Environmental Impact Statements and Regulations; Availability of EPA Comments, 57466 [E9-26825]
Download as PDF
57466
Federal Register / Vol. 74, No. 214 / Friday, November 6, 2009 / Notices
approximately 130 monitors, which will
result in the addition of 66 respondents.
What Is the Next Step in the Process for
This ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice pursuant
to 5 CFR 1320.5(a)(1)(iv) to announce
the submission of the ICR to OMB and
the opportunity to submit additional
comments to OMB. If you have any
questions about this ICR or the approval
process, please contact the technical
person listed under FOR FURTHER
INFORMATION CONTACT.
Dated: October 5, 2009.
Ronald Fraass,
Director, National Air and Radiation
Environmental Laboratory (NAREL).
[FR Doc. E9–26836 Filed 11–5–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8799–1]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146 or https://www.epa.gov/
compliance/nepa/.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009, (74 FR 34754).
mstockstill on DSKH9S0YB1PROD with NOTICES6
Draft EISs
EIS No. 20090192, ERP No. D–FHW–
L40238–ID, Idaho 16, I–84 to Idaho 44
Environmental Study, Proposed
Action is to Increase the
Transportation Capacity, Funding,
Ada and Canyon Counties, ID.
Summary: EPA expressed
environmental concerns about impacts
to air quality, wetlands, floodplains,
groundwater and riparian habitat
complexes and requested information
on public transit, designated nonmotorized infrastructure, and demand
management to reduce greenhouse
gases. Rating EC2.
VerDate Nov<24>2008
18:23 Nov 05, 2009
Jkt 220001
EIS No. 20090231, ERP No. D–BIA–
K60042–CA, Point Molate Mixed-Use
Tribal Destination Resort and Casino,
Proposed Project is to Strengthen the
Tribal Government and Improve the
Social Economic Status, Guidiville
Band of Pomo Indian of the Guidiville
Rancheria (Tribe), City of Richmond,
Contra Costa County, CA.
Summary: EPA expressed
environmental concerns about the
cleanup of onsite contamination and
requested additional information
regarding enforcement of cleanup orders
after the land is taken into Tribal trust.
Rating EC2.
EIS No. 20090244, ERP No. D–BLM–
K65375–CA, Santa Ana River Wash
Land Use Plan Amendment and Land
Exchange Project, Proposes to
Exchange Land Located within Upper
Santa Ana River Wash, for DistrictOwned Lands in San Bernardino
County, CA.
Summary: EPA expressed
environmental concerns about potential
adverse impacts to wetlands and
endangered species. Rating EC2.
EIS No. 20090298, ERP No. D–COE–
K39121–CA, Natomas Levee
Improvement Program Phase 4a
Landside Improvement Project,
Issuing of 408 Permission and 404
Permit, California Department of
Water Resources (DWR) and the
California Central Valley Flood
Protection Board, Sutter and
Sacramento Counties, CA.
Summary: EPA expressed
environmental concerns about air
quality conformity and requested that
residual flood risk be incorporated into
land use planning. Rating EC2.
EIS No. 20090318, ERP No. D–USA–
L15000–WA, Fort Lewis Army Growth
and Force Structures Realignment,
Implementation, Fort Lewis and
Yakima Training Center, Kittitas,
Pierce, Thurston and Yakima
Counties, WA.
Summary: EPA expressed
environmental concerns about water
quality, biological resources, noise and
human health impacts. Rating EC2.
EIS No. 20090308, ERP No. DS–USN–
E65055–FL, Renewal of Authorization
to Use Pinecastle Range, New
Information that was not Available in
the 2002 FEIS, Continued Use of the
Range for a 20 Year Period, Special
Use Permit Issuance, Ocala National
Forest, Marion and Lake Counties, FL.
Summary: Based on full
implementation of the existing and
proposed mitigation measures, EPA has
no objection to the proposed action.
Rating LO.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
EIS No. 20090310, ERP No. DS–AFS–
L65455–ID, Small-Scale Suction
Dredging in Lolo Creek and Moose
Creek Project, Updated Information to
Analysis Three Alternatives,
Clearwater National Forest, North
Fork Ranger District, Clearwater and
Idaho Counties, ID.
Summary: EPA expressed
environmental concerns about water
quality and cumulative impacts, and
requested information about the data
collected and level of uncertainty
regarding conclusions related to water
quality. EPA also requested a
cumulative effects analysis that
considers a temporal scale consistent
with the life of this approval and
continual dredging over time in the
stream channel. Rating EC2.
Final EISs
EIS No. 20090328, ERP No. F–FRC–
E03019–00, Phase VIII Expansion
Project, Proposed to Construct, Own,
Operate, and Maintain New Interstate
National Gas Pipeline, Compressor,
and Ancillary Facilities in Alabama
and Florida.
