San Diego Gas & Electric Company; Notice of Filing, 54032-54033 [E9-25257]

Download as PDF 54032 Federal Register / Vol. 74, No. 202 / Wednesday, October 21, 2009 / Notices Dated: October 16, 2009. Todd A. Stevenson, Secretary, Consumer Product Safety Commission. [FR Doc. E9–25311 Filed 10–20–09; 8:45 am] BILLING CODE 6355–01–P in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–25256 Filed 10–20–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3037–013] BTSFEO, LLC; TAI–O Associates, LP; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests jlentini on DSKJ8SOYB1PROD with NOTICES October 14, 2009. On April 10, 2009, BTSFEO, LLC (Transferor) and TAI–O Associates, LP (Transferee) filed a joint application for transfer of license of the Elizabeth Webbing Hydroelectric Project No. 3037. The project is located on the Blackstone River in Providence County, Rhode Island. Applicants seek Commission approval to transfer the license for the Elizabeth Webbing Hydroelectric Project from BTSFEO, LLC to TAI–O Associates, LP. Applicant Contact: For Transferor, Mr. Gene Carlino, Esq., BTSFEO, LLC, c/o Carlino Law Associates, 410 South Main Street, Providence, RI 02903, telephone (401) 831–9000, FAX (401) 831–9090. For Transferee, Mr. Louis Yip, TAI–O Associates, LP, 521 Roosevelt Avenue, Central Falls, RI 02863, telephone (401) 965–3666, FAX (212) 504–3097. FERC Contact: Diane M. Murray, (202) 502–8838. Deadline for filing comments, protests, and motions to intervene: 30 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–3037–013) 17:33 Oct 20, 2009 Jkt 220001 Federal Energy Regulatory Commission [Docket No. EL10–2–000] San Diego Gas & Electric Company; Notice of Filing October 14, 2009. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission VerDate Nov<24>2008 DEPARTMENT OF ENERGY [Project No. 77–212] Pacific Gas and Electric Company; Notice of Availability of Final Environmental Assessment October 14, 2009. In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47879), the Commission has reviewed an application, filed August 26, 2008 and supplemented January 30, 2009, requesting approval of a proposed plan to provide spring frost protection and late fall irrigation water for commercial crops and hay in the Potter Valley Project area, FERC Project No. 77. Commission staff has prepared a final Environmental Assessment (EA) and in the final EA, staff analyzed the potential environmental effects of the proposed plan and concludes that approval of the plan, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. The Order Granting Amendment of License Article 52 was issued on October 14, 2009 and the final EA is attached to the order. A copy of the final EA is also on file with the Commission and is available for public inspection. The final EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY, (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–25254 Filed 10–20–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 Take notice that on October 9, 2009, pursuant to Rule 207 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure and Regulations, 18 CFR 385.207 (2006), San Diego Gas & Electric Company (SDG&E) filed a Petition for Declaratory Order (Petition) requesting Commission approval of proposed accounting and ratemaking treatment for a portion of SDG&E’s 500 kV Sunrise Powerlink Project, to be located in Imperial Valley County between the San Diego County line and the Imperial Valley Substation (Border-East Line), that will be the subject of a thirty-year lease to Citizens Energy Corporation. This Petition is addressing the portion of the BorderEast Line that SDG&E is not leasing to Citizens. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail E:\FR\FM\21OCN1.SGM 21OCN1 Federal Register / Vol. 74, No. 202 / Wednesday, October 21, 2009 / Notices FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 9, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–25257 Filed 10–20–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10–3–000] Citizens Energy Corporation; Notice of Filing This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 9, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–25255 Filed 10–20–09; 8:45 am] BILLING CODE 6717–01–P jlentini on DSKJ8SOYB1PROD with NOTICES October 14, 2009. Take notice that on October 9, 2009, pursuant to Rule 207 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207 (2006), Section 219 of the Federal Power Act, 16 U.S.C. 791a– 828c, 824s, and Order No. 679, Promoting Transmission Investment Through Pricing Reform, Order No. 679, 116 FERC 61,057, order on reh’g, 117 FERC 61,345 (2006) (Order No. 679A) (Incentive Pricing Rule), Citizens Energy Corporation filed a Petition for Declaratory Order requesting Commission approval of two rate treatments for the Sunrise Powerlink Transmission Project, located in Imperial Valley, California. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Nov<24>2008 17:33 Oct 20, 2009 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NP09–26–000] North American Electric Reliability Corporation; Order Addressing Applicability of Section 215 of the Federal Power Act to Federal Entities October 15, 2009. 