Environmental Impacts Statements; Notice of Availability, 56194-56195 [E9-26179]
Download as PDF
56194
Federal Register / Vol. 74, No. 209 / Friday, October 30, 2009 / Notices
Final EISs
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8798–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146 or https://www.epa.gov/
compliance/nepa/.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009 (74 FR 34754).
sroberts on DSKD5P82C1PROD with NOTICES
Draft EISs
EIS No. 20090290, ERP No. D–FTA–
F54014–WI, Kenosha-Racine-Milwaukee
Commuter Rail Extension, Alternative
Analysis, U.S. COE Section 404 Permit,
Funding, Kenosha, Racine, and
Milwaukee Counties, WI.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and natural areas, and
requested additional information on
hazardous waste, noise and vibration.
Rating EC2.
EIS No. 20090296, ERP No. D–SFW–
K90033–CA, Sears Point Wetland and
Watershed Restoration Project, To
Restore Tidal Wetlands and Rehabilitate
Diked Wetlands, Sonoma County, CA.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and waters from
construction activities (trails, roads, and
utilities) not related to wetland
restoration and to air quality from
construction diesel emissions. Rating
EC2.
EIS No. 20090107, ERP No. DS–NRS–
D36121–WV, Lost River Subwatershed
of the Potomac River Watershed Project,
Construction of Site 16 on Lower Cove
Run and Deletion of Site 23 on Cullers
Run in the Lost River Watershed,
Change in Purpose for Site 16 and
Updates Information Relative to Site 23,
U.S. Army COE Section 404 Permit,
Hardy County, WV.
Summary: EPA continues to have
environmental concerns about impacts
to a cold water stream and loss of
wetland resources, and requested
additional information on project need,
current conditions of the study area and
secondary impacts of a water
distribution system. Rating EC2.
VerDate Nov<24>2008
16:30 Oct 29, 2009
Jkt 220001
EIS No. 20090183, ERP No. F–NRC–
D06006–PA, Generic—License Renewal
of Nuclear Plants, Supplement 36 to
NUREG–1437, Regarding Beaver Valley
Power Station, Units 1 and 2, Plant
Specific, Issuing Nuclear Power Plant
Operating License for an Additional 20Year Period, PA.
Summary: EPA has no objection to the
proposed action.
EIS No. 20090218, ERP No. F–NRC–
D06007–PA, GENERIC—License
Renewal of Nuclear Plants, Supplement
37 NUREG–1437, Regarding Three Mile
Island Nuclear Station, Unit 1, Dauphin
County, PA.
Summary: EPA continues to have
environmental concerns about
construction impacts.
EIS No. 20090281, ERP No. F–BLM–
J01083–WY, South Gillette Area Coal
Lease Applications, WYW172585,
WYW173360, WYW172657,
WYW161248, Proposal to Lease Four
Tracts of Federal Coal Reserves, Belle
Ayr, Coal Creek, Caballo, and Cordero
Rojo Mines, Wyoming Powder River
Basin, Campbell County, WY.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20090301, ERP No. FS–NRS–
B36121–WV, Lost River Subwatershed
of the Potomac River Watershed Project,
Construction of Site 16 on Lower Cove
Run and Deletion of Site 23 on Cullers
Run in the Lost River Watershed,
Change in Purpose for Site 16 and
Updates Information Relative to Site 23,
U.S. Army COE Section 404 Permit,
Hardy County, WV.
Summary: EPA continues to have
environmental concerns about wetland
and cold water stream impacts, and
requested additional information on
current environmental conditions and
the function of structures already in the
watershed.
Dated: October 27, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–26218 Filed 10–29–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8598–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Weekly receipt of Environmental Impact
Statements
Filed 10/19/2009 through 10/23/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090359, Final EIS, FHW, MO,
MO–63 Corridor Improvement
Project, To Correct Roadway
Deficiencies, Reduce Congestion and
Provide Continuity along the MO–63
Corridor on the Existing Roadway and
on New Location, Osage, Maries and
Phelps Counties, MO, Wait Period
Ends: 11/30/2009, Contact: Peggy
Casey, 573–636–7104.
EIS No. 20090360, Draft EIS, NGB, VT,
158th Fighter Wing Vermont Air
National Guard Project, Proposed
Realignment of National Guard
Avenue and Main Gate Construction,
Burlington International Airport in
South Burlington, VT, Comment
Period Ends: 12/14/2009, Contact:
Robert L. Dogan, 301–836–8859.
