Application To Export Electric Energy; NorthPoint Energy Solutions Inc., 59532 [E9-27656]
Download as PDF
59532
Federal Register / Vol. 74, No. 221 / Wednesday, November 18, 2009 / Notices
Authority: Title V, Subtitle E of the Energy
Independence and Security Act (EISA),
Public Law 110–140.
Issued in Washington, DC, on November 5,
2009.
Cathy Zoi,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
[FR Doc. E9–27597 Filed 11–17–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–275–B]
Application To Export Electric Energy;
NorthPoint Energy Solutions Inc.
mstockstill on DSKH9S0YB1PROD with NOTICES
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Application.
SUMMARY: NorthPoint Energy Solutions
Inc. (NorthPoint) has applied to renew
its authority to transmit electric energy
from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before December 18, 2009.
ADDRESSES: Comments, protests or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office) 202–586–
9624 or Michael Skinker (Program
Attorney) 202–586–2793.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C.824a(e)).
On April 8, 2003, DOE issued Order
No. EA–275 authorizing NorthPoint to
transmit electric energy from the United
States to Canada as a power marketer
using existing international electric
transmission facilities for two years. On
December 10, 2004, DOE issued Order
No. EA–275–A, which renewed
NorthPoint’s authority for a five-year
period, effective April 8, 2005. That
authorization will expire on April 8,
2010. On November 2, 2009, NorthPoint
filed an application with DOE to renew
the export authority contained in Order
VerDate Nov<24>2008
16:30 Nov 17, 2009
Jkt 220001
No. EA–275–A and has requested a tenyear term.
The electric energy which NorthPoint
proposes to export to Canada would be
surplus energy purchased from electric
utilities, Federal power marketing
agencies and other entities within the
United States. Each of the international
transmission facilities to be utilized by
NorthPoint has previously been
authorized by a Presidential permit
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the NorthPoint
application to export electric energy to
Canada should be clearly marked with
Docket No. EA–275–B. Additional
copies are to be filed directly with
Douglas F. John and Elizabeth A.
Zembruski, John & Hengerer, 1730
Rhode Island Ave., NW., Suite 600,
Washington, DC, 20036 and General
Counsel of SaskPower—Law, Land and
Regulatory Affairs, 2025 Victoria Ave.,
Regina, Saskatchewan, Canada S4P 0S1.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://www.oe.
energy.gov/permits_pending.htm, or by
e-mailing Odessa Hopkins at
Odessa.Hopkins@hq.doe.gov.
Issued in Washington, DC, on November
12, 2009.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E9–27656 Filed 11–17–09; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
[OE Docket Nos. EA–247–C and 248–C]
Application To Export Electric Energy;
Constellation NewEnergy, Inc.
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Application.
SUMMARY: Under two separate
applications, Constellation NewEnergy,
Inc. (Constellation) has applied for
authority to transmit electric energy
from the United States to Mexico and
from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before December 18, 2009.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX
202–586–8008).
FOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office)
202–586–9624 or Michael Skinker
(Program Attorney) 202–586–2793.
Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On November 13, 2001, DOE issued
Order No. EA–247 authorizing
Constellation to transmit electric energy
from the United States to Mexico as a
power marketer for a two year period.
DOE has twice renewed Constellation’s
authority to export. The most recent
authorization, in Order No. EA–247–B,
will expire on April 8, 2010. On October
27, 2009, Constellation applied to DOE
to renew the authorization contained in
Order No. EA–247–B for an additional
five-year term.
On November 26, 2001, DOE issued
Order No. EA–248 which authorized
Constellation to transmit electric energy
from the United States to Canada as a
power marketer. That Order was also
twice-renewed and will expire on April
8, 2010. On October 27, 2009,
Constellation applied to DOE to renew
the authorization contained in Order
No. EA–247–B for an additional fiveyear term.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\18NON1.SGM
18NON1
Agencies
[Federal Register Volume 74, Number 221 (Wednesday, November 18, 2009)]
[Notices]
[Page 59532]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27656]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-275-B]
Application To Export Electric Energy; NorthPoint Energy
Solutions Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Application.
-----------------------------------------------------------------------
SUMMARY: NorthPoint Energy Solutions Inc. (NorthPoint) has applied to
renew its authority to transmit electric energy from the United States
to Canada pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests, or requests to intervene must be submitted
on or before December 18, 2009.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).
FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202-
586-9624 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the FPA (16 U.S.C.824a(e)).
On April 8, 2003, DOE issued Order No. EA-275 authorizing
NorthPoint to transmit electric energy from the United States to Canada
as a power marketer using existing international electric transmission
facilities for two years. On December 10, 2004, DOE issued Order No.
EA-275-A, which renewed NorthPoint's authority for a five-year period,
effective April 8, 2005. That authorization will expire on April 8,
2010. On November 2, 2009, NorthPoint filed an application with DOE to
renew the export authority contained in Order No. EA-275-A and has
requested a ten-year term.
The electric energy which NorthPoint proposes to export to Canada
would be surplus energy purchased from electric utilities, Federal
power marketing agencies and other entities within the United States.
Each of the international transmission facilities to be utilized by
NorthPoint has previously been authorized by a Presidential permit
issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties.
Procedural Matters: Any person desiring to become a party to these
proceedings or to be heard by filing comments or protests to this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of the Federal Energy Regulatory Commission's Rules of Practice
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each
petition and protest should be filed with DOE on or before the date
listed above.
Comments on the NorthPoint application to export electric energy to
Canada should be clearly marked with Docket No. EA-275-B. Additional
copies are to be filed directly with Douglas F. John and Elizabeth A.
Zembruski, John & Hengerer, 1730 Rhode Island Ave., NW., Suite 600,
Washington, DC, 20036 and General Counsel of SaskPower--Law, Land and
Regulatory Affairs, 2025 Victoria Ave., Regina, Saskatchewan, Canada
S4P 0S1. A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by DOE
that the proposed action will not adversely impact on the reliability
of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by e-mailing Odessa Hopkins at
Odessa.Hopkins@hq.doe.gov.
Issued in Washington, DC, on November 12, 2009.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E9-27656 Filed 11-17-09; 8:45 am]
BILLING CODE 6450-01-P