to project facilities under Part 12 of the Federal Power Act at the Cabin Creek Pumped Storage Project, FERC Project No. 2351. The licensee seeks Commission approval to conduct emergency repairs to roadways within the project boundary. The Environmental Assessment (EA) analyzes the environmental impacts of the proposed roadway repairs and concludes that approval of the request, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. The project is located on Cabin Creek and South Clear Creek in Clear Creek County, Colorado. The EA was written by staff in the Office of Energy Projects, Federal Energy Regulatory Commission (Commission). A copy of the EA is on file with the Commission and is available for public inspections. The EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY, (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–28914 Filed 12–3–09; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 17:26 Dec 03, 2009 Jkt 220001 63747 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Take notice that the following material addressing required dam safety measures has been filed with the Commission and is available for public inspection: a. Filing: Environmental report to support replacement of the spillway at the Bond Falls Development which is being required under Part 12 of the Commission’s regulations. b. Project No: 1864–003. c. Date Filed: August 21, 2009, and supplemented on November 17, 2009. d. Licensee: Upper Peninsula Power Company. e. Name of Project: Bond Falls Hydroelectric Project. f. Location: The Bond Falls Hydroelectric Project is located on the Ontonagon River in Ontonagon and Gogebic Counties, Michigan, and Vilas county, Wisconsin, partially on lands within the Ottawa National Forest. The Bond Falls Development is located on the Middle Branch of the Ontonagon River in Ontonagon County, Michigan, and occupies 73.5 acres of land within the Ottawa National Forest. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contact: Rick Moser, Upper Peninsula Power Company, 700 North Adams Street, P.O. Box 19001, Green Bay, WI 54307–9001, (920) 433– 2290. i. FERC Contact: Rachel Price, (202) 502–8907, and e-mail: rachel.price@ferc.gov. j. Deadline for filing comments: December 28, 2009. All documents should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments may be filed electronically via the Internet, see 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘efiling’’ link. The Commission strongly encourages electronic filings. In lieu of electronic filing, an original and eight copies of all documents may be mailed to the Secretary at the address above. k. Description of material: Upper Peninsula Power Company has filed an Environmental Report in support of its plan to replace the spillway at the Bond E:\FR\FM\04DEN1.SGM 04DEN1

Agencies

[Federal Register Volume 74, Number 232 (Friday, December 4, 2009)]
[Notices]
[Page 63747]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28914]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Project No. 2351-015]


Public Service Company of Colorado; Notice of Availability of 
Final Environmental Assessment

November 25, 2009.
    In accordance with the National Environmental Policy Act of 1969, 
as amended, and the Federal Energy Regulatory Commission's regulations, 
18 CFR Part 380 (Order No. 486, 52 FR 47879), the Commission has 
reviewed a request to conduct emergency repairs to project facilities 
under Part 12 of the Federal Power Act at the Cabin Creek Pumped 
Storage Project, FERC Project No. 2351. The licensee seeks Commission 
approval to conduct emergency repairs to roadways within the project 
boundary. The Environmental Assessment (EA) analyzes the environmental 
impacts of the proposed roadway repairs and concludes that approval of 
the request, with appropriate environmental measures, would not 
constitute a major federal action significantly affecting the quality 
of the human environment. The project is located on Cabin Creek and 
South Clear Creek in Clear Creek County, Colorado.
    The EA was written by staff in the Office of Energy Projects, 
Federal Energy Regulatory Commission (Commission). A copy of the EA is 
on file with the Commission and is available for public inspections. 
The EA may also be viewed on the Commission's Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3372, or for TTY, 
(202) 502-8659.

Kimberly D. Bose,
Secretary.