Drawbridge Operating Regulations; Victoria Barge Canal, Bloomington, Texas, 62700 [E9-28704]
Download as PDF
62700
Federal Register / Vol. 74, No. 229 / Tuesday, December 1, 2009 / Rules and Regulations
for such entry by or through an official
patrol vessel.
DATES: The regulations in 33 CFR
100.1101 will be enforced from 5 p.m.
through 10 p.m. on 12 December 2009.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this notice, call
or e-mail Petty Officer Corey McDonald,
Waterways Management, U.S. Coast
Guard Sector San Diego, Coast Guard;
telephone 619–278–7262, e-mail
Corey.R.McDonald@uscg.mil.
SUPPLEMENTARY INFORMATION:
The Coast Guard will enforce the
special local regulation for the annual
Mission Bay Parade of Lights in 33 CFR
100.1101 from 5 p.m. through 10 p.m.
on 12 December 2009.
Under the provisions of 33 CFR
100.1101, a vessel may not enter the
regulated area, unless it receives
permission from the COTP. Spectator
vessels may safely transit outside the
regulated area but may not anchor,
block, loiter in, or impede the transit of
ship parade participants or official
patrol vessels. The Coast Guard may be
assisted by other Federal, State, or local
law enforcement agencies in enforcing
this regulation.
This notice is issued under authority
of 33 CFR 100.1101 and 5 U.S.C. 552(a).
In addition to this notice in the Federal
Register, the Coast Guard will provide
the maritime community with extensive
advance notification of this enforcement
period via the Local Notice to Mariners
and marine information broadcasts. If
the COTP or his designated
representative determines that the
regulated area need not be enforced for
the full duration stated in this notice, he
or she may use a Broadcast Notice to
Mariners to grant general permission to
enter the regulated area.
Dated: November 13, 2009.
T. H. Farris,
Captain, U.S. Coast Guard, Captain of the
Port San Diego.
[FR Doc. E9–28703 Filed 11–30–09; 8:45 am]
BILLING CODE 9910–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
mstockstill on DSKH9S0YB1PROD with RULES
33 CFR Part 117
[Docket Number USCG–2009–1011]
Drawbridge Operating Regulations;
Victoria Barge Canal, Bloomington,
Texas
AGENCY:
Coast Guard, DHS.
VerDate Nov<24>2008
16:14 Nov 30, 2009
Jkt 220001
ACTION: Notice of temporary deviation
from regulations.
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Union
Pacific Railroad (UPRR) Vertical Lift
Span Bridge across the Victoria Barge
Canal, mile 29.4 at Bloomington,
Victoria County, Texas. The deviation is
necessary to allow for replacement of
the steel lift cables of the draw span.
DATES: This deviation is effective from
8 a.m. on Wednesday, December 9, 2009
until 6 p.m. on Wednesday, December
23, 2009.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2009–
1011 and are available online by going
to www.regulations.gov, inserting
USCG–2009–1011 in the ‘‘Keyword’’
box and then clicking ‘‘Search.’’ They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Phil Johnson, Bridge
Administration Branch, Eighth Coast
Guard District; telephone 504–671–
2128, e-mail Philip.R.Johnson@uscg.mil.
If you have questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone
202–366–9826.
SUPPLEMENTARY INFORMATION: The
Victoria County Navigation District has
requested a temporary deviation from
the operating schedule of the UPRR
Vertical Lift Span Bridge across the
Victoria Barge Canal, mile 29.4 at
Bloomington, Texas. The vertical lift
bridge has a vertical clearance of 22 feet
above high water in the closed-tonavigation position and 50 feet above
high water in the open-to-navigation
position.
Presently, the bridge opens on signal
for the passage of vessels. This deviation
allows the draw span of the bridge to
remain closed to navigation for 10
consecutive hours between 8 a.m. and 6
p.m. on intermittent days from
December 9 through December 23, 2009.
Uncontrollable variables such as
material supply delays and inclement
weather make it difficult to predict the
exact dates that work can be conducted.
Thus, the exact dates for the closures
cannot be firmly scheduled. Notices will
be published in the Eighth Coast Guard
PO 00000
Frm 00026
Fmt 4700
Sfmt 4700
District Local Notice to Mariners and
will be broadcast via the Coast Guard
Broadcast Notice to Mariners System as
soon as information pertaining to the
exact closure dates becomes available.
