Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 58058-58063 [E9-26812]
Download as PDF
srobinson on DSKHWCL6B1PROD with NOTICES
58058
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
given in confidence to the agency by the
grant applicants. Because the proposed
meetings will consider information that
is likely to disclose trade secrets and
commercial or financial information
obtained from a person and privileged
or confidential and/or information of a
personal nature the disclosure of which
would constitute a clearly unwarranted
invasion of personal privacy, pursuant
to authority granted me by the
Chairman’s Delegation of Authority to
Close Advisory Committee meetings,
dated July 19, 1993, I have determined
that these meetings will be closed to the
public pursuant to subsections (c)(4),
and (6) of section 552b of Title 5, United
States Code.
1. Date: December 1, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 415.
Program: This meeting will review
applications for Research and
Development in Preservation and
Access Humanities Collection and
Reference Resources, submitted to the
Division of Preservation and Access at
the July 15, 2009 deadline.
2. Date: December 1, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 315.
Program: This meeting will review
applications for Enduring Questions:
Pilot Course Grants, submitted to the
Division of Education Programs at the
September 15, 2009 deadline.
3. Date: December 1, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: Library of Congress, Jefferson
Building, African and Middle Eastern
Conference Room, LJ–220, 101
Independence Avenue, SE.,
Washington, DC 20540.
Program: This meeting will review
applications for Kluge Fellowships,
submitted to the Division of Research
Programs at the July 15, 2009 deadline.
4. Date: December 2, 2009.
Time: 9 a.m. to 5 p.m.
Room: 402.
Program: This meeting will review
applications for Digital Humanities Start
Up Grants, submitted to the Office of
Digital Humanities at the October 6,
2009 deadline.
5. Date: December 3, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 415.
Program: This meeting will review
applications for American Studies I in
Preservation and Access Humanities
Collection and Reference Resources,
submitted to the Division of
Preservation and Access at the July 15,
2009 deadline.
6. Date: December 3, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: Library of Congress, Jefferson
Building, African and Middle Eastern
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
Conference Room, LJ–220, 101
Independence Avenue, SE.,
Washington, DC 20540.
Program: This meeting will review
applications for Kluge Fellowships,
submitted to the Division of Research
Programs at the July 15, 2009 deadline.
7. Date: December 7, 2009.
Time: 9 a.m. to 5 p.m.
Room: Room 402.
Program: This meeting will review
applications for Digital Start Up Grants,
submitted to the Office of Digital
Humanities at the October 6, 2009
deadline.
8. Date: December 8, 2009.
Time: 9 a.m. to 5 p.m.
Room: Room 402.
Program: This meeting will review
applications for Digital Start Up Grants,
submitted to the Office of Digital
Humanities at the October 6, 2009
deadline.
9. Date: December 8, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 415.
Program: This meeting will review
applications for Art and Architecture in
Preservation and Access Humanities
Collection and Reference Resources,
submitted to the Division of
Preservation and Access at the July 15,
2009 deadline.
10. Date: December 9, 2009.
Time: 9 a.m. to 5 p.m.
Room: Room 402.
Program: This meeting will review
applications for Digital Start Up Grants,
submitted to the Office of Digital
Humanities at the October 6, 2009
deadline.
11. Date: December 10, 2009.
Time: 9 a.m. to 5 p.m.
Room: Room 402.
Program: This meeting will review
applications for Digital Start Up Grants,
submitted to the Office of Digital
Humanities at the October 6, 2009
deadline.
12. Date: December 10, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 415.
Program: This meeting will review
applications for American Studies II in
Preservation and Access Humanities
Collection and Reference Resources,
submitted to the Division of
Preservation and Access at the July 15,
2009 deadline.
13. Date: December 16, 2009.
Time: 8:30 a.m. to 5 p.m.
Room: 315.
Program: This meeting will review
applications for Fellowship Programs at
Independent Research Institutions,
submitted to the Division of Research
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
Programs at the August 20, 2009
deadline.
Michael P. McDonald,
Advisory Committee, Management Officer.
