Sutton Hydroelectric Company LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 55545 [E9-25869]
Download as PDF
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 74, No. 207 / Wednesday, October 28, 2009 / Notices
requested be issued on or before May 1,
2010.
Questions concerning this application
may be directed to Lisa A. Moore,
General Manager, Rates and Certificates,
Gulfstream Natural Gas System, LLC at
5400 Westheimer Court, P.O. Box 1642,
Houston, TX 77251–1642, or by calling
(713) 627–4102, or by e-mailing
lamoore@spectraenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
VerDate Nov<24>2008
15:34 Oct 27, 2009
Jkt 220001
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 10, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25868 Filed 10–27–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12693–002]
Sutton Hydroelectric Company LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
October 20, 2009.
On October 1, 2009, the Sutton
Hydroelectric Company LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Sutton
Project, to be located at the U.S. Army
Corps of Engineers Sutton Dam, on the
Elk River, in Sutton, Braxton County,
West Virginia.
The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Sutton Dam and would
consist of: (1) A proposed powerhouse
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
55545
containing 3 generating units with a
total generating capacity of 9.2 MW; (2)
a 10-foot-diameter penstock; (3) a
proposed 1,600-foot-long, 138-kV
transmission line; (4) a tailrace; and (5)
appurtenant facilities. The project
would have an estimated average annual
generation of 38.1 gigawatts-hours.
Applicant Contact: Mr. Jeffrey M.
Auser, Brookfield Renewable Power,
200 Donald Lynch Boulevard, Suite 300,
Marlborough, MA 01752, phone (508)
251–7716.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at http:
//www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp.
Enter the docket number (P–12693) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25869 Filed 10–27–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13531–000]
Hydrodynamics, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
October 21, 2009.
On July 7, 2009, Hydrodynamics, Inc.
filed an application for a preliminary
permit, pursuant to section 4(f) of the
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 74, Number 207 (Wednesday, October 28, 2009)]
[Notices]
[Page 55545]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25869]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12693-002]
Sutton Hydroelectric Company LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
October 20, 2009.
On October 1, 2009, the Sutton Hydroelectric Company LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Sutton Project, to be located
at the U.S. Army Corps of Engineers Sutton Dam, on the Elk River, in
Sutton, Braxton County, West Virginia.
The proposed project would utilize the existing U.S. Army Corps of
Engineers' Sutton Dam and would consist of: (1) A proposed powerhouse
containing 3 generating units with a total generating capacity of 9.2
MW; (2) a 10-foot-diameter penstock; (3) a proposed 1,600-foot-long,
138-kV transmission line; (4) a tailrace; and (5) appurtenant
facilities. The project would have an estimated average annual
generation of 38.1 gigawatts-hours.
Applicant Contact: Mr. Jeffrey M. Auser, Brookfield Renewable
Power, 200 Donald Lynch Boulevard, Suite 300, Marlborough, MA 01752,
phone (508) 251-7716.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12693) in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-25869 Filed 10-27-09; 8:45 am]
BILLING CODE 6717-01-P