Notice of Intent To Prepare Two Environmental Impact Statements/Staff Assessments for the Proposed Chevron Energy Solutions/Solar Millennium Palen and Blythe Solar Power Plants, Riverside County, CA and Possible Land Use Plan Amendments, 61169-61171 [E9-27961]
Download as PDF
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
jlentini on DSKJ8SOYB1PROD with NOTICES
the city of Ridgecrest in Kern County,
California.
The purpose of the public scoping
process is to determine relevant issues
that will influence the scope of the
environmental analysis, including
alternatives, and guide the process for
developing the EIS. At present, the BLM
has identified the following preliminary
issues: special area designations; social
and economic impacts, including
impacts to the public from traffic;
ground and surface water quantity and
quality; special status species
management; cultural resources; and
visual resources.
Authorization of this proposal may
require amendment of the CDCA Plan
(1980, as amended). By this notice, the
BLM is complying with requirements in
43 CFR 1610.2(c) to notify the public of
potential amendments to land use plans,
predicated on the findings of the EIS. If
a land use plan amendment is
necessary, the BLM will integrate the
land use planning process with the
NEPA process for this project.
The BLM will use the NEPA
commenting process to satisfy the
public involvement process for Section
106 of the National Historic
Preservation Act (16 U.S.C. 470f) as
provided for in 36 CFR 800.2(d)(3).
Native American Tribal consultations
will be conducted in accordance with
BLM policy, and Tribal concerns will be
given due consideration, including
impacts on Indian trust assets. Federal,
State, and local agencies, tribes, and
stakeholders that may be interested or
affected by the BLM’s decision on this
project are invited to participate in the
scoping process and, if eligible, may
request or be requested by the BLM to
participate as a cooperating agency.
Before including your address, phone
number, e-mail address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1501.7 and 43 CFR
1610.2.
Thomas Pogacnik,
Deputy State Director, Natural Resources,
California State Office.
[FR Doc. E9–27981 Filed 11–20–09; 8:45 am]
BILLING CODE 4310–40–P
VerDate Nov<24>2008
16:37 Nov 20, 2009
Jkt 220001
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLES002000.L16100000.DO0000.L.X.SS.
015M0000]
Notice of Availability of Record of
Decision for the Alabama and
Mississippi Resource Management
Plan/Environmental Impact Statement
AGENCY: Bureau of Land Management,
Interior.
ACTION: Notice of availability.
SUMMARY: The Bureau of Land
Management (BLM) announces the
availability of the Record of Decision
(ROD)/Approved Resource Management
Plan (RMP) for the states of Alabama
and Mississippi. The Eastern State
Director signed the ROD on January 30,
2009, which constitutes the final
decision of the BLM and makes the
approved RMP effective immediately.
ADDRESSES: Copies of the ROD/
approved RMP are available upon
request from the Field Manager, Jackson
Field Office, Bureau of Land
Management, 411 Briarwood Drive Suite
404, Jackson, Mississippi 39206 or via
the Internet at https://wwwblm.gov/es/st/
en/fo/Jackson_Home_Page.html, e-mail
Gary_Taylor@blm.gov, or telephone
Gary Taylor at (601) 977–5400.
FOR FURTHER INFORMATION CONTACT: Gary
Taylor.
• E-mail: Gary_Taylor@blm.gov.
• Mail: Jackson Field Office, BLM,
Attn: Gary Taylor, 411 Briarwood Drive,
Suite 404, Jackson, Mississippi 39206.
SUPPLEMENTARY INFORMATION: The
planning area is located in the states of
Alabama and Mississippi. This planning
activity encompasses approximately
1.67 million acres of public lands and
resources. The State of Mississippi
participated in development of the plan
as a cooperating agency. The RMP
addresses the following major questions:
(1) How will human activities and uses
be managed? (2) What facilities, uses,
and infrastructure are appropriate to
provide resource exploration while
managing the protection of the
biological, historical, cultural, and
visual values of Federal resources in
Alabama and Mississippi? (3) How will
the RMP be integrated with other
Federal and state agency community
plans? (4) How will transportation and
access be managed? (5) How will the
RMP affect economic and social
conditions in the area?