[FR Doc. E9–27021 Filed 11–9–09; 8:45 am]
BILLING CODE 7536–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0473]
Notice; Applications and Amendments
to Facility Operating Licenses
Involving Proposed No Significant
Hazards Considerations and
Containing Sensitive Unclassified NonSafeguards Information and Order
Imposing Procedures for Access to
Sensitive Unclassified Non-Safeguards
Information
I. Background
Pursuant to section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (the Commission or NRC
staff) is publishing this notice. The Act
requires the Commission to publish
notice of any amendments issued, or
proposed to be issued and grants the
Commission the authority to issue and
make immediately effective any
amendment to an operating license
upon a determination by the
Commission that such amendment
involves no significant hazards
consideration, notwithstanding the
pendency before the Commission of a
request for a hearing from any person.
This notice includes notices of
amendments containing sensitive
unclassified non-safeguards information
(SUNSI).
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
Title 10 of the Code of Federal
Regulations (10 CFR), Section 50.92,
this means that operation of the facility
in accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
E:\FR\FM\10NON1.SGM
10NON1
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the
60-day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch (RDB), TWB–05–
B01M, Division of Administrative
Services, Office of Administration, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
should cite the publication date and
page number of this Federal Register
notice. Written comments may also be
faxed to the RDB at 301–492–3446.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR Part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area 01F21, 11555 Rockville Pike
(first floor), Rockville, Maryland, or at
https://www.nrc.gov/reading-rm/doccollections/cfr/part002/part0020309.html. Publicly available records
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
will be accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm.html. If a request for a
hearing or petition for leave to intervene
is filed within 60 days, the Commission
or a presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and/or petition; and
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also set forth the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner/requestor
intends to rely in proving the contention
at the hearing. The petitioner/requestor
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the petitioner/requestor intends
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the petitioner/
requestor to relief. A petitioner/
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
58059
requestor who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule,
which the NRC promulgated in the
Federal Register on August 28, 2007 (72
FR 49139). The E-Filing process requires
participants to submit and serve all
adjudicatory documents over the
Internet, or in some cases to mail copies
on electronic storage media. Participants
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
petitioner/requestor should contact the
Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by calling
301–415–1677, to request (1) a digital ID
certificate, which allows the participant
(or its counsel or representative) to
digitally sign documents and access the
E-Submittal server for any proceeding in
which it is participating; and/or (2)
creation of an electronic docket for the
proceeding (even in instances in which
the petitioner/requestor (or its counsel
E:\FR\FM\10NON1.SGM
10NON1
srobinson on DSKHWCL6B1PROD with NOTICES
58060
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
or representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
ViewerTM to access the Electronic
Information Exchange (EIE), a
component of the E-Filing system. The
Workplace Forms ViewerTM is free and
is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory e-filing system
may seek assistance through the
‘‘Contact Us’’ link located on the NRC
Web site at https://www.nrc.gov/sitehelp/e-submittals.html or by calling the
NRC electronic filing Help Desk, which
is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday,
excluding government holidays. The
toll-free help line number is 1–866–
672–7640. A person filing electronically
may also seek assistance by sending an
e-mail to the NRC electronic filing Help
Desk at MSHD.Resource@nrc.gov.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission, the presiding officer, or
the Atomic Safety and Licensing Board
that the request and/or petition should
be granted and/or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/ehd_proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer.
Participants are requested not to include
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to this
amendment action, see the application
for amendment which is available for
public inspection at the Commission’s
PDR, located at One White Flint North,
Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the ADAMS Public Electronic Reading
Room on the Internet at the NRC Web
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
site, https://www.nrc.gov/reading-rm/
adams.html. If you do not have access
to ADAMS or if there are problems in
accessing the documents located in
ADAMS, contact the PDR Reference
staff at 1–800–397–4209, 301–415–4737,
or by e-mail to pdr.resource@nrc.gov.
Carolina Power & Light Company, et al.,
Docket No. 50–400, Shearon Harris
Nuclear Power Plant, Unit 1, Wake and
Chatham Counties, North Carolina
Date of amendment request: July 21,
2009.
