Hydro Energy Technologies LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 61143 [E9-28016]

Download as PDF Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices jlentini on DSKJ8SOYB1PROD with NOTICES dam; (2) an existing 1,188-feet-long, 8.6feet-high concrete Providence dam; (3) an existing reservoir having a surface area of 1,792 acres and a storage capacity of 8,925 acre-feet; (4) a proposed powerhouse containing one or more open flume turbine generating units having an installed capacity of 600-kilowatts; (5) a proposed 100-feetlong, 480–VAC transmission line and transformer; and (6) appurtenant facilities. The proposed development would have an average annual generation of 4,000 megawatt-hours. Applicant Contact: Anthony J. Marra Jr., President, Hydro Energy Technologies LLC, 31300 Solon Rd., Suite 12, Solon, OH 44139; phone: (440) 498–1000. FERC Contact: Mary Greene, 202– 502–8865. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13611) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–28011 Filed 11–20–09; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 16:37 Nov 20, 2009 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13610–000] Hydro Energy Technologies LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 16, 2009. On October 30, 2009, Hydro Energy Technologies LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Independence Dam Hydroelectric Project, located in Defiance County, in the state of Ohio. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following developments: (1) An existing 652-feet-long, 11.8feet-high concrete gravity Independence dam; (2) an existing reservoir having a surface area of 545 acres and a storage capacity of 3,270 acre-feet and normal water surface elevation of 600 feet mean sea level; (3) a proposed powerhouse containing one or more vertical open flume turbine generating units having a combined nominal capacity of 1megawatt; (4) a proposed 150-feet-long, 480–VAC transmission line and transformer; and (5) appurtenant facilities. The proposed development would have an average annual generation of 6,000 megawatt-hours. Applicant Contact: Anthony J. Marra Jr., President, Hydro Energy Technologies LLC, 31300 Solon Rd., Suite 12, Solon, OH 44139; phone: (440) 498–1000. FERC Contact: Mary Greene, 202– 502–8865. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 61143 method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13610) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–28016 Filed 11–20–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP10–14–000; PF09–07–000] Kern River Gas Transmission Company; Notice of Application November 16, 2009. Take notice that on November 2, 2009, Kern River Gas Transmission Company (Kern River), 2755 East Cottonwood Parkway, Suite 300, Salt Lake City, Utah 84121, filed in the above referenced docket an application pursuant to section 7(c) of the Natural Gas Act seeking authority to expand its system comprised of new facilities and modifications to existing facilities as described more fully herein (Apex Expansion). Specifically, Kern River requests: (1) Authorization to construct, own and operate the facilities needed to expand its year-round, firm transportation capacity from the receipt points in Lincoln County, Wyoming, to the Pecos delivery point in Clark County, Nevada, by approximately 266,000 dekatherms per day (Dth/d); (2) approval of regulatory asset/liability accounting for differences between book and regulatory depreciation resulting from use of Kern River’s levelized rate design; (3) approval of incremental transportation rates and fuel factors; and (4) acceptance of the pro forma tariff sheets included in Exhibit P to the application, all as more fully set forth in E:\FR\FM\23NON1.SGM 23NON1

Agencies

[Federal Register Volume 74, Number 224 (Monday, November 23, 2009)]
[Notices]
[Page 61143]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28016]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13610-000]


Hydro Energy Technologies LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

November 16, 2009.
    On October 30, 2009, Hydro Energy Technologies LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the 
Independence Dam Hydroelectric Project, located in Defiance County, in 
the state of Ohio. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following developments:
    (1) An existing 652-feet-long, 11.8-feet-high concrete gravity 
Independence dam;
    (2) an existing reservoir having a surface area of 545 acres and a 
storage capacity of 3,270 acre-feet and normal water surface elevation 
of 600 feet mean sea level; (3) a proposed powerhouse containing one or 
more vertical open flume turbine generating units having a combined 
nominal capacity of 1-megawatt; (4) a proposed 150-feet-long, 480-VAC 
transmission line and transformer; and (5) appurtenant facilities. The 
proposed development would have an average annual generation of 6,000 
megawatt-hours.
    Applicant Contact: Anthony J. Marra Jr., President, Hydro Energy 
Technologies LLC, 31300 Solon Rd., Suite 12, Solon, OH 44139; phone: 
(440) 498-1000.
    FERC Contact: Mary Greene, 202-502-8865.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link. For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, 
for TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and eight copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13610) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-28016 Filed 11-20-09; 8:45 am]