Agency Information Collection Activities: Request for Comments for New Information Collection, 62381-62383 [E9-28411]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 74, No. 227 / Friday, November 27, 2009 / Notices
sensitive service in the rail industry for
violations of safety rules, regulations,
standards, orders, or laws evidencing
unfitness. FRA’s regulations, 49 CFR
Part 209, Subpart D, implement the
statutory provision by requiring (i) a
railroad employing or formerly
employing a disqualified individual to
disclose the terms and conditions of a
disqualification order to the individual’s
new or prospective employing railroad;
(ii) a railroad considering employing an
individual in a safety-sensitive position
to ask the individual’s previous
employing railroad whether the
individual is currently serving under a
disqualification order; and (iii) a
disqualified individual to inform his
new or prospective employer of the
disqualification order and provide a
copy of the same. Additionally, the
regulations prohibit a railroad from
employing a person serving under a
disqualification order to work in a
safety-sensitive position. This
information serves to inform a railroad
whether an employee or prospective
employee is currently disqualified from
performing safety-sensitive service
based on the issuance of a
disqualification order by FRA.
Furthermore, it prevents an individual
currently serving under a
disqualification order from retaining
and obtaining employment in a safetysensitive position in the rail industry.
Annual Estimated Burden: 5 hours.
ADDRESSES: Send comments regarding
these information collections to the
Office of Information and Regulatory
Affairs, Office of Management and
Budget, 725 Seventeenth Street, NW.,
Washington, DC, 20503; Attention: FRA
Desk Officer. Alternatively, comments
may be sent via e-mail to the Office of
Information and Regulatory Affairs
(OIRA), Office of Management and
Budget, at the following address:
oira_submissions@omb.eop.gov.
Comments are invited on the
following: Whether the proposed
collections of information are necessary
for the proper performance of the
functions of FRA, including whether the
information will have practical utility;
the accuracy of FRA’s estimates of the
burden of the proposed information
collections; ways to enhance the quality,
utility, and clarity of the information to
be collected; and ways to minimize the
burden of the collections of information
on respondents, including the use of
automated collection techniques or
other forms of information technology.
A comment to OMB is best assured of
having its full effect if OMB receives it
within 30 days of publication of this
notice in the Federal Register.
VerDate Nov<24>2008
18:08 Nov 25, 2009
Jkt 220001
Authority: 44 U.S.C. 3501–3520.
Issued in Washington, DC on November 20,
2009.
Donna Alwine,
Acting Director, Office of Financial
Management, Federal Railroad
Administration.
[FR Doc. E9–28412 Filed 11–25–09; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[Docket No. FHWA–2009–0113]
Agency Information Collection
Activities: Request for Comments for
New Information Collection
AGENCY: Federal Highway
Administration (FHWA), DOT.
ACTION: Notice and request for
comments.
SUMMARY: The FHWA invites public
comments about our intention to request
the Office of Management and Budget’s
(OMB) approval for a new information
collection, which is summarized below
under Supplementary Information. We
are required to publish this notice in the
Federal Register by the Paperwork
Reduction Act of 1995.
DATES: Please submit comments by
November 27, 2009.
ADDRESSES: You may submit comments
identified by DOT Docket ID Number
FHWA–2009–0113, by any of the
following methods:
Web Site: For access to the docket to
read background documents or
comments received go to the Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 1–202–493–2251.
Mail: Docket Management Facility,
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590–0001.
Hand Delivery or Courier: U.S.
Department of Transportation, West
Building Ground Floor, Room W12–140,
1200 New Jersey Avenue, S.E.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: For
questions concerning the Truck Parking
Initiatives Grant Program, please contact
Thomas Kearney, Office of Freight
Management and Operations, HOFM–1,
at (518) 431–4125 ext. 218, Department
of Transportation, 1200 New Jersey
Avenue, SE, Washington, DC 20590.
Office hours are from 7:45 a.m. to 4:15
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
62381
p.m., Monday through Friday, except
Federal holidays.
SUPPLEMENTARY INFORMATION:
Title: Truck Parking Initiative .
OMB Control #: 2125–0610.