Description of amendment request:
This amendment request contains
sensitive unclassified non-safeguards
information (SUNSI). The proposed
amendment would revise Technical
Specification Section 6.9.1.6 to add the
NRC-approved topical report (TR) EMF–
23 10(P)(A), ‘‘SRP Chapter 15 NonLOCA [Loss-of-Coolant Accident]
Methodology for Pressurized Water
Reactors,’’ to the Core Operating Limits
Report methodologies list. This change
will allow the use of thermal-hydraulic
computer analysis code, S–RELAP5 for
Final Safety Analysis Report (FSAR)
Chapter 15 non-LOCA transients in the
Shearon Harris Nuclear Power Plant,
Unit 1 (HNP) safety analyses. Topical
Report EMF–23 10(P)(A), Revision 0,
was approved by the NRC on May 11,
2001, for the application of the S–
RELAP5 thermal-hydraulic computer
analysis code to FSAR Chapter 15 nonLOCA transients. Revision 1 of TR
EMF–23 10(P)(A), approved by the NRC
on May 19, 2004, updated Section 5.6 of
the topical report.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The topical report has been reviewed and
approved by the NRC for use in determining
core operating limits. The core operating
limits to be developed using the new
methodologies for HNP will be established in
accordance with the applicable limitations as
documented in the NRC Safety Evaluation
Reports. In the May 11, 2001, NRC SE, the
NRC concluded that the S–RELAP5 code is
capable of addressing the thermal-hydraulic
response of the target non-LOCA events in a
conservative manner and is therefore an
acceptable replacement for the ANF RELAP
code. The May 19, 2004, SE for Revision 1
to EMF–23 10(P)(A), concluded that the code
remained acceptable for use for the nonLOCA events.
E:\FR\FM\10NON1.SGM
10NON1
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
The proposed change, by itself, does not
impact the current design bases. The
proposed change enables the use of new
methodology to re-analyze certain events.
Revised analyses may either result in
continued conformance with design bases or
may change the design bases. If design basis
changes result from a revised analysis, the
specific design changes will be evaluated in
accordance with HNP design change
procedures and 10 CFR 50.59.
The proposed change does not involve
physical changes to any plant structure,
system, or component. Therefore, the
probability of occurrence for a previously
analyzed accident is not significantly
increased.
The consequences of a previously analyzed
accident are dependent on the initial
conditions assumed for the analysis, the
behavior of the fission product barriers
during the analyzed accident, the availability
and successful functioning of the equipment
assumed to operate in response to the
analyzed event, and the setpoints at which
these actions are initiated. The proposed
methodologies will ensure that the plant
continues to meet applicable design and
safety analyses acceptance criteria. The
proposed change does not affect the
performance of any equipment used to
mitigate the consequences of an analyzed
accident. As a result, no analysis
assumptions are impacted and there are no
adverse effects on the factors that contribute
to offsite or onsite dose as a result of an
accident. The proposed change does not
affect setpoints that initiate protective or
mitigative actions. The proposed change
ensures that plant structures, systems, and
components are maintained consistent with
the safety analysis and licensing bases.
Therefore, this amendment does not
involve a significant increase in the
probability or consequences of a previously
analyzed accident.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change does not involve any
physical alteration of plant systems,
structures, or components, other than
allowing for fuel design in accordance with
NRC approved methodologies. No new or
different equipment is being installed. No
installed equipment is being operated in a
different manner. There is no change to the
parameters within which the plant is
normally operated or in the setpoints that
initiate protective or mitigative actions. As a
result, no new failure modes are being
introduced.
Therefore, the proposed change will not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
There is no impact on any margin of safety
resulting from the incorporation of this new
topical report into the Technical
Specifications. If design basis changes result
from a revised analysis that uses these new
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
methodologies, the specific design changes
will be evaluated in accordance with HNP
design change procedures and 10 CFR 50.59.
Any potential reduction in the margin of
safety would be evaluated for that specific
design change.
