Environmental Impact Statements; Notice of Availability, 58625-58626 [E9-27312]
Download as PDF
Federal Register / Vol. 74, No. 218 / Friday, November 13, 2009 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 25, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27289 Filed 11–12–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. ER10–117–000]
North American Power and Gas, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
888 First St. NE., Washington, DC,
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27290 Filed 11–12–09; 8:45 am]
BILLING CODE 6717–01–P
srobinson on DSKHWCL6B1PROD with NOTICES
November 6, 2009.
This is a supplemental notice in the
above-referenced proceeding of North
American Power and Gas, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC,
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
27, 2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
VerDate Nov<24>2008
17:07 Nov 12, 2009
Jkt 220001
DEPARTMENT OF ENERGY
58625
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Monday, November 16, 2009.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27288 Filed 11–12–09; 8:45 am]
[Docket No. PR10–2–000]
BILLING CODE 6717–01–P
PELICO Pipeline, LLC; Notice of
Petition for Rate Approval
November 5, 2009.
Take notice that on October 30, 2009,
PELICO Pipeline, LLC (PELICO) filed a
petition for rate approval pursuant to
section 284.123(b)(2) of the
Commission’s regulations. PELICO
requests that the Commission approve
an increase in its maximum rate f from
$0.2322 to $0.3291 per MMBtu for firm
and interruptible transportation service.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8799–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 11/02/2009 Through 11/06/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090379, Draft Supplement,
COE, FL, Brevard County, Florida
Hurricane and Storm Damage
Reduction Project, To Reduce the
Damages Caused by Erosion and
Coastal Storms to Shorefront
Structures Along the Mid-Reach
Segment, Implementation, Brevard
County, FL, Comment Period Ends:
12/28/2009, Contact: Candida
Bronson 904–232–1697.
EIS No. 20090380, Final EIS, NPS, GA,
Chattahoochee River National
Recreation Area General Management
Plan, Preferred Alternative is F,
Future Directions for the Management
and Use of Chattachoochee River
National Recreation Area,
Implementation, Chattahoochee River,
Atlanta, GA, Wait Period Ends: 12/14/
E:\FR\FM\13NON1.SGM
13NON1
srobinson on DSKHWCL6B1PROD with NOTICES
58626
Federal Register / Vol. 74, No. 218 / Friday, November 13, 2009 / Notices
2009, Contact: David Libman 404–
507–5701.
EIS No. 20090381, Draft EIS, IBR, CA,
New Melones Lakes Area Resource
Management Plan, Implementation,
Tuolumne and Calaveras Counties,
CA, Comment Period Ends: 01/04/
2010, Contact: Melissa Vignau 916–
989–7182.
EIS No. 20090382, Draft EIS, IBR, CA,
Central Valley Project Water Supply
Contracts Under Public Law 101–514
(Section 206), Proposed Water Service
Contracts with the El Dorado County
Water Agency, El Dorado County, CA,
Comment Period Ends: 12/28/2009,
Contact: Elizabeth Dyer 916–989–
7256.
EIS No. 20090383, Final EIS, BLM, NV,
Bald Mountain Mine North
Operations Area Project, Proposes to
Expand Current Mining Operations at
several Existing Pits, Rock Disposal
Areas, Heap Leach Pads, Processing
Facilities, and Interpit Area,
Combining the Bald Mountain Mine
Plan of Operations Boundary and the
Mooney Basin Operation Area
Boundary, White Pine County, NV,
Wait Period Ends: 12/14/2009,
Contact: Lynn Bjorklund 775–289–
1893.
EIS No. 20090384, Draft EIS, NOA, CA,
Fruit Growers Supply Company’s
Multi-Species Habitat Conservation
Plan, Implementation, Authorization
for Incidental Take Permit, Siskiyou
County, CA, Comment Period Ends:
02/11/2010, Contact: Lisa Roberts
707–825–5178.
EIS No. 20090385, Draft Supplement,
TVA, AL, Bellefonte Site Single
Nuclear Unit Project, Proposes to
Complete or Construct and Operate a
Single 1,100–1, 200 MW Nuclear
Generation Unit, Jackson County, AL,
Comment Period Ends: 12/28/2009,
Contact: Andrea L. Sterdis 423–751–
7119.
EIS No. 20090386, Draft EIS, BLM, CA,
Ivanpah Solar Electric Generating
System (07–AFC–5) Project, Proposal
to Construct a 400-m Megawatt
Concentrated Solar Power Tower,
Thermal-Electric Power Plant, San
Bernardino County, CA, Comment
Period Ends: 02/11/2010, Contact:
Tom Hurshman 970–240–5345.
