Central Oregon Irrigation District; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 59973-59974 [E9-27735]
Download as PDF
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 74, No. 222 / Thursday, November 19, 2009 / Notices
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Union
Electric Company, dba AmerenUE, filed
an application seeking Commission
authorization to permit Mystic Bay
Development to add one dock with six
multi-family residential boat slips to its
four existing community docks with a
total of 60 boat slips. The proposed dock
would be located along the shoreline
fronting Mystic Bay Condominiums.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field (P–459) to access the
document. You may also register online
at: https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
VerDate Nov<24>2008
15:22 Nov 18, 2009
Jkt 220001
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(l)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27808 Filed 11–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13607–000]
Central Oregon Irrigation District;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, and Terms and
Conditions
November 12, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: P–13607–000.
c. Date Filed: October 19, 2009.
d. Applicant: Central Oregon
Irrigation District.
e. Name of Project: Juniper Ridge
Hydroelectric Project.
f. Location: The Juniper Ridge
Hydroelectric Project would be located
on the Central Oregon Irrigation
District’s Pilot Butte Canal, also referred
to as the North Canal, in Deschutes
County, Bend, Oregon. The land in
which all the project structures are
located is owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Steven
Johnson, Central Oregon Irrigation
District, 1055 SW. Lake Court,
Redmond, OR 97756; stevej@coid.org.
i. FERC Contact: Patricia W. Gillis,
(202) 502–8735, patricia.gillis@ferc.gov.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
59973
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for Filing Responsive
Documents: The Commission directs,
pursuant to section 4.34(b) of the
Regulations (see Order No. 533, issued
May 8, 1991, 56 FR 23,108 (May 20,
1991)), that all comments, motions to
intervene, protests, recommendations,
terms and conditions, and prescriptions
concerning the application be filed with
the Commission by December 10, 2009.
All reply comments must be filed with
the Commission by December 28, 2009.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of Project: The proposed
Juniper Ridge Hydroelectric Project
consists of: (1) A proposed powerhouse
containing one generating unit having
an installed capacity of 5,000 kilowatts,
and (2) appurtenant facilities.
The project would have an estimated
annual generation of 12.6 megawatthours that would be used on-site with
any excess being sold to a local utility.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, here P–12624, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h. above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
E:\FR\FM\19NON1.SGM
19NON1
erowe on DSK5CLS3C1PROD with NOTICES
59974
Federal Register / Vol. 74, No. 222 / Thursday, November 19, 2009 / Notices
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit a competing development
application. A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION’’, ‘‘COMPETING
APPLICATION’’, ‘‘COMMENTS’’,
‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and eight copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
VerDate Nov<24>2008
15:22 Nov 18, 2009
Jkt 220001
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27735 Filed 11–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL10–13–000]
Tampa Electric Company, Complainant
v. Calpine Construction Finance
Company, L.P., Respondent; Notice of
Complaint
November 13, 2009.
Frm 00017
Fmt 4703
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27809 Filed 11–18–09; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on November 10,
2009, pursuant to section 206 of the
Federal Energy Regulatory Commission
(Commission) Rules and Practice and
Procedure, 18 CFR 385.206 and section
206 of the Federal Power Act, 16 U.S.C.
824(e), Tampa Electric Company
(Complainant) filed a formal complaint
against Calpine Construction Finance
Company, L.P. (Respondent) requesting
that the Commission issue an order
vacating the Respondent’s Rate
Schedule FERC No. 3, effective no later
than November 10, 2009, under which
the Respondent charges the
Complainant for reactive power service.
The Complainant states that copies of
the complaint were served on the
Respondent and the Florida Service
Commission
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
PO 00000
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 30, 2009.
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD09–10–000]
National Action Plan on Demand
Response; Notice Announcing Agenda
for the November 19–20, 2009
Technical Conference
November 12, 2009.
Section 529 of the Energy
Independence and Security Act of 2007
(EISA) 1 directed the Commission to
develop a National Action Plan. On
October 28, 2009, the Commission
issued a notice (October 28 Notice)
scheduling a staff technical conference
to elicit further input from interested
stakeholders on the possible elements of
the National Action Plan on Demand
Response (National Action Plan) as
discussed in the Discussion Draft on
Possible Elements of a National Action
Plan on Demand Response (Discussion
Draft). Commission Staff will draw on
the comments received and the
discussion at the technical conference to
prepare a draft of the National Action
Plan.
Attached is the agenda for the
November 19–20, 2009 technical
1 Public Law 110–140, § 529, 121 Stat. 1492, 1664
(to be codified at National Energy Conservation
Policy Act, 42 U.S.C. 8241–8287d, 8279).
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 74, Number 222 (Thursday, November 19, 2009)]
[Notices]
[Pages 59973-59974]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27735]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13607-000]
Central Oregon Irrigation District; Notice of Application
Accepted for Filing and Soliciting Comments, Motions To Intervene,
Protests, Recommendations, and Terms and Conditions
November 12, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: P-13607-000.
c. Date Filed: October 19, 2009.
d. Applicant: Central Oregon Irrigation District.
e. Name of Project: Juniper Ridge Hydroelectric Project.
f. Location: The Juniper Ridge Hydroelectric Project would be
located on the Central Oregon Irrigation District's Pilot Butte Canal,
also referred to as the North Canal, in Deschutes County, Bend, Oregon.
The land in which all the project structures are located is owned by
the applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Steven Johnson, Central Oregon Irrigation
District, 1055 SW. Lake Court, Redmond, OR 97756; stevej@coid.org.
i. FERC Contact: Patricia W. Gillis, (202) 502-8735,
patricia.gillis@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for Filing Responsive Documents: The Commission
directs, pursuant to section 4.34(b) of the Regulations (see Order No.
533, issued May 8, 1991, 56 FR 23,108 (May 20, 1991)), that all
comments, motions to intervene, protests, recommendations, terms and
conditions, and prescriptions concerning the application be filed with
the Commission by December 10, 2009. All reply comments must be filed
with the Commission by December 28, 2009.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link. The Commission strongly encourages electronic filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of Project: The proposed Juniper Ridge Hydroelectric
Project consists of: (1) A proposed powerhouse containing one
generating unit having an installed capacity of 5,000 kilowatts, and
(2) appurtenant facilities.
The project would have an estimated annual generation of 12.6
megawatt-hours that would be used on-site with any excess being sold to
a local utility.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street,
NE., Washington, DC 20426. The filing may also be viewed on the Web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number, here P-12624, in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for review and reproduction at the address in item h.
above.
n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the
[[Page 59974]]
particular application, a competing development application, or a
notice of intent to file such an application. Submission of a timely
notice of intent allows an interested person to file the competing
development application no later than 120 days after the specified
deadline date for the particular application. Applications for
preliminary permits will not be accepted in response to this notice.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit a competing development application. A notice of intent must be
served on the applicant(s) named in this public notice.
p. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'',
``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or
``PRESCRIPTIONS''; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Any of these documents must be filed by providing
the original and eight copies to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Hydropower
Administration and Compliance, Office of Energy Projects, Federal
Energy Regulatory Commission, at the above address. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-27735 Filed 11-18-09; 8:45 am]