Therefore, this amendment does not
involve a significant reduction in the margin
of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: David T.
Conley, Associate General Counsel II—
Legal Department, Progress Energy
Service Company, LLC, Post Office Box
1551, Raleigh, North Carolina 27602.
NRC Branch Chief: Thomas H. Boyce.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
Carolina Power & Light Company, et al.,
Docket No. 50–400, Shearon Harris
Nuclear Power Plant, Unit 1, Wake and
Chatham Counties, North Carolina
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requester shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The e-mail address for
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
58061
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) The identity of the individual or
entity requesting access to SUNSI and
the requester’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention;
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
E:\FR\FM\10NON1.SGM
10NON1
58062
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff either after
a determination on standing and need
for access, or after a determination on
trustworthiness and reliability, the NRC
staff shall immediately notify the
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requester may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
H. Review of Grants of Access. A party
other than the requester may challenge
an NRC staff determination granting
access to SUNSI whose release would
harm that party’s interest independent
of the proceeding. Such a challenge
must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 30th day
of October 2009.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 ..............................
Publication of FEDERAL REGISTER notice of hearing and opportunity to petition for leave to intervene, including order with
instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: Supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also
informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of
the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requester to file a motion seeking a
ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the
deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release
of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing
and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25
days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions
by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
10 ............................
60 ............................
20 ............................
25 ............................
30 ............................
40 ............................
A ..............................
A + 3 .......................
srobinson on DSKHWCL6B1PROD with NOTICES
A + 28 .....................
A + 53 .....................
A + 60 .....................
>A + 60 ...................
A ..............................
A + 3 .......................
3 Requesters should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
staff determinations (because they must be served
on a presiding officer or the Commission, as
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\10NON1.SGM
10NON1
Federal Register / Vol. 74, No. 216 / Tuesday, November 10, 2009 / Notices
58063
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
Event/activity
A + 28 .....................
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25
days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions
by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
A + 53 .....................
A + 60 .....................
>A + 60 ...................
[FR Doc. E9–26812 Filed 11–9–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0491; Docket No. 50–315]
Indiana Michigan Power Company,
Donald C. Cook Nuclear Plant, Unit 1;
Environmental Assessment and
Finding of No Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an exemption from Title 10
of the Code of Federal Regulations (10
CFR) part 50, § 26.205(d)(4) [10 CFR
2.205(d)(4)], for Facility Operating
License No. DPR–58, issued to Indiana
Michigan Power Company (the
licensee), for operation of the Donald C.
Cook Nuclear Plant, Unit 1 (CNP–1),
located in Berrien County. Therefore, as
required by 10 CFR 51.21, the NRC is
issuing this environmental assessment
and finding of no significant impact.
Environmental Assessment
srobinson on DSKHWCL6B1PROD with NOTICES
Identification of the Proposed Action
The proposed action is a one-time
scheduler exemption from the
requirements of 10 CFR 26.205(d)(4).
Under routine work conditions,
licensees shall ensure that work hour
schedules for certain individuals meet
the requirements as specified in 10 CFR
26.205(d)(3). The regulations permit
licensees to use less restrictive work
hour limits as specified in 10 CFR
26.205(d)(4) during the first 60 days of
a unit outage. The proposed exemption
would allow the less restrictive working
hour limitations during a 60-day period
that will encompass restart of CNP–1
from its current extended outage and
would apply only to operations and
maintenance personnel. Because CNP–1
entered its current outage in September
2008 and the first sixty days of the
outage have elapsed, the less restrictive
work hours of 10 CFR 26.205(d)(4) to
support unit restart would not apply
absent the exemption. The NRC is
VerDate Nov<24>2008
16:45 Nov 09, 2009
Jkt 220001
authorized to grant the exemption
pursuant to 10 CFR 26.9.
The proposed action is in accordance
with the licensee’s request dated
September 18, 2009 (Agencywide
Documents Access and Management
System (ADAMS) Accession No.
ML092680722), as supplemented by
letter dated October 15, 2009 (ADAMS
Accession No. ML092990410).