Background
The shortage of long-term truck
parking on the National Highway
System (NHS) is a problem that needs
to be addressed. It is nationally
recognized that truck drivers frequently
cannot find adequate, safe parking in
order to obtain rest needed to comply
with the Federal Motor Carrier Safety
Regulations and ensure safety. Further,
parking areas are often designed or
maintained for short-term parking only,
and as a result, allow parking for limited
time periods. Section 1305 of the Safe,
Accountable, Flexible, Efficient, and
Transportation Equity Act: A Legacy for
Users (SAFETEA–LU) directed the
Secretary of Transportation to establish
a Pilot program to address the long-term
parking shortages along the NHS.
Eligible projects under Section 1305
include:
1. Promoting the real-time
dissemination of publicly or privately
provided commercial motor vehicle
parking availability on the NHS using
ITS and other means;
2. Opening non-traditional facilities to
commercial motor vehicle parking,
including inspection and weigh
stations, and park and ride facilities;
3. Making capital improvements to
public commercial motor vehicle
parking facilities currently closed on a
seasonal basis to allow the facilities to
remain open year round;
4. Constructing turnouts along the
NHS to facilitate commercial motor
vehicle access to parking facilities, and/
or improving the geometric design of
interchanges to improve access to
commercial motor vehicle parking
facilities;
5. Constructing commercial motor
vehicle parking facilities adjacent to
commercial truck stops and travel
plazas;
6. Constructing safety rest areas that
include parking for commercial motor
vehicles.
In considering the award of funds to
projects applications, the Secretary was
directed to give priority to projects that:
1. Demonstrate a severe shortage of
commercial vehicle parking capacity in
the corridor;
2. Have consulted with affected State
and local governments, community
groups, private providers of commercial
vehicle parking and trucking and
motorist organizations; and
3. Demonstrate that implementation
will likely contribute to positive effects
E:\FR\FM\27NON1.SGM
27NON1
62382
Federal Register / Vol. 74, No. 227 / Friday, November 27, 2009 / Notices
on highway safety, traffic congestion or
air quality.
It is the belief of FHWA that, given
the limited resources available, the
broad dissemination of information
regarding the availability of public or
private long-term parking spaces
provides the greatest opportunity to
maximize the effectiveness of this pilot
program.
Guidelines and Administration
To administer this program, the
FHWA will collect information
necessary to evaluate and rank projects.
The information collection is intended
to only address the project funding
allotted through the program.
1. Projects funded under this section
shall be treated as projects on a FederalAid System under Chapter 1 of Title 23,
United States Code.
2. Grants may be funded at an 80 to
100 percent funding level based on the
criteria specified in Section 120 of Title
23, U.S. Code.
As soon as practicable, a Federal
Register Notice will be published with
information and guidance relating to the
application process. Also, a solicitation
letter will be sent to all FHWA Division
Offices containing the same
information. This information will also
be posted on the FHWA Web site,
https://www.fhwa.dot.gov/. All
applications must be submitted thru a
State Department of Transportation to
FHWA’s Office of Freight Management
and Operations, via the FHWA Division
Office in the state in which the
application was submitted. Awarded
projects will be administered by the
applicable State Department of
Transportation as a Federal aid grant.
sroberts on DSKD5P82C1PROD with NOTICES
Information Proposed for Collection
Information recommended under
SAFETEA–LU and proposed for the
current program includes the following:
1. Project Description. The proposal
should include a detailed project
description, which would include the
extent of the long-term truck parking
shortage in the corridor/area to be
addressed, along with contact
information for the project’s primary
point of contact, and whether funds are
being requested under 120 U.S.C. (b) or
(c) of Title 23. Data helping to define the
shortage may include truck volume
(Average Daily Truck Traffic—ADTT) in
the corridor to be addressed, current
number of long-term commercial motor
vehicle parking spaces, utilization of
current long-term parking spaces, driver
surveys, observational field studies,
proximity to freight loading/unloading
facilities, proximity to the NHS, etc.
VerDate Nov<24>2008
18:08 Nov 25, 2009
Jkt 220001
2. Project Rationale. The proposal
should set forth the rationale for the
project and should include an analysis
and demonstration of how the proposed
project will positively affect truck
parking, safety, traffic congestion, or air
quality in the identified corridor.