The Approved RMP was prepared
under the authorities of the Federal
Land Policy and Management Act of
1976 (FLPMA) and the National
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
61169
Environmental Policy Act of 1969
(NEPA). Additionally, this plan is
consistent with all local plans and
policies. The approved RMP is identical
to the proposed plan (Alternative 3)
presented in the 2008 Proposed RMP/
Final EIS. All decisions covered by the
ROD are either land-use planning
decisions that were protestable under
BLM’s planning regulations (43 CFR
1610), or are implementation decisions
that are appealable under 43 CFR part
4, as more fully discussed below. The
BLM will develop a plan evaluation
methodology to ensure that the RMP is
being followed. There was one protest
that was denied.
The decisions regarding oil and gas
leasing and disposal of Federal surface
lands are implementation decisions and
are appealable under 43 CFR part 4. Any
party adversely affected by these
decisions may appeal within 30 days of
publication of this Notice of Availability
pursuant to 43 CFR part 4, subpart E.
The appeal must be filed with the
Jackson Field Manager at the above
listed address. Please consult the
appropriate regulations (43 CFR part 4,
subpart E) for further appeal
requirements.
Juan Palma,
Director.
[FR Doc. E9–27785 Filed 11–20–09; 8:45 am]
BILLING CODE 4310–GJ–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA 048810 and CACA 048811,
LLCAD06000 L5101 ER0000
LVRBW09B26000]
Notice of Intent To Prepare Two
Environmental Impact Statements/Staff
Assessments for the Proposed
Chevron Energy Solutions/Solar
Millennium Palen and Blythe Solar
Power Plants, Riverside County, CA
and Possible Land Use Plan
Amendments
AGENCY: Bureau of Land Management,
Interior.
ACTION: Notice of intent.
SUMMARY: In compliance with the
National Environmental Policy Act
(NEPA) of 1969, as amended, the
Federal Land Policy and Management
Act of 1976, as amended, and the
California Environmental Quality Act
(CEQA), the Bureau of Land
Management (BLM) Palm Springs South
Coast Field Office, Palm Springs,
California, together with the California
Energy Commission (CEC), intend to
prepare two Environmental Impact
E:\FR\FM\23NON1.SGM
23NON1
jlentini on DSKJ8SOYB1PROD with NOTICES
61170
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
Statements (EIS)/Staff Assessments
(SAs), which may include an
amendment to the California Desert
Conservation Area (CDCA) Plan (1980,
as amended) and by this notice are
announcing the beginning of the
scoping process to solicit public
comments and identify issues.
DATES: This notice initiates the public
scoping process for the Draft EIS/SAs
and possible plan amendment.
Comments on issues may be submitted
in writing until December 23, 2009. The
dates and locations of scoping meetings,
information hearings, and site visits will
be announced at least 15 days in
advance through local media and the
BLM Web site at: https://www.blm.gov/
ca/st/en/fo/palmsprings.html and the
CEC Web sites at
https://www.energy.ca.gov/sitingcases/
solar_millennium_palen/ and
https://www.energy.ca.gov/sitingcases/
solar_millennium_blythe/. To
be considered in the Draft EIS/SAs, all
comments must be received prior to the
close of the scoping period or 15 days
after the last public meeting, whichever
is later. We will provide additional
opportunities for public participation
upon publication of the Draft EIS/SAs.
ADDRESSES: You may submit comments
on issues and planning criteria related
to the Proposed Chevron Energy
Solutions/Solar Millennium Palen and
Blythe Solar Power Plants EIS/SAs and
CDCA Plan amendment by any of the
following methods:
• E-mail:
asolomon@energy.state.ca.us,
CAPSSolarPalen@blm.gov, or
CAPSSolarBlythe@blm.gov.