The Need for the Proposed Action
The proposed action is requested to
support restart activities for CNP–1 from
the current extended forced outage
which began on September 20, 2008, as
a result of a main turbine failure.
Operations and maintenance personnel
are subject to the new working hour
limitations specified in 10 CFR part 26,
subpart I, implemented by the licensee
on October 1, 2009. Since CNP–1 has
been in its current outage for over one
year, the less restrictive work hour
requirements of 10 CFR 26.205(d)(4)
would not be available to accommodate
the increased workload associated with
restart of CNP–1, as those requirements
are only available for the first 60 days
of a unit outage.
The licensee has requested a one-time
scheduler exemption to allow use of the
work hour limitations specified in 10
CFR 26.205(d)(4) to support restart
activities from the current CNP–1
extended outage.
Environmental Impacts of the Proposed
Action
The NRC has completed its evaluation
of the proposed action and concludes
that there are no environmental impacts
associated with the proposed
exemption. The details of the staff’s
safety evaluation will be provided in the
exemption that will be issued as part of
the letter to the licensee approving the
exemption to the regulation.
The proposed action will not
significantly increase the probability or
consequences of accidents. No changes
are being made in the types of effluents
that may be released offsite. There is no
significant increase in the amount of
any effluent released offsite. There is no
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
significant increase in occupational or
public radiation exposure. Therefore,
there are no significant radiological
environmental impacts associated with
the proposed action.
With regard to potential nonradiological impacts, the proposed
action does not have any foreseeable
impacts to land, air, or water resources,
including impacts to biota. In addition,
there are also no known socioeconomic
or environmental justice impacts
associated with such proposed action.
Therefore, there are no significant nonradiological environmental impacts
associated with the proposed action.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the staff considered denial of the
proposed action (i.e., the ‘‘no-action’’
alternative). Denial of the application
would result in no change in current
environmental impacts. Therefore, the
environmental impacts of the proposed
action and the alternative action are
similar.
Alternative Use of Resources
The action does not involve the use of
any different resources than those
previously considered in the Final
Environmental Statement related to
operation of the Donald C. Cook Nuclear
Plant, Units 1 and 2, dated August 1973,
and the Generic Environmental Impact
Statement for License Renewal of the
Donald C. Cook Nuclear Plant, Units 1
and 2 (NUREG–1437, Supplement 20),
dated May 2005.
Agencies and Persons Consulted
On October 19, 2009, the staff
consulted with the Michigan State
official, Mr. Ken Yale, of the Michigan
Department of Environmental Quality,
regarding the environmental impact of
the proposed action. The State official
had no comments.
E:\FR\FM\10NON1.SGM
10NON1
Agencies
[Federal Register Volume 74, Number 216 (Tuesday, November 10, 2009)]
[Notices]
[Pages 58058-58063]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-26812]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2009-0473]
Notice; Applications and Amendments to Facility Operating
Licenses Involving Proposed No Significant Hazards Considerations and
Containing Sensitive Unclassified Non-Safeguards Information and Order
Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards
Information
I. Background
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC staff) is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license upon a
determination by the Commission that such amendment involves no
significant hazards consideration, notwithstanding the pendency before
the Commission of a request for a hearing from any person.
This notice includes notices of amendments containing sensitive
unclassified non-safeguards information (SUNSI).
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Title 10 of the Code of Federal
Regulations (10 CFR), Section 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
[[Page 58059]]
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Public File
Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland, or
at https://www.nrc.gov/reading-rm/doc-collections/cfr/part002/part002-0309.html. Publicly available records will be accessible from the
Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm.html. If a request for a hearing or petition for
leave to intervene is filed within 60 days, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner/
requestor intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner/requestor intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, any hearing held would take place before the
issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in the Federal Register on August 28, 2007 (72 FR 49139).
The E-Filing process requires participants to submit and serve all
adjudicatory documents over the Internet, or in some cases to mail
copies on electronic storage media. Participants may not submit paper
copies of their filings unless they seek an exemption in accordance
with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
should contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by calling 301-415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel
[[Page 58060]]
or representative) already holds an NRC-issued digital ID certificate).
