FPL Energy Point Beach, LLC; Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, 61179-61181 [E9-28092]
Download as PDF
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–266 and 50–301; NRC–
2009–0160]
jlentini on DSKJ8SOYB1PROD with NOTICES
FPL Energy Point Beach, LLC; Notice
of Consideration of Issuance of
Amendment to Renewed Facility
Operating License, Proposed No
Significant Hazards Consideration
Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of an amendment
to Renewed Facility Operating License
Nos. DPR–24 and DPR–27 issued to FPL
Energy Point Beach, LLC (the licensee)
for operation of the Point Beach Nuclear
Plant, Units 1 and 2 located in Town of
Two Creeks, Manitowoc County,
Wisconsin.
On April 14, 2009, the Nuclear
Regulatory Commission published a
Notice of Consideration of Issuance,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for Hearing in the Federal
Register (74 FR 17230) for a proposed
amendment that would revise the Point
Beach Nuclear Plant (PBNP) Units 1 and
2 current licensing basis to implement
the alternate source term (AST) through
reanalysis of the radiological
consequences of the Final Safety
Analysis Report (FSAR) Chapter 14
accidents.
On April 17, 2009, the licensee
submitted a supplement which
expanded the original scope of work.
The proposed revisions would add
Technical Specification (TS) 3.7.14,
‘‘Primary Auxiliary Building Ventilation
(VNPAB),’’ to the PBNP TS. The new TS
is being proposed as a result of the AST
assumptions crediting the VNPAB
exhaust function. The proposed change
also updates the Table of Contents of the
TS to incorporate the new TS.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
VerDate Nov<24>2008
16:37 Nov 20, 2009
Jkt 220001
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration. The NRC staff’s
own analysis is presented below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed TS change reflects the plant
configuration that is required to implement
the AST analyses. The operation of the
VNPAB exhaust is mitigating in nature and
relied upon only after an accident has been
initiated to provide the AST LOCA ECCS
equipment leakage activity release location
for the control room dose calculation. The
results of the LOCA radiological analysis
demonstrate that while operating the VNPAB
exhaust system, as supported by the
proposed TS, the dose consequences of this
limiting event are within the regulatory
limits and guidance provided by the NRC in
10 CFR 50.67 and RG 1.183 (Reference 6.2).
While the operation of this system does
change with the implementation of an AST,
the affected system in not an accident
initiator.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed TS change reflects the plant
configuration that is required to implement
the AST analyses, and no new or different
accidents result from utilizing the proposed
changes. The LOCA control room dose
analysis assumes that the ECCS equipment
leakage activity release pathway X/Q to be at
the location of the PAB vent stack. Operation
of the VNPAB exhaust fans assures this
release point. The VNPAB system operates
during normal unit operation.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed TS reflects the plant
configuration that is required to implement
the AST analyses. The operation of the
VNPAB exhaust is mitigating in nature and
relied upon only after an accident has been
initiated. The VNPAB assures the proper
X/Q for airborne radiological protection for
control room personnel, as demonstrated by
the control room dose analyses for the LOCA.
The proposed changes ensure that the dose
consequences in the control room due to the
DBA LOCA are within the acceptance criteria
presented in 10 CFR 50.67.
Therefore, the proposed change does not
involve a significant reduction in margin of
safety.
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
61179
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch (RDB), TWB–05–
B01M, Division of Administrative
Services, Office of Administration, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
should cite the publication date and
page number of this Federal Register
notice. Written comments may also be
faxed to the RDB at 301–492–3446.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
E:\FR\FM\23NON1.SGM
23NON1
jlentini on DSKJ8SOYB1PROD with NOTICES
61180
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner/requestor must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
VerDate Nov<24>2008
18:27 Nov 20, 2009
Jkt 220001
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
petitioner/requestor who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule,
which the NRC promulgated in the
August 28, 2007, Federal Register
notice (72 FR 49139). The E-Filing
process requires participants to submit
and serve all adjudicatory documents
over the internet, or in some cases to
mail copies on electronic storage media.
Participants may not submit paper
copies of their filings unless they seek
an exemption in accordance with the
procedures described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
petitioner/requestor should must
contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by
calling (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and/or (2) creation of an
electronic docket for the proceeding
(even in instances in which the
petitioner/requestor (or its counsel or
representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
ViewerTM to access the Electronic
Information Exchange (EIE), a
component of the E-Filing system. The
Workplace Forms ViewerTM is free and
is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory e-filing system
may seek assistance through the
‘‘Contact Us’’ link located on the NRC
Web site at https://www.nrc.gov/sitehelp/e-submittals.html or by calling the
NRC electronic filing Help Desk, which
is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday,
excluding government holidays. The
toll-free help line number is 1–866–
E:\FR\FM\23NON1.SGM
23NON1
jlentini on DSKJ8SOYB1PROD with NOTICES
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
672–7640. A person filing electronically
may also seek assistance by sending an
e-mail to the NRC electronic filing Help
Desk at MSHD.Resource@nrc.gov.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission, the presiding officer, or
the Atomic Safety and Licensing Board
that the request and/or petition should
be granted and/or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/ehd_proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer.