Examples may include: advance
information on availability of parking
that may help to reduce the number of
trucks parked on roadsides and increase
the utilization of available truck parking
spaces, etc.
3. Scope of work. The scope of work
should include a complete listing of
activities to be funded through the
grant; including technology
development, information processing,
information integration activities,
developmental phase activities
(planning, feasibility analysis,
environmental review, engineering or
design work, and other activities),
construction, reconstruction, acquisition
of real property (including land related
to the project and improvements to
land), environmental mitigation,
construction contingencies, acquisition
of equipment, and operational
improvements. Also to be included
should be a 3-year performance
measurement plan that continues
beyond the demonstration period of the
project.
4. Stakeholder identification.
Stakeholder identification should
include evidence of prior consultation
and/or partnership with affected
Metropolitan Planning Organizations
(MPO), local governments, community
groups, private providers of commercial
motor vehicle parking, and motorist and
trucking organizations. It should
include a listing of all public and
private partners, and the role each will
play in the execution of the project.
Consultation examples may include:
Memorandums of Agreement,
Memorandums of Understanding,
contracts, meeting minutes, letters of
support/commitment, documentation in
a Transportation Improvement Program
(TIPS) or Statewide Transportation
Improvement Program (STIPS) plans,
etc.
5. Cost estimate. Applicants should
provide a detailed quantification of
eligible project costs by activity, an
identification of all funding sources that
will supplement the grant and be
necessary to fully fund the project, and
the anticipated dates on which the
additional funds are to be made
available. Public and private sources of
funds (non-federal commitment) will be
considered by FHWA as an in-kind
match contributing to the project. State
matching funds will be required for
projects eligible under 120 U.S.C. (b).
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
6. Timeline. Applicants should also
submit a timeline that includes work to
be completed and anticipated funding
cycles. Gantt charts are preferred.
7. Environmental process. Applicants
should show the timeline for complying
with the National Environmental Policy
Act (NEPA), if applicable.
8. Project map. Applicants should
include a project map consisting of
schematic illustrations depicting the
project and connecting transportation
infrastructure.
9. Proposals should not exceed 20
pages in length.
Burden Hours for Information
Collection
Frequency: Annual.
Respondents: The 50 State DOTs and
Puerto Rico and the District of
Columbia.
Estimated Average Burden per
response: Burden hours estimates and
discussions are provided for each item
presented and required within the
application submittal process.
• Project Description (16 hours)—The
project description will be submitted
through the submitting State agency, in
conjunction with local governments,
MPO’s, and other potential partners.
• Project Rationale (8 hours)—Project
rationale should include an analysis and
demonstration of how the proposed
project will positively effect truck
parking, safety, traffic congestion, or air
quality in the identified corridor.
• Scope of Work (6 hours)—A
complete listing of activities to be
funded through the grant; including
technology development, information
processing, information integration
activities, developmental phase
activities (planning, feasibility analysis,
environmental review, engineering or
design work, and other activities),
construction, reconstruction, acquisition
of real property (including land related
to the project and improvements to
land), environmental mitigation,
construction contingencies, acquisition
of equipment, operational
improvements, and a 3 year
performance measurement plan that
continues beyond the demonstration
period of the project.
• Stakeholder Identification (1
hour)—Evidence of prior consultation
and/or partnership with affected MPOs,
local governments, community groups,
private providers of commercial motor
vehicle parking, and motorist and
trucking organizations. A listing of all
public and private partners, and the role
each will play in the execution of the
project should also be included.
• Cost estimate (4 hours)—A detailed
quantification of eligible project costs by
E:\FR\FM\27NON1.SGM
27NON1
Federal Register / Vol. 74, No. 227 / Friday, November 27, 2009 / Notices
activity, and an identification of all
funding sources that will supplement
the grant and be necessary to fully fund
the project, and the anticipated dates on
which the additional funds are to be
made available. Public and private
sources of funds (non-federal
commitment) will be considered. State
matching funds will be required for
projects eligible under 120 U.S.C. (b).
• Project Timeline (1 hour 30
minutes)—That includes work to be
completed and anticipated funding
cycles. Gantt charts preferred
• Environmental process (2 hours)—
Applicant should show the timeline for
complying with the National
Environmental Policy Act (NEPA), if
applicable.
