Slatersville Hydro, LLC; Notice of Intent To Waive Scoping, 55836-55837 [E9-25978]
Download as PDF
55836
Federal Register / Vol. 74, No. 208 / Thursday, October 29, 2009 / Notices
dcolon on DSK2BSOYB1PROD with NOTICES
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
10, 2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–26058 Filed 10–28–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER03–1383–001; ER03–1383–
003]
DeSoto County Generating Company,
LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
October 20, 2009.
This is a supplemental notice in the
above-referenced proceeding of DeSoto
County Generating Company, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
included a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.1
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 9,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
1 Filing submitted September 25, 2003 in Docket
No. ER03–1383–001.
VerDate Nov<24>2008
15:20 Oct 28, 2009
Jkt 220001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–26057 Filed 10–28–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13356–000]
Slatersville Hydro, LLC; Notice of
Intent To Waive Scoping
October 22, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–13356–000.
c. Date Filed: January 15, 2009.
d. Applicant: Slatersville Hydro, LLC.
e. Name of Project: Slatersville
Hydroelectric Project.
f. Location: On the Branch River in
Providence County, Rhode Island. The
project would not occupy any land of
the United States.
g. Filed Pursuant to: Public Utilities
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Michael P.
DeFrancesco, 87 Hall Road, Exeter, RI
02822, (401) 742–1968.
i. FERC Contact: Tom Dean, (202)
502–6041.
j. On May 8, 2009, Commission staff
requested additional information from
Slatersville Hydro including interim
water quality monitoring reports. On
August 5, 2009, Slatersville Hydro filed
the requested information, and on
August 13 and October 15, 2009,
Slatersville Hydro filed interim water
quality reports (the final water quality
report is due January 15, 2010).
Based on a review of the exemption
application, additional environmental
information subsequently filed by
Slatersville Hydro, resource agency
consultation letters and comments filed
to date, Commission staff intend to
prepare a single environmental
assessment (EA). The EA will assess the
potential effects of project construction
E:\FR\FM\29OCN1.SGM
29OCN1
Federal Register / Vol. 74, No. 208 / Thursday, October 29, 2009 / Notices
and operation on geology and soils,
aquatic, terrestrial, threatened and
endangered species, recreation and land
use, aesthetic, and cultural and historic
resources. Because staff believe the
issues that need to be addressed in its
EA have been adequately identified,
with this notice, we are soliciting
comments on our intent to waive
scoping for the Slatersville Project.
k. The deadline for filing comments is
30 days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25978 Filed 10–28–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Membership of Performance
Review Board for Senior Executives
(PRB)
dcolon on DSK2BSOYB1PROD with NOTICES
October 22, 2009.
The Federal Energy Regulatory
Commission hereby provides notice of
the membership of its Performance
Review Board (PRB) for the
Commission’s Senior Executive Service
(SES) members. The function of this
board is to make recommendations
relating to the performance of senior
executives in the Commission. This
action is undertaken in accordance with
Title 5, U.S.C., Section 4314(c)(4).
VerDate Nov<24>2008
15:20 Oct 28, 2009
Jkt 220001
The Commission’s PRB will remove
the following member: Cynthia A.
Marlette.
The Commission’s PRB will add the
following member: Thomas R. Sheets.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25977 Filed 10–28–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–7–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
October 22, 2009.
Take notice that on October 14, 2009,
Columbia Gas Transmission, LLC
(Columbia) 5151 San Felipe, Suite 2500,
Houston, Texas 77056, filed in Docket
No. CP10–7–000, an application
pursuant to sections 157.205, 157.208(b)
and 157.216(b) of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, to construct, uprate,
replace, and abandon certain natural gas
facilities near Columbia’s Majorsville
compressor station system in Marshall
County, West Virginia, under
Columbia’s blanket certificate issued in
Docket No. CP83–76–000,1 all as more
fully set forth in the application which
is on file with the Commission and open
to the public for inspection.
Columbia proposes to uprate the
Maximum Allowable Operating
Pressure on approximately 17 miles of
20-inch diameter pipeline (Line 1758)
from 760 psig to 936 psig; construct and
extend Line 1758 with approximately
0.7 miles of 20-inch pipeline and
appurtenances; construct approximately
2.9 miles of 20-inch diameter pipeline
and appurtenances (Line 10365); and
abandon approximately 0.04 mile of 20inch diameter pipeline and
appurtenances. Columbia also states
that the proposed facilities would
enable it to transport up to 225 MMcf/
day of natural gas from Chesapeake
Appalachia, LLC’s (Chesapeake) and
joint venture partner, Statoil Natural
Gas LLC, from Chesapeake’s production
fields in the Marcellus shale formation
to a new MarkWest Liberty Midstream
& Resources, L.L.C. processing plant to
be built on the grounds of Columbia’s
Majorsville compressor station.
Columbia further states that the
proposed new facilities and
1 22
PO 00000
FERC ¶ 62,029 (1983).
Frm 00034
Fmt 4703
Sfmt 4703
55837
modifications would cost an estimated
$28,200,000 to construct.
Any questions concerning this
application may be directed to Fredric
J. George, Senior Counsel, Columbia Gas
Transmission, LLC, P.O. Box 1273,
Charleston, West Virginia 25325–1273
or via telephone at (304) 357–2359 or by
facsimile (304) 357–3206.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25980 Filed 10–28–09; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2009–0819; FRL–8974–8]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Proposed
Information Collection Request for the
Steam Electric Power Generating
Effluent Guidelines; EPA ICR No.
2368.01, OMB Control No. 2040–NEW
AGENCY: Environmental Protection
Agency (EPA).
E:\FR\FM\29OCN1.SGM
29OCN1
Agencies
[Federal Register Volume 74, Number 208 (Thursday, October 29, 2009)]
[Notices]
[Pages 55836-55837]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25978]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13356-000]
Slatersville Hydro, LLC; Notice of Intent To Waive Scoping
October 22, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-13356-000.
c. Date Filed: January 15, 2009.
d. Applicant: Slatersville Hydro, LLC.
e. Name of Project: Slatersville Hydroelectric Project.
f. Location: On the Branch River in Providence County, Rhode
Island. The project would not occupy any land of the United States.
g. Filed Pursuant to: Public Utilities Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Michael P. DeFrancesco, 87 Hall Road, Exeter,
RI 02822, (401) 742-1968.
i. FERC Contact: Tom Dean, (202) 502-6041.
j. On May 8, 2009, Commission staff requested additional
information from Slatersville Hydro including interim water quality
monitoring reports. On August 5, 2009, Slatersville Hydro filed the
requested information, and on August 13 and October 15, 2009,
Slatersville Hydro filed interim water quality reports (the final water
quality report is due January 15, 2010).
Based on a review of the exemption application, additional
environmental information subsequently filed by Slatersville Hydro,
resource agency consultation letters and comments filed to date,
Commission staff intend to prepare a single environmental assessment
(EA). The EA will assess the potential effects of project construction
[[Page 55837]]
and operation on geology and soils, aquatic, terrestrial, threatened
and endangered species, recreation and land use, aesthetic, and
cultural and historic resources. Because staff believe the issues that
need to be addressed in its EA have been adequately identified, with
this notice, we are soliciting comments on our intent to waive scoping
for the Slatersville Project.
k. The deadline for filing comments is 30 days from the issuance
date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the three digits in the docket
number field to access the document. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-25978 Filed 10-28-09; 8:45 am]
BILLING CODE 6717-01-P