EIS No. 20090387, Final EIS, BLM, CA,
Carrizo Plain National Monument,
Draft Resource Management Plan,
Implementation, San Luis Obispo
County and Portion of western Kern
County, CA, Wait Period Ends: 12/14/
2009, Contact: Susan Porter 661–391–
6067.
EIS No. 20090388, Draft EIS, AFS, OR,
Fremont-Winema National Forests
Invasive Plant Treatment, Propose to
VerDate Nov<24>2008
17:07 Nov 12, 2009
Jkt 220001
Treat up to 8,700 Acres of Invasive
Plant Infestation Per Year, Klamath
and Lake Counties, OR, Comment
Period Ends: 12/28/2009, Contact:
Sarah Malaby 541–947–2151.
EIS No. 20090389, Final EIS, AFS, CA,
Beaverslide Timber Sale and Fuel
Treatment Project, Proposing to
Harvest Commercial Timber and Treat
Hazardous Fuels, Six Rivers National
Forest, Mad River Ranger District,
Trinity County, CA, Wait Period Ends:
12/14/2009, Contact: Keith Menasco
707–574–6233.
EIS No. 20090390, Draft EIS, NOA, 00,
Amendment 31 to the Fishery
Management Plan for Reef Fish
Resources, Addresses Bycatch of Sea
Turtles in the Bottom Longline
Component of the Reef Fish Fishery,
Gulf of Mexico, Comment Period
Ends: 12/28/2009, Contact: Roy E.
Crabtree 727–824–5701.
Dated: November 9, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–27312 Filed 11–12–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8980–9]
NACEPT Subcommittee on Promoting
Environmental Stewardship
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
SUMMARY: Under the Federal Advisory
Committee Act, Public Law 92–463,
EPA gives notice of a meeting of the
NACEPT Subcommittee on Promoting
Environmental Stewardship.
The purpose of the Subcommittee on
Promoting Environmental Stewardship
(SPES) of the National Advisory Council
for Environmental Policy and
Technology (NACEPT) is to advise the
U.S. Environmental Protection Agency
on how to promote environmental
stewardship practices that encompass
all environmental aspects of an
organization in the regulated
community and other sectors, as
appropriate, in order to enhance human
health and environmental protection. A
copy of the meeting agenda will be
posted at https://epa.gov/ncei/
dialogue.htm. This Web site also
includes the charge of the SPES, which
provides further information about the
purpose of the Subcommittee.
The meeting agenda will focus on the
Subcommittee’s potential
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
recommendations to the Agency on how
to promote environmental stewardship.
DATES: The NACEPT Subcommittee on
Promoting Environmental Stewardship
will hold an open meeting on December
1 (8 a.m.–5 p.m.) and December 2, 2009
8 a.m.–5 p.m.) Eastern.
ADDRESSES: The Westin Arlington
Gateway, 801 North Glebe Road,
Arlington, VA 22203, Ballroom B
(second floor). (two blocks from Ballston
Metro Station.)
FOR FURTHER INFORMATION CONTACT:
Regina Langton, Designated Federal
Officer, langton.regjna@epa.gov, 202–
566–2178, U.S. EPA Office of Policy,
Economics, and Innovation (MC1807T),
1200 Pennsylvania Avenue, NW.,
Washington, DC 20460.
SUPPLEMENTARY INFORMATION: Requests
to make brief oral comments or provide
written statements to the SPES should
be sent to Jennifer Peyser at (202) 965–
6215 or jpeyser@RESOLV.org. All
requests must be received no later than
November 24, 2009.
Meeting Access: For information on
access or services for individuals with
disabilities, please contact Jennifer
Peyser at jpeyser@RESOLV.org. To
request accommodation of a disability,
please contact Jennifer Peyser at least 10
days prior to the meeting to give EPA as
much time as possible to process your
request.
Dated: November 6, 2009.
Regina Langton,
Designated Federal Officer.
[FR Doc. E9–27286 Filed 11–12–09; 8:45 am]
BILLING CODE 6560–50–M
EQUAL EMPLOYMENT OPPORTUNITY
COMMISSION
Sunshine Act Notice
Equal
Employment Opportunity Commission.
DATE AND TIME: Wednesday, November
18, 2009, 2 p.m. Eastern Time.
PLACE: Commission Meeting Room on
the First Floor of the EEOC Office
Building, 131 ‘‘M’’ Street, NE.,
Washington, DC 20507.
STATUS: The meeting will be open to the
public.
MATTERS TO BE CONSIDERED:
AGENCY HOLDING THE MEETING:
Open Session
1. Announcement of Notation Votes,
and
2. Notice of Proposed Rulemaking on
Reasonable Factors Other than Age
under the Age Discrimination in
Employment Act.