• Project Map (1 hour)—Consisting of
schematic illustrations depicting the
project and connecting transportation
infrastructure.
• Contact information for the State
DOT, Local Agency or MPO (if
applicable), FHWA Division Office (5
minutes)—This requires providing a list
of contacts and involves a nominal
amount of time.
The total amount of time estimated to
complete the application is 39 hours
and 35 minutes.
Estimated Total Annual Burden
Hours: 1187 hours and 30 minutes. It is
estimated 30 applications will be
processed annually.
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including: (1)
Whether the proposed collection is
necessary for the FHWA’s performance;
(2) the accuracy of the estimated
burdens; (3) ways for the FHWA to
enhance the quality, usefulness, and
clarity of the collected information; and
(4) ways that the burden could be
minimized, including the use of
electronic technology, without reducing
the quality of the collected information.
The agency will summarize and/or
include your comments in the request
for OMB’s clearance of this information
collection.
sroberts on DSKD5P82C1PROD with NOTICES
Authority: The Paperwork Reduction Act
of 1995; 44 U.S.C. Chapter 35, as amended;
and 49 CFR 1.48.
Issued on November 20, 2009.
Tina Campbell,
Acting Chief, Management Programs, and
Analysis Division.
[FR Doc. E9–28411 Filed 11–25–09; 8:45 am]
BILLING CODE P
VerDate Nov<24>2008
18:08 Nov 25, 2009
Jkt 220001
DEPARTMENT OF TRANSPORTATION
Surface Transportation Board
[STB Finance Docket No. 35318]
Gabriel D. Hall—Continuance in
Control Exemption—U S Rail
Corporation of New Jersey
Gabriel D. Hall (Hall), a noncarrier,
has filed a verified notice of exemption
under 49 CFR 1180.2(d)(2) to continue
in control of U S Rail Corporation of
New Jersey (U S RCNJ), upon U S RCNJ
becoming a Class III rail carrier.
This transaction is related to the
concurrently filed verified notices of
exemption in: (1) STB Finance Docket
No. 35310, U S Rail Corporation of New
Jersey—Lease Exemption—County of
Salem, NJ, wherein U S RCNJ seeks to
lease from the County of Salem, NJ, an
approximately 17.24 mile rail line
between milepost 10.86 in Swedesboro,
NJ, and milepost 28.10 in Salem, NJ (the
line); and (2) STB Finance Docket No.
35317, U S Rail Corporation—Operation
Exemption—U S Rail Corporation of
New Jersey, wherein U S Rail
Corporation, an affiliate of U S RCNJ,
seeks to operate over the line.
The transactions are scheduled to be
consummated on or after December 12,
2009 (30 days after the notices of
exemption were filed).
Hall is a noncarrier that currently
controls directly or indirectly through
equity ownership two rail carriers:
USRP and U S Rail Holding, LLC.
Mr. Hall states that: (1) The rail line
to be acquired by lease does not connect
with the lines of any other railroad
controlled by Hall; (2) the continuance
in control is not part of a series of
anticipated transactions that would
connect the rail line with any railroads
controlled by Hall; and (3) the
transaction does not involve a Class I
railroad. Therefore, the transaction is
exempt from the prior approval
requirements of 49 U.S.C. 11323. See 49
CFR 1180.2(d)(2).
Under 49 U.S.C. 10502(g), the Board
may not use its exemption authority to
relieve a rail carrier of its statutory
obligation to protect the interests of its
employees. Section 11326(c), however,
does not provide for labor protection for
transactions under sections 11324 and
11325 that involve only Class III rail
carriers. Accordingly, the Board may not
impose labor protective conditions here
because all of the carriers involved are
Class III carriers.
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
62383
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than December 4, 2009
(at least 7 days before the exemption
becomes effective).
An original and 10 copies of all
pleadings, referring to STB Finance
Docket No. 35318, must be filed with
the Surface Transportation Board, 395 E
Street, SW., Washington, DC 20423–
0001. In addition, a copy must be served
on Eric M. Hocky, Thorp Reed &
Armstrong, LLP, One Commerce Square,
2005 Market Street, Suite 1000,
Philadelphia, PA 19103.
