Montana Department of Natural Resources and Conservation; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 54983 [E9-25614]
Download as PDF
Federal Register / Vol. 74, No. 205 / Monday, October 26, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13555–000]
Montana Department of Natural
Resources and Conservation; Notice
of Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Motions To
Intervene
mstockstill on DSKH9S0YB1PROD with NOTICES
October 16, 2009.
On July 16, 2009, the Montana
Department of Natural Resources and
Conservation (MDNRC) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Red Lodge Creek Power
Project, which would be located at the
existing Cooney Dam on Red Lodge
Creek, in Carbon County, Montana. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would use the
existing 102-foot-high, 2,369-foot-long
earthen dam with spillway, and the
existing 630-foot-long, 6-foot by 6-foot
horseshoe-shaped tunnel conduit.
MDNRC proposes to construct and
install: (1) A new 5-foot-diameter, 630foot-long steel liner in the existing dam
outlet conduit; (2) a new 5-footdiameter, 100-foot-long steel penstock
extending to a bifurcation; (3) a new 5foot-diameter, 50-foot-long steel
penstock extending from the bifurcation
to the powerhouse; (4) a new 5-footdiameter, 50-foot-long steel conduit
extending from the bifurcation to an
energy dissipation structure for excess
flows and bypass during turbine
outages; (5) a new powerhouse
containing two generating units with a
combined installed capacity of 1,000
kilowatts, discharging flows into Red
Lodge Creek; (6) a new substation next
to the powerhouse; (7) a new 25kilovolt, 4,000-foot-long transmission
line; (8) a new switchyard at the
interconnection point with the local
grid; (9) a new approximately 650-footlong access road; and (10) appurtenant
facilities. The proposed project would
have an average annual generation of 4.1
gigawatt-hours.
Applicant Contact: Kevin Smith, State
Water Projects Bureau, Montana
Department of Natural Resources and
Conservation, 1424 9th Ave., P.O. Box
VerDate Nov<24>2008
15:19 Oct 23, 2009
Jkt 220001
201601, Helena, MT 59620–1601;
phone: (406) 444–6646.
FERC Contact: Dianne Rodman, (202)
502–6077.
Competing Application: This
application competes with Project No.
13373–000 filed February 12, 2009. The
April 23, 2009, notice for Project No.
13373–000 established a June 22, 2009,
deadline for filing competing
applications or notices of intent to file
a competing application. MDNRC’s
notice of intent to file a competing
application was timely filed on May 19,
2009, and its competing application was
timely filed on July 16, 2009.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13555) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25614 Filed 10–23–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
October 19, 2009.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–5–000.
Applicants: Puget Sound Energy, Inc.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
54983
Description: Application for
Authorization for Acquisition of an
Existing Generation Facility.
Filed Date: 10/15/2009.
Accession Number: 20091015–5105.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 5, 2009.
Docket Numbers: EC10–6–000.
Applicants: Millennium Power
Partners, L.P., New Harquahala
Generating Company, LLC, MACH Gen,
LLC, New Athens Generating Company,
LLC, Varde Partners, L.P., Varde
Management, L.P., Varde Management
International, L.P.
Description: Application of MACH
Gen, LLC, et al. for Order Authorizing
Disposition of Jurisdictional Facilities
Under Section 203 of the Federal Power
Act and Request for Waivers and
Expedited Action.
Filed Date: 10/19/2009.
Accession Number: 20091019–5020.
Comment Date: 5 p.m. Eastern Time
on Monday, November 9, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–855–011.
Applicants: Wisconsin Electric Power
Company.
Description: Amendment to
Application of Wisconsin Electric
Power Company.
Filed Date: 10/19/2009.
Accession Number: 20091019–5081.
Comment Date: 5 p.m. Eastern Time
on Monday, November 9, 2009.
Docket Numbers: ER03–552–011;
ER03–984–009.
Applicants: New York Independent
System Operator, Inc.
Description: Status Report of the New
York Independent System Operator, Inc.
Filed Date: 10/15/2009.
Accession Number: 20091015–5101.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 5, 2009.
Docket Numbers: ER05–1218–005;
ER00–2887–008; ER05–1219–005;
ER06–703–004; ER07–1341–005; ER07–
911–003.
Applicants: York Generation
Company LLC, Bayonne Plant Holding,
L.L.C., Camden Plant Holding, L.L.C.,
Pedricktown Cogeneration Company LP,
Newark Bay Cogeneration Partnership,
L.P., RPL Holdings, Inc.
Description: Notice of Change in
Status of Bayonne Plant Holding, L.L.C.,
et al.
Filed Date: 10/16/2009.
Accession Number: 20091016–5059.
Comment Date: 5 p.m. Eastern Time
on Friday, November 6, 2009.
Docket Numbers: ER08–1377–002.
Applicants: Xcel Energy Services Inc.
Description: Northern States Power
Company et al. submits Substitute
E:\FR\FM\26OCN1.SGM
26OCN1
Agencies
[Federal Register Volume 74, Number 205 (Monday, October 26, 2009)]
[Notices]
[Page 54983]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25614]
[[Page 54983]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13555-000]
Montana Department of Natural Resources and Conservation; Notice
of Competing Preliminary Permit Application Accepted for Filing and
Soliciting Comments and Motions To Intervene
October 16, 2009.
On July 16, 2009, the Montana Department of Natural Resources and
Conservation (MDNRC) filed an application for a preliminary permit,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the Red Lodge Creek Power Project, which would be
located at the existing Cooney Dam on Red Lodge Creek, in Carbon
County, Montana. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would use the existing 102-foot-high, 2,369-
foot-long earthen dam with spillway, and the existing 630-foot-long, 6-
foot by 6-foot horseshoe-shaped tunnel conduit. MDNRC proposes to
construct and install: (1) A new 5-foot-diameter, 630-foot-long steel
liner in the existing dam outlet conduit; (2) a new 5-foot-diameter,
100-foot-long steel penstock extending to a bifurcation; (3) a new 5-
foot-diameter, 50-foot-long steel penstock extending from the
bifurcation to the powerhouse; (4) a new 5-foot-diameter, 50-foot-long
steel conduit extending from the bifurcation to an energy dissipation
structure for excess flows and bypass during turbine outages; (5) a new
powerhouse containing two generating units with a combined installed
capacity of 1,000 kilowatts, discharging flows into Red Lodge Creek;
(6) a new substation next to the powerhouse; (7) a new 25-kilovolt,
4,000-foot-long transmission line; (8) a new switchyard at the
interconnection point with the local grid; (9) a new approximately 650-
foot-long access road; and (10) appurtenant facilities. The proposed
project would have an average annual generation of 4.1 gigawatt-hours.
Applicant Contact: Kevin Smith, State Water Projects Bureau,
Montana Department of Natural Resources and Conservation, 1424 9th
Ave., P.O. Box 201601, Helena, MT 59620-1601; phone: (406) 444-6646.
FERC Contact: Dianne Rodman, (202) 502-6077.
Competing Application: This application competes with Project No.
13373-000 filed February 12, 2009. The April 23, 2009, notice for
Project No. 13373-000 established a June 22, 2009, deadline for filing
competing applications or notices of intent to file a competing
application. MDNRC's notice of intent to file a competing application
was timely filed on May 19, 2009, and its competing application was
timely filed on July 16, 2009.
Deadline for filing comments and motions to intervene: 60 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' link. For a simpler
method of submitting text only comments, click on ``Quick Comment.''
For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and eight copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13555) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-25614 Filed 10-23-09; 8:45 am]
BILLING CODE 6717-01-P