Each petitioner/requestor will need to download the Workplace Forms
ViewerTM to access the Electronic Information Exchange
(EIE), a component of the E-Filing system. The Workplace Forms
ViewerTM is free and is available at https://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying
for a digital ID certificate is available on NRC's public Web site at
https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html or by calling the NRC electronic filing Help Desk,
which is available between 8 a.m. and 8 p.m., Eastern Time, Monday
through Friday, excluding government holidays. The toll-free help line
number is 1-866-672-7640. A person filing electronically may also seek
assistance by sending an e-mail to the NRC electronic filing Help Desk
at MSHD.Resource@nrc.gov.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the request and/
or petition should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii).
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/ehd_proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings, unless an NRC regulation or
other law requires submission of such information. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this amendment action, see the
application for amendment which is available for public inspection at
the Commission's PDR, located at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible electronically from the
ADAMS Public Electronic Reading Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/adams.html. If you do not have
access to ADAMS or if there are problems in accessing the documents
located in ADAMS, contact the PDR Reference staff at 1-800-397-4209,
301-415-4737, or by e-mail to pdr.resource@nrc.gov.
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
Date of amendment request: July 21, 2009.
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information (SUNSI). The proposed
amendment would revise Technical Specification Section 6.9.1.6 to add
the NRC-approved topical report (TR) EMF-23 10(P)(A), ``SRP Chapter 15
Non-LOCA [Loss-of-Coolant Accident] Methodology for Pressurized Water
Reactors,'' to the Core Operating Limits Report methodologies list.
This change will allow the use of thermal-hydraulic computer analysis
code, S-RELAP5 for Final Safety Analysis Report (FSAR) Chapter 15 non-
LOCA transients in the Shearon Harris Nuclear Power Plant, Unit 1 (HNP)
safety analyses. Topical Report EMF-23 10(P)(A), Revision 0, was
approved by the NRC on May 11, 2001, for the application of the S-
RELAP5 thermal-hydraulic computer analysis code to FSAR Chapter 15 non-
LOCA transients. Revision 1 of TR EMF-23 10(P)(A), approved by the NRC
on May 19, 2004, updated Section 5.6 of the topical report.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The topical report has been reviewed and approved by the NRC for
use in determining core operating limits. The core operating limits
to be developed using the new methodologies for HNP will be
established in accordance with the applicable limitations as
documented in the NRC Safety Evaluation Reports. In the May 11,
2001, NRC SE, the NRC concluded that the S-RELAP5 code is capable of
addressing the thermal-hydraulic response of the target non-LOCA
events in a conservative manner and is therefore an acceptable
replacement for the ANF RELAP code. The May 19, 2004, SE for
Revision 1 to EMF-23 10(P)(A), concluded that the code remained
acceptable for use for the non-LOCA events.
[[Page 58061]]
The proposed change, by itself, does not impact the current
design bases. The proposed change enables the use of new methodology
to re-analyze certain events. Revised analyses may either result in
continued conformance with design bases or may change the design
bases. If design basis changes result from a revised analysis, the
specific design changes will be evaluated in accordance with HNP
design change procedures and 10 CFR 50.59.
The proposed change does not involve physical changes to any
plant structure, system, or component. Therefore, the probability of
occurrence for a previously analyzed accident is not significantly
increased.
The consequences of a previously analyzed accident are dependent
on the initial conditions assumed for the analysis, the behavior of
the fission product barriers during the analyzed accident, the
availability and successful functioning of the equipment assumed to
operate in response to the analyzed event, and the setpoints at
which these actions are initiated. The proposed methodologies will
ensure that the plant continues to meet applicable design and safety
analyses acceptance criteria. The proposed change does not affect
the performance of any equipment used to mitigate the consequences
of an analyzed accident. As a result, no analysis assumptions are
impacted and there are no adverse effects on the factors that
contribute to offsite or onsite dose as a result of an accident. The
proposed change does not affect setpoints that initiate protective
or mitigative actions. The proposed change ensures that plant
structures, systems, and components are maintained consistent with
the safety analysis and licensing bases.