Summary: EPA expressed
environmental concerns about noise
aquatic habitat, water resource, and
wetland impacts, and requested
mitigation for these impacts.
Dated: November 3, 2009.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. E9–26825 Filed 11–5–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8598–9]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 10/26/2009 Through 10/30/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090371, Draft EIS, NPS, KY,
Cumberland Gap National Historical
Park, General Management Plan,
Implementation, Middlesboro, KY,
Comment Period Ends: 01/04/2010,
Contact: David Libman, 404–507–
5701.
EIS No. 20090372, Draft EIS, FRBSF,
WA, Federal Reserve Bank of San
Francisco, Propose to sell the Property
at 1015 Second Avenue that is
E:\FR\FM\06NON1.SGM
06NON1
Agencies
[Federal Register Volume 74, Number 214 (Friday, November 6, 2009)]
[Notices]
[Page 57466]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-26825]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8799-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146 or https://www.epa.gov/compliance/nepa/.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated July 17, 2009, (74
FR 34754).
Draft EISs
EIS No. 20090192, ERP No. D-FHW-L40238-ID, Idaho 16, I-84 to Idaho 44
Environmental Study, Proposed Action is to Increase the Transportation
Capacity, Funding, Ada and Canyon Counties, ID.
Summary: EPA expressed environmental concerns about impacts to air
quality, wetlands, floodplains, groundwater and riparian habitat
complexes and requested information on public transit, designated non-
motorized infrastructure, and demand management to reduce greenhouse
gases. Rating EC2.
EIS No. 20090231, ERP No. D-BIA-K60042-CA, Point Molate Mixed-Use
Tribal Destination Resort and Casino, Proposed Project is to Strengthen
the Tribal Government and Improve the Social Economic Status,
Guidiville Band of Pomo Indian of the Guidiville Rancheria (Tribe),
City of Richmond, Contra Costa County, CA.
Summary: EPA expressed environmental concerns about the cleanup of
onsite contamination and requested additional information regarding
enforcement of cleanup orders after the land is taken into Tribal
trust. Rating EC2.
EIS No. 20090244, ERP No. D-BLM-K65375-CA, Santa Ana River Wash Land
Use Plan Amendment and Land Exchange Project, Proposes to Exchange Land
Located within Upper Santa Ana River Wash, for District-Owned Lands in
San Bernardino County, CA.
Summary: EPA expressed environmental concerns about potential
adverse impacts to wetlands and endangered species. Rating EC2.
EIS No. 20090298, ERP No. D-COE-K39121-CA, Natomas Levee Improvement
Program Phase 4a Landside Improvement Project, Issuing of 408
Permission and 404 Permit, California Department of Water Resources
(DWR) and the California Central Valley Flood Protection Board, Sutter
and Sacramento Counties, CA.
Summary: EPA expressed environmental concerns about air quality
conformity and requested that residual flood risk be incorporated into
land use planning. Rating EC2.
EIS No. 20090318, ERP No. D-USA-L15000-WA, Fort Lewis Army Growth and
Force Structures Realignment, Implementation, Fort Lewis and Yakima
Training Center, Kittitas, Pierce, Thurston and Yakima Counties, WA.
Summary: EPA expressed environmental concerns about water quality,
biological resources, noise and human health impacts. Rating EC2.
EIS No. 20090308, ERP No. DS-USN-E65055-FL, Renewal of Authorization to
Use Pinecastle Range, New Information that was not Available in the
2002 FEIS, Continued Use of the Range for a 20 Year Period, Special Use
Permit Issuance, Ocala National Forest, Marion and Lake Counties, FL.
Summary: Based on full implementation of the existing and proposed
mitigation measures, EPA has no objection to the proposed action.
Rating LO.
EIS No. 20090310, ERP No. DS-AFS-L65455-ID, Small-Scale Suction
Dredging in Lolo Creek and Moose Creek Project, Updated Information to
Analysis Three Alternatives, Clearwater National Forest, North Fork
Ranger District, Clearwater and Idaho Counties, ID.
Summary: EPA expressed environmental concerns about water quality
and cumulative impacts, and requested information about the data
collected and level of uncertainty regarding conclusions related to
water quality. EPA also requested a cumulative effects analysis that
considers a temporal scale consistent with the life of this approval
and continual dredging over time in the stream channel. Rating EC2.
Final EISs
EIS No. 20090328, ERP No. F-FRC-E03019-00, Phase VIII Expansion
Project, Proposed to Construct, Own, Operate, and Maintain New
Interstate National Gas Pipeline, Compressor, and Ancillary Facilities
in Alabama and Florida.
Summary: EPA expressed environmental concerns about noise aquatic
habitat, water resource, and wetland impacts, and requested mitigation
for these impacts.
Dated: November 3, 2009.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. E9-26825 Filed 11-5-09; 8:45 am]
BILLING CODE 6560-50-P