Central Oregon Irrigation District; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 59973-59974 [E9-27735]

Download as PDF erowe on DSK5CLS3C1PROD with NOTICES Federal Register / Vol. 74, No. 222 / Thursday, November 19, 2009 / Notices or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Union Electric Company, dba AmerenUE, filed an application seeking Commission authorization to permit Mystic Bay Development to add one dock with six multi-family residential boat slips to its four existing community docks with a total of 60 boat slips. The proposed dock would be located along the shoreline fronting Mystic Bay Condominiums. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary link. Enter the docket number excluding the last three digits in the docket number field (P–459) to access the document. You may also register online at: https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the VerDate Nov<24>2008 15:22 Nov 18, 2009 Jkt 220001 Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(l)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–27808 Filed 11–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13607–000] Central Oregon Irrigation District; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions November 12, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No.: P–13607–000. c. Date Filed: October 19, 2009. d. Applicant: Central Oregon Irrigation District. e. Name of Project: Juniper Ridge Hydroelectric Project. f. Location: The Juniper Ridge Hydroelectric Project would be located on the Central Oregon Irrigation District’s Pilot Butte Canal, also referred to as the North Canal, in Deschutes County, Bend, Oregon. The land in which all the project structures are located is owned by the applicant. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Steven Johnson, Central Oregon Irrigation District, 1055 SW. Lake Court, Redmond, OR 97756; stevej@coid.org. i. FERC Contact: Patricia W. Gillis, (202) 502–8735, patricia.gillis@ferc.gov. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 59973 j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for Filing Responsive Documents: The Commission directs, pursuant to section 4.34(b) of the Regulations (see Order No. 533, issued May 8, 1991, 56 FR 23,108 (May 20, 1991)), that all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions concerning the application be filed with the Commission by December 10, 2009. All reply comments must be filed with the Commission by December 28, 2009. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Project: The proposed Juniper Ridge Hydroelectric Project consists of: (1) A proposed powerhouse containing one generating unit having an installed capacity of 5,000 kilowatts, and (2) appurtenant facilities. The project would have an estimated annual generation of 12.6 megawatthours that would be used on-site with any excess being sold to a local utility. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, here P–12624, in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for review and reproduction at the address in item h. above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the E:\FR\FM\19NON1.SGM 19NON1 erowe on DSK5CLS3C1PROD with NOTICES 59974 Federal Register / Vol. 74, No. 222 / Thursday, November 19, 2009 / Notices particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Protests or Motions to Intervene— Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. q. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS’’, ‘‘TERMS AND CONDITIONS’’, or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and eight copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above VerDate Nov<24>2008 15:22 Nov 18, 2009 Jkt 220001 address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Kimberly D. Bose, Secretary. [FR Doc. E9–27735 Filed 11–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10–13–000] Tampa Electric Company, Complainant v. Calpine Construction Finance Company, L.P., Respondent; Notice of Complaint November 13, 2009. Frm 00017 Fmt 4703 Kimberly D. Bose, Secretary. [FR Doc. E9–27809 Filed 11–18–09; 8:45 am] BILLING CODE 6717–01–P Take notice that on November 10, 2009, pursuant to section 206 of the Federal Energy Regulatory Commission (Commission) Rules and Practice and Procedure, 18 CFR 385.206 and section 206 of the Federal Power Act, 16 U.S.C. 824(e), Tampa Electric Company (Complainant) filed a formal complaint against Calpine Construction Finance Company, L.P. (Respondent) requesting that the Commission issue an order vacating the Respondent’s Rate Schedule FERC No. 3, effective no later than November 10, 2009, under which the Respondent charges the Complainant for reactive power service. The Complainant states that copies of the complaint were served on the Respondent and the Florida Service Commission Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. PO 00000 The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 30, 2009. Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09–10–000] National Action Plan on Demand Response; Notice Announcing Agenda for the November 19–20, 2009 Technical Conference November 12, 2009. Section 529 of the Energy Independence and Security Act of 2007 (EISA) 1 directed the Commission to develop a National Action Plan. On October 28, 2009, the Commission issued a notice (October 28 Notice) scheduling a staff technical conference to elicit further input from interested stakeholders on the possible elements of the National Action Plan on Demand Response (National Action Plan) as discussed in the Discussion Draft on Possible Elements of a National Action Plan on Demand Response (Discussion Draft). Commission Staff will draw on the comments received and the discussion at the technical conference to prepare a draft of the National Action Plan. Attached is the agenda for the November 19–20, 2009 technical 1 Public Law 110–140, § 529, 121 Stat. 1492, 1664 (to be codified at National Energy Conservation Policy Act, 42 U.S.C. 8241–8287d, 8279). E:\FR\FM\19NON1.SGM 19NON1