Board decisions and notices are
available on our Web site at: ‘‘https://
www.stb.dot.gov.’’
Decided: November 23, 2009.
By the Board, Rachel D. Campbell,
Director, Office of Proceedings.
Kulunie L. Cannon,
Clearance Clerk.
[FR Doc. E9–28434 Filed 11–25–09; 8:45 am]
BILLING CODE 4915–01–P
DEPARTMENT OF TRANSPORTATION
Surface Transportation Board
[STB Finance Docket No. 35310]
U S Rail Corporation of New Jersey—
Lease Exemption—County of Salem,
NJ
U S Rail Corporation of New Jersey
(U S RCNJ), a noncarrier, has filed a
verified notice of exemption under 49
CFR 1150.31 to lease from the County of
Salem, NJ (County), approximately
17.24 miles of the County’s rail line (the
Line), extending between milepost 10.86
in Swedesboro, NJ, and milepost 28.10
in Salem, NJ.1
This transaction is related to the
concurrently filed verified notices of
exemption in: (1) STB Finance Docket
No. 35317, U S Rail Corporation—
Operation Exemption—U S Rail
Corporation of New Jersey, whereby
USRP has filed a verified notice of
exemption to operate the line; and
(2) STB Finance Docket No. 35318,
Gabriel D. Hall—Continuance in
Control—U S Rail Corporation of New
Jersey, whereby Gabriel D. Hall has filed
a verified notice of exemption to
continue in control of U S RCNJ upon
U S RCNJ becoming a Class III rail
carrier.
U S RCNJ certifies that its projected
annual revenues as a result of the
1 U S RCNJ is contracting with its affiliate U S
Rail Corporation (USRP) to perform the operations
on the line, with U S RCNJ retaining a residual
common carrier obligation.
E:\FR\FM\27NON1.SGM
27NON1
Agencies
[Federal Register Volume 74, Number 227 (Friday, November 27, 2009)]
[Notices]
[Pages 62381-62383]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28411]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[Docket No. FHWA-2009-0113]
Agency Information Collection Activities: Request for Comments
for New Information Collection
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice and request for comments.
-----------------------------------------------------------------------
SUMMARY: The FHWA invites public comments about our intention to
request the Office of Management and Budget's (OMB) approval for a new
information collection, which is summarized below under Supplementary
Information. We are required to publish this notice in the Federal
Register by the Paperwork Reduction Act of 1995.
DATES: Please submit comments by November 27, 2009.
ADDRESSES: You may submit comments identified by DOT Docket ID Number
FHWA-2009-0113, by any of the following methods:
Web Site: For access to the docket to read background documents or
comments received go to the Federal eRulemaking Portal: https://www.regulations.gov. Follow the online instructions for submitting
comments.
Fax: 1-202-493-2251.
Mail: Docket Management Facility, U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590-0001.
Hand Delivery or Courier: U.S. Department of Transportation, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, S.E.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: For questions concerning the Truck
Parking Initiatives Grant Program, please contact Thomas Kearney,
Office of Freight Management and Operations, HOFM-1, at (518) 431-4125
ext. 218, Department of Transportation, 1200 New Jersey Avenue, SE,
Washington, DC 20590. Office hours are from 7:45 a.m. to 4:15 p.m.,
Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Title: Truck Parking Initiative .
OMB Control #: 2125-0610.
Background
The shortage of long-term truck parking on the National Highway
System (NHS) is a problem that needs to be addressed. It is nationally
recognized that truck drivers frequently cannot find adequate, safe
parking in order to obtain rest needed to comply with the Federal Motor
Carrier Safety Regulations and ensure safety. Further, parking areas
are often designed or maintained for short-term parking only, and as a
result, allow parking for limited time periods. Section 1305 of the
Safe, Accountable, Flexible, Efficient, and Transportation Equity Act:
A Legacy for Users (SAFETEA-LU) directed the Secretary of
Transportation to establish a Pilot program to address the long-term
parking shortages along the NHS. Eligible projects under Section 1305
include:
1. Promoting the real-time dissemination of publicly or privately
provided commercial motor vehicle parking availability on the NHS using
ITS and other means;
2. Opening non-traditional facilities to commercial motor vehicle
parking, including inspection and weigh stations, and park and ride
facilities;
3. Making capital improvements to public commercial motor vehicle
parking facilities currently closed on a seasonal basis to allow the
facilities to remain open year round;
4. Constructing turnouts along the NHS to facilitate commercial
motor vehicle access to parking facilities, and/or improving the
geometric design of interchanges to improve access to commercial motor
vehicle parking facilities;
5. Constructing commercial motor vehicle parking facilities
adjacent to commercial truck stops and travel plazas;
6. Constructing safety rest areas that include parking for
commercial motor vehicles.