• Fax: (760) 833–7199.
• Mail or hand delivery: Alan
Solomon, Project Manager, Siting,
Transmission and Environmental
Protection Division, CEC, 1516 Ninth
Street, MS–15, Sacramento, California
95814 or Holly L. Roberts, Project
Manager, Palm Springs-South Coast
Field Office, BLM, 1201 Bird Center
Drive, Palm Springs, California 92262.
The administrative record of this
proposal may be examined at the Palm
Springs South Coast Field Office during
normal business hours.
FOR FURTHER INFORMATION CONTACT: For
further information or to have your
name added to our mailing list, contact
Alan Solomon, CEC project manager at
telephone (916) 653–8236, or address
1516 Ninth Street, MS–15, Sacramento,
CA 95814, or e-mail
asolomon@energy.state.ca.us; or Allison
Shaffer, BLM project manager at
telephone (760) 833–7100, or address
Palm Springs-South Coast Field Office,
BLM, 1201 Bird Center Drive, Palm
VerDate Nov<24>2008
16:37 Nov 20, 2009
Jkt 220001
Springs, California 92262, or e-mail
CAPSSolarPalen@blm.gov or
CAPSSolarBlythe@blm.gov. Information
on participating in the CEC’s review of
the project may also be obtained
through the CEC’s Public Advisor’s
Office at (916) 654–8236 or toll free in
California, (800) 822–6228, or by e-mail:
publicadviser@energy.state.ca.us. News
media inquiries should be directed to
the CEC’s media office at (916) 654–
4989, or mediaoffice@energy.state.ca.us.
You can also subscribe to an email
notification list of all notices at:
https://www.energy.ca.gov/listservers.
SUPPLEMENTARY INFORMATION: Chevron
Energy Solutions/Solar Millennium
(CESSM) has applied for two separate
right-of-way (ROW) authorizations to
construct and operate the Palen and
Blythe solar thermal power plants in
eastern Riverside County, California
with an expected combined capacity of
1,452 megawatts (MW) using solar
parabolic trough generating stations.
Approximately 10,100 acres of
BLM-administered public land are
needed to develop the two projects.
Pursuant to the BLM’s CDCA Plan,
sites associated with power generation
or transmission not identified in the
CDCA Plan will be considered through
the plan amendment process. Under
Federal law, the BLM is responsible for
processing requests for ROWs to
authorize solar projects and associated
transmission lines and other associated
facilities on the land it manages. Under
California law, the CEC is responsible
for reviewing applications for
certification (AFC) filed for thermal
power plants over 50 MW. The CEC also
serves as lead agency for the
environmental review of such projects
under CEQA. On August 24, 2009,
CESSM submitted to the CEC AFCs for
the Palen and Blythe projects.
The Palen site is 10 miles east of
Desert Center, California and a half mile
north of Interstate 10; the Blythe site is
eight miles west of Blythe, California
and three miles north of Interstate 10.
The Palen facility will be constructed in
two phases, while the Blythe facility
will be constructed in four phases.
The proposed Palen Solar Power
Project would consist of two parabolic
trough solar thermal power plants, each
of which would have a solar field
comprised of rows of parabolic mirrors
focusing solar energy on collector tubes.
The tubes would carry heated oil to a
boiler, which would then send steam to
a turbine. The two phases would
generate approximately 484 MW of
electricity. The two power plants would
share administrative buildings, parking
areas, maintenance buildings, switch
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
yards, bioremediation areas, wastewater
treatment facilities, access and
maintenance roads, and perimeter
fencing. The project would also include
a natural gas pipeline, communication
lines, and a 230 kV transmission line.
The total expected project footprint
would be approximately 3,800 acres.
During construction, the project would
require approximately 1,100 acre-feet of
water for dust control and soil
compaction. During operation, the
project would require approximately
300 acre-feet of water per year. CESSM
proposes to use water from new wells.