EIS No. 20090361, Final EIS, NOA, 00,
PROGRAMMATIC—Toward an
Ecosystem Approach for the Western
Pacific Region: From Species-Based
Fishery Management Plans to PlaceBased Fishery Ecosystem Plans,
Bottomfish and Seamount
Groundfish, Coral Reef Ecosystems,
Crustaceans, Precious Corals,
Pelagics, Implementation, American
Samoa, Commonwealth of the
Northern Mariana Islands, Hawaii,
U.S. Pacific Remote Island Area, Wait
Period Ends: 11/30/2009, Contact:
William L. Robinson, 808–944–2200.
EIS No. 20090362, Draft EIS, DOE, WA,
Hanford Site Tank Closure and Waste
Management Project, Implementation,
Richland, Benton County, WA,
Comment Period Ends: 03/19/2010,
Contact: Mary Beth Burandi 888–829–
6347.
EIS No. 20090363, Draft EIS, SFW, TX,
Hays County Regional Habitat
Conservation Plan, Application for an
Incidental Take Permit, Hays County,
TX, Comment Period Ends: 01/28/
2010, Contact: Allison Arnold, 512–
490–0057 Ext. 242.
EIS No. 20090364, Final EIS, NPS, SD,
Wind Cave National Park Project, Elk
General Management Plan,
Implementation, Custer County, SD,
Wait Period Ends: 11/30/2009,
Contact: Nick Chevance, 402–661–
1844.
EIS No. 20090365, Draft EIS, COE, CO,
Moffat Collection System Project, to
Provide High Quality Dependable,
and Safe Drinking Water to Over 1.1
Million Customers in the City and
County of Denver, Application for an
Section 404 Permit, City and County
Denver, Adams, Boulder, Jeffferson
and Grand Counties, CO, Comment
E:\FR\FM\30OCN1.SGM
30OCN1
Federal Register / Vol. 74, No. 209 / Friday, October 30, 2009 / Notices
Period Ends: 01/28/2010, Contact:
Scott Franklin, 303–979–4120.
EIS No. 20090366, Final EIS, FHW, CO,
US–36 Corridor, Multi-Modal
Transportation Improvements
between I–25 in Adams County and
Foothills Parkway/Table Mesa Drive
in Boulder, Adams, Denver,
Broomfield, Boulder and Jefferson
Counties, CO, Wait Period Ends: 11/
30/2009, Contact: Monica Pavlik,
720–963–3012.
EIS No. 20090367, Draft EIS, USA, 00,
Fort Bliss Army Growth and Force
Structure Realignment Project,
Implementing Land Use Changes and
Improving Training Infrastructure to
Support the Growth the Army (GTA)
Stationing Decision, El Paso Country,
TX and Dona Ana and Otero Counties,
NM, Comment Period Ends: 12/30/
2009, Contact: Jennifer Shore, 703–
602–4238.
EIS No. 20090368, Draft EIS, NSA, TN,
Y–12 National Security Complex
Project, to Support the Stockpile
Stewardship Program and to Meet the
Mission Assigned to Y–12, Oak Ridge,
TN, Comment Period Ends: 01/04/
2010, Contact: Pam Gorman, 865–
576–9903.
EIS No. 20090369, Draft EIS, USA, LA,
Joint Readiness Training Center and
Fort Polk Land Acquisition Program,
Purchase and Lease Lands for
Training and Management Activities,
in the Parishes of Vernon, Sabine,
Natchitoches, LA, Comment Period
Ends: 12/14/2009, Contact: Kristin
Evenstad, 703–692–6427.
EIS No. 20090370, Final EIS, NOA, 00,
Amendment 16 to the Northwest
Multispecies Fishery Management
Plan, Propose to Adopt, Approval and
Implementation Measures to Continue
Formal Rebuilding Program for
Overfishing and to End Overfishing
on those Stock where it Occurring,
Gulf of Maine, Wait Period Ends: 11/
30/2009, Contact: Patricia A. Kurkul,
978–281–9200.
sroberts on DSKD5P82C1PROD with NOTICES
Amended Notices
EIS No. 20090312, Draft EIS, COE, OH,
Cleveland Harbor Dredged Material
Management Plan, Operations and
Maintenance, Cuyahoga County, OH,
Comment Period Ends: 12/07/2009,
Contact: Frank O’Connor, 716–879–
4131. Revision to FR Notice Published
09/11/2009: Extending Comment
period from 10/26/2009 to 12/07/
2009.
VerDate Nov<24>2008
16:30 Oct 29, 2009
Jkt 220001
Dated: October 27, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–26179 Filed 10–29–09; 8:45 am]
BILLING CODE 6560–50–P
FARM CREDIT ADMINISTRATION
Farm Credit Administration Board
Policy Statements
Farm Credit Administration.