1. On June 24, 2009, the North American Electric Reliability Corporation (NERC) filed a Notice of Penalty for a self-certified violation of a Commission-approved Reliability Standard by the U.S. Army Corps of Engineers (Corps)-Tulsa District. In that filing, NERC requested that the Commission issue a decision addressing the jurisdictional issue of whether, pursuant to section 215 of the Federal Power Act (FPA), federal entities that use, own, or operate the Bulk-Power System, such as the Corps-Tulsa District, must comply with mandatory Reliability Standards. 2. The Corps-Tulsa District did not seek Commission review of the Notice of Penalty, which took effect on the 31st day after filing pursuant to section 215(e)(2) of the FPA.1 In this order, we affirm that, pursuant to section 215 of the FPA, the Corps-Tulsa District and other federal entities that use, own, or operate the Bulk-Power System must comply with mandatory Reliability Standards. Background A. Statutory Framework 3. Section 215 of the FPA authorizes the Commission to certify and oversee 1 16 PO 00000 U.S.C. 824o(e)(2) (2006). Frm 00016 Fmt 4703 Sfmt 4703 54033 an electric reliability organization (ERO), which is responsible for developing and enforcing mandatory Reliability Standards that are applicable to owners, users, and operators of the Bulk-Power System.2 Section 215(e) authorizes the ERO, as well as the Commission on its own motion or on complaint, to assess penalties for violation of Reliability Standards.3 Exercising this statutory authority, the Commission certified NERC as the ERO 4 and initially approved 83 Reliability Standards.5 Further, consistent with the statute, NERC as the ERO delegated to eight Regional Entities, including Texas Regional Entity, authority to, inter alia, enforce mandatory Reliability Standards.6 4. Users, owners, and operators of the Bulk-Power System are required to register with NERC.7 NERC’s Compliance Registry identifies all entities subject to compliance with the approved Reliability Standards. Further, NERC has developed a statement of Registry Criteria that is employed by NERC and the Regional Entities to determine which organizations should be registered because they are material to the reliability of the Bulk-Power System.8 In cases where an entity is registered involuntarily by NERC, that entity has an opportunity to timely appeal its registration status in accordance with Rule 504 and Appendix 5 to NERC’s Rules of Procedure. 5. NERC must file a Notice of Penalty with the Commission before a Regional Entity or NERC penalty assessment for the violation of a Reliability Standard takes effect.9 Each penalty determination is subject to Commission review, on its own motion or by an application for review by the recipient 2 16 U.S.C. 824o(c) (2006). § 824o(e). 4 North American Electric Reliability Corp., 116 FERC ¶ 61,062, order on reh’g and compliance, 117 FERC ¶ 61,126 (2006), order on compliance, 118 FERC ¶ 61,030, order on compliance, 118 FERC ¶ 61,190, order on reh’g, 119 FERC ¶ 61,046 (2007), aff’d sub nom. Alcoa Inc. v. FERC, 554 F.3d 1342 (D.C. Cir., 2009). 5 Mandatory Reliability Standards for the BulkPower System, Order No. 693, FERC Stats & Regs. ¶ 31,242, order on reh’g, Order No. 693–A, 120 FERC ¶ 61,053 (2007). 6 North American Electric Reliability Corp., 119 FERC ¶ 61,060, order on reh’g, ¶ 61,260 (2007). 7 18 CFR 39.2(c) (2009). 8 The Commission accepted the NERC Registry Criteria in Order No. 693, FERC Stats. & Regs. ¶ 31,242 at P 93–95. 9 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ¶ 31,204 at P 506, order on reh’g, Order No. 672–A, FERC Stats. & Regs. ¶ 31,212 (2006). 3 Id. E:\FR\FM\21OCN1.SGM 21OCN1

Agencies

[Federal Register Volume 74, Number 202 (Wednesday, October 21, 2009)]
[Notices]
[Pages 54032-54033]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25257]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL10-2-000]


San Diego Gas & Electric Company; Notice of Filing

October 14, 2009.
    Take notice that on October 9, 2009, pursuant to Rule 207 of the 
Federal Energy Regulatory Commission's Rules of Practice and Procedure 
and Regulations, 18 CFR 385.207 (2006), San Diego Gas & Electric 
Company (SDG&E) filed a Petition for Declaratory Order (Petition) 
requesting Commission approval of proposed accounting and ratemaking 
treatment for a portion of SDG&E's 500 kV Sunrise Powerlink Project, to 
be located in Imperial Valley County between the San Diego County line 
and the Imperial Valley Substation (Border-East Line), that will be the 
subject of a thirty-year lease to Citizens Energy Corporation. This 
Petition is addressing the portion of the Border-East Line that SDG&E 
is not leasing to Citizens.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail

[[Page 54033]]

FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on November 9, 2009.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-25257 Filed 10-20-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.