The proposed Blythe Solar Power
Project would consist of four parabolic
trough solar thermal power plants
similar to the Palen project. The four
power plants would generate
approximately 968 MW of electricity.
All four plants would share
administrative buildings, parking areas,
maintenance buildings, switch yards,
bioremediation areas, wastewater
treatment facilities, access and
maintenance roads, and perimeter
fencing. The project would also include
a natural gas pipeline, communication
lines, and a 500 kV transmission line.
The total expected project footprint
would be approximately 6,300 acres.
During construction, the project would
require approximately 3, 100 acre feet of
water for dust control and soil
compaction. During operation, the
project would require approximately
600 acre-feet of water per year. CESSM
proposes to use water from new wells.
If approved, both projects would begin
construction in late 2010. The purpose
of the public scoping process is to
determine relevant issues that will
influence the scope of the
environmental analysis, including
alternatives, and guide the process for
developing the EISs. The BLM has
identified the following preliminary
issues: special area designations, air
quality, biological resources, hazardous
materials, recreation, cultural resources,
water resources, geological resources,
land use, noise, paleontological
resources, public health,
socioeconomics, soils, traffic and
transportation, and visual resources.
Authorization of these proposals may
require amendment of the CDCA Plan.
By this notice, the BLM is complying
with requirements in 43 CFR 1610.2(c)
to notify the public of potential
amendments to land use plans, subject
to the findings of the EISs. If a land use
plan amendment is necessary, the BLM
will integrate the land use planning
process with the NEPA process for these
projects.
The BLM will use the NEPA
commenting process to satisfy the
E:\FR\FM\23NON1.SGM
23NON1
Federal Register / Vol. 74, No. 224 / Monday, November 23, 2009 / Notices
public involvement process for Section
106 of the National Historic
Preservation Act (16 U.S.C. 470f) as
provided for in 36 CFR 800.2(d)(3).
Native American Tribal consultations
will be conducted and Tribal concerns
will be given due consideration,
including impacts on Indian trust assets.
Federal, State, and local agencies, along
with Tribes and other stakeholders that
may be interested or affected by the
BLM’s decision on this project, are
invited to participate in the scoping
process and, if eligible, may request or
be requested by the BLM to participate
as a cooperating agency.
Before including your address, phone
number, e-mail address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1501.7 and 43 CFR
1610.2.
Tom Pogacnik,
Deputy State Director for Natural Resources,
BLM California State Office.
[FR Doc. E9–27961 Filed 11–20–09; 8:45 am]
BILLING CODE 4310–40–P
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS–R8–FHC–2009–N248; 81331–1334–
8TWG–W4]
Trinity Adaptive Management Working
Group
AGENCY:
jlentini on DSKJ8SOYB1PROD with NOTICES
Interior.
ACTION: Notice of meeting.
Under
section 10(a)(2) of the Federal Advisory
Committee Act (5 U.S.C. App.), this
notice announces a meeting of the
TAMWG. The meeting will include
discussion of the following topics:
• TAMWG role and effectiveness in
Trinity River Restoration Program;
• TRRP staff organization;
• TRRP science program;
• TRRP budget process and budget
update;
• Trinity River channel rehabilitation
projects;
• Trinity reservoir operations;
• Proposed Klamath River dam
removal; and
• Tribal harvest management and
allocation.
Completion of the agenda is dependent
on the amount of time each item takes.
The meeting could end early if the
agenda has been completed.
SUPPLEMENTARY INFORMATION:
Dated: November 17, 2009.
Randy A. Brown,
Designated Federal Officer, Arcata Fish and
Wildlife Office, Arcata, CA.
[FR Doc. E9–28070 Filed 11–20–09; 8:45 am]
DEPARTMENT OF THE INTERIOR
SUMMARY: The Trinity Adaptive
Management Working Group (TAMWG)
affords stakeholders the opportunity to
give policy, management, and technical
input concerning Trinity River
(California) restoration efforts to the
Trinity Management Council (TMC).
