DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2618–020]
Domtar Maine LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
srobinson on DSKHWCL6B1PROD with NOTICES
November 5, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 2618–020.
c. Date filed: March 19, 2009.
d. Applicant: Domtar Maine LLC.
e. Name of Project: West Branch
Project.
f. Location: On Grand Lake Stream, a
tributary of the St. Croix River in
Penobscot, Washington and Hancock
Counties, Maine.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Scott Beal,
Domtar Maine LLC, 144 Main Street,
Baileyville, Maine 04694, (207) 427–
4004.
i. FERC Contact: John Costello (202)
502–6119 or john.costello@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
VerDate Nov<24>2008
17:07 Nov 12, 2009
Jkt 220001
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘e-filing’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing West Branch Project
includes two developments (Sysladobsis
and West Grand) comprising two dams
and a dike. There are no generating
facilities located at the project. The
23,500 acre impounded waters are
comprised of West Grand, Junior,
Pocumcus, Pug, Bottle, Norway, and
Scraggly lakes.
The Sysladobsis development
includes the 250-foot-long by 9-foothigh Sysladobsis Dam (the furthest
upstream), an earth embankment
structure with a timber gate and fish
facility. The dam impounds the 5,400acres Sysladobsis Lake and discharges
directly into the West Grand
development.
The West Grand development
includes the 487-foot-long West Grand
Dam which has a 105.9-foot-long gate
structure with five waste gates. A
vertical slot design upstream fish
passage facility is located adjacent to the
dam’s waste gate No. 1.
The approximately 535-foot-long by
15-foot-high Farm Cove Dike is located
approximately 3.5 miles west of the
main outlet dam to West Grand Lake.
The dike comprises a 10-foot-wide by
30-foot-long fishway. The dike has no
gates or other flow controls; the only
flow passing capability is through the
fishway.
No new construction is planned.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must: (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS’’; (2) set forth in the
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27294 Filed 11–12–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2660–024]
Domtar Maine LLC; Notice Of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
November 5, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New license.
b. Project No.: 2660–024.
c. Date filed: March 19, 2009.
d. Applicant: Domtar Maine LLC.
e. Name of Project: Forest City Project.
f. Location: On Forest City Stream, a
tributary of the St. Croix River in
Washington and Aroostock Counties,
Maine and Canada.
E:\FR\FM\13NON1.SGM
13NON1
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 74, No. 218 / Friday, November 13, 2009 / Notices
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r)
h. Applicant Contact: Mr. Scott Beal,
Domtar Maine LLC, 144 Main Street,
Baileyville, Maine 04694 (207) 427–
4004.
i. FERC Contact: John Costello (202)
502–6119 or john.costello@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘e-filing’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Forest City Project
comprise an earth embankment dam
containing a gated timber spillway and
two impoundments (East Grand and
North lakes). There are no generating
facilities located at the project.
Approximately one-quarter of the 544foot-long dam (i.e., approximately 147
feet) is within the United States. The
United States (western) section of the
dam is an earth embankment measuring
approximately 110-feet-long with a
maximum height of 12 feet. The center
section of the dam (i.e., that portion
located in the river channel) contains a
55-foot-wide gated timber crib spillway
structure with three wooden gates (gates
1 and 2 are located within the United
States). The spillway is approximately
33 feet-wide with an elevation of 426.61
feet. A 5 foot-wide vertical slot design
fishway is located in Canada. The
eastern (Canadian) embankment is an
VerDate Nov<24>2008
17:07 Nov 12, 2009
Jkt 220001
earth structure approximately 397 feetlong, 30 feet-long with a crest elevation
of 437.27 feet msl. No new construction
is planned.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–27295 Filed 11–12–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
58621
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
November 3, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP10–110–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: Gulf Crossing Pipeline
Company, LLC submits an amendment
to negotiated rate letter agreements with
Enterprise Products Operating LLC re
the Gulf Crossing Project.
Filed Date: 10/30/2009.
Accession Number: 20091102–0105.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 12, 2009.
Docket Numbers: RP10–111–000.
Applicants: Equitrans, L.P.
Description: Equitrans, LP submits
Seventh Revised Tariff Sheets No. 317
to FERC Gas Tariff, Original volume No.
1, effective 11/1/09 .
Filed Date: 10/30/2009.
Accession Number: 20091102–0106.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 12, 2009.
Docket Numbers: RP10–112–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits an amendment to
a negotiated rate letter agreement with
ONEOK Entergy Services Co., LP re the
Southeast Expansion Project.
Filed Date: 10/30/2009.
Accession Number: 20091102–0107.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 12, 2009.
Docket Numbers: RP10–113–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Gulf South Pipeline
Company, LP submits capacity release
agreement containing negotiated rate
provisions executed by Texla Energy
Management, Inc.
Filed Date: 10/30/2009.
Accession Number: 20091102–0108.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 12, 2009.
Docket Numbers: RP10–115–000.
Applicants: CenterPoint Energy Gas
Transmission Company.
Description: CenterPoint Energy Gas
Transmission Company submits
amended negotiated rate agreement
between CEGT and BD Energy Trading
LLC.
Filed Date: 10/30/2009.
Accession Number: 20091102–0152.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 12, 2009.
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 74, Number 218 (Friday, November 13, 2009)]
[Notices]
[Pages 58620-58621]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-27295]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2660-024]
Domtar Maine LLC; Notice Of Application Ready for Environmental
Analysis and Soliciting Comments, Recommendations, Terms and
Conditions, and Prescriptions
November 5, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New license.
b. Project No.: 2660-024.
c. Date filed: March 19, 2009.
d. Applicant: Domtar Maine LLC.
e. Name of Project: Forest City Project.
f. Location: On Forest City Stream, a tributary of the St. Croix
River in Washington and Aroostock Counties, Maine and Canada.
[[Page 58621]]
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r)
h. Applicant Contact: Mr. Scott Beal, Domtar Maine LLC, 144 Main
Street, Baileyville, Maine 04694 (207) 427-4004.
i. FERC Contact: John Costello (202) 502-6119 or
john.costello@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions is 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``e-filing''
link. For a simpler method of submitting text only comments, click on
``Quick Comment.''
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The existing Forest City Project comprise an earth embankment
dam containing a gated timber spillway and two impoundments (East Grand
and North lakes). There are no generating facilities located at the
project. Approximately one-quarter of the 544-foot-long dam (i.e.,
approximately 147 feet) is within the United States. The United States
(western) section of the dam is an earth embankment measuring
approximately 110-feet-long with a maximum height of 12 feet. The
center section of the dam (i.e., that portion located in the river
channel) contains a 55-foot-wide gated timber crib spillway structure
with three wooden gates (gates 1 and 2 are located within the United
States). The spillway is approximately 33 feet-wide with an elevation
of 426.61 feet. A 5 foot-wide vertical slot design fishway is located
in Canada. The eastern (Canadian) embankment is an earth structure
approximately 397 feet-long, 30 feet-long with a crest elevation of
437.27 feet msl. No new construction is planned.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-27295 Filed 11-12-09; 8:45 am]
BILLING CODE 6717-01-P