Grouse Creek Ranch; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 59148-59149 [E9-27564]
Download as PDF
59148
Federal Register / Vol. 74, No. 220 / Tuesday, November 17, 2009 / Notices
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Discuss requests by any federal or state
agency or Indian tribe acting as a
cooperating agency for development of
an environmental document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and the scoping document are
included in item n of this document.
Evening Scoping Meeting
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
Date: Thursday, December 3, 2009.
Time: 7 p.m. (CST).
Location: Lions Community Building,
North 9th Street, Forest Park,
Shelbyville, IL 62565.
Phone: (217) 774–5531
Daytime Scoping Meeting
Date: Friday, December 4, 2009.
Time: 9 a.m. (CST).
Location: Same location.
The scoping document, which
outlines the issues to be addressed in
the environmental document, will be
mailed to the individuals and entities
on the Commission’s mailing list.
Copies of the scoping document will be
available at the scoping meetings, and
may be viewed on the Web at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Follow the directions for accessing
information in paragraph n. Depending
on the extent of comments received, a
revised Scoping Document may or may
not be issued.
Site Visit (Environmental Site Review)
Shelbyville Hydro LLC will conduct a
tour of the proposed project site at 2
p.m. on Thursday December 3, 2009. All
participants should meet in the parking
lot of the Spillway Access Area off route
16 at the Lake Shelbyville Dam. Anyone
with questions about the site visit
should contact Ms. Corrine Servis of
Symbiotics, LLC at (208) 745–0834 or email
corrine.servis@symbioticsenergy.com on
or before November 25, 2009.
mstockstill on DSKH9S0YB1PROD with NOTICES
Scoping Meeting Objectives
At the scoping meetings, staff will: (1)
Present a proposed list of issues to be
addressed in the EA; (2) Review and
discuss existing conditions and resource
agency management objectives; (3)
Review and discuss existing information
and identify preliminary information
and study needs; (4) Review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
VerDate Nov<24>2008
20:50 Nov 16, 2009
Jkt 220001
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27471 Filed 11–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI10–2–000]
Grouse Creek Ranch; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and/or Motions
To Intervene
November 10, 2009.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI10–2–000.
c. Date Filed: October 28, 2009.
d. Applicant: Grouse Creek Ranch.
e. Name of Project: Grouse Creek
Ranch Hydroelectric Project.
f. Location: The proposed Grouse
Creek Ranch Hydroelectric Project will
be located on an irrigation conduit that
uses water from the Imnaha River, near
the town of Imnaha in Wallowa County,
Oregon, affecting T. 2 S, R. 48 E,
Willamette Meridian.
g. Filed Pursuant to: section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Ben Henson,
Renewable Energy Solutions LLC, P.O.
Box 156, Enterprise OR 97842;
telephone: (541) 577–3003; e-mail:
Docket No. DI10–2–
000www.mporter33@juno.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or e-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: December 11,
2009.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
Please include the docket number
(DI10–2–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Grouse Creek Ranch
Hydropower Project will include: (1) A
15-inch diameter, 3-mile-long pvc pipe,
conveying water from the Imnaha River
for irrigation purposes; (2) a 7-kW
Pelton Wheel turbine/generator; (3) a
tailrace discharging into the existing
irrigation conduit which returns the
water to the Imnaha River; and (4)
appurtenant facilities. The proposed
project will be connected to an
interstate grid.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOlineSupport@ferc.gov; for
TTY, call (202) 502–8659. A copy is also
E:\FR\FM\17NON1.SGM
17NON1
Federal Register / Vol. 74, No. 220 / Tuesday, November 17, 2009 / Notices
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 211, 214. In
determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27564 Filed 11–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
mstockstill on DSKH9S0YB1PROD with NOTICES
November 9, 2009.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–15–000.
Applicants: West Georgia Generating
Company, L.L.C, DeSoto County
Generating Company, LLC, Broadway
Gen Funding, LLC, Southern Power
Company.
VerDate Nov<24>2008
20:50 Nov 16, 2009
Jkt 220001
Description: West Georgia Generating
Co, LLC et al. (Joint Applicants) submits
the joint application for authorization
under Section 203 of the Federal Power
Act and Request for Expedited and
Privileged Treatment.