Notice.
AGENCY:
ACTION:
SUMMARY: The Farm Credit
Administration (FCA) is publishing the
list of FCA Board policy statements,
which includes three changes since its
last publication and one policy
statement in its entirety.
FOR FURTHER INFORMATION CONTACT:
Wendy Laguarda, Assistant General
Counsel, Office of General Counsel,
Farm Credit Administration, 1501 Farm
Credit Drive, McLean, Virginia 22102–
5090, (703) 883–4020, TTY (703) 883–
4020.
SUPPLEMENTARY INFORMATION: On
November 25, 2005, we published a list
of all current FCA Board policy
statements and the text of each in their
entirety. (See 70 FR 71142.) On June 13,
2006, we published just the list and
stated that there were no changes. (See
71 FR 34132.) Since then, we published
a revised policy statement (FCA–PS–62)
(71 FR 46481, Aug. 14, 2006). The list
being published today contains a
revised policy statement (FCA–PS–79)
which was originally published at 73 FR
9804, Feb. 22, 2008. We are publishing
the text of policy statement FCA–PS–79
in its entirety.
You can view each policy statement
online at https://www.fca.gov/
handbook.nsf. The FCA will continue to
publish new or revised policy
statements in their full text.
FCA Board Policy Statements
FCA–PS–34 Disclosure of the Issuance
and Termination of Enforcement
Documents
FCA–PS–37 Communications During
Rulemaking
FCA–PS–41 Alternative Means of
Dispute Resolution
FCA–PS–44 Travel
FCA–PS–53 Examination Philosophy
FCA–PS–59 Regulatory Philosophy
FCA–PS–62 Equal Employment
Opportunity Diversity
FCA–PS–64 Rules for the Transaction
of Business of the Farm Credit
Administration Board
FCA–PS–65 Release of Consolidated
Reporting System Information
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
56195
FCA–PS–67 Nondiscrimination on the
Basis of Disability in Agency
Programs and Activities
FCA–PS–68 FCS Building Association
Management Operations Policies and
Practices
FCA–PS–71 Disaster Relief Efforts by
Farm Credit Institutions
FCA–PS–72 Financial Institution
Rating System (FIRS)
FCA–PS–77 Borrower Privacy
FCA–PS–78 Official Names of Farm
Credit System Institutions
FCA–PS–79 Consideration and
Referral of Supervisory Strategies and
Enforcement Actions
Consideration and Referral of
Supervisory Strategies and
Enforcement Actions
FCA–PS–79 [NV–09–16]
Effective Date: August 7, 2009.
Effect on Previous Action: Rescinds
and supersedes the previous PS–79.
Source of Authority: Sections 5.19,
5.25–5.35 of the Farm Credit Act of
1971, as amended.
The FCA board hereby adopts the
following policy statement:
The Farm Credit Administration (FCA
or Agency) Board provides for the
regulation and examination of Farm
Credit System (System or FCS)
institutions, which includes the Federal
Agricultural Mortgage Corporation
(Farmer Mac), in accordance with the
Farm Credit Act of 1971, as amended
(the ‘‘Act’’). This policy addresses
conditions that warrant referrals to the
Agency’s Regulatory Enforcement
Committee (REC) to consider
appropriate supervisory strategies and
recommend to the FCA Board the use of
the enforcement authorities conferred
on the Agency under Part C, Title V of
the Act or other statutes. Enforcement
actions include formal agreements,
orders to cease and desist, temporary
orders to cease and desist, civil money
penalties, suspensions or removals of
directors or officers, and conditions
imposed in writing to address unsafe or
unsound practices or violations of law,
rule or regulation (Enforcement
Document). Taking these actions, in an
appropriate and timely manner, is
critical to maintaining shareholder,
investor, and public confidence in the
financial strength and future viability of
the System.
This policy provides only internal
FCA guidance. It is not intended to
create any rights, substantive or
procedural, enforceable at law or in any
administrative proceeding.
Composition of the REC
The Chairman of the FCA Board will
designate the Chief Operating Officer
E:\FR\FM\30OCN1.SGM
30OCN1
Agencies
[Federal Register Volume 74, Number 209 (Friday, October 30, 2009)]
[Notices]
[Pages 56194-56195]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-26179]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8598-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/19/2009 through 10/23/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090359, Final EIS, FHW, MO, MO-63 Corridor Improvement
Project, To Correct Roadway Deficiencies, Reduce Congestion and Provide
Continuity along the MO-63 Corridor on the Existing Roadway and on New
Location, Osage, Maries and Phelps Counties, MO, Wait Period Ends: 11/
30/2009, Contact: Peggy Casey, 573-636-7104.