The TMC interprets and recommends
policy, coordinates and reviews
management actions, and provides
organizational budget oversight. This
notice announces a TAMWG meeting,
which is open to the public.
DATES: TAMWG will meet from 1 to 5
p.m. on Monday, December 14, 2009,
and from 8:30 a.m. to 5 p.m. on
Tuesday, December 15, 2009.
16:37 Nov 20, 2009
FOR FURTHER INFORMATION CONTACT:
Meeting information: Randy A. Brown,
TAMWG Designated Federal Officer,
U.S. Fish and Wildlife Service, 1655
Heindon Road, Arcata, CA 95521;
telephone: (707) 822–7201. Trinity River
Restoration Program (TRRP)
information: Mike Hamman, Executive
Director, Trinity River Restoration
Program, P.O. Box 1300, 1313 South
Main Street, Weaverville, CA 96093;
telephone: (530) 623–1800; e-mail:
mhamman@mp.usbr.gov.
BILLING CODE 4310–55–P
Fish and Wildlife Service,
VerDate Nov<24>2008
The meeting will be held at
the Weaverville Victorian Inn, 1709
Main St., 299 West Weaverville, CA
96093.
ADDRESSES:
Jkt 220001
Minerals Management Service
Notice on Outer Continental Shelf Oil
and Gas Lease Sales
AGENCY:
Minerals Management Service,
Interior.
ACTION: List of Restricted Joint Bidders.
SUMMARY: Pursuant to the authority
vested in the Director of the Minerals
Management Service by the joint
bidding provisions of 30 CFR 256.41,
each entity within one of the following
groups shall be restricted from bidding
with any entity in any other of the
following groups at Outer Continental
Shelf oil and gas lease sales to be held
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
61171
during the bidding period November 1,
2009 through April 30, 2010. The List of
Restricted Joint Bidders published in
the Federal Register on April 20, 2009,
covered the period May 1, 2009 through
October 31, 2009.
Group I
Exxon Mobil Corporation
ExxonMobil Exploration Company
Group II
Shell Oil Company
Shell Offshore Inc.
SWEPI LP
Shell Frontier Oil & Gas Inc.
Shell Consolidated Energy Resources
Inc.
Shell Land & Energy Company
Shell Onshore Ventures Inc.
Shell Offshore Properties and Capital II,
Inc.
SOI Finance Inc.
Shell Rocky Mountain Production LLC
Shell Gulf of Mexico Inc.
Group III
BP America Production Company
BP Exploration & Production Inc.
BP Exploration (Alaska) Inc.
Group IV
TOTAL E&P USA, Inc.
Group V
Chevron Corporation
Chevron U.S.A. Inc.
Chevron Midcontinent, L.P.
Unocal Corporation
Union Oil Company of California
Pure Partners, L.P.
Group VI
ConocoPhillips Company
ConocoPhillips Alaska, Inc.
ConocoPhillips Petroleum Company
Phillips Pt. Arguello Production
Company
Burlington Resources Oil & Gas
Company LP
Burlington Resources Offshore Inc.
The Louisiana Land and Exploration
Company
Inexeco Oil Company
Group VII
Eni Petroleum Co. Inc.
Eni Petroleum US LLC
Eni Oil US LLC
Eni Marketing Inc.
Eni BB Petroleum Inc.
Eni US Operating Co. Inc.
Eni BB Pipeline LLC
Group VIII
Petrobras America Inc.