Filed Date: 11/02/2009.
Accession Number: 20091105–0154.
Comment Date: 5 p.m. Eastern Time
on Monday, November 23, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–4109–005;
ER01–1178–006; ER03–175–009; ER03–
394–007; ER03–427–007; ER04–170–
009; ER07–265–012; ER08–100–011;
ER09–1453–001; ER99–3426–011.
Applicants: El Dorado Energy, LLC;
Sempra Generation; Termoelectrica U.S.
LLC; Elk Hills Power, LLC; Mesquite
Power, LLC; MxEnergy Electric Inc.;
Sempra Energy Solutions LLC; Sempra
Energy Trading LLC; Gateway Energy
Services Corporation; San Diego Gas &
Electric Company.
Description: Notice of Non-Material
Changes in Status of Sempra Energy et
al.
Filed Date: 11/02/2009.
Accession Number: 20091102–5143.
Comment Date: 5 p.m. Eastern Time
on Monday, November 23, 2009.
Docket Numbers: ER01–3121–021;
ER02–2085–016; ER02–417–020; ER02–
418–020; ER03–1326–019; ER03–296–
023; ER03–416–023; ER03–951–023;
ER04–94–020; ER05–1146–020; ER05–
1262–022; ER05–332–020; ER05–365–
020; ER05–481–021; ER06–1093–018;
ER06–200–019; ER07–1378–012; ER07–
195–015; ER07–242–014; ER07–254–
013; ER07–287–013; ER07–460–010;
ER08–387–010; ER08–912–007; ER08–
933–007; ER09–1284–002; ER09–1285–
001; ER09–1723–001; ER09–279–003;
ER09–281–002; ER09–282–003; ER09–
30–004; ER09–31–004; ER09–32–005;
ER09–382–003.
Applicants: Klamath Energy LLC;
Northern Iowa Windpower LLC;
Phoenix Wind Power LLC; Klamath
Generation LLC; Colorado Green
Holdings, LLC; Flying Cloud Power
Partners, LLC; Klondike Wind Power
LLC; Moraine Wind LLC; Mountain
View Power Partners III, LLC; Shiloh I
Wind Project LLC; Flat Rock
Windpower LLC; Klondike Wind Power
II LLC; Elk River Windfarm LLC;
Trimont Wind I LLC; Flat Rock
Windpower II LLC; Big Horn Wind
Project LLC; Providence Heights Wind,
LLC; Locust Ridge Wind Farm, LLC;
MinnDakota Wind LLC; Casselman
Windpower, LLC; Klondike Wind Power
III LLC; Dillon Wind LLC; Atlantic
Renewables Projects II LLC; Iberdrola
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
59149
Renewables MBR Sellers; Lempster
Wind, LLC; Rugby Wind, LLC; StreatorCayuga Ridge Wind Power, LLC; Dry
Lake Wind Power, LLC; Buffalo Ridge I
LLC; Pebble Springs Wind, LLC;
Moraine Wind II LLC; Elm Creek Wind,
LLC; Farmers City Wind, LLC; Barton
Windpower LLC; Hay Canyon Wind
LLC.
Description: Quarterly Report
pursuant to 18 C.F.R. 35.42(d) of
Iberdrola Renewables MBR Sellers.
Filed Date: 10/30/2009.
Accession Number: 20091030–5109.
Comment Date: 5 p.m. Eastern Time
on Friday, November 20, 2009.
Docket Numbers: ER03–879–007;
ER03–880–007; ER03–882–007.
Applicants: D.E. Shaw Plasma
Trading, LLC, D.E. Shaw & Co. Energy,
LLC, D.E. Shaw Plasma Power, LLC.
Description: Notification of Change in
Status of D.E. Shaw Plasma Trading,
LLC, D.E. Shaw & Co. Energy, LLC and
D.E. Shaw Plasma Power, LLC .
Filed Date: 10/30/2009.
Accession Number: 20091030–5104.
Comment Date: 5 p.m. Eastern Time
on Friday, November 20, 2009.
