Lockhart Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 63146 [E9-28793]
Download as PDF
63146
Federal Register / Vol. 74, No. 230 / Wednesday, December 2, 2009 / Notices
mstockstill on DSKH9S0YB1PROD with NOTICES
However, assessment practices that a
transmitting utility uses in applying these
criteria are as important as the criteria
themselves. These practices, developed
through experience and study, include
consideration of detailed factors that a
transmitting utility may not list in the criteria
that it submits under Part 4. For example, a
utility might have certain operating
restrictions and limitations that must be met
by appropriate modeling within a simulation
study.
Also, through experience and study, each
transmitting utility may have developed a list
of various contingencies it typically tests
against in the application of its transmission
planning reliability criteria. For example,
before testing for the limits of transmission
capability that could be used for firm power
transfers on its system, a transmitting utility
will assume, based on experience or realistic
expectation, that certain facilities will be
unavailable for some period of time. Each
transmitting utility must identify these
contingencies and submit them under this
Part.
A description of the Respondent’s practices
when applying the transmission planning
reliability criteria submitted in Part 4 must be
submitted under this part. The description
must include the substantive planning
assessment practices that a Respondent
follows in the normal course of business. The
information filed should help requesters to
perform planning or screening studies and to
better understand the process of determining
available transmission capacity and known
constraints.
In subsequent years, Respondents need
only identify and file changed assessment
practices. If the practices are unchanged from
a previous filing, please provide the date of
that filing. If this date is prior to the 2010
filing deadline, Respondents need only state
that the previous filing was ‘‘prior to the
2010 filing.’’
F. Part 6: Evaluation of Transmission System
Performance
The transmitting utility must provide a
narrative evaluation or assessment of the
performance of its transmission system in
future time periods based on the application
of its reliability criteria. It must provide a
clear understanding of existing and likely
future transmission constraints, their sources,
how it identified these constraints, and a
description of any plans to mitigate the
constraints. The evaluation must provide a
clear understanding of the existing and
expected system performance of the
Respondent’s transmission system. The
evaluation should include a description of all
existing transmission stability limits that the
transmitting utility has uncovered through
dynamic system simulation studies. If, in
their studies, Respondents identify stability
as a regional transmission limiting factor,
Respondents must, on request, provide the
results of their studies.
The required evaluation is to be drawn
from existing utility transmission planning
studies and the experience and judgment of
the Respondents’ transmission system
planners. Respondents may base the required
evaluation, in part, on recently performed
VerDate Nov<24>2008
18:28 Dec 01, 2009
Jkt 220001
operating studies that determine transfer
capabilities for the upcoming peak load
season.
[FR Doc. E9–28791 Filed 12–1–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ P–13590–000]
Lockhart Power Company; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
November 23, 2009.
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13590–000.
c. Date Filed: September 28, 2009.
d. Submitted By: Lockhart Power
Company (Lockhart Power).
e. Name of Project: Riverdale
Hydroelectric Project.
f. Location: On the Enoree River in
Spartanburg and Laurens Counties,
South Carolina. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s Regulations
h. Potential Applicant Contact: Bryan
Stone, Lockhart Power Company, Chief
Operating Officer, 420 River Street, P.O.
Box 10, Lockhart, South Carolina 29364;
1–800–368–1289.
i. FERC Contact: Bryan RodenReynolds at (202) 502–6618; or e-mail at
bryan.roden-reynolds@ferc.gov.
j. Lockhart Power filed its request to
use the Traditional Licensing Process on
September 28, 2009. Lockhart Power
provided public notice of its request on
September 29 and 30, 2009. In a letter
dated November 20, 2009, the Director
of the Office of Energy Projects
approved Lockhart Power’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and National
Marine Fisheries Service (NMFS) under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50 CFR part 402; (b)
NMFS under section 305(b) of the
Magnuson-Stevens Fishery
Conservation and Management Act and
implementing regulations at 50 CFR
600.920; and (c) the South Carolina
State Historic Preservation Officer, as
required by Section 106, National
Historical Preservation Act, and the
implementing regulations of the
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Lockhart Power as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
Section 7 of the Endangered Species
Act, Section 305 of the MagnusonStevens Fishery Conservation and
Management Act, and Section 106 of the
National Historic Preservation Act.
m. Lockhart Power filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–28793 Filed 12–1–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL05–146–010]
Independent Energy Producers
Association v. California Independent
System Operator Corporation; Notice
of Compliance Filing
November 24, 2009.
Take notice that on November 20,
2009, Mirant Energy Trading, LLC filed
an amendment to their compliance
refund report submitted on October 2,
2009, pursuant to the Commission’s
order issued on August 18, 2009, 128
FERC ¶ 61,165 (2009) (Order on
Remand).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
E:\FR\FM\02DEN1.SGM
02DEN1
Agencies
[Federal Register Volume 74, Number 230 (Wednesday, December 2, 2009)]
[Notices]
[Page 63146]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28793]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ P-13590-000]
Lockhart Power Company; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
November 23, 2009.
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 13590-000.
c. Date Filed: September 28, 2009.
d. Submitted By: Lockhart Power Company (Lockhart Power).
e. Name of Project: Riverdale Hydroelectric Project.
f. Location: On the Enoree River in Spartanburg and Laurens
Counties, South Carolina. No federal lands are occupied by the project
works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's Regulations
h. Potential Applicant Contact: Bryan Stone, Lockhart Power
Company, Chief Operating Officer, 420 River Street, P.O. Box 10,
Lockhart, South Carolina 29364; 1-800-368-1289.
i. FERC Contact: Bryan Roden-Reynolds at (202) 502-6618; or e-mail
at bryan.roden-reynolds@ferc.gov.
j. Lockhart Power filed its request to use the Traditional
Licensing Process on September 28, 2009. Lockhart Power provided public
notice of its request on September 29 and 30, 2009. In a letter dated
November 20, 2009, the Director of the Office of Energy Projects
approved Lockhart Power's request to use the Traditional Licensing
Process.
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and National Marine Fisheries
Service (NMFS) under section 7 of the Endangered Species Act and the
joint agency regulations thereunder at 50 CFR part 402; (b) NMFS under
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act and implementing regulations at 50 CFR 600.920; and (c)
the South Carolina State Historic Preservation Officer, as required by
Section 106, National Historical Preservation Act, and the implementing
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
l. With this notice, we are designating Lockhart Power as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to Section 7 of the Endangered Species Act,
Section 305 of the Magnuson-Stevens Fishery Conservation and Management
Act, and Section 106 of the National Historic Preservation Act.
m. Lockhart Power filed a Pre-Application Document (PAD; including
a proposed process plan and schedule) with the Commission, pursuant to
18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-28793 Filed 12-1-09; 8:45 am]