Notice of Effectiveness of Exempt Wholesale Generator Status; Elizabethtown Energy, LLC, et al., 57463 [E9-26742]

Download as PDF Federal Register / Vol. 74, No. 214 / Friday, November 6, 2009 / Notices site at https://www.ferc.gov under the ‘‘e-Filing’’ link. 57463 DEPARTMENT OF ENERGY Kimberly D. Bose, Secretary. [FR Doc. E9–26740 Filed 11–5–09; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status; Elizabethtown Energy, LLC, et al. October 30, 2009. Docket Nos. Elizabethtown Energy, LLC .............................................................................................................................................................. Lumberton Energy, LLC ................................................................................................................................................................... Milford Wind Corridor Phase I, LLC ................................................................................................................................................. Prairie Breeze Wind Energy LLC ..................................................................................................................................................... Dominion Nuclear Connecticut, Inc .................................................................................................................................................. Fox Islands Wind, LLC ..................................................................................................................................................................... Rolling Thunder I Power Partners, LLC ........................................................................................................................................... Black Bear Hydro Partners, LLC ...................................................................................................................................................... Tilton Energy LLC ............................................................................................................................................................................. Langford Wind Power, LLC .............................................................................................................................................................. Take notice that during the month of September, 2009, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations 18 CFR 366.7(a). Kimberly D. Bose, Secretary. [FR Doc. E9–26742 Filed 11–5–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13600–000] Alaska Power & Telephone Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications mstockstill on DSKH9S0YB1PROD with NOTICES6 October 30, 2009. On October 5, 2009, Alaska Power & Telephone Company filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Yukon River Hydrokinetic Water Power Project, located on the Yukon River, in the Southeast Fairbanks Census Area, near Eagle, Alaska. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. VerDate Nov<24>2008 18:23 Nov 05, 2009 Jkt 220001 The proposed project would consist of: (1) A 41.5-foot-long fabricated aluminum pontoon barge used to deploy and support the turbines; (2) a 25kilowatt (kW) turbine generator unit attached to the pontoon barge; (3) a Vshaped floating debris boom tethered to the pontoon; (4) a power conversion station (PCS) building, located on the river bank adjacent to the moored pontoon barge; (5) a 750-foot-long, 600volt power and control cable linking the turbine generator unit with the PCS building; (6) a 150-foot-long, 7.2-kilovolt (kV) transmission line connecting the PCS building to an existing 7.2-kV utility transmission line; and (7) appurtenant facilities. The project is projected to operate from May 15th to October 15th annually. The pontoon barge, turbine/generator unit, debris boom, and power and control cable will be removed from the river each October and redeployed the following May to prevent damage to the project facilities from winter ice in the Yukon River. The proposed Yukon River Hydrokinetic Water Power Project would have an average annual generation of 55–60 megawatt-hours. Applicant Contact: Mr. Robert S. Grimm, CEO/President, Alaska Power & Telephone Company, P.O. Box 3222, Port Townsend, WA 98368; phone: (360) 385–1733. FERC Contact: Jennifer Harper, 202– 502–6136. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 EG09–69–000 EG09–70–000 EG09–71–000 EG09–72–000 EG09–73–000 EG09–74–000 EG09–75–000 EG09–77–000 EG09–78–000 EG09–79–000 via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13600) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–26739 Filed 11–5–09; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\06NON1.SGM 06NON1

Agencies

[Federal Register Volume 74, Number 214 (Friday, November 6, 2009)]
[Notices]
[Page 57463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-26742]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status; 
Elizabethtown Energy, LLC, et al.

October 30, 2009.

------------------------------------------------------------------------
                                                   Docket Nos.
------------------------------------------------------------------------
Elizabethtown Energy, LLC..............  EG09-69-000
Lumberton Energy, LLC..................  EG09-70-000
Milford Wind Corridor Phase I, LLC.....  EG09-71-000
Prairie Breeze Wind Energy LLC.........  EG09-72-000
Dominion Nuclear Connecticut, Inc......  EG09-73-000
Fox Islands Wind, LLC..................  EG09-74-000
Rolling Thunder I Power Partners, LLC..  EG09-75-000
Black Bear Hydro Partners, LLC.........  EG09-77-000
Tilton Energy LLC......................  EG09-78-000
Langford Wind Power, LLC...............  EG09-79-000
------------------------------------------------------------------------

    Take notice that during the month of September, 2009, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations 18 CFR 366.7(a).

Kimberly D. Bose,
Secretary.
[FR Doc. E9-26742 Filed 11-5-09; 8:45 am]
BILLING CODE 6717-01-P