In considering the award of funds to projects applications, the
Secretary was directed to give priority to projects that:
1. Demonstrate a severe shortage of commercial vehicle parking
capacity in the corridor;
2. Have consulted with affected State and local governments,
community groups, private providers of commercial vehicle parking and
trucking and motorist organizations; and
3. Demonstrate that implementation will likely contribute to
positive effects
[[Page 62382]]
on highway safety, traffic congestion or air quality.
It is the belief of FHWA that, given the limited resources
available, the broad dissemination of information regarding the
availability of public or private long-term parking spaces provides the
greatest opportunity to maximize the effectiveness of this pilot
program.
Guidelines and Administration
To administer this program, the FHWA will collect information
necessary to evaluate and rank projects. The information collection is
intended to only address the project funding allotted through the
program.
1. Projects funded under this section shall be treated as projects
on a Federal-Aid System under Chapter 1 of Title 23, United States
Code.
2. Grants may be funded at an 80 to 100 percent funding level based
on the criteria specified in Section 120 of Title 23, U.S. Code.
As soon as practicable, a Federal Register Notice will be published
with information and guidance relating to the application process.
Also, a solicitation letter will be sent to all FHWA Division Offices
containing the same information. This information will also be posted
on the FHWA Web site, https://www.fhwa.dot.gov/. All applications must
be submitted thru a State Department of Transportation to FHWA's Office
of Freight Management and Operations, via the FHWA Division Office in
the state in which the application was submitted. Awarded projects will
be administered by the applicable State Department of Transportation as
a Federal aid grant.
Information Proposed for Collection
Information recommended under SAFETEA-LU and proposed for the
current program includes the following:
1. Project Description. The proposal should include a detailed
project description, which would include the extent of the long-term
truck parking shortage in the corridor/area to be addressed, along with
contact information for the project's primary point of contact, and
whether funds are being requested under 120 U.S.C. (b) or (c) of Title
23. Data helping to define the shortage may include truck volume
(Average Daily Truck Traffic--ADTT) in the corridor to be addressed,
current number of long-term commercial motor vehicle parking spaces,
utilization of current long-term parking spaces, driver surveys,
observational field studies, proximity to freight loading/unloading
facilities, proximity to the NHS, etc.
2. Project Rationale. The proposal should set forth the rationale
for the project and should include an analysis and demonstration of how
the proposed project will positively affect truck parking, safety,
traffic congestion, or air quality in the identified corridor. Examples
may include: advance information on availability of parking that may
help to reduce the number of trucks parked on roadsides and increase
the utilization of available truck parking spaces, etc.
3. Scope of work. The scope of work should include a complete
listing of activities to be funded through the grant; including
technology development, information processing, information integration
activities, developmental phase activities (planning, feasibility
analysis, environmental review, engineering or design work, and other
activities), construction, reconstruction, acquisition of real property
(including land related to the project and improvements to land),
environmental mitigation, construction contingencies, acquisition of
equipment, and operational improvements. Also to be included should be
a 3-year performance measurement plan that continues beyond the
demonstration period of the project.
4. Stakeholder identification. Stakeholder identification should
include evidence of prior consultation and/or partnership with affected
Metropolitan Planning Organizations (MPO), local governments, community
groups, private providers of commercial motor vehicle parking, and
motorist and trucking organizations. It should include a listing of all
public and private partners, and the role each will play in the
execution of the project. Consultation examples may include:
Memorandums of Agreement, Memorandums of Understanding, contracts,
meeting minutes, letters of support/commitment, documentation in a
Transportation Improvement Program (TIPS) or Statewide Transportation
Improvement Program (STIPS) plans, etc.