Participants are requested not to include
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submissions.
For further details with respect to this
license amendment application, see the
application for amendment dated
December 8, 2008, which is available for
VerDate Nov<24>2008
16:37 Nov 20, 2009
Jkt 220001
public inspection at the Commission’s
PDR, located at One White Flint North,
Room O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible electronically from the
Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by e-mail
to pdr.resource@nrc.gov.
Attorney for licensee: M. S. Ross, Vice
President & Associate General Counsel,
Florida Power & Light Company, PO
Box 14000, Juno Beach, FL 33408–0420.
Dated at Rockville, Maryland, this 16th day
of November 2009.
For the Nuclear Regulatory Commission.
Justin C. Poole,
Project Manager, Plant Licensing Branch III–
1, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. E9–28092 Filed 11–20–09; 8:45 am]
BILLING CODE 7590–01–P
SMALL BUSINESS ADMINISTRATION
[Disaster Declaration # 11929]
Washington Disaster # WA–00024
Declaration of Economic Injury
AGENCY: U.S. Small Business
Administration.
ACTION: Notice.
SUMMARY: This is a notice of an
Economic Injury Disaster Loan (EIDL)
declaration for the State of Washington,
dated 11/13/2009.
Incident: Yakima County SR 410
Landslide.
Incident Period: 10/10/2009.
Effective Date: 11/13/2009.
EIDL Loan Application Deadline Date:
8/13/2010.
ADDRESSES: Submit completed loan
applications to: U.S. Small Business
Administration, Processing and
Disbursement Center, 14925 Kingsport
Road, Fort Worth, TX 76155.
FOR FURTHER INFORMATION CONTACT:
Alan Escobar, Office of Disaster
Assistance, U.S. Small Business
Administration, 409 3rd Street, SW.,
Suite 6050, Washington, DC 20416.
SUPPLEMENTARY INFORMATION: Notice is
hereby given that as a result of the
Administrator’s EIDL declaration,
applications for economic injury
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
61181
disaster loans may be filed at the
address listed above or other locally
announced locations.
The following areas have been
determined to be adversely affected by
the disaster:
Primary Counties: Yakima.
Contiguous Counties:
Washington: Benton, Grant, King,
Kittitas, Klickitat, Lewis, Pierce,
Skamania.
The Interest Rate is: 4.000.
The number assigned to this disaster
for economic injury is 119290.
The State which received an EIDL
Declaration # is Washington.
(Catalog of Federal Domestic Assistance
Number 59002)
Dated: November 13, 2009.
Karen G. Mills,
Administrator.
[FR Doc. E9–27983 Filed 11–20–09; 8:45 am]
BILLING CODE 8025–01–P
SECURITIES AND EXCHANGE
COMMISSION
Sunshine Act Meeting
Notice is hereby given, pursuant to
the provisions of the Government in the
Sunshine Act, Public Law 94–409, that
the Securities and Exchange
Commission will hold a Closed Meeting
on Monday, November 23, 2009 at 9
a.m.
Commissioners, Counsel to the
Commissioners, the Secretary to the
Commission, and recording secretaries
will attend the Closed Meeting. Certain
staff members who have an interest in
the matters also may be present.
The General Counsel of the
Commission, or his designee, has
certified that, in his opinion, one or
more of the exemptions set forth in 5
U.S.C. 552b(c), (5), (7), (8), 9(B) and (10)
and 17 CFR 200.402(a)(5), (7), (8), 9(ii)
and (10), permit consideration of the
scheduled matter at the Closed Meeting.
Commissioner Walter, as duty officer,
voted to consider the item listed for the
Closed Meeting in a closed session, and
determined that no earlier notice thereof
was possible.
The subject matter of the Closed
Meeting scheduled for Monday,
November 23, 2009 will be:
Institution and settlement of injunctive
actions; and
Institution and settlement of
administrative proceedings.
At times, changes in Commission
priorities require alterations in the
scheduling of meeting items.