Docket Numbers: ER04–947–008;
ER08–1297–004; ER02–2559–010;
ER01–1071–015; ER02–669–009; ER02–
2018–010; ER01–2074–009; ER08–1293–
004; ER08–1294–004; ER05–222–006;
ER00–2391–010; ER98–2494–013;
ER97–3359–015; ER06–9–010; ER09–
902–002; ER05–487–006; ER04–127–
007; ER03–34–014; ER98–3511–013;
ER02–1903–011; ER99–2917–011;
ER06–1261–009; ER03–179–008; ER03–
1104–011; ER03–1105–011; ER03–1332–
005; ER09–138–002; ER08–197–008;
ER03–1333–006; ER03–1103–006;
ER01–838–009; ER03–1025–005; ER02–
2120–007; ER05–714–004; ER01–1972–
009; ER98–2076–017; ER03–155–009;
ER03–623–009; ER09–1462–001; ER08–
250–005; ER07–1157–005; ER04–290–
005; ER02–256–002; ER09–988–003;
ER09–832–002; ER09–989–003; ER09–
990–002; ER05–236–007; ER04–187–
007; ER09–1297–001; ER07–174–009;
ER08–1296–004; ER07–875–004; ER02–
2166–009; ER09–901–002; ER01–2139–
013; ER03–1375–006; ER08–1300–004;
ER09–900–002; ER00–3068–009; ER98–
3563–013; ER9803564–014.
Applicants: POSDEF Power Company,
LP; Ashtabula Wind, LLC; Backbone
Mountain Windpower, LLC; Badger
Windpower LLC; Bayswater Peaking
Facility, LLC; Blythe Energy, LLC;
Calhoun Power Company, LLC; Crystal
Lake Wind, LLC; Crystal Lake Wind II,
LLC; Diablo Winds, LLC; Doswell
Limited Partnership; ESI Vansycle
Partners, LP; Florida Power & Light
Company; FPL Energy Burleigh County
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 74, Number 220 (Tuesday, November 17, 2009)]
[Notices]
[Pages 59148-59149]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27564]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI10-2-000]
Grouse Creek Ranch; Notice of Declaration of Intention and
Soliciting Comments, Protests, and/or Motions To Intervene
November 10, 2009.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI10-2-000.
c. Date Filed: October 28, 2009.
d. Applicant: Grouse Creek Ranch.
e. Name of Project: Grouse Creek Ranch Hydroelectric Project.
f. Location: The proposed Grouse Creek Ranch Hydroelectric Project
will be located on an irrigation conduit that uses water from the
Imnaha River, near the town of Imnaha in Wallowa County, Oregon,
affecting T. 2 S, R. 48 E, Willamette Meridian.
g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Ben Henson, Renewable Energy Solutions LLC,
P.O. Box 156, Enterprise OR 97842; telephone: (541) 577-3003; e-mail:
Docket No. DI10-2-000www.mporter33@juno.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or e-mail address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: December
11, 2009.
Comments, Motions to Intervene, and Protests may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and eight copies should be mailed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For more information on how to
submit these types of filings, please go to the Commission's Web site
located at https://www.ferc.gov/filing-comments.asp.
Please include the docket number (DI10-2-000) on any comments,
protests, and/or motions filed.
k. Description of Project: The proposed Grouse Creek Ranch
Hydropower Project will include: (1) A 15-inch diameter, 3-mile-long
pvc pipe, conveying water from the Imnaha River for irrigation
purposes; (2) a 7-kW Pelton Wheel turbine/generator; (3) a tailrace
discharging into the existing irrigation conduit which returns the
water to the Imnaha River; and (4) appurtenant facilities. The proposed
project will be connected to an interstate grid.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the interests of interstate or foreign
commerce would be affected by the project. The Commission also
determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the Docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOlineSupport@ferc.gov; for TTY, call (202) 502-8659. A copy is also
[[Page 59149]]
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 211,
214. In determining the appropriate action to take, the Commission will
consider all protests or other comments filed, but only those who file
a motion to intervene in accordance with the Commission's Rules may
become a party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
o. Filing and Service of Responsive Documents--All filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
Motion to Intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-27564 Filed 11-16-09; 8:45 am]