Therefore, this amendment does not involve a significant
increase in the probability or consequences of a previously analyzed
accident.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not involve any physical alteration of
plant systems, structures, or components, other than allowing for
fuel design in accordance with NRC approved methodologies. No new or
different equipment is being installed. No installed equipment is
being operated in a different manner. There is no change to the
parameters within which the plant is normally operated or in the
setpoints that initiate protective or mitigative actions. As a
result, no new failure modes are being introduced.
Therefore, the proposed change will not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
There is no impact on any margin of safety resulting from the
incorporation of this new topical report into the Technical
Specifications. If design basis changes result from a revised
analysis that uses these new methodologies, the specific design
changes will be evaluated in accordance with HNP design change
procedures and 10 CFR 50.59. Any potential reduction in the margin
of safety would be evaluated for that specific design change.
Therefore, this amendment does not involve a significant
reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: David T. Conley, Associate General Counsel
II--Legal Department, Progress Energy Service Company, LLC, Post Office
Box 1551, Raleigh, North Carolina 27602.
NRC Branch Chief: Thomas H. Boyce.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requester shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requester's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no
[[Page 58062]]
later than 25 days after the requestor is granted access to that
information. However, if more than 25 days remain between the date the
petitioner is granted access to the information and the deadline for
filing all other contentions (as established in the notice of hearing
or opportunity for hearing), the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requester may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requester may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requesters should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 30th day of October 2009.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in this Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0................................. Publication of Federal Register
notice of hearing and opportunity
to petition for leave to intervene,
including order with instructions
for access requests.
10................................ Deadline for submitting requests for
access to Sensitive Unclassified
Non-Safeguards Information (SUNSI)
with information: Supporting the
standing of a potential party
identified by name and address;
describing the need for the
information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding.
60................................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does
not require access to SUNSI (+25
Answers to petition for
intervention; +7 petitioner/
requestor reply).
20................................ Nuclear Regulatory Commission (NRC)
staff informs the requester of the
staff's determination whether the
request for access provides a
reasonable basis to believe
standing can be established and
shows need for SUNSI. (NRC staff
also informs any party to the
proceeding whose interest
independent of the proceeding would
be harmed by the release of the
information.) If NRC staff makes
the finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing
(preparation of redactions or
review of redacted documents).
25................................ If NRC staff finds no ``need'' or no
likelihood of standing, the
deadline for petitioner/requester
to file a motion seeking a ruling
to reverse the NRC staff's denial
of access; NRC staff files copy of
access determination with the
presiding officer (or Chief
Administrative Judge or other
designated officer, as
appropriate). If NRC staff finds
``need'' for SUNSI, the deadline
for any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information to file
a motion seeking a ruling to
reverse the NRC staff's grant of
access.
30................................ Deadline for NRC staff reply to
motions to reverse NRC staff
determination(s).
40................................ (Receipt +30) If NRC staff finds
standing and need for SUNSI,
deadline for NRC staff to complete
information processing and file
motion for Protective Order and
draft Non-Disclosure Affidavit.
Deadline for applicant/licensee to
file Non-Disclosure Agreement for
SUNSI.
A................................. If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing
a final adverse determination by
the NRC staff.
A + 3............................. Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
A + 28............................ Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days
remain between the petitioner's
receipt of (or access to) the
information and the deadline for
filing all other contentions (as
established in the notice of
hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53............................ (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
A + 60............................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60........................... Decision on contention admission.
A................................. If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing
a final adverse determination by
the NRC staff.
A + 3............................. Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
[[Page 58063]]
A + 28............................ Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days
remain between the petitioner's
receipt of (or access to) the
information and the deadline for
filing all other contentions (as
established in the notice of
hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53............................ (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
A + 60............................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60........................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. E9-26812 Filed 11-9-09; 8:45 am]
BILLING CODE 7590-01-P