Environmental Impacts Statements; Notice of Availability, 60260 [E9-27968]
Download as PDF
60260
Federal Register / Vol. 74, No. 223 / Friday, November 20, 2009 / Notices
to the Office of Federal Activities at
202–564–7146 or https://www.epa.gov/
compliance/nepa/.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009 (74 FR 34754).
Draft EISs
EIS No. 20090312, ERP No. D–COE–
F39043–OH, Cleveland Harbor
Dredged Material Management Plan,
Operations and Maintenance,
Cuyahoga County, OH.
Summary: EPA expressed
environmental concerns about air
quality impacts, and recommended
implementation of mitigation measures.
Rating EC2.
EIS No. 20090315, ERP No. D–FTA–
K40273–CA, Crenshaw Transit
Corridor Project, Proposes to Improve
Transit Services, Funding, Los
Angeles County Metropolitan
Transportation Authority (LACMTA),
Los Angeles County, CA.
Summary: EPA expressed
environmental concerns about the air
quality analysis, and offered additional
suggestions for water quality impact
analysis and mitigation. Rating EC2.
EIS No. 20090382, ERP No. D–IBR–
K39123–CA, Central Valley Project
Water Supply Contracts Under Public
Law 101–514 (Section 206), Proposed
Water Service Contracts with the El
Dorado County Water Agency, El
Dorado County, CA.
Summary: EPA does not object to the
proposed action. Rating LO.
srobinson on DSKHWCL6B1PROD with NOTICES
Final EISs
EIS No. 20090340, ERP No. F–AFS–
J65499–UT, Pockets Resource
Management Project, Additional
Information on Analysis and
Disclosure on the Effect of the PA and
Alternatives on Three Unroaded and
Undeveloped Areas Identified on a
2005 Draft Map, Proposes to Salvage
Dead and Dying Spruce/Fir,
Regenerate Aspen, and Manage
Travel, Escalate Ranger District, Dixie
National Forest, Garfield County, UT.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20090375, ERP No. F–AFS–
L65575–OR, Deadlog Vegetation
Management Project, To Implement
Treatments that would Reduce the
Risk of High Intensity, Stand
Replacement Wildlife and the Risk of
Heavy Tree Mortality from Insects and
Disease, Deschutes National Forest
Lands, Deschutes County, OR.
Summary: EPA does not object to the
proposed action.
VerDate Nov<24>2008
17:03 Nov 19, 2009
Jkt 220001
Dated: November 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–27966 Filed 11–20–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8799–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 11/09/2009 through 11/13/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090391, Final EIS, AFS, CA,
Salt Timber Harvest and Fuel Hazard
Reduction Project, Proposing
Vegetation Management in the Salt
Creek Watershed, South Fork
Management Unit, Hayfork Ranger
District, Shasta-Trinity National
Forest, Trinity County, CA, Wait
Period Ends: 12/21/2009, Contact:
Sand Mack 406–375–2638.
EIS No. 20090392, Draft Supplement,
FHW, HI, Saddle Road (HI–200)
Improvements Project. Proposed
Improvement from Mamalahoa
Highway (HI–190) to Milepost 41,
Hawaii County, HI, Comment Period
Ends: 01/07/2010, Contact: Melissa
Dickard 720–963–3691.
EIS No. 20090393, Final EIS, DOE, MN,
Mesaba Energy Project, Proposes to
Design, Construct and Operate a CoalBased Integrated Gasification Cycle
(IGCC) Electric Power Generating
Facility, Located in the Taconite Tax
Relief Area (TTRA), Itasca and St.
Louis Counties, MN, Wait Period
Ends: 12/21/2009, Contact: Richard A.
Hargis, Jr 412–386–6065.
EIS No. 20090394, Draft EIS, USN, GU,
Guam and Commonwealth of the
Northern Mariana Islands (CNMI)
Military Relocation, Proposed
Relocating Marines from Okinawa,
Visiting Aircraft Carrier Berthing, and
Army Air and Missile Defense Task
Force, Implementation, GU, Comment
Period Ends: 01/04/2010, Contact:
Kyle Fujimoto 808–472–1442.
EIS No. 20090395, Draft EIS, FTA, CO,
North Metro Corridor Project,
Proposed a Commuter Rail Transit
from downtown Denver, Colorado,
north to State Highway (SH) 7, in the
Cities of Denver, Commerce City,
Thornton, Northglenn, and Adams
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
County, CO, Comment Period Ends:
01/15/2010, Contact: David
Beckhouse 720–963–3306.
EIS No. 20090396, Draft Supplement,
CGD, AL, Bienville Offshore Energy
Terminal (BOET) Deepwater Port
License Application Amendment
(Docket # USCG–2006–24644),
Proposes to Construct and Operate a
Liquefied Natural Gas Receiving and
Regasification Facility, Outer
Continental Shelf of the Gulf of
Mexico, South of Fort Morgan, AL,
Comment Period Ends: 01/04/2010,
Contact: Lt. Hannah Kawamoto 202–
372–1438.
EIS No. 20090397, Draft EIS, USA, 00,
Programmatic—Louisiana Coastal
Area (LCA) Beneficial Use of Dredged
Material (BUDMAT) Program Study,
To Establish the Structure and
Management Architecture of the
BUDMAT Program, Implementation,
MS, TX and LA, Comment Period
Ends: 01/04/2010, Contact: Elizabeth
McCasland 504–862–2021.
Amended Notices.