Group IX
StatoilHydro ASA
Statoil Gulf of Mexico LLC
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 74, Number 224 (Monday, November 23, 2009)]
[Notices]
[Pages 61169-61171]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27961]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA 048810 and CACA 048811, LLCAD06000 L5101 ER0000 LVRBW09B26000]
Notice of Intent To Prepare Two Environmental Impact Statements/
Staff Assessments for the Proposed Chevron Energy Solutions/Solar
Millennium Palen and Blythe Solar Power Plants, Riverside County, CA
and Possible Land Use Plan Amendments
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: In compliance with the National Environmental Policy Act
(NEPA) of 1969, as amended, the Federal Land Policy and Management Act
of 1976, as amended, and the California Environmental Quality Act
(CEQA), the Bureau of Land Management (BLM) Palm Springs South Coast
Field Office, Palm Springs, California, together with the California
Energy Commission (CEC), intend to prepare two Environmental Impact
[[Page 61170]]
Statements (EIS)/Staff Assessments (SAs), which may include an
amendment to the California Desert Conservation Area (CDCA) Plan (1980,
as amended) and by this notice are announcing the beginning of the
scoping process to solicit public comments and identify issues.
DATES: This notice initiates the public scoping process for the Draft
EIS/SAs and possible plan amendment. Comments on issues may be
submitted in writing until December 23, 2009. The dates and locations
of scoping meetings, information hearings, and site visits will be
announced at least 15 days in advance through local media and the BLM
Web site at: https://www.blm.gov/ca/st/en/fo/palmsprings.html and the
CEC Web sites at https://www.energy.ca.gov/sitingcases/solar_millennium_palen/ and https://www.energy.ca.gov/sitingcases/solar_millennium_blythe/. To be considered in the Draft
EIS/SAs, all comments must be received prior to the close of the
scoping period or 15 days after the last public meeting, whichever is
later. We will provide additional opportunities for public
participation upon publication of the Draft EIS/SAs.
ADDRESSES: You may submit comments on issues and planning criteria
related to the Proposed Chevron Energy Solutions/Solar Millennium Palen
and Blythe Solar Power Plants EIS/SAs and CDCA Plan amendment by any of
the following methods:
E-mail: asolomon@energy.state.ca.us,
CAPSSolarPalen@blm.gov, or CAPSSolarBlythe@blm.gov.
Fax: (760) 833-7199.
Mail or hand delivery: Alan Solomon, Project Manager,
Siting, Transmission and Environmental Protection Division, CEC, 1516
Ninth Street, MS-15, Sacramento, California 95814 or Holly L. Roberts,
Project Manager, Palm Springs-South Coast Field Office, BLM, 1201 Bird
Center Drive, Palm Springs, California 92262.
The administrative record of this proposal may be examined at the
Palm Springs South Coast Field Office during normal business hours.
FOR FURTHER INFORMATION CONTACT: For further information or to have
your name added to our mailing list, contact Alan Solomon, CEC project
manager at telephone (916) 653-8236, or address 1516 Ninth Street, MS-
15, Sacramento, CA 95814, or e-mail asolomon@energy.state.ca.us; or
Allison Shaffer, BLM project manager at telephone (760) 833-7100, or
address Palm Springs-South Coast Field Office, BLM, 1201 Bird Center
Drive, Palm Springs, California 92262, or e-mail CAPSSolarPalen@blm.gov
or CAPSSolarBlythe@blm.gov. Information on participating in the CEC's
review of the project may also be obtained through the CEC's Public
Advisor's Office at (916) 654-8236 or toll free in California, (800)
822-6228, or by e-mail: publicadviser@energy.state.ca.us. News media
inquiries should be directed to the CEC's media office at (916) 654-
4989, or mediaoffice@energy.state.ca.us. You can also subscribe to an
email notification list of all notices at: https://www.energy.ca.gov/listservers.
SUPPLEMENTARY INFORMATION: Chevron Energy Solutions/Solar Millennium
(CESSM) has applied for two separate right-of-way (ROW) authorizations
to construct and operate the Palen and Blythe solar thermal power
plants in eastern Riverside County, California with an expected
combined capacity of 1,452 megawatts (MW) using solar parabolic trough
generating stations. Approximately 10,100 acres of BLM-administered
public land are needed to develop the two projects.