5. Cost estimate. Applicants should provide a detailed
quantification of eligible project costs by activity, an identification
of all funding sources that will supplement the grant and be necessary
to fully fund the project, and the anticipated dates on which the
additional funds are to be made available. Public and private sources
of funds (non-federal commitment) will be considered by FHWA as an in-
kind match contributing to the project. State matching funds will be
required for projects eligible under 120 U.S.C. (b).
6. Timeline. Applicants should also submit a timeline that includes
work to be completed and anticipated funding cycles. Gantt charts are
preferred.
7. Environmental process. Applicants should show the timeline for
complying with the National Environmental Policy Act (NEPA), if
applicable.
8. Project map. Applicants should include a project map consisting
of schematic illustrations depicting the project and connecting
transportation infrastructure.
9. Proposals should not exceed 20 pages in length.
Burden Hours for Information Collection
Frequency: Annual.
Respondents: The 50 State DOTs and Puerto Rico and the District of
Columbia.
Estimated Average Burden per response: Burden hours estimates and
discussions are provided for each item presented and required within
the application submittal process.
Project Description (16 hours)--The project description
will be submitted through the submitting State agency, in conjunction
with local governments, MPO's, and other potential partners.
Project Rationale (8 hours)--Project rationale should
include an analysis and demonstration of how the proposed project will
positively effect truck parking, safety, traffic congestion, or air
quality in the identified corridor.
Scope of Work (6 hours)--A complete listing of activities
to be funded through the grant; including technology development,
information processing, information integration activities,
developmental phase activities (planning, feasibility analysis,
environmental review, engineering or design work, and other
activities), construction, reconstruction, acquisition of real property
(including land related to the project and improvements to land),
environmental mitigation, construction contingencies, acquisition of
equipment, operational improvements, and a 3 year performance
measurement plan that continues beyond the demonstration period of the
project.
Stakeholder Identification (1 hour)--Evidence of prior
consultation and/or partnership with affected MPOs, local governments,
community groups, private providers of commercial motor vehicle
parking, and motorist and trucking organizations. A listing of all
public and private partners, and the role each will play in the
execution of the project should also be included.
Cost estimate (4 hours)--A detailed quantification of
eligible project costs by
[[Page 62383]]
activity, and an identification of all funding sources that will
supplement the grant and be necessary to fully fund the project, and
the anticipated dates on which the additional funds are to be made
available. Public and private sources of funds (non-federal commitment)
will be considered. State matching funds will be required for projects
eligible under 120 U.S.C. (b).
Project Timeline (1 hour 30 minutes)--That includes work
to be completed and anticipated funding cycles. Gantt charts preferred
Environmental process (2 hours)--Applicant should show the
timeline for complying with the National Environmental Policy Act
(NEPA), if applicable.
Project Map (1 hour)--Consisting of schematic
illustrations depicting the project and connecting transportation
infrastructure.
Contact information for the State DOT, Local Agency or MPO
(if applicable), FHWA Division Office (5 minutes)--This requires
providing a list of contacts and involves a nominal amount of time.
The total amount of time estimated to complete the application is
39 hours and 35 minutes.
Estimated Total Annual Burden Hours: 1187 hours and 30 minutes. It
is estimated 30 applications will be processed annually.
Public Comments Invited: You are asked to comment on any aspect of
this information collection, including: (1) Whether the proposed
collection is necessary for the FHWA's performance; (2) the accuracy of
the estimated burdens; (3) ways for the FHWA to enhance the quality,
usefulness, and clarity of the collected information; and (4) ways that
the burden could be minimized, including the use of electronic
technology, without reducing the quality of the collected information.
The agency will summarize and/or include your comments in the request
for OMB's clearance of this information collection.
Authority: The Paperwork Reduction Act of 1995; 44 U.S.C.
Chapter 35, as amended; and 49 CFR 1.48.
Issued on November 20, 2009.
Tina Campbell,
Acting Chief, Management Programs, and Analysis Division.
[FR Doc. E9-28411 Filed 11-25-09; 8:45 am]
BILLING CODE P