Application To Export Electric Energy; Basin Electric Power Cooperative, 54558 [E9-25437]
Download as PDF
54558
Federal Register / Vol. 74, No. 203 / Thursday, October 22, 2009 / Notices
If you use a TDD, call the FRS, toll
free, at 1–800–877–8339.
VIII. Other Information
Accessible Format: Individuals with
disabilities can obtain this document
and a copy of the application package in
an accessible format (e.g., braille, large
print, audiotape, or computer diskette)
on request to the program contact
person listed under For Further
Information Contact in Section VII of
this notice.
Electronic Access to This Document:
You can view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF) on the Internet at the
following site: https://www.ed.gov/news/
fedregister.
To use PDF, you must have Adobe
Acrobat Reader, which is available free
at this site. If you have questions about
using PDF, call the U.S. Government
Printing Office (GPO), toll free, at 1–
888–293–6498; or in the Washington,
DC area at (202) 512–1530.
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations is available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Delegation of Authority: The Secretary
of Education has delegated authority to
Daniel T. Madzelan, Director,
Forecasting and Policy Analysis for the
Office of Postsecondary Education, to
perform the functions and duties of the
Assistant Secretary for Postsecondary
Education.
Dated: October 16, 2009.
Daniel T. Madzelan,
Director, Forecasting and Policy Analysis.
[FR Doc. E9–25389 Filed 10–21–09; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–64–A]
dcolon on DSK2BSOYB1PROD with NOTICES
Application To Export Electric Energy;
Basin Electric Power Cooperative
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
SUMMARY: Basin Electric Power
Cooperative (Basin Electric) has applied
to amend its authorization to export
electric energy from the United States to
Canada issued pursuant to section
202(e) of the Federal Power Act.
VerDate Nov<24>2008
15:13 Oct 21, 2009
Jkt 220001
DATES: Comments, protests, or requests
to intervene must be submitted on or
before November 23, 2009.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office) 202–586–
9624 or Michael Skinker (Program
Attorney) 202–586–2793.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On March 6, 1980, DOE issued Order
No. EA–64 authorizing Basin Electric to
transmit electric energy from the United
States to Saskatchewan Power
Corporation (SaskPower), the provincial
electric utility of Saskatchewan, Canada,
using Basin Electric’s international
transmission facilities known as the
Tioga-Saskatchewan 230-kV intertie.
Construction of these facilities was
authorized by DOE in Presidential
Permit No. PP–64. Order No. EA–64
contained limits on the capacity and
energy that could be exported during
peak and non-peak times in accordance
with the 1978 Interconnection and
Transaction Agreement between Basin
Electric and SasksPower. For peaking
exports, Basin Electric was limited to a
capacity of 100 megawatts with an
energy limit of 438,000 megawatt hours
(MWH) in any calendar year.
On October 13, 2009, Basin Electric
applied to DOE to amend Order No. EA–
64 in order to be able to export to
NorthPoint Energy Solutions, a
subsidiary of SaskPower, and future
purchasers inside Canada. In addition,
Basic Electric seeks to remove the
438,000–MWH energy limit and
increase the capacity limit to 165 MW,
which Basin Electric claims is the
present total transfer capacity of the
Tioga-Saskatchewan 230-kV intertie.
The electric energy which Basin
Electric proposes to export to Canada
would be provided from its own
generation resources or purchased by
Basin Electric from other sources.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the Basin Electric
application to export electric energy to
Canada should be clearly marked with
Docket No. EA–64–A. Additional copies
are to be filed directly with Dave Rantz,
Basin Electric Power Cooperative, 1717
Interstate Avenue, Bismarck, ND 58503.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on October 16,
2009.
Ellen Russell,
Acting Director, Permitting and Siting, Office
of Electricity Delivery and Energy Reliability.
[FR Doc. E9–25437 Filed 10–21–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–284–B]
Application to Export Electric Energy;
Sempra Energy Solutions LLC
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
SUMMARY: Sempra Energy Solutions LLC
(SES) applied to renew its authority to
export electric energy from the United
States to Mexico for a period of five
years pursuant to section 202(e) of the
Federal Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before November 23, 2009.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 74, Number 203 (Thursday, October 22, 2009)]
[Notices]
[Page 54558]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25437]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-64-A]
Application To Export Electric Energy; Basin Electric Power
Cooperative
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Basin Electric Power Cooperative (Basin Electric) has applied
to amend its authorization to export electric energy from the United
States to Canada issued pursuant to section 202(e) of the Federal Power
Act.
DATES: Comments, protests, or requests to intervene must be submitted
on or before November 23, 2009.
ADDRESSES: Comments, protests, or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).
FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202-
586-9624 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
On March 6, 1980, DOE issued Order No. EA-64 authorizing Basin
Electric to transmit electric energy from the United States to
Saskatchewan Power Corporation (SaskPower), the provincial electric
utility of Saskatchewan, Canada, using Basin Electric's international
transmission facilities known as the Tioga-Saskatchewan 230-kV
intertie. Construction of these facilities was authorized by DOE in
Presidential Permit No. PP-64. Order No. EA-64 contained limits on the
capacity and energy that could be exported during peak and non-peak
times in accordance with the 1978 Interconnection and Transaction
Agreement between Basin Electric and SasksPower. For peaking exports,
Basin Electric was limited to a capacity of 100 megawatts with an
energy limit of 438,000 megawatt hours (MWH) in any calendar year.
On October 13, 2009, Basin Electric applied to DOE to amend Order
No. EA-64 in order to be able to export to NorthPoint Energy Solutions,
a subsidiary of SaskPower, and future purchasers inside Canada. In
addition, Basic Electric seeks to remove the 438,000-MWH energy limit
and increase the capacity limit to 165 MW, which Basin Electric claims
is the present total transfer capacity of the Tioga-Saskatchewan 230-kV
intertie.
The electric energy which Basin Electric proposes to export to
Canada would be provided from its own generation resources or purchased
by Basin Electric from other sources.
Procedural Matters: Any person desiring to become a party to these
proceedings or to be heard by filing comments or protests to this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of the Federal Energy Regulatory Commission's Rules of Practice
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each
petition and protest should be filed with DOE on or before the date
listed above.
Comments on the Basin Electric application to export electric
energy to Canada should be clearly marked with Docket No. EA-64-A.
Additional copies are to be filed directly with Dave Rantz, Basin
Electric Power Cooperative, 1717 Interstate Avenue, Bismarck, ND 58503.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by DOE
that the proposed action will not adversely impact on the reliability
of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by e-mailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on October 16, 2009.
Ellen Russell,
Acting Director, Permitting and Siting, Office of Electricity Delivery
and Energy Reliability.
[FR Doc. E9-25437 Filed 10-21-09; 8:45 am]