Public Utility District No.1 of Snohomish County; Notice of Settlement Agreement and Soliciting Comments, Extending Due Date for Filing Motions To Intervene and Protests, Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, and Modifying Process Plan, 54562 [E9-25400]
Download as PDF
54562
Federal Register / Vol. 74, No. 203 / Thursday, October 22, 2009 / Notices
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filing in the above proceeding is
accessible in the Commission’s eLibrary
system by clicking on the appropriate
link in the above list. They are also
available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket. For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 23, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25398 Filed 10–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2157–188]
Public Utility District No.1 of
Snohomish County; Notice of
Settlement Agreement and Soliciting
Comments, Extending Due Date for
Filing Motions To Intervene and
Protests, Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions, and Modifying
Process Plan
dcolon on DSK2BSOYB1PROD with NOTICES
October 15, 2009.
Take notice that the following
Settlement Agreement (Settlement) has
been filed with the Commission and is
available for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project No.: P–2157–188.
c. Date Filed: October 14, 2009.
d. Applicant: Public Utility District
No. 1 of Snohomish County.
e. Name of Project: Henry M. Jackson
Hydroelectric Project.
f. Location: The existing project is
located on the Sultan River in
Snohomish County, Washington, about
20 miles east of Everett, Washington.
The project penstock underlies 10.9
acres of Mount Baker-Snoqualmie
National Forest.
VerDate Nov<24>2008
15:13 Oct 21, 2009
Jkt 220001
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602, Federal
Power Act 16 U.S.C. 791 (a)—825(r)
h. Applicant Contact: Public Utility
District No. 1 of Snohomish County
(District), Steven J. Klein, General
Manager, 2320 California Street, P.O.
Box 1107, Everett, WA 98206–1107.
i. FERC Contact: David Turner (202)
502–6091 or via e-mail at
david.turner@ferc.gov.
j. Deadline for filing comments on the
Settlement: November 6, 2009. Reply
comments due December 21, 2009. All
documents (original and eight copies)
should be filed with: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
k. The District filed a comprehensive
settlement agreement (Agreement) on
behalf of itself, United States National
Marine Fisheries Service, United States
Forest Service, United States Fish and
Wildlife Service, United States National
Park Service, Washington Department of
Fish and Wildlife, Washington
Department of Ecology, Tulalip Tribes
of Washington, Snohomish County, City
of Everett, City of Sultan, and American
Whitewater. The purpose of the
Agreement is to resolve among the
signatories all issues associated with
issuance of a new license for the project,
including, in part, reservoir operations,
minimum instream flows, process flows,
whitewater boating flows, ramping
rates, fish passage, fish habitat
improvements, wildlife habitat
management, marbled murrelet
protection measures, recreation, and
historic properties management.
The District requests that the
Commission: (1) Accept and
incorporate, without material
modification, all of the proposed license
articles in Appendix 1 of the Settlement
in the new project license; and (2) issue
a new license for a term of 45 years.
l. The A copy of the Settlement
Agreement is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘e-Library’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
m. Procedural Schedule: We are
extending the due date to file
interventions, recommendations,
preliminary terms and conditions, and
fishway prescriptions and reply
comments on these filings to coordinate
with the filing of comments on the
Settlement. Therefore, the application
will be processed according to the
following Hydro Licensing Schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Filing of Interventions,
Recommendations,
Preliminary Terms
and Conditions, and
Fishway Prescriptions.
Reply Comments Due
Issue Draft EA ...........
Comments on Draft
EA Due.
Filing of Modified
Mandatory Terms
and Conditions.
Issue Final EA ...........
Target date
November 6, 2009.
December 21, 2009.
May 5, 2010.
June 4, 2010.
August 3, 2010.