Pursuant to the BLM's CDCA Plan, sites associated with power
generation or transmission not identified in the CDCA Plan will be
considered through the plan amendment process. Under Federal law, the
BLM is responsible for processing requests for ROWs to authorize solar
projects and associated transmission lines and other associated
facilities on the land it manages. Under California law, the CEC is
responsible for reviewing applications for certification (AFC) filed
for thermal power plants over 50 MW. The CEC also serves as lead agency
for the environmental review of such projects under CEQA. On August 24,
2009, CESSM submitted to the CEC AFCs for the Palen and Blythe
projects.
The Palen site is 10 miles east of Desert Center, California and a
half mile north of Interstate 10; the Blythe site is eight miles west
of Blythe, California and three miles north of Interstate 10. The Palen
facility will be constructed in two phases, while the Blythe facility
will be constructed in four phases.
The proposed Palen Solar Power Project would consist of two
parabolic trough solar thermal power plants, each of which would have a
solar field comprised of rows of parabolic mirrors focusing solar
energy on collector tubes. The tubes would carry heated oil to a
boiler, which would then send steam to a turbine. The two phases would
generate approximately 484 MW of electricity. The two power plants
would share administrative buildings, parking areas, maintenance
buildings, switch yards, bioremediation areas, wastewater treatment
facilities, access and maintenance roads, and perimeter fencing. The
project would also include a natural gas pipeline, communication lines,
and a 230 kV transmission line. The total expected project footprint
would be approximately 3,800 acres. During construction, the project
would require approximately 1,100 acre-feet of water for dust control
and soil compaction. During operation, the project would require
approximately 300 acre-feet of water per year. CESSM proposes to use
water from new wells.
The proposed Blythe Solar Power Project would consist of four
parabolic trough solar thermal power plants similar to the Palen
project. The four power plants would generate approximately 968 MW of
electricity. All four plants would share administrative buildings,
parking areas, maintenance buildings, switch yards, bioremediation
areas, wastewater treatment facilities, access and maintenance roads,
and perimeter fencing. The project would also include a natural gas
pipeline, communication lines, and a 500 kV transmission line. The
total expected project footprint would be approximately 6,300 acres.
During construction, the project would require approximately 3, 100
acre feet of water for dust control and soil compaction. During
operation, the project would require approximately 600 acre-feet of
water per year. CESSM proposes to use water from new wells. If
approved, both projects would begin construction in late 2010. The
purpose of the public scoping process is to determine relevant issues
that will influence the scope of the environmental analysis, including
alternatives, and guide the process for developing the EISs. The BLM
has identified the following preliminary issues: special area
designations, air quality, biological resources, hazardous materials,
recreation, cultural resources, water resources, geological resources,
land use, noise, paleontological resources, public health,
socioeconomics, soils, traffic and transportation, and visual
resources.
Authorization of these proposals may require amendment of the CDCA
Plan. By this notice, the BLM is complying with requirements in 43 CFR
1610.2(c) to notify the public of potential amendments to land use
plans, subject to the findings of the EISs. If a land use plan
amendment is necessary, the BLM will integrate the land use planning
process with the NEPA process for these projects.
The BLM will use the NEPA commenting process to satisfy the
[[Page 61171]]
public involvement process for Section 106 of the National Historic
Preservation Act (16 U.S.C. 470f) as provided for in 36 CFR
800.2(d)(3). Native American Tribal consultations will be conducted and
Tribal concerns will be given due consideration, including impacts on
Indian trust assets. Federal, State, and local agencies, along with
Tribes and other stakeholders that may be interested or affected by the
BLM's decision on this project, are invited to participate in the
scoping process and, if eligible, may request or be requested by the
BLM to participate as a cooperating agency.
Before including your address, phone number, e-mail address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1501.7 and 43 CFR 1610.2.
Tom Pogacnik,
Deputy State Director for Natural Resources, BLM California State
Office.
[FR Doc. E9-27961 Filed 11-20-09; 8:45 am]
BILLING CODE 4310-40-P