For further information and to
ascertain what, if any, matters have been
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 74, Number 224 (Monday, November 23, 2009)]
[Notices]
[Pages 61179-61181]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28092]
[[Page 61179]]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-266 and 50-301; NRC-2009-0160]
FPL Energy Point Beach, LLC; Notice of Consideration of Issuance
of Amendment to Renewed Facility Operating License, Proposed No
Significant Hazards Consideration Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Renewed Facility Operating
License Nos. DPR-24 and DPR-27 issued to FPL Energy Point Beach, LLC
(the licensee) for operation of the Point Beach Nuclear Plant, Units 1
and 2 located in Town of Two Creeks, Manitowoc County, Wisconsin.
On April 14, 2009, the Nuclear Regulatory Commission published a
Notice of Consideration of Issuance, Proposed No Significant Hazards
Consideration Determination, and Opportunity for Hearing in the Federal
Register (74 FR 17230) for a proposed amendment that would revise the
Point Beach Nuclear Plant (PBNP) Units 1 and 2 current licensing basis
to implement the alternate source term (AST) through reanalysis of the
radiological consequences of the Final Safety Analysis Report (FSAR)
Chapter 14 accidents.
On April 17, 2009, the licensee submitted a supplement which
expanded the original scope of work. The proposed revisions would add
Technical Specification (TS) 3.7.14, ``Primary Auxiliary Building
Ventilation (VNPAB),'' to the PBNP TS. The new TS is being proposed as
a result of the AST assumptions crediting the VNPAB exhaust function.
The proposed change also updates the Table of Contents of the TS to
incorporate the new TS.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration. The NRC staff's own analysis
is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed TS change reflects the plant configuration that is
required to implement the AST analyses. The operation of the VNPAB
exhaust is mitigating in nature and relied upon only after an
accident has been initiated to provide the AST LOCA ECCS equipment
leakage activity release location for the control room dose
calculation. The results of the LOCA radiological analysis
demonstrate that while operating the VNPAB exhaust system, as
supported by the proposed TS, the dose consequences of this limiting
event are within the regulatory limits and guidance provided by the
NRC in 10 CFR 50.67 and RG 1.183 (Reference 6.2). While the
operation of this system does change with the implementation of an
AST, the affected system in not an accident initiator.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed TS change reflects the plant configuration that is
required to implement the AST analyses, and no new or different
accidents result from utilizing the proposed changes. The LOCA
control room dose analysis assumes that the ECCS equipment leakage
activity release pathway X/Q to be at the location of the PAB vent
stack. Operation of the VNPAB exhaust fans assures this release
point. The VNPAB system operates during normal unit operation.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed TS reflects the plant configuration that is
required to implement the AST analyses. The operation of the VNPAB
exhaust is mitigating in nature and relied upon only after an
accident has been initiated. The VNPAB assures the proper X/Q for
airborne radiological protection for control room personnel, as
demonstrated by the control room dose analyses for the LOCA. The
proposed changes ensure that the dose consequences in the control
room due to the DBA LOCA are within the acceptance criteria
presented in 10 CFR 50.67.
Therefore, the proposed change does not involve a significant
reduction in margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in
[[Page 61180]]
accordance with the Commission's ``Rules of Practice for Domestic
Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309, which is available at the
Commission's PDR, located at One White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in the August 28, 2007, Federal Register notice (72 FR
49139). The E-Filing process requires participants to submit and serve
all adjudicatory documents over the internet, or in some cases to mail
copies on electronic storage media. Participants may not submit paper
copies of their filings unless they seek an exemption in accordance
with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
should must contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by calling (301) 415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms ViewerTM
to access the Electronic Information Exchange (EIE), a component of the
E-Filing system. The Workplace Forms ViewerTM is free and is
available at https://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html or by calling the NRC electronic filing Help Desk,
which is available between 8 a.m. and 8 p.m., Eastern Time, Monday
through Friday, excluding government holidays. The toll-free help line
number is 1-866-
[[Page 61181]]
672-7640. A person filing electronically may also seek assistance by
sending an e-mail to the NRC electronic filing Help Desk at
MSHD.Resource@nrc.gov.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the request and/
or petition should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii).
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/ehd_proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings, unless an NRC regulation or
other law requires submission of such information. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submissions.
For further details with respect to this license amendment
application, see the application for amendment dated December 8, 2008,
which is available for public inspection at the Commission's PDR,
located at One White Flint North, Room O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available records will be
accessible electronically from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to pdr.resource@nrc.gov.
Attorney for licensee: M. S. Ross, Vice President & Associate
General Counsel, Florida Power & Light Company, PO Box 14000, Juno
Beach, FL 33408-0420.
Dated at Rockville, Maryland, this 16th day of November 2009.
For the Nuclear Regulatory Commission.
Justin C. Poole,
Project Manager, Plant Licensing Branch III-1, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E9-28092 Filed 11-20-09; 8:45 am]
BILLING CODE 7590-01-P