November 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–25400 Filed 10–21–09; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8971–7]
Science Advisory Board Staff Office
Notification of a Public Teleconference
of the Clean Air Scientific Advisory
Committee (CASAC) Ozone Review
Panel
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: The Environmental Protection
Agency (EPA) Science Advisory Board
(SAB) Staff Office announces a public
teleconference of the Clean Air
Scientific Advisory Committee Ozone
Review Panel to conduct a consultation
on EPA’s draft Integrated Review Plan
for the National Ambient Air Quality
Standards for Ozone (External Review
Draft, September 2009).
DATES: The public teleconference will
be held on Friday, November 13, 2009
from 10 a.m. to 2 p.m. (Eastern Time).
ADDRESSES: The public teleconference
will be conducted by telephone only.
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 74, Number 203 (Thursday, October 22, 2009)]
[Notices]
[Page 54562]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25400]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2157-188]
Public Utility District No.1 of Snohomish County; Notice of
Settlement Agreement and Soliciting Comments, Extending Due Date for
Filing Motions To Intervene and Protests, Comments, Recommendations,
Preliminary Terms and Conditions, and Preliminary Fishway
Prescriptions, and Modifying Process Plan
October 15, 2009.
Take notice that the following Settlement Agreement (Settlement)
has been filed with the Commission and is available for public
inspection.
a. Type of Application: Settlement Agreement.
b. Project No.: P-2157-188.
c. Date Filed: October 14, 2009.
d. Applicant: Public Utility District No. 1 of Snohomish County.
e. Name of Project: Henry M. Jackson Hydroelectric Project.
f. Location: The existing project is located on the Sultan River in
Snohomish County, Washington, about 20 miles east of Everett,
Washington. The project penstock underlies 10.9 acres of Mount Baker-
Snoqualmie National Forest.
g. Filed Pursuant to: Rule 602 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.602, Federal Power Act 16 U.S.C. 791
(a)--825(r)
h. Applicant Contact: Public Utility District No. 1 of Snohomish
County (District), Steven J. Klein, General Manager, 2320 California
Street, P.O. Box 1107, Everett, WA 98206-1107.
i. FERC Contact: David Turner (202) 502-6091 or via e-mail at
david.turner@ferc.gov.
j. Deadline for filing comments on the Settlement: November 6,
2009. Reply comments due December 21, 2009. All documents (original and
eight copies) should be filed with: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
k. The District filed a comprehensive settlement agreement
(Agreement) on behalf of itself, United States National Marine
Fisheries Service, United States Forest Service, United States Fish and
Wildlife Service, United States National Park Service, Washington
Department of Fish and Wildlife, Washington Department of Ecology,
Tulalip Tribes of Washington, Snohomish County, City of Everett, City
of Sultan, and American Whitewater. The purpose of the Agreement is to
resolve among the signatories all issues associated with issuance of a
new license for the project, including, in part, reservoir operations,
minimum instream flows, process flows, whitewater boating flows,
ramping rates, fish passage, fish habitat improvements, wildlife
habitat management, marbled murrelet protection measures, recreation,
and historic properties management.
The District requests that the Commission: (1) Accept and
incorporate, without material modification, all of the proposed license
articles in Appendix 1 of the Settlement in the new project license;
and (2) issue a new license for a term of 45 years.
l. The A copy of the Settlement Agreement is available for review
at the Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``e-Library''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
Register online at https://www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
m. Procedural Schedule: We are extending the due date to file
interventions, recommendations, preliminary terms and conditions, and
fishway prescriptions and reply comments on these filings to coordinate
with the filing of comments on the Settlement. Therefore, the
application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of Interventions, Recommendations, November 6, 2009.
Preliminary Terms and Conditions, and
Fishway Prescriptions.
Reply Comments Due........................ December 21, 2009.
Issue Draft EA............................ May 5, 2010.
Comments on Draft EA Due.................. June 4, 2010.
Filing of Modified Mandatory Terms and August 3, 2010.
Conditions.
Issue Final EA............................ November 1, 2010.
------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
[FR Doc. E9-25400 Filed 10-21-09; 8:45 am]