Sutton Hydroelectric Company LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 55545 [E9-25869]

Download as PDF erowe on DSK5CLS3C1PROD with NOTICES Federal Register / Vol. 74, No. 207 / Wednesday, October 28, 2009 / Notices requested be issued on or before May 1, 2010. Questions concerning this application may be directed to Lisa A. Moore, General Manager, Rates and Certificates, Gulfstream Natural Gas System, LLC at 5400 Westheimer Court, P.O. Box 1642, Houston, TX 77251–1642, or by calling (713) 627–4102, or by e-mailing lamoore@spectraenergy.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will VerDate Nov<24>2008 15:34 Oct 27, 2009 Jkt 220001 consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 10, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–25868 Filed 10–27–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12693–002] Sutton Hydroelectric Company LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications October 20, 2009. On October 1, 2009, the Sutton Hydroelectric Company LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Sutton Project, to be located at the U.S. Army Corps of Engineers Sutton Dam, on the Elk River, in Sutton, Braxton County, West Virginia. The proposed project would utilize the existing U.S. Army Corps of Engineers’ Sutton Dam and would consist of: (1) A proposed powerhouse PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 55545 containing 3 generating units with a total generating capacity of 9.2 MW; (2) a 10-foot-diameter penstock; (3) a proposed 1,600-foot-long, 138-kV transmission line; (4) a tailrace; and (5) appurtenant facilities. The project would have an estimated average annual generation of 38.1 gigawatts-hours. Applicant Contact: Mr. Jeffrey M. Auser, Brookfield Renewable Power, 200 Donald Lynch Boulevard, Suite 300, Marlborough, MA 01752, phone (508) 251–7716. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at http: //www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12693) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–25869 Filed 10–27–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13531–000] Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications October 21, 2009. On July 7, 2009, Hydrodynamics, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the E:\FR\FM\28OCN1.SGM 28OCN1

Agencies

[Federal Register Volume 74, Number 207 (Wednesday, October 28, 2009)]
[Notices]
[Page 55545]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25869]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12693-002]


Sutton Hydroelectric Company LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

October 20, 2009.
    On October 1, 2009, the Sutton Hydroelectric Company LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Sutton Project, to be located 
at the U.S. Army Corps of Engineers Sutton Dam, on the Elk River, in 
Sutton, Braxton County, West Virginia.
    The proposed project would utilize the existing U.S. Army Corps of 
Engineers' Sutton Dam and would consist of: (1) A proposed powerhouse 
containing 3 generating units with a total generating capacity of 9.2 
MW; (2) a 10-foot-diameter penstock; (3) a proposed 1,600-foot-long, 
138-kV transmission line; (4) a tailrace; and (5) appurtenant 
facilities. The project would have an estimated average annual 
generation of 38.1 gigawatts-hours.
    Applicant Contact: Mr. Jeffrey M. Auser, Brookfield Renewable 
Power, 200 Donald Lynch Boulevard, Suite 300, Marlborough, MA 01752, 
phone (508) 251-7716.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
    Enter the docket number (P-12693) in the docket number field to 
access the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-25869 Filed 10-27-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.