EIS No. 20090360, Draft EIS, NGB, VT, 158th Fighter Wing Vermont Air
National Guard Project, Proposed Realignment of National Guard Avenue
and Main Gate Construction, Burlington International Airport in South
Burlington, VT, Comment Period Ends: 12/14/2009, Contact: Robert L.
Dogan, 301-836-8859.
EIS No. 20090361, Final EIS, NOA, 00, PROGRAMMATIC--Toward an Ecosystem
Approach for the Western Pacific Region: From Species-Based Fishery
Management Plans to Place-Based Fishery Ecosystem Plans, Bottomfish and
Seamount Groundfish, Coral Reef Ecosystems, Crustaceans, Precious
Corals, Pelagics, Implementation, American Samoa, Commonwealth of the
Northern Mariana Islands, Hawaii, U.S. Pacific Remote Island Area, Wait
Period Ends: 11/30/2009, Contact: William L. Robinson, 808-944-2200.
EIS No. 20090362, Draft EIS, DOE, WA, Hanford Site Tank Closure and
Waste Management Project, Implementation, Richland, Benton County, WA,
Comment Period Ends: 03/19/2010, Contact: Mary Beth Burandi 888-829-
6347.
EIS No. 20090363, Draft EIS, SFW, TX, Hays County Regional Habitat
Conservation Plan, Application for an Incidental Take Permit, Hays
County, TX, Comment Period Ends: 01/28/2010, Contact: Allison Arnold,
512-490-0057 Ext. 242.
EIS No. 20090364, Final EIS, NPS, SD, Wind Cave National Park Project,
Elk General Management Plan, Implementation, Custer County, SD, Wait
Period Ends: 11/30/2009, Contact: Nick Chevance, 402-661-1844.
EIS No. 20090365, Draft EIS, COE, CO, Moffat Collection System Project,
to Provide High Quality Dependable, and Safe Drinking Water to Over 1.1
Million Customers in the City and County of Denver, Application for an
Section 404 Permit, City and County Denver, Adams, Boulder, Jeffferson
and Grand Counties, CO, Comment
[[Page 56195]]
Period Ends: 01/28/2010, Contact: Scott Franklin, 303-979-4120.
EIS No. 20090366, Final EIS, FHW, CO, US-36 Corridor, Multi-Modal
Transportation Improvements between I-25 in Adams County and Foothills
Parkway/Table Mesa Drive in Boulder, Adams, Denver, Broomfield, Boulder
and Jefferson Counties, CO, Wait Period Ends: 11/30/2009, Contact:
Monica Pavlik, 720-963-3012.
EIS No. 20090367, Draft EIS, USA, 00, Fort Bliss Army Growth and Force
Structure Realignment Project, Implementing Land Use Changes and
Improving Training Infrastructure to Support the Growth the Army (GTA)
Stationing Decision, El Paso Country, TX and Dona Ana and Otero
Counties, NM, Comment Period Ends: 12/30/2009, Contact: Jennifer Shore,
703-602-4238.
EIS No. 20090368, Draft EIS, NSA, TN, Y-12 National Security Complex
Project, to Support the Stockpile Stewardship Program and to Meet the
Mission Assigned to Y-12, Oak Ridge, TN, Comment Period Ends: 01/04/
2010, Contact: Pam Gorman, 865-576-9903.
EIS No. 20090369, Draft EIS, USA, LA, Joint Readiness Training Center
and Fort Polk Land Acquisition Program, Purchase and Lease Lands for
Training and Management Activities, in the Parishes of Vernon, Sabine,
Natchitoches, LA, Comment Period Ends: 12/14/2009, Contact: Kristin
Evenstad, 703-692-6427.
EIS No. 20090370, Final EIS, NOA, 00, Amendment 16 to the Northwest
Multispecies Fishery Management Plan, Propose to Adopt, Approval and
Implementation Measures to Continue Formal Rebuilding Program for
Overfishing and to End Overfishing on those Stock where it Occurring,
Gulf of Maine, Wait Period Ends: 11/30/2009, Contact: Patricia A.
Kurkul, 978-281-9200.
Amended Notices
EIS No. 20090312, Draft EIS, COE, OH, Cleveland Harbor Dredged Material
Management Plan, Operations and Maintenance, Cuyahoga County, OH,
Comment Period Ends: 12/07/2009, Contact: Frank O'Connor, 716-879-4131.
Revision to FR Notice Published 09/11/2009: Extending Comment period
from 10/26/2009 to 12/07/2009.
Dated: October 27, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-26179 Filed 10-29-09; 8:45 am]