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 74, Number 218 (Friday, November 13, 2009)]
[Notices]
[Pages 58625-58626]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27312]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8799-2]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 11/02/2009 Through 11/06/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090379, Draft Supplement, COE, FL, Brevard County, Florida
Hurricane and Storm Damage Reduction Project, To Reduce the Damages
Caused by Erosion and Coastal Storms to Shorefront Structures Along the
Mid-Reach Segment, Implementation, Brevard County, FL, Comment Period
Ends: 12/28/2009, Contact: Candida Bronson 904-232-1697.
EIS No. 20090380, Final EIS, NPS, GA, Chattahoochee River National
Recreation Area General Management Plan, Preferred Alternative is F,
Future Directions for the Management and Use of Chattachoochee River
National Recreation Area, Implementation, Chattahoochee River, Atlanta,
GA, Wait Period Ends: 12/14/
[[Page 58626]]
2009, Contact: David Libman 404-507-5701.
EIS No. 20090381, Draft EIS, IBR, CA, New Melones Lakes Area Resource
Management Plan, Implementation, Tuolumne and Calaveras Counties, CA,
Comment Period Ends: 01/04/2010, Contact: Melissa Vignau 916-989-7182.
EIS No. 20090382, Draft EIS, IBR, CA, Central Valley Project Water
Supply Contracts Under Public Law 101-514 (Section 206), Proposed Water
Service Contracts with the El Dorado County Water Agency, El Dorado
County, CA, Comment Period Ends: 12/28/2009, Contact: Elizabeth Dyer
916-989-7256.
EIS No. 20090383, Final EIS, BLM, NV, Bald Mountain Mine North
Operations Area Project, Proposes to Expand Current Mining Operations
at several Existing Pits, Rock Disposal Areas, Heap Leach Pads,
Processing Facilities, and Interpit Area, Combining the Bald Mountain
Mine Plan of Operations Boundary and the Mooney Basin Operation Area
Boundary, White Pine County, NV, Wait Period Ends: 12/14/2009, Contact:
Lynn Bjorklund 775-289-1893.
EIS No. 20090384, Draft EIS, NOA, CA, Fruit Growers Supply Company's
Multi-Species Habitat Conservation Plan, Implementation, Authorization
for Incidental Take Permit, Siskiyou County, CA, Comment Period Ends:
02/11/2010, Contact: Lisa Roberts 707-825-5178.
EIS No. 20090385, Draft Supplement, TVA, AL, Bellefonte Site Single
Nuclear Unit Project, Proposes to Complete or Construct and Operate a
Single 1,100-1, 200 MW Nuclear Generation Unit, Jackson County, AL,
Comment Period Ends: 12/28/2009, Contact: Andrea L. Sterdis 423-751-
7119.
EIS No. 20090386, Draft EIS, BLM, CA, Ivanpah Solar Electric Generating
System (07-AFC-5) Project, Proposal to Construct a 400-m Megawatt
Concentrated Solar Power Tower, Thermal-Electric Power Plant, San
Bernardino County, CA, Comment Period Ends: 02/11/2010, Contact: Tom
Hurshman 970-240-5345.
EIS No. 20090387, Final EIS, BLM, CA, Carrizo Plain National Monument,
Draft Resource Management Plan, Implementation, San Luis Obispo County
and Portion of western Kern County, CA, Wait Period Ends: 12/14/2009,
Contact: Susan Porter 661-391-6067.
EIS No. 20090388, Draft EIS, AFS, OR, Fremont-Winema National Forests
Invasive Plant Treatment, Propose to Treat up to 8,700 Acres of
Invasive Plant Infestation Per Year, Klamath and Lake Counties, OR,
Comment Period Ends: 12/28/2009, Contact: Sarah Malaby 541-947-2151.
EIS No. 20090389, Final EIS, AFS, CA, Beaverslide Timber Sale and Fuel
Treatment Project, Proposing to Harvest Commercial Timber and Treat
Hazardous Fuels, Six Rivers National Forest, Mad River Ranger District,
Trinity County, CA, Wait Period Ends: 12/14/2009, Contact: Keith
Menasco 707-574-6233.
EIS No. 20090390, Draft EIS, NOA, 00, Amendment 31 to the Fishery
Management Plan for Reef Fish Resources, Addresses Bycatch of Sea
Turtles in the Bottom Longline Component of the Reef Fish Fishery, Gulf
of Mexico, Comment Period Ends: 12/28/2009, Contact: Roy E. Crabtree
727-824-5701.
Dated: November 9, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-27312 Filed 11-12-09; 8:45 am]
BILLING CODE 6560-50-P