Agencies

[Federal Register Volume 74, Number 222 (Thursday, November 19, 2009)]
[Notices]
[Pages 59973-59974]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27735]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13607-000]


Central Oregon Irrigation District; Notice of Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, 
Protests, Recommendations, and Terms and Conditions

November 12, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit Exemption.
    b. Project No.: P-13607-000.
    c. Date Filed: October 19, 2009.
    d. Applicant: Central Oregon Irrigation District.
    e. Name of Project: Juniper Ridge Hydroelectric Project.
    f. Location: The Juniper Ridge Hydroelectric Project would be 
located on the Central Oregon Irrigation District's Pilot Butte Canal, 
also referred to as the North Canal, in Deschutes County, Bend, Oregon. 
The land in which all the project structures are located is owned by 
the applicant.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Steven Johnson, Central Oregon Irrigation 
District, 1055 SW. Lake Court, Redmond, OR 97756; stevej@coid.org.
    i. FERC Contact: Patricia W. Gillis, (202) 502-8735, 
patricia.gillis@ferc.gov.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time, and the Commission is requesting 
comments, reply comments, recommendations, terms and conditions, and 
prescriptions.
    k. Deadline for Filing Responsive Documents: The Commission 
directs, pursuant to section 4.34(b) of the Regulations (see Order No. 
533, issued May 8, 1991, 56 FR 23,108 (May 20, 1991)), that all 
comments, motions to intervene, protests, recommendations, terms and 
conditions, and prescriptions concerning the application be filed with 
the Commission by December 10, 2009. All reply comments must be filed 
with the Commission by December 28, 2009.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link. The Commission strongly encourages electronic filings.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    l. Description of Project: The proposed Juniper Ridge Hydroelectric 
Project consists of: (1) A proposed powerhouse containing one 
generating unit having an installed capacity of 5,000 kilowatts, and 
(2) appurtenant facilities.
    The project would have an estimated annual generation of 12.6 
megawatt-hours that would be used on-site with any excess being sold to 
a local utility.
    m. This filing is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street, 
NE., Washington, DC 20426. The filing may also be viewed on the Web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number, here P-12624, in the docket number field to access the 
document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for review and reproduction at the address in item h. 
above.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the

[[Page 59974]]

particular application, a competing development application, or a 
notice of intent to file such an application. Submission of a timely 
notice of intent allows an interested person to file the competing 
development application no later than 120 days after the specified 
deadline date for the particular application. Applications for 
preliminary permits will not be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit a competing development application. A notice of intent must be 
served on the applicant(s) named in this public notice.
    p. Protests or Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'', 
``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or 
``PRESCRIPTIONS''; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
the original and eight copies to: The Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An 
additional copy must be sent to Director, Division of Hydropower 
Administration and Compliance, Office of Energy Projects, Federal 
Energy Regulatory Commission, at the above address. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application. A copy of all 
other filings in reference to this application must be accompanied by 
proof of service on all persons listed in the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-27735 Filed 11-18-09; 8:45 am]
BILLING CODE 6717-01-P