EIS No. 20090324, Draft EIS, AFS, 00,
Nebraska National Forests and
Grassland Travel Management Project,
Proposes to Designate Routes and
Areas Open to Motorized Travel,
Buffalo Gap National Grassland,
Oglala National Grassland, Samuel R.
McKelvie National Forest, and the
Pine Ridge and Bessey Units of the
Nebraska National Forest, Fall River,
Custer, Pennington, Jackson Counties;
SD and Sioux, Dawes, Cherry,
Thomas and Blaine Counties, NE.,
Comment Period Ends: 12/24/2009,
Contact: Mark Reichert 530–841–
4422.
Revision to FR Published 09/25/2009:
Extending Comment Period from 11/09/
2009 to 12/24/2009.
EIS No. 20090366, Final EIS, FHW, CO,
US–36 Corridor, Multi-Modal
Transportation Improvements
between I–25 in Adams County and
Foothills Parkway/Table Mesa Drive
in Boulder, Adams, Denver,
Broomfield, Boulder and Jefferson
Counties, CO, Wait Period Ends: 12/
14/2009, Contact: Monica Pavlik 720–
963–3012.
Revision to FR Notice Published 10/
30/2009: Extending Comment Period
from 11/30/2009 to 12/14/2009.
Dated: November 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–27968 Filed 11–19–09; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 74, Number 223 (Friday, November 20, 2009)]
[Notices]
[Page 60260]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27968]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8799-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 11/09/2009 through 11/13/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090391, Final EIS, AFS, CA, Salt Timber Harvest and Fuel
Hazard Reduction Project, Proposing Vegetation Management in the Salt
Creek Watershed, South Fork Management Unit, Hayfork Ranger District,
Shasta-Trinity National Forest, Trinity County, CA, Wait Period Ends:
12/21/2009, Contact: Sand Mack 406-375-2638.
EIS No. 20090392, Draft Supplement, FHW, HI, Saddle Road (HI-200)
Improvements Project. Proposed Improvement from Mamalahoa Highway (HI-
190) to Milepost 41, Hawaii County, HI, Comment Period Ends: 01/07/
2010, Contact: Melissa Dickard 720-963-3691.
EIS No. 20090393, Final EIS, DOE, MN, Mesaba Energy Project, Proposes
to Design, Construct and Operate a Coal-Based Integrated Gasification
Cycle (IGCC) Electric Power Generating Facility, Located in the
Taconite Tax Relief Area (TTRA), Itasca and St. Louis Counties, MN,
Wait Period Ends: 12/21/2009, Contact: Richard A. Hargis, Jr 412-386-
6065.
EIS No. 20090394, Draft EIS, USN, GU, Guam and Commonwealth of the
Northern Mariana Islands (CNMI) Military Relocation, Proposed
Relocating Marines from Okinawa, Visiting Aircraft Carrier Berthing,
and Army Air and Missile Defense Task Force, Implementation, GU,
Comment Period Ends: 01/04/2010, Contact: Kyle Fujimoto 808-472-1442.
EIS No. 20090395, Draft EIS, FTA, CO, North Metro Corridor Project,
Proposed a Commuter Rail Transit from downtown Denver, Colorado, north
to State Highway (SH) 7, in the Cities of Denver, Commerce City,
Thornton, Northglenn, and Adams County, CO, Comment Period Ends: 01/15/
2010, Contact: David Beckhouse 720-963-3306.
EIS No. 20090396, Draft Supplement, CGD, AL, Bienville Offshore Energy
Terminal (BOET) Deepwater Port License Application Amendment (Docket
USCG-2006-24644), Proposes to Construct and Operate a
Liquefied Natural Gas Receiving and Regasification Facility, Outer
Continental Shelf of the Gulf of Mexico, South of Fort Morgan, AL,
Comment Period Ends: 01/04/2010, Contact: Lt. Hannah Kawamoto 202-372-
1438.
EIS No. 20090397, Draft EIS, USA, 00, Programmatic--Louisiana Coastal
Area (LCA) Beneficial Use of Dredged Material (BUDMAT) Program Study,
To Establish the Structure and Management Architecture of the BUDMAT
Program, Implementation, MS, TX and LA, Comment Period Ends: 01/04/
2010, Contact: Elizabeth McCasland 504-862-2021.
Amended Notices.
EIS No. 20090324, Draft EIS, AFS, 00, Nebraska National Forests and
Grassland Travel Management Project, Proposes to Designate Routes and
Areas Open to Motorized Travel, Buffalo Gap National Grassland, Oglala
National Grassland, Samuel R. McKelvie National Forest, and the Pine
Ridge and Bessey Units of the Nebraska National Forest, Fall River,
Custer, Pennington, Jackson Counties; SD and Sioux, Dawes, Cherry,
Thomas and Blaine Counties, NE., Comment Period Ends: 12/24/2009,
Contact: Mark Reichert 530-841-4422.
Revision to FR Published 09/25/2009: Extending Comment Period from
11/09/2009 to 12/24/2009.
EIS No. 20090366, Final EIS, FHW, CO, US-36 Corridor, Multi-Modal
Transportation Improvements between I-25 in Adams County and Foothills
Parkway/Table Mesa Drive in Boulder, Adams, Denver, Broomfield, Boulder
and Jefferson Counties, CO, Wait Period Ends: 12/14/2009, Contact:
Monica Pavlik 720-963-3012.
Revision to FR Notice Published 10/30/2009: Extending Comment
Period from 11/30/2009 to 12/14/2009.
Dated: November 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-27968 Filed 11-19-09; 8:45 am]
BILLING CODE 6560-50-P