Navigation on the waterway consists
mainly of tugs with tows. Due to prior
experience and coordination with
waterway users, it has been determined
that this closure will not have a
significant effect on these vessels.
No alternate routes are available. The
closures are necessary for the
replacement of the steel lift cables on
the bridge. The Coast Guard will
coordinate the closures with the
commercial users of the waterway as
exact closure dates are known.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: November 18, 2009.
David M. Frank,
Bridge Administrator.
[FR Doc. E9–28704 Filed 11–30–09; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2009–0920]
RIN 1625–AA00
Safety Zone; Naval Training December
2009 and January 2010; San Clemente
Island, CA
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard is
establishing a safety zone on the
navigable waters of the Pacific Ocean at
the north end of San Clemente Island in
support of Naval Live Fire Training.
This safety zone is necessary to ensure
non-authorized personnel and vessels
remain safe by keeping clear of the
hazardous area during the training
activity. Persons and vessels are
prohibited from entering into, transiting
through, or anchoring within this safety
zone unless authorized by the Captain
of the Port (COTP) or his designated
representative.
DATES: This rule is effective in the CFR
on December 1, 2009 until January 31,
2010. This rule is effective with actual
notice for purposes of enforcement on
December 1, 2009 until January 31,
2010.
E:\FR\FM\01DER1.SGM
01DER1
Agencies
[Federal Register Volume 74, Number 229 (Tuesday, December 1, 2009)]
[Rules and Regulations]
[Page 62700]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28704]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket Number USCG-2009-1011]
Drawbridge Operating Regulations; Victoria Barge Canal,
Bloomington, Texas
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Union Pacific Railroad (UPRR) Vertical Lift Span Bridge across the
Victoria Barge Canal, mile 29.4 at Bloomington, Victoria County, Texas.
The deviation is necessary to allow for replacement of the steel lift
cables of the draw span.
DATES: This deviation is effective from 8 a.m. on Wednesday, December
9, 2009 until 6 p.m. on Wednesday, December 23, 2009.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2009-1011 and are available online
by going to www.regulations.gov, inserting USCG-2009-1011 in the
``Keyword'' box and then clicking ``Search.'' They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590 between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Phil Johnson, Bridge Administration Branch, Eighth Coast
Guard District; telephone 504-671-2128, e-mail
Philip.R.Johnson@uscg.mil. If you have questions on viewing the docket,
call Renee V. Wright, Program Manager, Docket Operations, telephone
202-366-9826.
SUPPLEMENTARY INFORMATION: The Victoria County Navigation District has
requested a temporary deviation from the operating schedule of the UPRR
Vertical Lift Span Bridge across the Victoria Barge Canal, mile 29.4 at
Bloomington, Texas. The vertical lift bridge has a vertical clearance
of 22 feet above high water in the closed-to-navigation position and 50
feet above high water in the open-to-navigation position.
Presently, the bridge opens on signal for the passage of vessels.
This deviation allows the draw span of the bridge to remain closed to
navigation for 10 consecutive hours between 8 a.m. and 6 p.m. on
intermittent days from December 9 through December 23, 2009.
Uncontrollable variables such as material supply delays and inclement
weather make it difficult to predict the exact dates that work can be
conducted. Thus, the exact dates for the closures cannot be firmly
scheduled. Notices will be published in the Eighth Coast Guard District
Local Notice to Mariners and will be broadcast via the Coast Guard
Broadcast Notice to Mariners System as soon as information pertaining
to the exact closure dates becomes available. Navigation on the
waterway consists mainly of tugs with tows. Due to prior experience and
coordination with waterway users, it has been determined that this
closure will not have a significant effect on these vessels.
No alternate routes are available. The closures are necessary for
the replacement of the steel lift cables on the bridge. The Coast Guard
will coordinate the closures with the commercial users of the waterway
as exact closure dates are known.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: November 18, 2009.
David M. Frank,
Bridge Administrator.
[FR Doc. E9-28704 Filed 11-30-09; 8:45 am]
BILLING CODE 9110-04-P